SW5231001_Design Calculations_20231008
Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for Cover Description hydrologic soil group Cover type and hydrologic condition Average percent A B C D impervious area Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, etc.)3: Poor condition (grass cover< 50%) 68 79 86 89 Fair condition (grass cover 50% to 75%) 49 69 79 84 Good condition (grass cover> 75%) 39 61 74 80 Impervious areas: Paved parking lots, roofs, driveways, etc. (excluding right-of-way) 98 98 98 98 Streets and roads: Paved; curbs and storm sewers (excluding 98 98 98 98 right-of-way) Paved; open ditches (including right-of-way) 83 89 92 93 Gravel (including right-of-way) 76 85 89 91 Dirt(including right-of-way) 72 82 87 89 Urban districts: Commercial and business 85 89 92 94 95 Industrial 72 81 88 91 93 Residential districts by average lot size: 1/8 acre or less (town houses) 65 77 85 90 92 1/4 acre 38 61 75 83 87 1/3 acre 30 57 72 81 86 1/2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acres 12 46 65 77 82 Developing urban areas Newly graded areas 77 86 91 94 (pervious areas only, no vegetation)4 Idle lands (CN's are determined using cover types similar to those in table 2-2c). 1.Average runoff condition,and la=0.2S. 2.The average percent impervious area shown was used to develop the composite CN's.Other assumptions are as follows:impervious areas are directly connected to the drainage system,impervious areas have a CN of 98,and pervious areas are considered equivalent to open space in good hydrologic condition.CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3.CN's shown are equivalent to those of pasture.Composite CN's may be computed for other combinations of open space cover type. 4.Composite CN's to use for the design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development(impervious area percentage)and the CN's for the newly graded pervious areas. Rev.6/06 8.03.17 8 Table 8.03f Runoff curve numbers for cultivated agriculture lands' Curve numbers for Cover description hydrologic soil groups Hydrologic Cover type Treatments' conditions3 A B C D Fallow Bare soil 77 86 91 94 Row crops Straight row Good 67 78 85 89 Contoured & Good 62 71 78 81 terraced 1 Average runoff condition, and la=0.2S 2 Crop residue cover applies only if residue is on at least 5% of the surface throughout the year. 3 Hydraulic condition is based on combination factors that affect infiltration and runoff, including (a)density and canopy of vegetative areas, (b) amount of year-round cover, (c) amount of grass or close-seeded legumes, (d) percent of residue cover on the land surface (good >_ 20%), and (e) degree of surface roughness. Poor: Factors impair infiltration and tend to increase runoff. Good: Factors encourage average and better than average infiltration and tend to decrease runoff. 8.03.18 Rev.6/06 Appendices Table 8.03g Runoff curve numbers for other agriculture lands' Curve numbers for Cover description hydrologic soil groups Hydrologic Cover type conditions' A B C D Pasture, grassland, or range— Poor 68 79 86 89 continuous forage for grazing. 2 Fair 49 69 79 84 Good 39 61 74 80 Meadow—continuous grass, protected — 30 58 71 78 from grazing and generally mowed for hay. Brush—brush-weed-grass mixture with Poor 48 67 77 83 brush the major element. 3 Fair 35 56 70 77 Good 30 4 48 65 73 Woods—grass combination (orchard or Poor 57 73 82 86 tree farm). 5 Fair 43 65 76 82 Good 32 58 72 79 Woods. 6 Poor 45 66 77 83 Fair 36 60 73 79 Good 30 4 55 70 77 Farmsteads—buildings, lanes, — 59 74 82 86 driveways, and surrounding lots. 1 Average runoff condition, and la=0.2S. 2 Poor:<50%ground cover or heavily grazed with no mulch. Fair:50 to 75%ground cover and not heavily grazed. Good:>75%ground cover and lightly or only occasionally grazed. 3 Poor:<50%ground cover. Fair:50 to 75%ground cover. Good:>75%ground cover. 4 Actual curve number is less than 30; use CN = 30 for runoff computations. 5 CN's shown were computed for areas with 50%woods and 50%grass(pasture)cover. Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor:Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair:Woods are grazed but not burned, and some forest litter covers the soil. Good:Woods are protected from grazing, and litter and brush adequately cover the soil. Rev.6/06 8.03.19 SGW POND 1 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 1 Pre-Dev DA-1A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 6.29 484.3 CN(weighted) =total product/total area Totals = 6.290 484.3 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 1 Pre-Dev DA-1B Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 2.53 194.8 CN(weighted) =total product/total area Totals = 2.530 194.8 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 1 Post-Dev DA-1 Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 11.15 1092.7 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 11.150 1092.7 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 SUBMERGED GRAVEL WETLAND POND 1 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 11.15 AC Imp Area= 11.15 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd= 1 in Design Storm Rv= 0.95 Dv= 38,450.78 FT3 DA= 11.15 AC Vol. Provided = 58,305.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 38,450.78 FT3 Design Volume Ponding Depth Ponding Depth = 2.00 FT SA= 19,225.39 FT2 SA Provided = 27,553.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport August 2023 Authority PE3 Expansion Hydraflow Table of Contents SGW Pond 1.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, Combine, Pre-Dev Combined 8 Hydrograph No. 4, SCS Runoff, Post Pond 1 9 Hydrograph No. 5, Reservoir, POND 1 ROUTING 10 Pond Report - SGW POND 1 11 2 - Year Summary Report 12 Hydrograph Reports 13 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 13 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 14 Hydrograph No. 3, Combine, Pre-Dev Combined 15 Hydrograph No. 4, SCS Runoff, Post Pond 1 16 Hydrograph No. 5, Reservoir, POND 1 ROUTING 17 5 - Year Summary Report 18 Hydrograph Reports 19 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 19 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 20 Hydrograph No. 3, Combine, Pre-Dev Combined 21 Hydrograph No. 4, SCS Runoff, Post Pond 1 22 Hydrograph No. 5, Reservoir, POND 1 ROUTING 23 10 - Year Summary Report 24 Hydrograph Reports 25 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 25 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 26 Hydrograph No. 3, Combine, Pre-Dev Combined 27 Hydrograph No. 4, SCS Runoff, Post Pond 1 28 Hydrograph No. 5, Reservoir, POND 1 ROUTING 29 25 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 31 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 32 Contents continued... SGW Pond 1.gpw Hydrograph No. 3, Combine, Pre-Dev Combined 33 Hydrograph No. 4, SCS Runoff, Post Pond 1 34 Hydrograph No. 5, Reservoir, POND 1 ROUTING 35 50 - Year Summary Report 36 Hydrograph Reports 37 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 37 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 38 Hydrograph No. 3, Combine, Pre-Dev Combined 39 Hydrograph No. 4, SCS Runoff, Post Pond 1 40 Hydrograph No. 5, Reservoir, POND 1 ROUTING 41 100 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pond 1 Pre DA 1A 43 Hydrograph No. 2, SCS Runoff, Pond 1 Pre DA 1 B 44 Hydrograph No. 3, Combine, Pre-Dev Combined 45 Hydrograph No. 4, SCS Runoff, Post Pond 1 46 Hydrograph No. 5, Reservoir, POND 1 ROUTING 47 IDF Report 48 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk,Inc.v2021 4 V3 11111 Legend Hyd. Origin Description 1 SCS Runoff Pond 1 Pre DA 1A 2 SCS Runoff Pond 1 Pre DA 1 B 3 Combine Pre-Dev Combined 4 SCS Runoff Post Pond 1 5 Reservoir POND 1 ROUTING Project: SGW Pond 1.gpw Thursday, 08/24/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 5.153 7.617 11.44 14.64 19.08 22.65 26.31 Pond 1 Pre DA 1A 2 SCS Runoff 2.682 3.934 5.912 7.548 9.811 11.63 13.49 Pond 1 Pre DA 1 B 3 Combine 1,2 7.443 11.03 16.62 21.25 27.67 32.83 38.12 Pre-Dev Combined 4 SCS Runoff 42.45 51.54 64.58 74.85 88.62 99.47 110.47 Post Pond 1 5 Reservoir 4 0.000 0.591 2.057 4.178 6.561 8.038 9.297 POND 1 ROUTING Proj. file: SGW Pond 1.gpw Thursday, 08/24/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.153 2 732 21,804 Pond 1 Pre DA 1A 2 SCS Runoff 2.682 2 726 8,770 Pond 1 Pre DA 1B 3 Combine 7.443 2 730 30,574 1,2 Pre-Dev Combined 4 SCS Runoff 42.45 2 716 98,619 Post Pond 1 5 Reservoir 0.000 2 n/a 0 4 326.19 98,619 POND 1 ROUTING SGW Pond 1.gpw Return Period: 1 Year Thursday, 08/24/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 5.153 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 21,804 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - .-- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 1 Pre DA 1A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 26.28 + 0.00 + 0.00 = 26.28 Shallow Concentrated Flow Flow length (ft) = 170.00 0.00 0.00 Watercourse slope (%) = 3.88 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.18 0.00 0.00 Travel Time (min) = 0.89 + 0.00 + 0.00 = 0.89 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 8.41 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =9.83 0.00 0.00 Flow length (ft) ({0})547.0 0.0 0.0 Travel Time (min) = 0.93 + 0.00 + 0.00 = 0.93 Total Travel Time, Tc 28.10 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 2.682 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 8,770 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 3.00 3.00 t 2.00 2.00 1.00 1.00 . . 0.00 ,. , . 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 1 Pre DA 1 B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 1.42 0.00 0.00 Travel Time (min) = 15.83 + 0.00 + 0.00 = 15.83 Shallow Concentrated Flow Flow length (ft) = 161.00 0.00 0.00 Watercourse slope (%) = 1.91 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.23 0.00 0.00 Travel Time (min) = 1.20 + 0.00 + 0.00 = 1.20 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 10.20 0.00 0.00 Channel slope (%) = 4.19 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =5.40 0.00 0.00 Flow length (ft) ({0})322.0 0.0 0.0 Travel Time (min) = 0.99 + 0.00 + 0.00 = 0.99 Total Travel Time, Tc 18.00 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 7.443 cfs Storm frequency = 1 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 30,574 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 - �- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 42.45 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 98,619 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 326.19 ft Reservoir name = SGW POND 1 Max. Storage = 98,619 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 I 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 5 Hyd No. 4 II I I I I I Total storage used = 98,619 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Pond No. 1 - SGW POND 1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=323.