HomeMy WebLinkAbout20230550 Ver 2_ePCN Application_20231006DW R
Dlvislon of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only if needed.
Pre -Filing Meeting Date Request was submitted on:
9/20/2022
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned
Version# *
20230550
2
Is a payment required for this project?*
No payment required
What amount is owed?*
Fee received
$240.00 $570.00
Fee needed - send electronic notification
$323.00 $767.00
Reviewing Office*
Select Project Reviewer*
Fayetteville Regional Office - (910) 433-3300
Chad Turlington:chad.turlington
Information for Initial Review
1a. Name of project:
PNG Line 479 Transmission
1a. Who is the Primary Contact?*
Tom Morris
1b. Primary Contact Email: * 1c. Primary Contact Phone:*
Tom.Morris2@duke-energy.com (704 )731-4245
Date Submitted
10/6/2023
Nearest Body of Water
Lumber River
Basin
Lumber
Water Classification
WS-IV, B; Sw, HOW
Site Coordinates
Latitude: Longitude:
34.590315-79.050919
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Robeson
O
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
1a.Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
Please provide the date of the previous submission.
4/17/2023
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 12 - Utility Lines
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Piedmont Natural Gas
2b. Deed book and page no.:
2c. Contact Person:
Tom Morris
401 Water Quality Certification - Express
Riparian Buffer Authorization
Yes No
Yes No
O
2d. Address
Street Address
525 S Tryon Street
Address Line 2
City
Charlotte
Postal / Zip Code
28202
2e. Telephone Number:
(704)731-4245
2g. Email Address:*
Tom.Morris2@duke-energy.com
4. Agent/Consultant (if applicable)
4a. Name:
Thomas Malecki
4b. Business Name:
Kleinfelder, Inc.
4c.Address
Street Address
6330 Hedgewood Drive
Address Line 2
Suite 310
city
Allentown
Postal / Zip Code
18106
4d. Telephone Number:
(724)200-7499
4f. Email Address:*
tmalecki@kleinfelder.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Lumberton
2. Project Identification
2a. Property Identification Number:
See Appendix D, Previous Application
2c. Project Address
Street Address
See Appendix D, Previous Application
Address Line 2
city
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Lumber River
3b. Water Resources Classification of nearest receiving water:
WS-IV, B; Sw, HQW
3c. What river basin(s) is your project located in?*
Lumber
State / Province / Region
NC
Country
United States
2f. Fax Number:
State / Province / Region
PA
Country
United States
4e. Fax Number:
2b. Property size:
349.2
State / Province / Region
Country
O
3d. Please provide the 12-digit HUC in which the project is located.
030402030802,030402031002,030402031003,030402031004,030402031005,030402030402,
030402030505
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The twenty -eight -mile natural gas pipeline traverses through existing agriculture fields, forested areas, roadways, and rural residential development. The northwestern portion of the project
is adjacent to an existing utility corridor. The forested areas range from previously cleared areas with early successional growth to pocosin wetland forest, to hardwood cypress swamps.
The project crosses the Lumber River, Jack's Branch, Mill Branch, Jacob Swamp, Tenmile Branch, Jacob Branch, Little Jacob Branch, Holy Swamp, White Oak Branch, Moss Neck
Swamp, and Bear Swamp.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
48.421
4g. List the total estimated linear feet of all existing streams on the property:
1829
4h. Explain the purpose of the proposed project: *
The proposed project consists of the installation of approximately 28 miles of new 12" steel natural gas transmission pipe. Line 479 will replace an existing line that was installed in 1959 to
meet current industry standards and expand services to the local area. The project will start south of Old Allentown Road east of Lumberton, continue south and west around Lumberton
and then turn northwest terminating at SR 710 north of the community of Pembroke, see Figure 1 for the project location and vicinity.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
The proposed pipeline will be installed via open cut trench through most of the 28 miles, including the majority of stream crossings, resulting in temporary impacts. There are four total
horizontal directional drill (HDD) locations proposed: two will be under the Lumber River, one will be under Holy Swamp, and one will be under Faith Road, Union Chapel Road, and the
CSX railroad. All other road and railroad crossings will be installed via jack -and -bore. Most of the pipeline alignment will require tree clearing to an average 80-foot-wide for construction
workspace. However, the tree clearing needed for the HDD locations, including the Lumber River crossings, will be reduced to a 20-foot-wide. A cleared corridor is required along the
entire line in order to install pipeline markers to maintain line of sight per regulations. The HDD locations will be hand cleared with no grubbing. No tree clearing will occur within the stream
banks of the Lumber River. This is being conducted to minimize impacts and to satisfy the National Park Service (NPS) concerns about the Lumber River's designation as a Wild and
Scenic River. Additional temporary workspaces and access roads will be utilized in limited areas dependent upon access to certain installation sites. Following installation of the pipe, the
trench will be backfilled and returned to pre -construction grade. A 30- to 50-foot-wide permanent maintenance easement along the pipeline alignment will be maintained in an herbaceous
state. The remaining temporary workspaces will be allowed to regenerate naturally. Permanent easement maintenance involves mowing the easement annually, no herbicide use.
Equipment being used will be drill, excavator, front-end loaders, chainsaws for hand -clearing, and construction vehicles on the Project. wetlands and streams within the workspace will be
matted to minimize soil disturbance.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes
Comments:
No
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2023-00656
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): multiple
Agency/Consultant Company: Kleinfelder, Inc.
Other:
6. Future Project Plans
6a. Is this a phased project?*
O Unknown
Yes O No
6b. If yes, explain.
This project is split out into 2 phases. Both phases are included in permit application.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
N/A
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
M
2. Wetland Impacts
2a1 Reason (?)
2b. Impact type*(?)
2c. Type of W.
2d. W. name
2e. Forested"
2f. Type of Jurisdicition*
2g. Impact
area
Fig 2A
Temporary Workspace
T
Pocosin
175WL
Yes
Both
1.023
(acres)
Fig 2A
Pipe Installation
T
FC,sin
176WL
No
Both
0.906
(acres)
Fig 26
Temporary Workspace
T
F-sin
179WL
Yes
Both
0.035
(acres)
Fig 2B
Pipe Installation
T �Fco.,n
179WL
No
Both
0.056
(acres)
Fig 2B
Pipe Installation
T
Seep
18OWL
No
Both
0.034
(acres)
Fig 2D
Temporary Workspace
T
Pocosin
196WL
Yes
Both
0.101
(acres)
Fig 2D
Pipe Installation
T
F-sin
196WL
No
Both
0.163
(acres)
Fig 2E
Temporary Workspace
T
Pocosin
198WL
Yes
Both
0.117
(acres)
Fig 2E
Pipe Installation
T
Fcosin
196WL
No
Both
0.352
(acres)
Fig 2E
Pipe Installation
T
Pocosin
199WL
No
Both
0.297
(acres)
Fig 2E
Pipe Installation
T
Pocosin
203WL
No
Both
0.045
(acres)
Fig 2F
Pipe Installation
T
Seep
206WL
No
Both
0.114
(acres)
Fig 2F
Pipe Installation
T
Seep
21OWL
No
Both
0.032
(acres)
Fig 2G
Pipe Installation
T
Seep
216WL
No
Both
0.187
(acres)
Fig 2G
Temporary Installation
T
FC,sin
219WL
Yes
Both
0.153
(acres)
Fig 2G
Pipe Installation
T
Pocosin
219WL
No
Both
0.252
(acres)
Fig 21
Temporary Workspace
T
Pocosin
227WL
Yes
Both
0.021
(acres)
Fig 21
Pipe Installation
T
Fcosin
227WL
No
Both
0.051
(acres)
Fig 21
Temporary Workspace
T
Pocosin
230WL
Yes
Both
0.081
(acres)
Fig 21
Pipe Installation
T
Seep
239WL
No
Both
0.229
(acres)
Fig 21
Pipe Installation
T
Seep
240WL
No
Both
0.119
(acres)
Fig 2J
Pipe Installation
T
Seep
244WL
No
Both
0.017
(acres)
Fig 2J
Pipe Installation
T
Seep
245WL
No
Both
0.022
(acres)
Fig 2L
Temporary Workspace
T
Pocosin
004WL
Yes
Both
0.035
(acres)
Fig 2M
Line of Sight Clearing
P
f7verine Swamp Forest
008WL
Yes
Both
0.461
(acres)
Fig 20
Pipe Installation
P
F-sin
024WL
Yes
Both
0.009
(acres)
Fig 20
Temporary Workspace
T
Pocosin
024WL
Yes
Both
0.008
(acres)
Fig 2P
Temporary Workspace
T
FC,sin
025WL
Yes
Both
0.004
(acres)
Fig 2P
Pipe Installation
P
Pocosin
026WL
Yes
--]
Both
0.063
(acres)
Fig 2P
Pipe Installation
T
Pocosin
027WL
No
Both
0.009
(acres)
Fig 2R
Pipe Installation
P
Pocosin
041 WL
Yes
Both
0.108
(acres)
Fig 2R
Temporary Workspace
T
F.-sin
041 WL
Yes
Both
0.073
(acres)
Fig 2S
Pipe Installation
P
Fr -sin
051 WL
Yes
Both
1.398
(acres)
Fig 2S
Temporary Workspace
T
F-Osin
051 WL
Yes
Both
0.725
(acres)
Fig 2T
Pipe Installation
T
F.-sin
OS5WL
No
Both
0.022
(acres)
Fig 2T
Pipe Installation
P
F-Osin
056WL
Yes
Both
0.087
(acres)
Fig 2T
Temporary Workspace
T
F.,sin
056WL
Yes
Both
0.136
(acres)
Fig 2T
Temporary Workspace
T
Seep
057WL
No
Both
0.064
(acres)
Fig 2T
Pipe Installation
P
F-Osin
059WL
Yes
Both
0.071
(acres)
Fig 2T
Temporary Workspace
T
Fc-sin
059WL
Yes
Both
0.052
(acres)
Fig 2U
Line of Site Clearing
P
rverine Swamp Forest
060WL
Yes
Both
0.385
(acres)
Fig 2U
Line of Site Clearing
P
f7verine Swamp Forest
062WL
Yes
Both
0.625
(acres)
Fig 2W
Pipe Installation
T
Fc-sin
063WL
No
Both
0.089
(acres)
Fig 2W
Temporary Workspace
T �F-O.in
066WL
No
Both
0.001
(acres)
Fig 2W
Pipe Installation
T
Fc-sin
067WL
No
Both
0.028
(acres)
Fig 2X
Pipe Installation
T
Fr -sin
069WL
No
Both
0.081
(acres)
Fig 2X
Pipe Installation
T
Fcosin
070WL
No
Both
0.842
(acres)
Fig 2X
Pipe Installation
T
Fc-sin
279WL
No
Both
0.333
(acres)
Fig 2X
Pipe Installation
T
Fcosin
281 WL
No
Both
0.022
(acres)
Fig 2Y
Pipe Installation
T
Pocosin
282WL
No
Both
0.561
(acres)
Fig 2CC
Pipe Installation
P
F�---sin
092WL
Yes
Both
0.394
(acres)
Fig 2CC
Temporary Workspace
T
Fcosin
092WL
Yes
Both
0.214
(acres)
Fig 2DD
Pipe Installation
P
Pocosin
093WL
Yes
Both
0.900
(acres)
Fig 2DD
Temporary Workspace
T
Fcosin
093WL
Yes
Both
0.648
(acres)
Fig 2EE
Pipe Installation
T
sin
FCO
099WL
No
Both
0.028
(acres)
Fig 2EE
Pipe Installation
P
Fc-sin
100WL
Yes
Both
1.654
(acres)
Fig 2EE
Temporary Workspace
T �Fco.in
100WL
Yes
Both
1.035
(acres)
Fig 2FF
Pipe Installation
T
ff-sin
104WL
Yes
Both
0.233
(acres)
Fig 2FF
Pipe Installation
P
Pocosin
104WL
Yes
--]
Both
1.486
(acres)
Fig 2FF
Temporary Workspace
T
Pocosin
104WL
Yes
Both
0.947
(acres)
Fig 2GG
Pipe Installation
P
Pocosin
105WL
Yes
Both
0.948
(acres)
Fig 2GG
Temporary Workspace
T
F-Osin
105WL
Yes
Both
0.562
(acres)
Fig 2GG
Pipe Installation
P
Fc-sin
106WL
Yes
Both
1.162
(acres)
Fig 2GG
Temporary Workspace
T
F-Osin
106WL
Yes
Both
0.703
(acres)
Fig 2HH
Pipe Installation
P
Fc-sin
107WL
Yes
Both
0.988
(acres)
Fig 2HH
Temporary Workspace
T
Fcosin
107WL
Yes
Both
0.591
(acres)
Fig 2HH
Temporary Workspace
T
F.,sin
110WL
No
Both
0.018
(acres)
Fig 2HH
Temporary Workspace
T
Fc-sin
113WL
No
Both
0.009
(acres)
Fig 2HH
Line of Site Clearing
P
F-Osin
115WL
Yes
Both
0.140
(acres)
Fig 2HH
Line of Site Clearing
P
f7verine Swamp Forest
116WL
Yes
Both
0.307
(acres)
Fig 211
Line of Site Clearing
P
f7verine Swamp Forest
