Loading...
HomeMy WebLinkAboutNCC205662_NOT Closeout Documents_20231009 L TAR )< 2 ROY COOPER g_ REC'D S E P 15 2923 Governor ELIZABETH S.BISER Secretary ftriiioile WILLIAM E.TOBY VINSON,JR NORTH CAROLINA dnter1m Director Environmental Quality SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER INSPECTION REPORT Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, i Scott Graboski Environmental Specialist II (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report 0 imi 4 North Carolina Department of Environmental Quality Divisiei I of Energy Mineral and Land Resources Washington Regional Office ; 943 Washington Square Mall _ Washington.North Carolina 27889 ,, 252.946.6481 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481 County: Pitt Project: HWY 33 Sewer Relocation Project River basin: Tar-Pamlico Person financially responsible:Town of Grimesland-Eleanor Farr,Mayor Project#: PITT-2021-006 Address: PO Box 147,Grimesland,NC 27837 1. Project Location: HWY 33,GRIMESLAND Pictures: No 2. Weather and soil conditions: 90 degrees,sunny,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. _Is the site in compliance with S.P.C.A.and rules? Yes _ If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No contact was made. Title: Inspection report: Sent Report Date given/sent: September 12,2023 9. Corrective action needed: 10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO 1)via a Notice of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: September 11,2023 Time arriving on site: 4:00 PM Time leaving site: 4:10 PM cc: