HomeMy WebLinkAboutNCC233011_ESC Approval Submitted_20231009 ROY COOPER d"`
Governor
ELIZABETH BISER
Secretary
r.„k
DOUGLAS ANSEL
Interim Director NORTH CAROLINA
Environmental Quality
August 4, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
CMC Jomada Holdings, LLC
Attention: Michael Criscuolo,Manager
PO Box 168
Oak Ridge,NC 27310
RE: Project Name: Holt Campus at Flynnwood and Main
Acres Approved: 19.2
Project ID: FORSY-2024-001
County: Forsyth
City: Kernersville.
Address: North Main Street
River Basin: Roanoke
Stream Classification:C
Submitted By: Green Mountain Engineering. PLLC
Date Received by LQS: July 6, 2023
Plan Type: New
Dear Mr. Criscuolo:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be
kept on file at the job site:
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
Letter of Approval with Modifications
CMC Jomada Holdings, LLC
August 4, 2023
Page 2 of 4
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincer ,
Nicole Chi es, EI
— — — — Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Green Mountain Engineering, PLLC
Attn: Joseph O'Buch, PE
I/\ ,Wendy Court
Greensboro,NC 27409
• Letter of Approval with Modifications
CMC Jomada Holdings, LLC
August 4,2023
Page 3 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Holt Campus at Flynnwood and Main
Project ID: FORSY-2024-001
County: Forsyth
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Sheet 4.01 Erosion & Sediment Control: Initial Conditions calls out multiple diversion
ditches but there is not any linework to match the call outs. Please revise.
2. Both ESC sheets still say the Limits of Disturbance is 22 acres, please revise to the approved
19.2 or please resubmit the Financial Responsibility Ownership form and applicable fees to
match the 22 acres.
3. The baffle detail is illegible,please revise.
4. Rock check dams, sediment wattles, or erosion control matting should be used in the existing
channel and in the temporary diversions in the initial phase.
5. Once these edits are made, please provide this office with an updated copy of the full design
drawing set for inspection purposes.
6. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
7. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
8. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
your construction accordingly to avoid contacting our office prematurely for a closure
Letter of Approval with Modifications
CMC Jomada Holdings, LLC
August 4, 2023
Page 4 of 4
inspection. Also be advised you may be asked for representative site pictures prior to a
closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
• = n fg n its ?
_O C �►' A: rfp r: a, O
..
z
CS � �O A c . ,jy W r n
y
)111
mil n CD = n H
sr, sm
,... .3 A: = ,..1
rNt 0 ow• ar 4` CD r�r•
CD 11' CD CA
11
tt
g2.1.
O = sg 1 - '1' ,fir, `9. ' C
N Z '
O Af.
AD 1
o v byd = ''' _-
- O Iget • d ____________
O O
0' AD O J J r
e z Q. fl:, • = E *0
lg
CM=
c. g. 'd0 o"i _ eD
-
e , O
w •
C
DI * �. :
fp c C , �-s
U�t• t,,i (--_,.
CD n = O
0- cm O Lt ar
- -
= ).i... c, ,....." r
cral 0
es- g - so
1
-- -