HomeMy WebLinkAbout20230550 Ver 2_ePCN Application_20231006DW R Dlvislon of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 9/20/2022 Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20230550 2 Is a payment required for this project?* No payment required What amount is owed?* Fee received $240.00 $570.00 Fee needed - send electronic notification $323.00 $767.00 Reviewing Office* Select Project Reviewer* Fayetteville Regional Office - (910) 433-3300 Chad Turlington:chad.turlington Information for Initial Review 1a. Name of project: PNG Line 479 Transmission 1a. Who is the Primary Contact?* Tom Morris 1b. Primary Contact Email: * 1c. Primary Contact Phone:* Tom.Morris2@duke-energy.com (704 )731-4245 Date Submitted 10/6/2023 Nearest Body of Water Lumber River Basin Lumber Water Classification WS-IV, B; Sw, HOW Site Coordinates Latitude: Longitude: 34.590315-79.050919 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Robeson O Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission. 4/17/2023 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Piedmont Natural Gas 2b. Deed book and page no.: 2c. Contact Person: Tom Morris 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No O 2d. Address Street Address 525 S Tryon Street Address Line 2 City Charlotte Postal / Zip Code 28202 2e. Telephone Number: (704)731-4245 2g. Email Address:* Tom.Morris2@duke-energy.com 4. Agent/Consultant (if applicable) 4a. Name: Thomas Malecki 4b. Business Name: Kleinfelder, Inc. 4c.Address Street Address 6330 Hedgewood Drive Address Line 2 Suite 310 city Allentown Postal / Zip Code 18106 4d. Telephone Number: (724)200-7499 4f. Email Address:* tmalecki@kleinfelder.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Lumberton 2. Project Identification 2a. Property Identification Number: See Appendix D, Previous Application 2c. Project Address Street Address See Appendix D, Previous Application Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Lumber River 3b. Water Resources Classification of nearest receiving water: WS-IV, B; Sw, HQW 3c. What river basin(s) is your project located in?* Lumber State / Province / Region NC Country United States 2f. Fax Number: State / Province / Region PA Country United States 4e. Fax Number: 2b. Property size: 349.2 State / Province / Region Country O 3d. Please provide the 12-digit HUC in which the project is located. 030402030802,030402031002,030402031003,030402031004,030402031005,030402030402, 030402030505 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The twenty -eight -mile natural gas pipeline traverses through existing agriculture fields, forested areas, roadways, and rural residential development. The northwestern portion of the project is adjacent to an existing utility corridor. The forested areas range from previously cleared areas with early successional growth to pocosin wetland forest, to hardwood cypress swamps. The project crosses the Lumber River, Jack's Branch, Mill Branch, Jacob Swamp, Tenmile Branch, Jacob Branch, Little Jacob Branch, Holy Swamp, White Oak Branch, Moss Neck Swamp, and Bear Swamp. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 48.421 4g. List the total estimated linear feet of all existing streams on the property: 1829 4h. Explain the purpose of the proposed project: * The proposed project consists of the installation of approximately 28 miles of new 12" steel natural gas transmission pipe. Line 479 will replace an existing line that was installed in 1959 to meet current industry standards and expand services to the local area. The project will start south of Old Allentown Road east of Lumberton, continue south and west around Lumberton and then turn northwest terminating at SR 710 north of the community of Pembroke, see Figure 1 for the project location and vicinity. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed pipeline will be installed via open cut trench through most of the 28 miles, including the majority of stream crossings, resulting in temporary impacts. There are four total horizontal directional drill (HDD) locations proposed: two will be under the Lumber River, one will be under Holy Swamp, and one will be under Faith Road, Union Chapel Road, and the CSX railroad. All other road and railroad crossings will be installed via jack -and -bore. Most of the pipeline alignment will require tree clearing to an average 80-foot-wide for construction workspace. However, the tree clearing needed for the HDD locations, including the Lumber River crossings, will be reduced to a 20-foot-wide. A cleared corridor is required along the entire line in order to install pipeline markers to maintain line of sight per regulations. The HDD locations will be hand cleared with no grubbing. No tree clearing will occur within the stream banks of the Lumber River. This is being conducted to minimize impacts and to satisfy the National Park Service (NPS) concerns about the Lumber River's designation as a Wild and Scenic River. Additional temporary workspaces and access roads will be utilized in limited areas dependent upon access to certain installation sites. Following installation of the pipe, the trench will be backfilled and returned to pre -construction grade. A 30- to 50-foot-wide permanent maintenance easement along the pipeline alignment will be maintained in an herbaceous state. The remaining temporary workspaces will be allowed to regenerate naturally. Permanent easement maintenance involves mowing the easement annually, no herbicide use. Equipment being used will be drill, excavator, front-end loaders, chainsaws for hand -clearing, and construction vehicles on the Project. wetlands and streams within the workspace will be matted to minimize soil disturbance. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2023-00656 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): multiple Agency/Consultant Company: Kleinfelder, Inc. Other: 6. Future Project Plans 6a. Is this a phased project?* O Unknown Yes O No 6b. If yes, explain. This project is split out into 2 phases. Both phases are included in permit application. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? N/A D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction M 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type*(?) 2c. Type of W. 2d. W. name 2e. Forested" 2f. Type of Jurisdicition* 2g. Impact area Fig 2A Temporary Workspace T Pocosin 175WL Yes Both 1.023 (acres) Fig 2A Pipe Installation T FC,sin 176WL No Both 0.906 (acres) Fig 26 Temporary Workspace T F-sin 179WL Yes Both 0.035 (acres) Fig 2B Pipe Installation T �Fco.,n 179WL No Both 0.056 (acres) Fig 2B Pipe Installation T Seep 18OWL No Both 0.034 (acres) Fig 2D Temporary Workspace T Pocosin 196WL Yes Both 0.101 (acres) Fig 2D Pipe Installation T F-sin 196WL No Both 0.163 (acres) Fig 2E Temporary Workspace T Pocosin 198WL Yes Both 0.117 (acres) Fig 2E Pipe Installation T Fcosin 196WL No Both 0.352 (acres) Fig 2E Pipe Installation T Pocosin 199WL No Both 0.297 (acres) Fig 2E Pipe Installation T Pocosin 203WL No Both 0.045 (acres) Fig 2F Pipe Installation T Seep 206WL No Both 0.114 (acres) Fig 2F Pipe Installation T Seep 21OWL No Both 0.032 (acres) Fig 2G Pipe Installation T Seep 216WL No Both 0.187 (acres) Fig 2G Temporary Installation T FC,sin 219WL Yes Both 0.153 (acres) Fig 2G Pipe Installation T Pocosin 219WL No Both 0.252 (acres) Fig 21 Temporary Workspace T Pocosin 227WL Yes Both 0.021 (acres) Fig 21 Pipe Installation T Fcosin 227WL No Both 0.051 (acres) Fig 21 Temporary Workspace T Pocosin 230WL Yes Both 0.081 (acres) Fig 21 Pipe Installation T Seep 239WL No Both 0.229 (acres) Fig 21 Pipe Installation T Seep 240WL No Both 0.119 (acres) Fig 2J Pipe Installation T Seep 244WL No Both 0.017 (acres) Fig 2J Pipe Installation T Seep 245WL No Both 0.022 (acres) Fig 2L Temporary Workspace T Pocosin 004WL Yes Both 0.035 (acres) Fig 2M Line of Sight Clearing P f7verine Swamp Forest 008WL Yes Both 0.461 (acres) Fig 20 Pipe Installation P F-sin 024WL Yes Both 0.009 (acres) Fig 20 Temporary Workspace T Pocosin 024WL Yes Both 0.008 (acres) Fig 2P Temporary Workspace T FC,sin 025WL Yes Both 0.004 (acres) Fig 2P Pipe Installation P Pocosin 026WL Yes --] Both 0.063 (acres) Fig 2P Pipe Installation T Pocosin 027WL No Both 0.009 (acres) Fig 2R Pipe Installation P Pocosin 041 WL Yes Both 0.108 (acres) Fig 2R Temporary Workspace T F.-sin 041 WL Yes Both 0.073 (acres) Fig 2S Pipe Installation P Fr -sin 051 WL Yes Both 1.398 (acres) Fig 2S Temporary Workspace T F-Osin 051 WL Yes Both 0.725 (acres) Fig 2T Pipe Installation T F.-sin OS5WL No Both 0.022 (acres) Fig 2T Pipe Installation P F-Osin 056WL Yes Both 0.087 (acres) Fig 2T Temporary Workspace T F.,sin 056WL Yes Both 0.136 (acres) Fig 2T Temporary Workspace T Seep 057WL No Both 0.064 (acres) Fig 2T Pipe Installation P F-Osin 059WL Yes Both 0.071 (acres) Fig 2T Temporary Workspace T Fc-sin 059WL Yes Both 0.052 (acres) Fig 2U Line of Site Clearing P rverine Swamp Forest 060WL Yes Both 0.385 (acres) Fig 2U Line of Site Clearing P f7verine Swamp Forest 062WL Yes Both 0.625 (acres) Fig 2W Pipe Installation T Fc-sin 063WL No Both 0.089 (acres) Fig 2W Temporary Workspace T �F-O.in 066WL No Both 0.001 (acres) Fig 2W Pipe Installation T Fc-sin 067WL No Both 0.028 (acres) Fig 2X Pipe Installation T Fr -sin 069WL No Both 0.081 (acres) Fig 2X Pipe Installation T Fcosin 070WL No Both 0.842 (acres) Fig 2X Pipe Installation T Fc-sin 279WL No Both 0.333 (acres) Fig 2X Pipe Installation T Fcosin 281 WL No Both 0.022 (acres) Fig 2Y Pipe Installation T Pocosin 282WL No Both 0.561 (acres) Fig 2CC Pipe Installation P F�---sin 092WL Yes Both 0.394 (acres) Fig 2CC Temporary Workspace T Fcosin 092WL Yes Both 0.214 (acres) Fig 2DD Pipe Installation P Pocosin 093WL Yes Both 0.900 (acres) Fig 2DD Temporary Workspace T Fcosin 093WL Yes Both 0.648 (acres) Fig 2EE Pipe Installation T sin FCO 099WL No Both 0.028 (acres) Fig 2EE Pipe Installation P Fc-sin 100WL Yes Both 1.654 (acres) Fig 2EE Temporary Workspace T �Fco.in 100WL Yes Both 1.035 (acres) Fig 2FF Pipe Installation T ff-sin 104WL Yes Both 0.233 (acres) Fig 2FF Pipe Installation P Pocosin 104WL Yes --] Both 1.486 (acres) Fig 2FF Temporary Workspace T Pocosin 104WL Yes Both 0.947 (acres) Fig 2GG Pipe Installation P Pocosin 105WL Yes Both 0.948 (acres) Fig 2GG Temporary Workspace T F-Osin 105WL Yes Both 0.562 (acres) Fig 2GG Pipe Installation P Fc-sin 106WL Yes Both 1.162 (acres) Fig 2GG Temporary Workspace T F-Osin 106WL Yes Both 0.703 (acres) Fig 2HH Pipe Installation P Fc-sin 107WL Yes Both 0.988 (acres) Fig 2HH Temporary Workspace T Fcosin 107WL Yes Both 0.591 (acres) Fig 2HH Temporary Workspace T F.,sin 110WL No Both 0.018 (acres) Fig 2HH Temporary Workspace T Fc-sin 113WL No Both 0.009 (acres) Fig 2HH Line of Site Clearing P F-Osin 115WL Yes Both 0.140 (acres) Fig 2HH Line of Site Clearing P f7verine Swamp Forest 116WL Yes Both 0.307 (acres) Fig 211 Line of Site Clearing P f7verine Swamp Forest 122WL Yes Both 0.492 (acres) Fig 211 Line of Site Clearing IT Riverine Swamp Forest 124WL No Both 0.377 (acres) Fig 211 Line of Site Clearing P f7verine Swamp Forest 125WL Yes Both 0.157 (acres) Fig 211 Line of Site Clearing T F71'erine Swamp Forest 126WL No Both 0.486 (acres) Fig 211 Line of Site Clearing P f7verine Swamp Forest 128WL Yes Both 0.034 (acres) Fig 211 Line of Site Clearing P f7verine Swamp Forest 129WL Yes Both 0.662 (acres) Fig 2JJ Pipe Installation P Fcosin 130WL Yes Both 1.323 (acres) Fig 2JJ Temporary Workspace T Fc-sin 130WL Yes Both 0.785 (acres) Fig 2JJ Pipe Installation P Fcosin 134WL Yes Both 2.663 (acres) Fig 2JJ Temporary Workspace T Pocosin 134WL Yes Both 1.606 (acres) Fig 2NN Pipe Installation P Fc-sin 148WL Yes Both 2.195 (acres) Fig 2NN Temporary Workspace T Fcosin 148WL Yes Both 1.789 (acres) Fig 2NN Temporary Workspace T F.