122WL
Yes
Both
0.492
(acres)
Fig 211
Line of Site Clearing IT
Riverine Swamp Forest
124WL
No
Both
0.377
(acres)
Fig 211
Line of Site Clearing
P
f7verine Swamp Forest
125WL
Yes
Both
0.157
(acres)
Fig 211
Line of Site Clearing
T
F71'erine Swamp Forest
126WL
No
Both
0.486
(acres)
Fig 211
Line of Site Clearing
P
f7verine Swamp Forest
128WL
Yes
Both
0.034
(acres)
Fig 211
Line of Site Clearing
P
f7verine Swamp Forest
129WL
Yes
Both
0.662
(acres)
Fig 2JJ
Pipe Installation
P
Fcosin
130WL
Yes
Both
1.323
(acres)
Fig 2JJ
Temporary Workspace
T
Fc-sin
130WL
Yes
Both
0.785
(acres)
Fig 2JJ
Pipe Installation
P
Fcosin
134WL
Yes
Both
2.663
(acres)
Fig 2JJ
Temporary Workspace
T
Pocosin
134WL
Yes
Both
1.606
(acres)
Fig 2NN
Pipe Installation
P
Fc-sin
148WL
Yes
Both
2.195
(acres)
Fig 2NN
Temporary Workspace
T
Fcosin
148WL
Yes
Both
1.789
(acres)
Fig 2NN
Temporary Workspace
T
F.-sin
258WL
Yes
Both
0.138
(acres)
Fig 2NN
Temporary Workspace
T
F-Osin
259WL
Yes
Both
0.025
(acres)
Fig 200
Pipe Installation
T
FCOsin
146WL
No
Both
0.106
(acres)
Fig 200
Pipe Installation
P
Fc-sin
149WL
Yes
Both
0.752
(acres)
Fig 200
Temporary Workspace
T �Fco.in
149WL
Yes
Both
0.490
(acres)
Fig 200
Pipe Installation
T
ff-sin
150WL
No
Both
0.139
(acres)
Fig 200
Pipe Installation
P
Pocosin
151WL
Yes
--]
Both
2.186
(acres)
Fig 200
Temporary Workspace
T
Pocosin
151WL
Yes
Both
1.585
(acres)
Fig 2PP
Temporary Access
T
Seep
Both
0.076
(acres)
Fig 200
Pipe Installation
P
F-sin
154WL
Yes
Both
0.682
(acres)
Fig 200
Temporary Workspace
T
Pocosin
154WL
Yes
Both
0.416
(acres)
Fig 200
Pipe Installation
P
Fcosin
155WL
Yes
Both
0.821
(acres)
Fig 200
Temporary Workspace
T
Pocosin
155WL
Yes
Both
0.493
(acres)
Fig 2SS
Access Road
P
Pocosin
167WL
No
Both
0.101
(acres)
Fig 2U
Temporary Workspace
T
f7verine Swamp Forest
060WL
Yes
Both
0.593
(acres)
Fig 2U
Temporary Workspace
T
f7verine Swamp Forest
062WL
Yes
Both
0.908
(acres)
Fig 2HH
Temporary Workspace
T
Fcosin
115WL
Yes
Both
0.214
(acres)
Fig 2HH
Temporary Workspace
T
f7verine Swamp Forest
116WL
Yes
Both
0.464
(acres)
Fig 211
Temporary Workspace
T
f7verine Swamp Forest
122WL
Yes
Both
0.707
(acres)
Fig 211
Temporary Workspace
T
Riverine Swamp Forest
125WL
Yes
Both
0.236
(acres)
Fig 211
Temporary Workspace
T
f7verine Swamp Forest
128WL
Yes
Both
0.052
(acres)
Fig 211
Temporary Workspace —]
T
Riverine Swamp Forest
129WL
Yes
Both
1.002
(acres)
2g. Total Temporary Wetland Impact
25.167
2g. Total Wetland Impact
48.421
2g. Total Permanent Wetland Impact
23.254
2i. Comments:
Permanent impacts will occur from the conversion of forested wetland to herbaceous wetland within the permanent easement corridor with no net loss of
wetlands. There is one permanent fill impact to Wetland 167WL (Figure 2SS) from a permanent access road.
3. Stream Impacts
❑
3a. Reason for impact (?)
3b.lmpact type "
3c. Type of impact*
3d. S. name *
3e. Stream Type*
3f. Type of
3g. S. width
3h. Impact
Jurisdiction*
length*
S1
Pipe Installation
Temporary
Other
177D
Jurisdictional Ditch
Corps
493
Average (feet)
(linear feet)
Sp
Pipe Installation
Temporary
Other
269D
Jurisdictional Ditch
Corps
28
Average (feet)
(linear feet)
S3
Pipe Installation
Temporary
Other
181D
Jurisdictional Ditch
Corps
148
Averege (feet)
(linear feet)
S4
Pipe Installation
Temporary
Other
184D
Jurisdictional Ditch
Corps
240
Average (feet)
(linear feet)
S5
Pipe Installation
Temporary
Other
186D
Jurisdictional Ditch
Corps
77
Averege (feet)
(linear feet)
S6
Pipe Installation
Temporary
Other
189D
Jurisdictional Ditch
Corps
47
Average (feet)
(linear feet)
S7
Pipe Installation
Temporary
Other
190D
Jurisdictional Ditch
Corps
45
Average (feet)
(linear feet)
gg
Pipe Installation
Temporary
Other
191 D
Jurisdictional Ditch
Corps
238
Averege (feet)
(linear feet)
S9
Pipe Installation
Temporary
Other
193D
Jurisdictional Ditch
Corps
70
Average (feet)
(linear feet)
S10
Pipe Installation
Temporary
Other
195D
Jurisdictional Ditch
Corps
95
Averege (feet)
(linear feet)
S11
Pipe Installation
Temporary
Other J971S
Intermittent
Both
6
91
Averege (feet)
(linear feet)
S12
Pipe Installation
Temporary
Other
202PS
Perennial
Both
25
104
Average (feet)
(linear feet)
S13
Pipe Installation
Temporary
Other
204D
Jurisdictional Ditch
Corps
102
Averege (feet)
(linear feet)
S14
Pipe Installation
Temporary
Other
205ES
Jurisdictional Ditch
Corps
3
101
Average (feet)
(linear feet)
S15
Pipe Installation
Temporary
Other
20815
Intermittent
Both
101
Average (feet)
(linear feet)
S16
Pipe Installation
Temporary
Other
211D
Jurisdictional Ditch
Corps
3
100
Averege (feet)
(linear feet)
S17
Pipe Installation
Temporary
Other
21315
Intermittent
Both
5
105
Average (feet)
(linear feet)
S18
Temporary Workspace
Temporary
Other
215D
Jurisdictional Ditch
Corps
62
Averege (feet)
(linear feet)
31g
Pipe Installation
Temporary
Other
217ES
Jurisdictional Ditch
Corps
3
48
Averege (feet)
(linear feet)
S20
Temporary Workspace
Temporary
Other
273D
Jurisdictional Ditch
Corps
135
Averege (feet)
(linear feet)
S21
Pipe Installation
Temporary
Other
218ES
Jurisdictional Ditch
Corps
2
45
Averege (feet)
(linear feet)
S22
Pipe Installation
Temporary
Other
220ES
Jurisdictional Ditch
Corps
51
Average (feet)
(linear feet)
S23
Pipe Installation
Temporary
Other
223ES
Jurisdictional Ditch
Corps
70
Average (feet)
(linear feet)
S24
Pipe Installation
Temporary
Other
225ES
Jurisdictional Ditch
Corps
5
79
Averege (feet)
(linear feet)
S25
Pipe Installation
Temporary
Other
228PS
Perennial
Both
10
77
Average (feet)
(linear feet)
S26
Pipe Installation
Temporary
Other
234ES
Jurisdictional Ditch
Corps
70
Averege (feet)
(linear feet)
S27
Pipe Installation
Temporary
Other
236ES
Jurisdictional Ditch
Corps
76
Average (feet)
(linear feet)
S28
Pipe Installation
Temporary
Other
238ES
Jurisdictional Ditch
Corps
80
Average (feet)
(linear feet)
S29
Pipe Installation
Temporary
Other
2421S
Intermittent
Both
12
127
Averege (feet)
(linear feet)
S30
Pipe Installation
Temporary
Other
24315
Intermittent
Both
5
74
Average (feet)
(linear feet)
S31
Pipe Installation
Temporary
Other
001PS
Perennial
Both
7
67
Averege (feet)
(linear feet)
S32
Pipe Installation
Temporary
Other
002ES
Jurisdictional Ditch
Corps
45
Average (feet)
(linear feet)
S33
Pipe Installation
Temporary
Other
003D
Jurisdictional Ditch
Corps
87
Average (feet)
(linear feet)
S34
Pipe Installation
Temporary
Other 1
O6D
Jurisdictional Ditch
Corps
4
80
Averege (feet)
(linear feet)
S35
Pipe Installation
Temporary
Other
007D
Jurisdictional Ditch
Corps
12
75
Averege (feet)
(linear feet)
S36
Pipe Installation
Temporary
Other
014D
Jurisdictional Ditch
Corps
101
Average (feet)
(linear feet)
S37
Pipe Installation
Temporary
Other
0161S
Intermittent
Both
4
56
Averege (feet)
(linear feet)
S38
Pipe Installation
Temporary
Other
021D
Jurisdictional Ditch
Corps
2
45
Average (feet)
(linear feet)
S39
Pipe Installation
Temporary
Other
028D
Jurisdictional Ditch
Corps
86
Average (feet)
(linear feet)
S40
Pipe Installation
Temporary
Other
035D
Jurisdictional Ditch
Corps
81
Averege (feet)
(linear feet)
S41
Pipe Installation
Temporary
Other
036D
Jurisdictional Ditch
Corps
82
Averege (feet)
(linear feet)
S42
fipe Installation
Temporary
Other
042PS
Perennial
Both
5
81
Average (feet)
(linear feet)
S43
Pipe Installation
Temporary
Other
044D
Jurisdictional Ditch
Corps
83
Averege (feet)
(linear feet)
gq4
Pipe Installation
Temporary
Other
048D
Jurisdictional Ditch
Corps
31
Average (feet)
(linear feet)
S45
Pipe Installation
Temporary
Other
05215
Intermittent
Both
45
Average (feet)
(linear feet)
S46
Pipe Installation
Temporary
Other
053ES
Jurisdictional Ditch
Corps
5
53
Averege (feet)
(linear feet)
S47
Pipe Installation
Temporary
Other
054ES
Jurisdictional Ditch
Corps
51
Average (feet)
(linear feet)
Sq8
Pipe Installation
Temporary
Other
064D
Jurisdictional Ditch
Corps
45
Averege (feet)
(linear feet)
S49
Pipe Installation
Temporary
Other
065PS
Perennial
Both
10
50
Averege (feet)
(linear feet)
S50
Pipe Installation
Temporary
Other
068D
Jurisdictional Ditch
Corps
1
121
Averege (feet)
(linear feet)
S51
Pipe Installation
Temporary
Other
280PS
Perennial
Both
5
80
Averege (feet)
(linear feet)
S52
Pipe Installation
Temporary
Other
072ES
Jurisdictional Ditch
Corps
51
Average (feet)
(linear feet)
S53
Pipe Installation
Temporary
Other
075ES
Jurisdictional Ditch
Corps
58
Average (feet)
(linear feet)
g54
Pipe Installation
Temporary
Other
081D
Jurisdictional Ditch
Corps
126
Averege (feet)
(linear feet)
S55
Pipe Installation
Temporary
Other
082D
Jurisdictional Ditch
Corps
3
32
Average (feet)
(linear feet)
S56
Pipe Installation
Temporary
Other
083D
Jurisdictional Ditch
Corps
652
Averege (feet)
(linear feet)
S57
Pipe Installation
Temporary
Other
086D
Jurisdictional Ditch
Corps
385
Average (feet)
(linear feet)
S58
Pipe Installation
Temporary
Other
088D
Jurisdictional Ditch
Corps
33
Averege (feet)
(linear feet)
S59
Pipe Installation
Temporary
Other
090ES
Jurisdictional Ditch
Corps
5
51
Averege (feet)
(linear feet)
S60
Pipe Installation
Temporary
Other
095D
Jurisdictional Ditch
Corps
81
Average (feet)
(linear feet)
S61
Pipe Installation
Temporary
Other
096D
Jurisdictional Ditch
Corps
134
Averege (feet)
(linear feet)
S62
Pipe Installation
Temporary
Other
097D
Jurisdictional Ditch
Corps
170
Average (feet)
(linear feet)
S63
Pipe Installation
Temporary
Other
098D
Jurisdictional Ditch
Corps
81
Average (feet)
(linear feet)
S64
Pipe Installation
