Loading...
HomeMy WebLinkAboutSW3210801_Supplemental Info Review_20231011 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 10/11/2023 7:37:18 AM (Supplemental Submittal) Accept by Kaitlin Peck 10/11/2023 7:46:51 AM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 10/11/2023 7:37:19 AM =DEQ • Submittal from 10/11/2023 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW3210801 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* 1-85 Commerce Center Owner/Operator* Nathaniel Hagedorn County: Rowan Submitter Name:* Nestor Hernandez Who is submitting this information? E-mail Address:* hernandez.n@tandh.com Phone Number* 3362644440 Additional E-mail for nestor199one@gmail.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* As-Built-Certification File Upload Click the upload button,or drag and drop files to attach As-Built Permitee Certification Form-Signed.pdf 282.01 KB Only PDF files are accepted. File Type* Recorded Document File Upload Click the upload button,or drag and drop files to attach Stormwater Easement Deed-Recorded.pdf 327.88KB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND d I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Nestor Hernandez Signature: �7� 1�"mw yyFtwwwa"P.z Date Submitted: 10/11/2023 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW3210801 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 10/11/2023