Loading...
HomeMy WebLinkAboutNCC233008_ESC Approval Submitted_20231009 d,44 o ROY COOPER 4 ,t Governor 1 r1 ELIZABETH S.BISER Secretary `AtnuM,wd° DOUGLAS R.ANSEL NORTH CAROLINA Environmental Qaaltty Interim Director September 26,2023 LETTER OF APPROVAL WITH MODIFICATIONS CNA Holdings,LLC Attention: Lawrence Wolnik,Director of Production 2525 Blacksburg Road Grover,North Carolina 28073 RE: Project Name: Celanese North Outfall Storm Water Project ID: CLEVE-2023-040 Acres Approved: 4.98 County: Cleveland City: Grover Location: 2525 Blacksburg Rd River Basin: Broad Stream Classification: Other Submitted By: Wood Date Received by LQS: September 14, 2023 Plan Type: Revised Dear Mr. Wolnik: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page.This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 704-663-1699 Letter of Approval with Modifications CNA Holdings, LLC September 26,2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, �j 911&I < Jerry W. Eplin, PE Assistant Regional Engineer Land Quality Section JWE Enclosure: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Wood Group USA Inc. Attention: Brent T. Hanley, PE 30 Patewood Drive, Suite 200 Greenville, SC 29615 E North Carolina Department of Environmental Quality Division of Energy.Mineral,and Land Resources •��/A Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704.663-1699 Letter of Approval with Modifications CNA Holdings, LLC September 26, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Celanese North Outfall Storm Water Project ID: CLEVE-2023-040 County: Cleveland Reviewed by: Jerry W. Eplin,PE 1. It was not clear from the drawings that the sediment trap meets the minimum freeboard requirement of 1.5 feet and has a top berm of at least 5-foot width. Adjust these,if necessary,to meet at least the minimum requirements. 2. The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities rj • �� North Carolina Department of Environmental Quality 1 Division of Energy,Mineral,and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 —_r • 704-663-1699 PI ert• ' - V1 �' �, '� O II Ci) et CD © © CD 01 a b ot a CID A: F° � oars p' °" � � o ft sz b cCT v J p a ,�. � '�. 1 1 et o 0 C' 11 II c o e c.,.) t= est gr o 2_ 7: cm a eD C -- t oet 1.0 � CD tD et, i ...7 r-( -i- 1 ,.-ft. g kQ AD t11 © to :4 4 0 �n-r g cN1t ziii O p_ `�r`. c t, CZ ft •• tv Pi* *1 - ‘1.}1 1 wdd Iti eD , rs � � CO _o Z'. Pj IZ c o fat 1.1 a' C a. a -� 0I 0- n A. a Clti lit =. a' y p c C cn W a • '"p I o' 1 N till /4- a p• 0 co C 7d a 'y: � ^'. �• O Q''CM 0 ~ep - . m of r o y v�' to c Ct crclrt *I V~i p O ` - � p CD � r.. CD