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 323.00 24,553 0 0 1.00 324.00 29,917 27,188 27,188 2.00 325.00 32,338 31,117 58,305 3.00 326.00 34,815 33,566 91,870 4.00 327.00 37,349 36,071 127,941 5.00 328.00 39,939 38,633 166,574 6.00 329.00 42,586 41,251 207,825 7.00 330.00 45,289 43,926 251,752 8.00 331.00 48,049 46,658 298,409 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 60.00 6.00 0.00 0.00 Crest Len(ft) = 24.00 0.00 0.00 0.00 Span(in) = 60.00 36.00 0.00 0.00 Crest El.(ft) = 330.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 318.00 326.25 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 177.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 323.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 27,188 324.00 101.20 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 58,305 325.00 101.20 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 91,870 326.00 101.20 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 127,941 327.00 101.20 oc 5.11 ic --- --- 0.00 --- --- --- --- --- 5.107 5.00 166,574 328.00 101.20 oc 8.85 ic --- --- 0.00 --- --- --- --- --- 8.846 6.00 207,825 329.00 101.20 oc 11.42 ic --- --- 0.00 --- --- --- --- --- 11.42 7.00 251,752 330.00 101.20 oc 13.51 ic --- --- 0.00 --- --- --- --- --- 13.51 8.00 298,409 331.00 101.20 oc 15.32 ic --- --- 79.92 --- --- --- --- --- 95.24 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 7.617 2 732 31,312 Pond 1 Pre DA 1A 2 SCS Runoff 3.934 2 726 12,594 Pond 1 Pre DA 1B 3 Combine 11.03 2 728 43,906 1,2 Pre-Dev Combined 4 SCS Runoff 51.54 2 716 120,920 Post Pond 1 5 Reservoir 0.591 2 1120 21,804 4 326.40 106,281 POND 1 ROUTING SGW Pond 1.gpw Return Period: 2 Year Thursday, 08/24/2023 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 7.617 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 31,312 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 3.934 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 12,594 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 11.03 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 43,906 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 Llimilminam....2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 51.54 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 120,920 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 0.591 cfs Storm frequency = 2 yrs Time to peak = 18.67 hrs Time interval = 2 min Hyd. volume = 21,804 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 326.40 ft Reservoir name = SGW POND 1 Max. Storage = 106,281 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 6 12 18 24 30 36 42 48 54 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 106,281 cuft 18 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 11.44 2 732 46,244 Pond 1 Pre DA 1A 2 SCS Runoff 5.912 2 724 18,601 Pond 1 Pre DA 1B 3 Combine 16.62 2 728 64,844 1,2 Pre-Dev Combined 4 SCS Runoff 64.58 2 716 153,088 Post Pond 1 5 Reservoir 2.057 2 818 53,972 4 326.59 113,263 POND 1 ROUTING SGW Pond 1.gpw Return Period: 5 Year Thursday, 08/24/2023 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 11.44 cfs Storm frequency = 5 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 46,244 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 5.912 cfs Storm frequency = 5 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 18,601 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 6.00 I 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 16.62 cfs Storm frequency = 5 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 64,844 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 64.58 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 153,088 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 2.057 cfs Storm frequency = 5 yrs Time to peak = 13.63 hrs Time interval = 2 min Hyd. volume = 53,972 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 326.59 ft Reservoir name = SGW POND 1 Max. Storage = 113,263 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 113,263 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.64 2 730 58,746 Pond 1 Pre DA 1A 2 SCS Runoff 7.548 2 724 23,629 Pond 1 Pre DA 1B 3 Combine 21.25 2 728 82,375 1,2 Pre-Dev Combined 4 SCS Runoff 74.85 2 716 178,465 Post Pond 1 5 Reservoir 4.178 2 762 79,349 4 326.84 122,034 POND 1 ROUTING SGW Pond 1.gpw Return Period: 10 Year Thursday, 08/24/2023 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 14.64 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 58,746 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 7.548 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 23,629 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 8.00 8.00 I 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 21.25 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 82,375 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 41"- - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 74.85 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 178,465 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ....---- *---,---_, 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 4.178 cfs Storm frequency = 10 yrs Time to peak = 12.70 hrs Time interval = 2 min Hyd. volume = 79,349 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 326.84 ft Reservoir name = SGW POND 1 Max. Storage = 122,034 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 80.00 I 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 122,034 cuft 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 19.08 2 730 76,255 Pond 1 Pre DA 1A 2 SCS Runoff 9.811 2 724 30,672 Pond 1 Pre DA 1B 3 Combine 27.67 2 728 106,927 1,2 Pre-Dev Combined 4 SCS Runoff 88.62 2 716 212,569 Post Pond 1 5 Reservoir 6.561 2 748 113,453 4 327.33 140,529 POND 1 ROUTING SGW Pond 1.gpw Return Period: 25 Year Thursday, 08/24/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 19.08 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 76,255 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 9.811 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 30,672 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 4 6.00 4.00 4.00 2.00 2.00 0.00 — ' — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 27.67 cfs Storm frequency = 25 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 106,927 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3--25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 1 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 88.62 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 212,569 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4--25 Year Q (cfs) 90.00 90.00 80.00 1 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ______--.-- *-----. 10.00 0.00 - - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 6.561 cfs Storm frequency = 25 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 113,453 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 327.33 ft Reservoir name = SGW POND 1 Max. Storage = 140,529 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5--25 Year Q (cfs) 90.00 — 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 h 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 140,529 cuft 36 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 22.65 2 730 90,501 Pond 1 Pre DA 1A 2 SCS Runoff 11.63 2 724 36,402 Pond 1 Pre DA 1B 3 Combine 32.83 2 728 126,902 1,2 Pre-Dev Combined 4 SCS Runoff 99.47 2 716 239,481 Post Pond 1 5 Reservoir 8.038 2 746 140,365 4 327.74 156,497 POND 1 ROUTING SGW Pond 1.gpw Return Period: 50 Year Thursday, 08/24/2023 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 22.65 cfs Storm frequency = 50 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 90,501 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 11.63 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 36,402 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 32.83 cfs Storm frequency = 50 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 126,902 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 99.47 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 239,481 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 100.00 100.00 1 80.00 80.00 60.00 60.00 40.00 40.00 20.00 J .___ 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 8.038 cfs Storm frequency = 50 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 140,365 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 327.74 ft Reservoir name = SGW POND 1 Max. Storage = 156,497 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 156,497 cuft 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 26.31 2 730 105,242 Pond 1 Pre DA 1A 2 SCS Runoff 13.49 2 724 42,331 Pond 1 Pre DA 1B 3 Combine 38.12 2 728 147,572 1,2 Pre-Dev Combined 4 SCS Runoff 110.47 2 716 266,779 Post Pond 1 5 Reservoir 9.297 2 744 167,663 4 328.16 173,067 POND 1 ROUTING SGW Pond 1.gpw Return Period: 100 Year Thursday, 08/24/2023 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 1 Pre DA 1A Hydrograph type = SCS Runoff Peak discharge = 26.31 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 105,242 cuft Drainage area = 6.290 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.10 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 1 Pre DA 1 B Hydrograph type = SCS Runoff Peak discharge = 13.49 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 42,331 cuft Drainage area = 2.530 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 1 Pre DA 1 B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 I 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — -- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 38.12 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 147,572 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 8.820 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 1 Hydrograph type = SCS Runoff Peak discharge = 110.47 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 266,779 cuft Drainage area = 11.150 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 1 Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 1 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 POND 1 ROUTING Hydrograph type = Reservoir Peak discharge = 9.297 cfs Storm frequency = 100 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 167,663 cuft Inflow hyd. No. = 4 - Post Pond 1 Max. Elevation = 328.16 ft Reservoir name = SGW POND 1 Max. Storage = 173,067 cuft Storage Indication method used. POND 1 ROUTING Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 173,067 cuft 48 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 1 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833 (ft/hr) *0.0833 fUhr-From planting media information.Does not Top of treatment volume: Elev. = 326.25 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 323.00 pipe system.Runoff from the first 1"of rainfall must draw Number of increments = 13.00 (each) down between 2-5 days. Filter Pipe Information Runs Length Length of pipe(L) = 12 (ft) 4 300 Pipe diameter(d) = 0.5 (ft) Pipe invert elevation = 319 (ft) Depth of Filter Media(D) = 0.5 (ft) Width of Filter Media(W) = 85 (ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005 (ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAVG) Increm.