Loading...
HomeMy WebLinkAboutNC0023981_Pretreatment Annual Review 2022_20230920Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ® YES ❑ NO ❑ YES ❑ NO Historical SNC ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA ❑ YES ❑ NO ❑ NA Regional Office: ARO POTW: City of Lenoir NPDES Permit No. NCO023981 Report Period: 01/2022 to 12/2022 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below; 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? (See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment vote: txceotions snouia De exoiainea in the comment section Deiow: Reviewed By: Rachel Rose Date: 09/20/2023 Regional Pretreatment Annual Report Review NC0023981 Pretreatment Annual Review 2022 2023092016