Temporary
Other
1021S
Intermittent
Both
5
177
Averege (feet)
(linear feet)
S65
Pipe Installation
Temporary
Other
249ES
Jurisdictional Ditch
Corps
79
Averege (feet)
(linear feet)
S66
Pipe Installation
Temporary
Other
250D
Jurisdictional Ditch
Corps
84
Average (feet)
Qinear feet)
S67
Pipe Installation
Temporary
Other
252D
Jurisdictional Ditch
Corps
4
369
Averege (feet)
(linear feet)
S68
Temporary Workspace
Temporary
Other �ff7
Jurisdictional Ditch
Corps
187
Average (feet)
(linear feet)
S69
Temporary Workspace
Temporary
Other
111D
Jurisdictional Ditch
Corps
184
Average (feet)
(linear feet)
S70
Temporary Workspace
Temporary
Other
112D
Jurisdictional Ditch
Corps
208
Averege (feet)
(linear feet)
S71
Temporary Workspace
Temporary
Other
114ES
Jurisdictional Ditch
Corps
152
Averege (feet)
(linear feet)
S72
Pipe Installation
Temporary
Other
131D
Jurisdictional Ditch
Corps
10
87
Average (feet)
(linear feet)
S73
Pipe Installation
Temporary
Other
133PS
Perennial
Both
15
82
Averege (feet)
(linear feet)
S74
Pipe Installation
Temporary
Other
256D
Jurisdictional Ditch
Corps
353
Average (feet)
(linear feet)
S75
Pipe Installation
Temporary
Other
257D
Jurisdictional Ditch
Corps
Average (feet)
(linear feet)
S78
Pipe Installation
Temporary
Other
140D
Jurisdictional Ditch
Corps
1
743
Averege (feet)
(linear feet)
S77
Pipe Installation
Temporary
Other
142ES
Jurisdictional Ditch
Corps
52
Average (feet)
(linear feet)
S78
Pipe Installation
Temporary
Other
147ES
Jurisdictional Ditch
Corps
96
Averege (feet)
(linear feet)
g7g
Temporary Workspace
Temporary
Other
260ES
Jurisdictional Ditch
Corps
29
Averege (feet)
(linear feet)
S80
Temporary Workspace
Temporary
Other 161
D
Jurisdictional Ditch
Corps
32
Average (feet)
(linear feet)
Sg1
Temporary Workspace
Temporary
Other
263D
Jurisdictional Ditch
Corps
5
37
Averege (feet)
(linear feet)
�2�Temporary
Workspace
Temporary
Other
26415
Intermittent
Both
188
Average (feet)
(linear feet)
S83
Pipe Installation
Temporary
Other
153PS
Perennial
Both
8
85
Average (feet)
(linear feet)
S84
Pipe Installation
Temporary
Other J
57Ps
Perennial
Both
3
113
Averege (feet)
(linear feet)
S85
Pipe Installation
Temporary
Other
158PS
Perennial
Both
10
51
Average (feet)
(linear feet)
S86
Pipe Installation
Temporary
Other
159D
Jurisdictional Ditch
Corps
117
Averege (feet)
(linear feet)
S87
Temporary Workspace
Temporary
Other
160ES
Jurisdictional Ditch
Corps
Average (feet)
(linear feet)
S88
Pipe Installation
Temporary
Other
161 ES
Jurisdictional Ditch
Corps
57
Average (feet)
(linear feet)
S89
Pipe Installation
Temporary
Other
162ES
Jurisdictional Ditch
Corps
51
Averege (feet)
(linear feet)
S90
Pipe Installation
Temporary
Other
164PS
Perennial
Both
7
56
Average (feet)
(linear feet)
Sg1
Pipe Installation
Temporary
Other
1681S
Intermittent
Both
3
51
Average (feet)
(linear feet)
Sg2
Pipe Installation
Temporary
Other
170D
Jurisdictional Ditch
Corps
143
Average (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet
26,922
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
0 10,358
31. Total stream and ditch impacts:
10358
3j. Comments:
Onsite streams will be temporarily impacted by pipe installation, and temporary workspace. Bottom sediments removed from the streambed will be
stored onsite and replaced once construction is complete.