(t) ft (fti) (ft') (ft) (I) (ft`) (ft'/hr) (ft'/hr) (hrs) _ 326.19 92824.4 6.94 13.88 1020 1179.3 _ 5804.9 1163.2 5.0 326.00 87019.5 6.75 13.50 1020 1147.0 _ 7584.7 1125.81 6.7 325.75 79434.8 6.5 13.00 1020 1104.6 7524.2 1083.31 6.9 325.50 71910.6' 6.25 12.50 1020 1062.1 7463.6 1040.8 7.2 325.25 64447.0 6 12.00 1020 1019.6 7403.0 998.4 7.4 325.00 57044.0 5.75 11.50 1020 977.1 7342.5 955.9 7.7 324.75 49701.5 5.5 11.00 1020 934.6 7281.9 913.41 8.0 324.50 42419.6 5.25 10.50 1020 892.1 7221.3 870.91 8.3 324.25, 35198.3 5 10.00 1020 849.7 7160.8 828.41 8.6 324.00 28037.5 4.75 9.50 1020 807.2 _ 7100.2 785.91 9.0 323.75 20937.3 4.5 9.00 1 1020 764.71 7039.7 743.5 9.5 323.50 13897.6 4.25 8.50 1 1020 722.2 6979.1 701.0 10.0 323.25 6918.5 4 8.00 1020 679.7 6918.5 658.5 10.5 323.00 0.0 3.75 7.50 1020 637.2 Pond Geometry Total Drawdown Time= 47.6 (hours) Side slopes: Horizontal: 3 Vertical: 1 Req.pipe capacity(inside dia)= 5.1 (inches) Bottom Area: 27553 square feet Pipe diameter to be used= 6 (inches) Bottom Perm: 323 feet Main line pipe slope= 0.005 (feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 1 Inside Area of Structure Length 6.00 ft Width 6.00 ft Total 36.00 sq.ft Outside Area of Structure Length 7.00 ft Width 7.00 ft Total 49.00 sq.ft. Total Area 13.00 sq.ft. Height of Riser 12.00 ft Volume of Riser 156.00 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 9734.40 lb Safety Factor 1.10 Required Anchor Weight 10707.84 lb/cu.ft. Volume of Concrete Required 122.24 cu.ft. Volume of Concrete Length 8.00 Width 8.00 Depth 2.00 Total Volume 128.00 cu.ft. Yards of Concrete 4.74 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 2 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 2 Pre-Dev DA-2A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 10.03 772.3 CN(weighted) =total product/total area Totals = 10.030 772.3 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 2 Pre-Dev DA-2B Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 3.16 243.3 CN(weighted) =total product/total area Totals = 3.160 243.3 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 2 Pre-Dev DA-2C Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 3.52 271.0 CN(weighted) =total product/total area Totals = 3.520 271.0 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 2 Post-Dev DA-2A Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 12.64 1238.7 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 12.640 1238.7 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 SUBMERGED GRAVEL WETLAND POND 2 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 12.64 AC Imp Area= 12.64 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd= 1 in Design Storm Rv= 0.95 Dv= 43,589.04 FT3 DA= 12.64 AC Vol. Provided = 95,701.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 43,589.04 FT3 Design Volume Ponding Depth Ponding Depth = 3.44 FT SA= 12,671.23 FT2 SA Provided = 28,518.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 2.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 8 TR-55 Tc Worksheet 9 Hydrograph No. 4, Combine, Pre-Dev Combined 10 Hydrograph No. 5, SCS Runoff, Post Pond 2 11 Hydrograph No. 6, Reservoir, POND 2 ROUTING 12 Pond Report - SGW POND 2 13 2 - Year Summary Report 14 Hydrograph Reports 15 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 15 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 16 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 17 Hydrograph No. 4, Combine, Pre-Dev Combined 18 Hydrograph No. 5, SCS Runoff, Post Pond 2 19 Hydrograph No. 6, Reservoir, POND 2 ROUTING 20 5 - Year Summary Report 21 Hydrograph Reports 22 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 22 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 23 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 24 Hydrograph No. 4, Combine, Pre-Dev Combined 25 Hydrograph No. 5, SCS Runoff, Post Pond 2 26 Hydrograph No. 6, Reservoir, POND 2 ROUTING 27 10 - Year Summary Report 28 Hydrograph Reports 29 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 29 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 30 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 31 Hydrograph No. 4, Combine, Pre-Dev Combined 32 Hydrograph No. 5, SCS Runoff, Post Pond 2 33 Hydrograph No. 6, Reservoir, POND 2 ROUTING 34 25 - Year Contents continued... SGW Pond 2.gpw Summary Report 35 Hydrograph Reports 36 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 36 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 37 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 38 Hydrograph No. 4, Combine, Pre-Dev Combined 39 Hydrograph No. 5, SCS Runoff, Post Pond 2 40 Hydrograph No. 6, Reservoir, POND 2 ROUTING 41 50 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 43 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 44 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 45 Hydrograph No. 4, Combine, Pre-Dev Combined 46 Hydrograph No. 5, SCS Runoff, Post Pond 2 47 Hydrograph No. 6, Reservoir, POND 2 ROUTING 