Loading...
HomeMy WebLinkAboutWQ0044772_Application (FTSE)_20230922 (2)State of North Carolina DWR Division of Water Resources Entity Requesting Allocation: Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Town of Smithfield Project Name for which flow is being requested: Home2 Suites - Smithfield More than one FTSE may be requiredfor a single project if the owner of the WWTP is not responsible for allpump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Central Johnston County Regional WTF b. WWTP Facility Permit #: NC 0030716 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 9.50 0.01176 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity, Number) No. MGD (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Daily Current Not Yet Current Flow** Avg. Daily Tributary Flow Plus (Firm / p fl, Flow, Daily Flow, Obligated Available MGD MGD MGD Flow Capacity*** The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Smithfield Downstream Permit Number: WQCS00270 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Ted Credle certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible parry. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature DIRF'GT09 OE Pv&-t c. 1), 1 LIT -It Title of Signing Official Fa- 6,N IJE YAA�eZ5' ,�r e5TE M Page 2 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Johnston County Project Name for which flow is being requested: Home2 Suites More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all punip stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Central Johnston County WWTP b. WWTP Facility Permit #: NC0030716 All flows are in MGD c. WWTP facility's permitted flow 9.5 d. Estimated obligated flow not yet tributary to the WWTP 2.075 e. WWTP facility's actual avg. flow 5.507 f. Total flow for this specific request 0.01176 g. Total actual and obligated flows to the facility 7.5934 h. Percent of permitted flow used 58 actual, 80 w/paper lI. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / po, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a pealing factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): CJCRWWTF Downstream Permit Number: WQ0030716 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Chandra C. Farmer, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. U�yvls� C a b Signing Official Signature t Date � ' 41'IA Ies Title of Signing Official Page 2 of 6 FTSE 10-18 � MCADAMS Date: September 14, 2023 To: NCDEQ, Raleigh Regional Office Water Quality Section 3800 Barrett Drive Raleigh, North Carolina 27609 (919) 791-4200 I am sending you the following items: ❑ Drawings ❑ Letter ❑ Specifications ® Submittal ❑ Plans ❑ Prints LETTER OF TRANSMITTAL HAND DELIVER Re: Home2Suites —Smithfield FTSE Application Job #: WIN19000 ❑ Statement of Qualifications ❑ Other QUANTITY UNIT DESCRIPTION 1 Original FTSE Application, Sealed, Johnston County (Form 06-21) 1 Original Flow Tracking for Sewer Extension, Johnston County (Form 10-18) 1 Original Flow Tracking for Sewer Extension, Town of Smithfield (Form 10-18) 1 Original Sewer Permit Narrative, Sealed 1 Check FTSE Application Fee (Check #128005 for $480.00) 1 Print USGS Topographic Map, Selma Quadrangle, North Carolina 1 Print Aerial Location Map/Site Map 1 Copy Set All above documents, paper 1 Copy Set All above documents, electronic via thumb drive Transmitted as checked below: ® For approval ❑ For your use ❑ As requested Copy to: ❑ For review + comment ❑ Other ❑ Other Signature: N. Ray tson, Jr, PE Technical Manager, National Brands creating experiences through experience 621 Hillsborough Street, Suite 500, Raleigh, NC 27603 / 919. 361. 5000 'J McADAMS September 12, 2023 Home2Suites 180 Towne Centre Place Smithfield, North Carolina Johnston County GENERAL DESCRIPTION SEWER PERMIT NARRATIVE > WIN190000 This project is located on Towne Centre Place (PIN: 260305-08-8796), which is by the interchange of E Market Street (U.S. Highway 70 Business) and Interstate 95. The subject property is part of the Smithfield Business Park located at the end of the Towne Centre Place cul-de-sac in Smithfield, Johnston County, North Carolina (Zip: 27577). Proposed development on this approximately 2.28-acre site will consist of a commercial hotel facility with driveway, parking, associated utility infrastructures, and storm water system. Section VI Wastewater Flow Based on North Carolina 2T rules, based on the projected number of rooms, the projected flow is calculated as follows: - Hotel (without in -room cooking facilities) - 120 gallons/room - 98 rooms - Total: 11,760 GPD Section VII Length of Gravity Sewer There is 67 linear feet of proposed 8-inch SDR-35 PVC sanitary sewer line that will connect to a proposed doghouse manhole on the existing sanitary line. The existing line is an 8-inch line in a recorded Drainage, Utility & Access Easement as recorded in Plat Book 75, Page 156 located on the west side of the site. If you should have any questions or comments, please feel free to contact me at 919.418.4715 or watson@mcadamsco.com. Sincerely, MCADAMS ', N Ray Watson Jr, PE Technical Manager, National Brands ��r• 6•p .' iH " i p r' '' i 11682 �r�lHRµ o0w- creating experiences through experience 621 Hillsborough Street, Suite 500, Raleigh, NC 27603 / 919. 361. 5000