-sin 258WL Yes Both 0.138 (acres) Fig 2NN Temporary Workspace T F-Osin 259WL Yes Both 0.025 (acres) Fig 200 Pipe Installation T FCOsin 146WL No Both 0.106 (acres) Fig 200 Pipe Installation P Fc-sin 149WL Yes Both 0.752 (acres) Fig 200 Temporary Workspace T �Fco.in 149WL Yes Both 0.490 (acres) Fig 200 Pipe Installation T ff-sin 150WL No Both 0.139 (acres) Fig 200 Pipe Installation P Pocosin 151WL Yes --] Both 2.186 (acres) Fig 200 Temporary Workspace T Pocosin 151WL Yes Both 1.585 (acres) Fig 2PP Temporary Access T Seep Both 0.076 (acres) Fig 200 Pipe Installation P F-sin 154WL Yes Both 0.682 (acres) Fig 200 Temporary Workspace T Pocosin 154WL Yes Both 0.416 (acres) Fig 200 Pipe Installation P Fcosin 155WL Yes Both 0.821 (acres) Fig 200 Temporary Workspace T Pocosin 155WL Yes Both 0.493 (acres) Fig 2SS Access Road P Pocosin 167WL No Both 0.101 (acres) Fig 2U Temporary Workspace T f7verine Swamp Forest 060WL Yes Both 0.593 (acres) Fig 2U Temporary Workspace T f7verine Swamp Forest 062WL Yes Both 0.908 (acres) Fig 2HH Temporary Workspace T Fcosin 115WL Yes Both 0.214 (acres) Fig 2HH Temporary Workspace T f7verine Swamp Forest 116WL Yes Both 0.464 (acres) Fig 211 Temporary Workspace T f7verine Swamp Forest 122WL Yes Both 0.707 (acres) Fig 211 Temporary Workspace T Riverine Swamp Forest 125WL Yes Both 0.236 (acres) Fig 211 Temporary Workspace T f7verine Swamp Forest 128WL Yes Both 0.052 (acres) Fig 211 Temporary Workspace —] T Riverine Swamp Forest 129WL Yes Both 1.002 (acres) 2g. Total Temporary Wetland Impact 25.167 2g. Total Wetland Impact 48.421 2g. Total Permanent Wetland Impact 23.254 2i. Comments: Permanent impacts will occur from the conversion of forested wetland to herbaceous wetland within the permanent easement corridor with no net loss of wetlands. There is one permanent fill impact to Wetland 167WL (Figure 2SS) from a permanent access road. 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type " 3c. Type of impact* 3d. S. name * 3e. Stream Type* 3f. Type of 3g. S. width 3h. Impact Jurisdiction* length* S1 Pipe Installation Temporary Other 177D Jurisdictional Ditch Corps 493 Average (feet) (linear feet) Sp Pipe Installation Temporary Other 269D Jurisdictional Ditch Corps 28 Average (feet) (linear feet) S3 Pipe Installation Temporary Other 181D Jurisdictional Ditch Corps 148 Averege (feet) (linear feet) S4 Pipe Installation Temporary Other 184D Jurisdictional Ditch Corps 240 Average (feet) (linear feet) S5 Pipe Installation Temporary Other 186D Jurisdictional Ditch Corps 77 Averege (feet) (linear feet) S6 Pipe Installation Temporary Other 189D Jurisdictional Ditch Corps 47 Average (feet) (linear feet) S7 Pipe Installation Temporary Other 190D Jurisdictional Ditch Corps 45 Average (feet) (linear feet) gg Pipe Installation Temporary Other 191 D Jurisdictional Ditch Corps 238 Averege (feet) (linear feet) S9 Pipe Installation Temporary Other 193D Jurisdictional Ditch Corps 70 Average (feet) (linear feet) S10 Pipe Installation Temporary Other 195D Jurisdictional Ditch Corps 95 Averege (feet) (linear feet) S11 Pipe Installation Temporary Other J971S Intermittent Both 6 91 Averege (feet) (linear feet) S12 Pipe Installation Temporary Other 202PS Perennial Both 25 104 Average (feet) (linear feet) S13 Pipe Installation Temporary Other 204D Jurisdictional Ditch Corps 102 Averege (feet) (linear feet) S14 Pipe Installation Temporary Other 205ES Jurisdictional Ditch Corps 3 101 Average (feet) (linear feet) S15 Pipe Installation Temporary Other 20815 Intermittent Both 101 Average (feet) (linear feet) S16 Pipe Installation Temporary Other 211D Jurisdictional Ditch Corps 3 100 Averege (feet) (linear feet) S17 Pipe Installation Temporary Other 21315 Intermittent Both 5 105 Average (feet) (linear feet) S18 Temporary Workspace Temporary Other 215D Jurisdictional Ditch Corps 62 Averege (feet) (linear feet) 31g Pipe Installation Temporary Other 217ES Jurisdictional Ditch Corps 3 48 Averege (feet) (linear feet) S20 Temporary Workspace Temporary Other 273D Jurisdictional Ditch Corps 135 Averege (feet) (linear feet) S21 Pipe Installation Temporary Other 218ES Jurisdictional Ditch Corps 2 45 Averege (feet) (linear feet) S22 Pipe Installation Temporary Other 220ES Jurisdictional Ditch Corps 51 