48 100 - Year Summary Report 49 Hydrograph Reports 50 Hydrograph No. 1, SCS Runoff, Pond 2 Pre DA 2a 50 Hydrograph No. 2, SCS Runoff, Pond 2 Pre DA 2B 51 Hydrograph No. 3, SCS Runoff, Pond 2 Pre DA 2C 52 Hydrograph No. 4, Combine, Pre-Dev Combined 53 Hydrograph No. 5, SCS Runoff, Post Pond 2 54 Hydrograph No. 6, Reservoir, POND 2 ROUTING 55 IDF Report 56 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 1es, 2E 3 llig 5 Legend Hyd. Origin Description 1 SCS Runoff Pond 2 Pre DA 2a 2 SCS Runoff Pond 2 Pre DA 2B 3 SCS Runoff Pond 2 Pre DA 2C 4 Combine Pre-Dev Combined 5 SCS Runoff Post Pond 2 6 Reservoir POND 2 ROUTING Project: SGW Pond 2.gpw Thursday, 08/24/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 13.48 19.63 29.25 37.26 48.32 57.20 66.28 Pond 2 Pre DA 2a 2 SCS Runoff 3.667 5.378 8.054 10.26 13.32 15.77 18.28 Pond 2 Pre DA 2B 3 SCS Runoff 4.730 6.888 10.27 13.08 16.96 20.07 23.26 Pond 2 Pre DA 2C 4 Combine 1,2,3 21.86 31.89 47.37 60.10 78.00 92.38 107.10 Pre-Dev Combined 5 SCS Runoff 48.13 58.42 73.21 84.85 100.46 112.76 125.23 Post Pond 2 6 Reservoir 5 0.000 0.706 2.428 4.625 7.099 8.628 9.923 POND 2 ROUTING Proj. file: SGW Pond 2.gpw Thursday, 08/24/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 13.48 2 722 35,855 Pond 2 Pre DA 2a 2 SCS Runoff 3.667 2 724 10,680 Pond 2 Pre DA 2B 3 SCS Runoff 4.730 2 722 12,583 Pond 2 Pre DA 2C 4 Combine 21.86 2 722 59,119 1,2,3 Pre-Dev Combined 5 SCS Runoff 48.13 2 716 111,798 Post Pond 2 6 Reservoir 0.000 2 n/a 0 5 322.94 111,798 POND 2 ROUTING SGW Pond 2.gpw Return Period: 1 Year Thursday, 08/24/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 13.48 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 35,855 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 14.00 14.00 12.00 i 12.00 10.00 I 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - — - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 2 Pre DA 2a Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 117.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 5.13 0.00 0.00 Travel Time (min) = 10.74 + 0.00 + 0.00 = 10.74 Shallow Concentrated Flow Flow length (ft) = 180.00 0.00 0.00 Watercourse slope (%) = 9.44 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.96 0.00 0.00 Travel Time (min) = 0.61 + 0.00 + 0.00 = 0.61 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 10.20 0.00 0.00 Channel slope (%) = 6.08 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =6.51 0.00 0.00 Flow length (ft) ({0})576.0 0.0 0.0 Travel Time (min) = 1.47 + 0.00 + 0.00 = 1.47 Total Travel Time, Tc 12.80 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 3.667 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 10,680 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 2 Pre DA 2B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 129.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 3.88 0.00 0.00 Travel Time (min) = 12.98 + 0.00 + 0.00 = 12.98 Shallow Concentrated Flow Flow length (ft) = 269.00 0.00 0.00 Watercourse slope (%) = 11.15 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.39 0.00 0.00 Travel Time (min) = 0.83 + 0.00 + 0.00 = 0.83 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 7.02 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =8.98 0.00 0.00 Flow length (ft) ({0})285.0 0.0 0.0 Travel Time (min) = 0.53 + 0.00 + 0.00 = 0.53 Total Travel Time, Tc 14.30 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 4.730 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 12,583 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 U 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 9 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 3 Pond 2 Pre DA 2C Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 130.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 4.62 0.00 0.00 Travel Time (min) = 12.18 + 0.00 + 0.00 = 12.18 Shallow Concentrated Flow Flow length (ft) = 187.00 0.00 0.00 Watercourse slope (%) = 10.70 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.28 0.00 0.00 Travel Time (min) = 0.59 + 0.00 + 0.00 = 0.59 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 10.20 0.00 0.00 Channel slope (%) = 7.73 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =7.34 0.00 0.00 Flow length (ft) ({0})220.0 0.0 0.0 Travel Time (min) = 0.50 + 0.00 + 0.00 = 0.50 Total Travel Time, Tc 13.30 min 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 21.86 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 59,119 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 48.13 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 111,798 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 1 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 322.94 ft Reservoir name = SGW POND 2 Max. Storage = 111,798 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 fia •- 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 111,798 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Pond No. 1 - SGW POND 2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=319.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 319.50 28,518 0 0 1.00 320.50 30,719 29,609 29,609 2.00 321.50 32,977 31,838 61,447 3.00 322.50 35,292 34,125 95,571 4.00 323.50 37,664 36,468 132,039 5.00 324.50 40,092 38,868 170,907 6.00 325.50 42,578 41,325 212,232 7.00 326.50 45,120 43,839 256,070 8.00 327.50 47,718 46,408 302,479 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 60.00 6.00 0.00 0.00 Crest Len(ft) = 24.00 0.00 0.00 0.00 Span(in) = 60.00 36.00 0.00 0.00 Crest El.