Loading...
HomeMy WebLinkAboutSW6221202_Email_20231010 Peck, Kaitlin From:svc_post_construction_stormwater Sent:Tuesday, October 10, 2023 3:03 PM To:guyljr@lampemanagement.com Cc:Joyner, Melissa; john@csd-engineering.com; robert@csd-engineering.com; terryw@lampemanagement.com; Brad Sutton; Hines, Lee R Subject:RE: SW6221201 Ample Storage Attachments:Cover Letter & Permit 10-10-23.pdf Good A?ernoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Applica?on for the subject project on July 27, 2023. Staff review of the plans and specifica?ons has determined that the project, as proposed, will comply with the Stormwater Regula?ons set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW6221201, dated October 10, 2023, for the construc?on, opera?on and maintenance of the subject project and the stormwater system. This permit shall be effec?ve from the date of issuance and shall be subject to the condi?ons and limita?ons as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permi?ee, Guy Lampe, at the following address (NOTE: An electronic version of this permit can be found in our online repository: h?ps://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Turtle Run, LLC Attn: Guy Lampe, Jr., Manager/Vice President PO BOX 608 Smithfield, NC 27577 We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are no?ced and correc?ons need to be made) a?er which point, it will be kept on file at the Faye?eville Regional Office. If you have any ques?ons, or need addi?onal informa?on concerning this ma?er, please contact us at postconstruc?on@deq.nc.gov. Thanks, Jim Farkas Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov 1 From: Farkas, Jim J Sent: Tuesday, March 7, 2023 7:48 AM To: guyljr@lampemanagement.com; terryw@lampemanagement.com; john@csd-engineering.com; robert@csd- engineering.com Cc: Joyner, Melissa <melissa.joyner@ncdenr.gov> Subject: RE: SW6221201 Ample Storage Good Morning, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater th Management Permit Application for the subject project on December 6, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, December 6, 2022 1:31 PM To: guyljr@lampemanagement.com; terryw@lampemanagement.com; john@csd-engineering.com; robert@csd- engineering.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW6221201 Ample Storage Good afternoon, We received your post-construction stormwater permit application for the above mentioned project on 12/6/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload 2 IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6221201 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 3