Average (feet) (linear feet) S23 Pipe Installation Temporary Other 223ES Jurisdictional Ditch Corps 70 Average (feet) (linear feet) S24 Pipe Installation Temporary Other 225ES Jurisdictional Ditch Corps 5 79 Averege (feet) (linear feet) S25 Pipe Installation Temporary Other 228PS Perennial Both 10 77 Average (feet) (linear feet) S26 Pipe Installation Temporary Other 234ES Jurisdictional Ditch Corps 70 Averege (feet) (linear feet) S27 Pipe Installation Temporary Other 236ES Jurisdictional Ditch Corps 76 Average (feet) (linear feet) S28 Pipe Installation Temporary Other 238ES Jurisdictional Ditch Corps 80 Average (feet) (linear feet) S29 Pipe Installation Temporary Other 2421S Intermittent Both 12 127 Averege (feet) (linear feet) S30 Pipe Installation Temporary Other 24315 Intermittent Both 5 74 Average (feet) (linear feet) S31 Pipe Installation Temporary Other 001PS Perennial Both 7 67 Averege (feet) (linear feet) S32 Pipe Installation Temporary Other 002ES Jurisdictional Ditch Corps 45 Average (feet) (linear feet) S33 Pipe Installation Temporary Other 003D Jurisdictional Ditch Corps 87 Average (feet) (linear feet) S34 Pipe Installation Temporary Other 1 O6D Jurisdictional Ditch Corps 4 80 Averege (feet) (linear feet) S35 Pipe Installation Temporary Other 007D Jurisdictional Ditch Corps 12 75 Averege (feet) (linear feet) S36 Pipe Installation Temporary Other 014D Jurisdictional Ditch Corps 101 Average (feet) (linear feet) S37 Pipe Installation Temporary Other 0161S Intermittent Both 4 56 Averege (feet) (linear feet) S38 Pipe Installation Temporary Other 021D Jurisdictional Ditch Corps 2 45 Average (feet) (linear feet) S39 Pipe Installation Temporary Other 028D Jurisdictional Ditch Corps 86 Average (feet) (linear feet) S40 Pipe Installation Temporary Other 035D Jurisdictional Ditch Corps 81 Averege (feet) (linear feet) S41 Pipe Installation Temporary Other 036D Jurisdictional Ditch Corps 82 Averege (feet) (linear feet) S42 fipe Installation Temporary Other 042PS Perennial Both 5 81 Average (feet) (linear feet) S43 Pipe Installation Temporary Other 044D Jurisdictional Ditch Corps 83 Averege (feet) (linear feet) gq4 Pipe Installation Temporary Other 048D Jurisdictional Ditch Corps 31 Average (feet) (linear feet) S45 Pipe Installation Temporary Other 05215 Intermittent Both 45 Average (feet) (linear feet) S46 Pipe Installation Temporary Other 053ES Jurisdictional Ditch Corps 5 53 Averege (feet) (linear feet) S47 Pipe Installation Temporary Other 054ES Jurisdictional Ditch Corps 51 Average (feet) (linear feet) Sq8 Pipe Installation Temporary Other 064D Jurisdictional Ditch Corps 45 Averege (feet) (linear feet) S49 Pipe Installation Temporary Other 065PS Perennial Both 10 50 Averege (feet) (linear feet) S50 Pipe Installation Temporary Other 068D Jurisdictional Ditch Corps 1 121 Averege (feet) (linear feet) S51 Pipe Installation Temporary Other 280PS Perennial Both 5 80 Averege (feet) (linear feet) S52 Pipe Installation Temporary Other 072ES Jurisdictional Ditch Corps 51 Average (feet) (linear feet) S53 Pipe Installation Temporary Other 075ES Jurisdictional Ditch Corps 58 Average (feet) (linear feet) g54 Pipe Installation Temporary Other 081D Jurisdictional Ditch Corps 126 Averege (feet) (linear feet) S55 Pipe Installation Temporary Other 082D Jurisdictional Ditch Corps 3 32 Average (feet) (linear feet) S56 Pipe Installation Temporary Other 083D Jurisdictional Ditch Corps 652 Averege (feet) (linear feet) S57 Pipe Installation Temporary Other 086D Jurisdictional Ditch Corps 385 Average (feet) (linear feet) S58 Pipe Installation Temporary Other 088D Jurisdictional Ditch Corps 33 Averege (feet) (linear feet) S59 Pipe Installation Temporary Other 090ES Jurisdictional Ditch Corps 5 51 Averege (feet) (linear feet) S60 Pipe Installation Temporary Other 095D Jurisdictional Ditch Corps 81 Average (feet) (linear feet) S61 Pipe Installation Temporary Other 096D Jurisdictional Ditch Corps 134 Averege (feet) (linear feet) S62 Pipe Installation Temporary Other 097D Jurisdictional