(ft) = 326.50 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 314.00 323.00 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 115.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 319.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 29,609 320.50 117.92 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 61,447 321.50 117.92 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 95,571 322.50 117.92 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 132,039 323.50 117.92 oc 3.61 ic --- --- 0.00 --- --- --- --- --- 3.611 5.00 170,907 324.50 117.92 oc 8.07 ic --- --- 0.00 --- --- --- --- --- 8.075 6.00 212,232 325.50 117.92 oc 10.83 ic --- --- 0.00 --- --- --- --- --- 10.83 7.00 256,070 326.50 117.92 oc 13.02 ic --- --- 0.00 --- --- --- --- --- 13.02 8.00 302,479 327.50 117.92 oc 14.89 ic --- --- 79.92 --- --- --- --- --- 94.81 14 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 19.63 2 722 51,490 Pond 2 Pre DA 2a 2 SCS Runoff 5.378 2 722 15,337 Pond 2 Pre DA 2B 3 SCS Runoff 6.888 2 722 18,070 Pond 2 Pre DA 2C 4 Combine 31.89 2 722 84,898 1,2,3 Pre-Dev Combined 5 SCS Runoff 58.42 2 716 137,079 Post Pond 2 6 Reservoir 0.706 2 1100 23,262 5 323.16 119,818 POND 2 ROUTING SGW Pond 2.gpw Return Period: 2 Year Thursday, 08/24/2023 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 19.63 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 51,490 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 5.378 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 15,337 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 6.00 6.00 5.00 I 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 6.888 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 18,070 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 - 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 31.89 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 84,898 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 t 5.00 I 0.00 - / �— � 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 58.42 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 137,079 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 60.00 60.00 50.00 I 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 ...-- (`----. 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 0.706 cfs Storm frequency = 2 yrs Time to peak = 18.33 hrs Time interval = 2 min Hyd. volume = 23,262 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 323.16 ft Reservoir name = SGW POND 2 Max. Storage = 119,818 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6 --2 Year Q (cfs) 60.00 60.00 i___ 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 119,818 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 29.25 2 720 76,045 Pond 2 Pre DA 2a 2 SCS Runoff 8.054 2 722 22,651 Pond 2 Pre DA 2B 3 SCS Runoff 10.27 2 720 26,688 Pond 2 Pre DA 2C 4 Combine 47.37 2 722 125,384 1,2,3 Pre-Dev Combined 5 SCS Runoff 73.21 2 716 173,546 Post Pond 2 6 Reservoir 2.428 2 812 59,729 5 323.38 127,763 POND 2 ROUTING SGW Pond 2.gpw Return Period: 5 Year Thursday, 08/24/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 29.25 cfs Storm frequency = 5 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 76,045 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 30.00 , 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 — - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 8.054 cfs Storm frequency = 5 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 22,651 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — . 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 10.27 cfs Storm frequency = 5 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 26,688 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 i .....______ 2.00 2.00 0.00 — . - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 47.37 cfs Storm frequency = 5 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 125,384 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 50.00 50.00 40.00 40.00 • 30.00 30.00 20.00 20.00 10.00 10.00 0.00 gamm= 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 73.21 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 173,546 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ---- *--------- 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 2.428 cfs Storm frequency = 5 yrs Time to peak = 13.53 hrs Time interval = 2 min Hyd. volume = 59,729 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 323.38 ft Reservoir name = SGW POND 2 Max. Storage = 127,763 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6 --5 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 127,763 cuft 28 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.26 2 720 96,603 Pond 2 Pre DA 2a 2 SCS Runoff 10.26 2 722 28,775 Pond 2 Pre DA 2B 3 SCS Runoff 13.08 2 720 33,902 Pond 2 Pre DA 2C 4 Combine 60.10 2 722 159,280 1,2,3 Pre-Dev Combined 5 SCS Runoff 84.85 2 716 202,313 Post Pond 2 6 Reservoir 4.625 2 764 88,497 5 323.66 138,320 POND 2 ROUTING SGW Pond 2.gpw Return Period: 10 Year Thursday, 08/24/2023 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 37.26 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 96,603 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 10.26 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 28,775 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 i .......