HomeMy WebLinkAboutMica Ridge_NBR_Durham_EBXBufferMRTRevised 9-7-2023.pdf F,,,STATE
ROY COOPER A
Governor
ELIZABETH S.BISEP,
Secretary *�EQwv N°�''
RICHARD E.ROGEPS,JR. NORTH CAROLINA
Director Environmental Quality
COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORM
September 7,2023
Permittee: Charlie Yokley&Lennar Corp.—Raleigh Division DWR Project#20230870
Project Name: Mica Ridge County: Durham
The Division has received a Statement of Availability(SOA)from EBX-Neuse I,LLC Neuse Riparian
Buffer Umbrella Mitigation Bank, RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank,
RES Poplar Creek Buffer&Nutrient Offset Umbrella Mitigation Bank,EBX Upper Neuse Riparian
Buffer Umbrella Mitigation Bank,RES 2021 Neuse Umbrella Mitigation Bank, or RES 2022 Phase II
Umbrella Mitigation Bank(Mitigation Provider) for the Buffalo Branch, Selma Mill, Cedar Grove,
Hatley,Bucher,Hannah Bridge, Stone Creek,Meadow Spring,Uzzle,Poplar Creek,Polecat,Wolf King,
Shady Grove, Thunder Swamp, and Caraway Bluff Bank site(s)to ap rtia11X satisfy the mitigation
requirements set forth in the Buffer Authorization issued to Charlie Yokley and Lennar Corporation—
Raleigh Division, dated August 17th,2023, as provided in the table below.
Compensatory Mitigation River and 8-digit HUC
Number
Neuse Buffer 4,854.324 square feet credits Neuse River/03020201
The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then
sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the
Mitigation Provider has signed this form, it is the Permittee's responsibility to ensure that a signed copy
of this form and the mitigation transfer certificate is submitted to the Division before conducting any of
the authorized impacts.
The Mitigation Provider verifies that the mitigation requirements(credits) shown above,have been
released and are available at the identified bank site(s). By signing below,the Mitigation Provider is
accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider,no
more than 25 percent of the total mitigation required by Division can be met through preservation,unless
requested and approved by the Division Director(15A NCAC 02H. 0506(c)(7)).
Signature Authority Name(print): Amy Staley
Signature: —Ant Date: 10/6/23
D E Q North Carolina Department of Environmental Quality I Division of Water Resources
vRaleigh Regional Office I 3800 Barrett Drive I Raleigh,North Carolina 27609
NORTH CAROLINA 919.791.4200
oepartmem or a AkonmenW anai� /