HomeMy WebLinkAboutNCC205662_NOT Closeout Documents_20231009 L
TAR )<
2
ROY COOPER g_
REC'D S E P 15 2923
Governor
ELIZABETH S.BISER
Secretary ftriiioile
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
dnter1m Director Environmental Quality
SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER
INSPECTION REPORT
Dear Sir or Madam:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
i
Scott Graboski
Environmental Specialist II
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
0 imi 4 North Carolina Department of Environmental Quality Divisiei I of Energy Mineral and Land Resources
Washington Regional Office ; 943 Washington Square Mall _ Washington.North Carolina 27889
,, 252.946.6481
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481
County: Pitt Project: HWY 33 Sewer Relocation Project River basin: Tar-Pamlico
Person financially responsible:Town of Grimesland-Eleanor Farr,Mayor Project#: PITT-2021-006
Address: PO Box 147,Grimesland,NC 27837
1. Project Location: HWY 33,GRIMESLAND
Pictures: No
2. Weather and soil conditions: 90 degrees,sunny,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. _Is the site in compliance with S.P.C.A.and rules? Yes _ If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: September 12,2023
9. Corrective action needed:
10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or
self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request
termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO 1)via a Notice of
Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: September 11,2023 Time arriving on site: 4:00 PM Time leaving site: 4:10 PM
cc: