Loading...
HomeMy WebLinkAbout20131285 Ver 2_DCM Permit Renewals_20231009NC Division of Coastal Management CAMA Mayor Permit Renewal Request District: Major Permit Staff: Project Address: �� tree! Addressn CAMA Permit No.: Permit Expiration Date: A;ent's Name: !3 Received in Office: ' 23 City - ZIP Code l�3/,23 Ghuw* 2/7-ZCz Payment S 74X 5 NO District Manager/Field Rep Approve? (Initial Appropriate ) ❑ Other Information DWK Project USACE Action No: No: �o� � i 2� ID No.: Has substantial YES NO If Yes, /�� development occurred? ❑ Explain: / 2 �Arh NO Recommend to Renew? /111 ❑ If Not Approved, provide Justification: Date: ! 4'-�) �Z ' North Permit Number 3-14 Permit Clpss RENEWAL/ MAINTENANCE-5 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Verna for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Kim Quinn PO Box 336 Kenansville NC 28439 Authorizing development in Pender County at adjacent to Topsail Sound 804 Channel Blvd., Topsail Beach , as requested in the permittee's application dated -letter dated 11/08/18. This permit, issued on December 6, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suuJect ro lines, imprisonment or civil action; or may cause ine permn to oe nun ana vora. 1) This Renewal shall be attached to the original of Permit No. 3-14, which was issued to the permittee on O1/09/14, as well as the Major Modification issued on 08/07/15 and the Minor Modification issued on 05/12/14, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this Renewal. (See attached sheet for additional conditions.) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources commission. TT Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Mailing Address: Phone Number: Email Address: I certify that I have authorized 'O ZGi 0 i�tM km I v'l6- (W4 to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: V---Q U A I (fAM A -- Pc' (M at my property located at Cr atA \&4 t 7 in Re Oh V- County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Print or Type Name Title Date This certification is valid through �/ 3 � / DECEIVED SEP 2 S 2023 k QCM WILMINGTON. NC Dail, Jason From: Gary Ange <gs080311 @gmail.com> Sent: Tuesday, September 26, 2023 3:43 PM To: Dail, Jason Cc: Kim Quinn Subject: [External] CAMA 3-14 Renewal CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jason, Mr. Quinn is requesting an extension on CAMA 3-14. 1. All work has been completed per original permit and there is no remaining work to be completed. There have been no change of plans since the issuance of the original permit and modifications granted 5/12/14, 8/7/15 and 3/29/21. And the project is in compliance with conditions of the current permit and modifications. 2. He wishes to maintain the dredging component of the original permit for 5 years. 3. There has been no change of ownership of the property. 4. The original footprint of the dredge area has not changed and the extension request would remain consistent with the project, as permitted. Note: Dredge material consent letter was sent under separate email. Sent from my Pad Gary Ange 910 547-2955 Sent from my Pad Dail, Jason From: Gary Ange <gs080311 @gmail.com> Sent: Tuesday, September 26, 2023 2:18 PM To: Dail, Jason Subject: [External] CAMA 3-14 Dredge Material CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jason Dail NC DEQ Re: CAMA 3-14 Renewal Dredge Disposal All Dredge Disposal Material from this Permit will be placed on 805 Channel Blvd, Topsail Beach NC This lot is owned by Quinn Ventures, LLC and Kim Quinn is the Member Manager, Owner. Sent from my iPad Gary Ange Authorized Agent Quinn Ventures, LLC Permit Class Permit Number MODIFICATIONIMAJOR 3-14 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermtt for X . Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Kim Quinn, PO Box 336 Kenansville, NC 28439 Authorizing development in Pender County at adj. to Topsail Sound, 804 Channel Blvd., Topsail Beach as requested in the perntittee's application dated 3/23/15 (MP-1) and 3/12/15 (MP-2) 3/10/15, met. attached drawings (3) 1 of 3 dated revised 12/3/13, 2 of 3 dated 10/6/14 and 3 of 3 dated 10/14. 'rhis permit, issued on Aunust 9, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may- be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Excavation 11 In order to protect juvenile shrimp and finfish populations, no excavation or filling shall be permitted between April I and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agency personnel.' 2) Excavation shall not exceed -4 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of connecting waters. 3) No excavation shall take place outside of the alignment of the area indicated on the attached workplan drawing(s). (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty. (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. ( )ems Braxton, . avis, Director. F Division of Coastal Management Thispermitand its conditions are hereby accepted. R E C E i V E0 AUG ' 0 2015 Signature of Permittee <,-. x wa.+xewya„�-w�.wn.w w�caxoo-nwv�,:.wcaa.co: Y Kim Ouinii AflbitIONAL CONDITIONS` Permit No. 3-14 Page 2 of 3 4) No vegetated wetlands shall be excavated or filled, even temporarily. t .. }s ; "Spoil Disposal f 5) All excavated materials shall .be confined above normal high water and landward of regularly or irregularly; flooded, Coastal Wetlands behind adequate dikes; or other retaining structures to prevent spillover of-splids into any. marsh or surrounding waters. 6) The spoil disposal area shall be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. 7) No spoil material is to be placed within 30 feet of the normal high water line. 2 Maintenance Clause 8) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the origihal.permit plans with cross -hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, - design and holding capacity of the spoil disposalsite shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. Sedimentation and Erosion Control 9) All disturbed, areas shall beproperly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. -i I V E D CM . IILi'iINCTON, NC General aUG 0 2015 10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 11) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which maybe Caused from existing or future operations undertaken by the United States in the public interest. 12) ' This Major Modification shall be attached to the original of Permit No. 3-14, which was issued on 1/9/14, as well as the Minor Modification of 5/12/14, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance, Kim Quinn ADDITIONAL CONDITIONS Permit No. 3-14 Page 3 of 3 13) All conditions and stipulations of the active permit remain in force under this Major Modification unless specifically altered herein. r NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, i approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the proposed project Action ID No. SAW-2013- 02377, NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 20131285v2. NOTE: Future development of the_permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any tsuch activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: An application processing fee of $475 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. t: ;VL '%;V!U,.ilNGT0 ';,J, NC Auc, 11 0 2015 +� V o00 v ++ c u a " O 00 ai s G1 u w (c Q v �m �Q O O a -a -> �m a � o 0 o a N Yu � � � N U o Z N V O a N Y Qj LL U in L OJ O Qj E Z � v a E 0 � u v U E Y Qj 01 Q1 n 0 Q Q! 0 a ro iQji . O Ln Q V Ln O r-I