Ditch Corps 170 Average (feet) (linear feet) S63 Pipe Installation Temporary Other 098D Jurisdictional Ditch Corps 81 Average (feet) (linear feet) S64 Pipe Installation Temporary Other 1021S Intermittent Both 5 177 Averege (feet) (linear feet) S65 Pipe Installation Temporary Other 249ES Jurisdictional Ditch Corps 79 Averege (feet) (linear feet) S66 Pipe Installation Temporary Other 250D Jurisdictional Ditch Corps 84 Average (feet) Qinear feet) S67 Pipe Installation Temporary Other 252D Jurisdictional Ditch Corps 4 369 Averege (feet) (linear feet) S68 Temporary Workspace Temporary Other �ff7 Jurisdictional Ditch Corps 187 Average (feet) (linear feet) S69 Temporary Workspace Temporary Other 111D Jurisdictional Ditch Corps 184 Average (feet) (linear feet) S70 Temporary Workspace Temporary Other 112D Jurisdictional Ditch Corps 208 Averege (feet) (linear feet) S71 Temporary Workspace Temporary Other 114ES Jurisdictional Ditch Corps 152 Averege (feet) (linear feet) S72 Pipe Installation Temporary Other 131D Jurisdictional Ditch Corps 10 87 Average (feet) (linear feet) S73 Pipe Installation Temporary Other 133PS Perennial Both 15 82 Averege (feet) (linear feet) S74 Pipe Installation Temporary Other 256D Jurisdictional Ditch Corps 353 Average (feet) (linear feet) S75 Pipe Installation Temporary Other 257D Jurisdictional Ditch Corps Average (feet) (linear feet) S78 Pipe Installation Temporary Other 140D Jurisdictional Ditch Corps 1 743 Averege (feet) (linear feet) S77 Pipe Installation Temporary Other 142ES Jurisdictional Ditch Corps 52 Average (feet) (linear feet) S78 Pipe Installation Temporary Other 147ES Jurisdictional Ditch Corps 96 Averege (feet) (linear feet) g7g Temporary Workspace Temporary Other 260ES Jurisdictional Ditch Corps 29 Averege (feet) (linear feet) S80 Temporary Workspace Temporary Other 161 D Jurisdictional Ditch Corps 32 Average (feet) (linear feet) Sg1 Temporary Workspace Temporary Other 263D Jurisdictional Ditch Corps 5 37 Averege (feet) (linear feet) �2�Temporary Workspace Temporary Other 26415 Intermittent Both 188 Average (feet) (linear feet) S83 Pipe Installation Temporary Other 153PS Perennial Both 8 85 Average (feet) (linear feet) S84 Pipe Installation Temporary Other J 57Ps Perennial Both 3 113 Averege (feet) (linear feet) S85 Pipe Installation Temporary Other 158PS Perennial Both 10 51 Average (feet) (linear feet) S86 Pipe Installation Temporary Other 159D Jurisdictional Ditch Corps 117 Averege (feet) (linear feet) S87 Temporary Workspace Temporary Other 160ES Jurisdictional Ditch Corps Average (feet) (linear feet) S88 Pipe Installation Temporary Other 161 ES Jurisdictional Ditch Corps 57 Average (feet) (linear feet) S89 Pipe Installation Temporary Other 162ES Jurisdictional Ditch Corps 51 Averege (feet) (linear feet) S90 Pipe Installation Temporary Other 164PS Perennial Both 7 56 Average (feet) (linear feet) Sg1 Pipe Installation Temporary Other 1681S Intermittent Both 3 51 Average (feet) (linear feet) Sg2 Pipe Installation Temporary Other 170D Jurisdictional Ditch Corps 143 Average (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet 26,922 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 0 10,358 31. Total stream and ditch impacts: 10358 3j. Comments: Onsite streams will be temporarily impacted by pipe installation, and temporary workspace. Bottom sediments removed from the streambed will be stored onsite and replaced once construction is complete. E. Impact Justification and Mitigation O 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Stream and wetland impacts were minimized to the greatest extent possible. All stream crossings will be temporary and close to perpendicular as possible. Stream crossings at the Lumber River and Holy Swamp will be HDD to avoid impacts at the major aquatic complexes. Approximately 69 acres of the project will parallel an existing easement to reduce additional impacts. At multiple stream crossings, the construction width was reduced to limit impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Wetlands within the temporary workspace will be matted to minimize soil disturbance and impacts. The use of HDDs will be implemented to avoid impacts at the Lumber River and Holy Swamp. Bridging will be utilized to cross smaller streams and ditches in the travel lane of the construction corridor. No grubbing will occur over HDD locations that require minimal line of sight clearing per PHMSA standards. No tree clearing will occur within the stream banks of the Lumber River. Following installation of the pipe, the trench will be backfilled and returned to pre -construction grade. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: 4c. If using stream mitigation, what is the stream temperature (linear feet) 4d. Buffer mitigation requested (DWR only): 4e. Riparian wetland mitigation requested: (square feet) (acres) 4f. Non -riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested 4h. Comments Permanent impacts will occur from the conversion of forested wetland to herbaceous wetland for the purposes of utility easement maintenance. One impact will occur from a permanent access road. F. Stormwater Management and Diffuse Flow Plan (required by DWR) O 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: The proposed project area is located within the Lumber River Basin which is not included in the North Carolina Riparian Buffer Protection Program. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?" Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: N/A G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. No further development is anticipated due to the construction of this project 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Environmental Conservation Online System for Information Planning and Consultation (IPAC) Resource List. Consultation with USFWS and concurrence email is attached in Appendix B, Previous Application. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? National Oceanic and Atmospheric Administration's Essential Fish Habitat Mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * A Phase 1 archaeology study of the project area was conducted to assess for impacts to cultural resources, see Appendix C, Previous Application. The study area included the pipeline alignment with a review area of 100-ft along the corridor. the sites that were identified are not recommended as eligible for listing in the NRHR A cemetery was delineated within the project area, the design has been adjusted to add a 30-foot buffer around the cemetery for complete avoidance. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8b. If yes, explain how project meets FEMA requirements: A floodplain development permit to Robeson County will be submitted separately. 8c. What source(s) did you use to make the floodplain determination? * FEMA National Flood Hazard Layer, FIRMS 3710937000K, 3710938000K, 3710939000K, 3720031000K, 3710928800J, 3720020900K, 3720021900K, 3710933500K, 3710934500K, 3710936400J, 3710934400K, 3710935400J, 3710936300J, 3710937300J, 3710937200K, 3710937100K, 3720032000K Miscellaneous O V Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop flies here to attach document Line479_Fig5_ Impacts _20231002_v4_Condensed _Stream_102.pdf 5.36MB File must be PDF or KMZ Comments Uploaded is the Impact Exhibit Map, Figure 2EE, pertaining to Stream 1021S impact update from previously submitted PCN. No other changes have been made from previously submitted PCN on 4/17/2023. A link can be provided via email for all previous PCN attachments if needed. The National Park Service (NPS) concurs that the Lumbar River, although a Wild and Scenic River, will not be impacted by the project, as the HDD and limits of disturbance are outside of the ordinary high water. Email correspondence with NIPS is attached in Appendix E, Previous Application. Signature By checking the box and signing below, I certify that • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Thomas Malecki Signature F///!Y/t/IJ �i�lr0/lYJii Date 10/6/2023 a