E. Impact Justification and Mitigation O
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Stream and wetland impacts were minimized to the greatest extent possible. All stream crossings will be temporary and close to perpendicular as
possible. Stream crossings at the Lumber River and Holy Swamp will be HDD to avoid impacts at the major aquatic complexes. Approximately 69 acres
of the project will parallel an existing easement to reduce additional impacts. At multiple stream crossings, the construction width was reduced to limit
impacts.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Wetlands within the temporary workspace will be matted to minimize soil disturbance and impacts. The use of HDDs will be implemented to avoid
impacts at the Lumber River and Holy Swamp. Bridging will be utilized to cross smaller streams and ditches in the travel lane of the construction corridor.
No grubbing will occur over HDD locations that require minimal line of sight clearing per PHMSA standards. No tree clearing will occur within the stream
banks of the Lumber River. Following installation of the pipe, the trench will be backfilled and returned to pre -construction grade.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested: 4c. If using stream mitigation, what is the stream temperature
(linear feet)
4d. Buffer mitigation requested (DWR only): 4e. Riparian wetland mitigation requested:
(square feet) (acres)
4f. Non -riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested
4h. Comments
Permanent impacts will occur from the conversion of forested wetland to herbaceous wetland for the purposes of utility easement maintenance. One
impact will occur from a permanent access road.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) O
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes
No
If no, explain why:
The proposed project area is located within the Lumber River Basin which is not included in the North Carolina Riparian Buffer Protection Program.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?"
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
N/A
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
Yes
No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
No further development is anticipated due to the construction of this project
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS Environmental Conservation Online System for Information Planning and Consultation (IPAC) Resource List. Consultation with USFWS and
concurrence email is attached in Appendix B, Previous Application.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
National Oceanic and Atmospheric Administration's Essential Fish Habitat Mapper.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
A Phase 1 archaeology study of the project area was conducted to assess for impacts to cultural resources, see Appendix C, Previous Application. The
study area included the pipeline alignment with a review area of 100-ft along the corridor. the sites that were identified are not recommended as eligible
for listing in the NRHR A cemetery was delineated within the project area, the design has been adjusted to add a 30-foot buffer around the cemetery for
complete avoidance.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8b. If yes, explain how project meets FEMA requirements:
A floodplain development permit to Robeson County will be submitted separately.
8c. What source(s) did you use to make the floodplain determination? *
FEMA National Flood Hazard Layer, FIRMS 3710937000K, 3710938000K, 3710939000K, 3720031000K, 3710928800J, 3720020900K, 3720021900K,
3710933500K, 3710934500K, 3710936400J, 3710934400K, 3710935400J, 3710936300J, 3710937300J, 3710937200K, 3710937100K, 3720032000K
Miscellaneous
O
V
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop flies here to attach document
Line479_Fig5_ Impacts _20231002_v4_Condensed _Stream_102.pdf 5.36MB
File must be PDF or KMZ
Comments
Uploaded is the Impact Exhibit Map, Figure 2EE, pertaining to Stream 1021S impact update from previously submitted PCN. No other changes have been made from previously submitted
PCN on 4/17/2023.
A link can be provided via email for all previous PCN attachments if needed.
The National Park Service (NPS) concurs that the Lumbar River, although a Wild and Scenic River, will not be impacted by the project, as the HDD and limits of disturbance are outside of
the ordinary high water. Email correspondence with NIPS is attached in Appendix E, Previous Application.
Signature
By checking the box and signing below, I certify that
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Thomas Malecki
Signature
F///!Y/t/IJ �i�lr0/lYJii
Date
10/6/2023
a