___. - 2.00 2.00 0.00 - ~ - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 13.08 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 33,902 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 1 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — ‘ - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 60.10 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 159,280 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 84.85 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 202,313 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 -------""".."*"------ 10.00 0.00 ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 4.625 cfs Storm frequency = 10 yrs Time to peak = 12.73 hrs Time interval = 2 min Hyd. volume = 88,497 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 323.66 ft Reservoir name = SGW POND 2 Max. Storage = 138,320 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 138,320 cuft 35 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 48.32 2 720 125,396 Pond 2 Pre DA 2a 2 SCS Runoff 13.32 2 722 37,352 Pond 2 Pre DA 2B 3 SCS Runoff 16.96 2 720 44,008 Pond 2 Pre DA 2C 4 Combine 78.00 2 720 206,756 1,2,3 Pre-Dev Combined 5 SCS Runoff 100.46 2 716 240,975 Post Pond 2 6 Reservoir 7.099 2 750 127,158 5 324.22 159,886 POND 2 ROUTING SGW Pond 2.gpw Return Period: 25 Year Thursday, 08/24/2023 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 48.32 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 125,396 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 13.32 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 37,352 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 14.00 1 14.00 12.00 12.00 10.00 10.00 8.00 1 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 16.96 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 44,008 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3--25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — . - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 78.00 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 206,756 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4--25 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 A II 10.00 10.00 0.00 _ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 100.46 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 240,975 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5--25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 7.099 cfs Storm frequency = 25 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 127,158 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 324.22 ft Reservoir name = SGW POND 2 Max. Storage = 159,886 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6--25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 159,886 cuft 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 57.20 2 720 148,822 Pond 2 Pre DA 2a 2 SCS Runoff 15.77 2 722 44,330 Pond 2 Pre DA 2B 3 SCS Runoff 20.07 2 720 52,229 Pond 2 Pre DA 2C 4 Combine 92.38 2 720 245,380 1,2,3 Pre-Dev Combined 5 SCS Runoff 112.76 2 716 271,484 Post Pond 2 6 Reservoir 8.628 2 748 157,667 5 324.68 178,239 POND 2 ROUTING SGW Pond 2.gpw Return Period: 50 Year Thursday, 08/24/2023 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 57.20 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 148,822 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 15.77 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 44,330 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 20.07 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 52,229 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 92.38 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 245,380 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 112.76 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 271,484 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 ....-- (----.. 20.00 0.00 ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 8.628 cfs Storm frequency = 50 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 157,667 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 324.68 ft Reservoir name = SGW POND 2 Max. Storage = 178,239 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6-- 50 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 1 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 178,239 cuft 49 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 66.28 2 720 173,062 Pond 2 Pre DA 2a 2 SCS Runoff 18.28 2 722 51,550 Pond 2 Pre DA 2B 3 SCS Runoff 23.26 2 720 60,736 Pond 2 Pre DA 2C 4 Combine 107.10 2 720 285,348 1,2,3 Pre-Dev Combined 5 SCS Runoff 125.23 2 716 302,429 Post Pond 2 6 Reservoir 9.923 2 746 188,612 5 325.14 197,273 POND 2 ROUTING SGW Pond 2.gpw Return Period: 100 Year Thursday, 08/24/2023 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 2 Pre DA 2a Hydrograph type = SCS Runoff Peak discharge = 66.28 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 173,062 cuft Drainage area = 10.030 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.80 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2a Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 • 40.00 • 40.00 30.00 30.00 II 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 2 Pre DA 2B Hydrograph type = SCS Runoff Peak discharge = 18.28 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 51,550 cuft Drainage area = 3.160 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 21.00 I I 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 2 Pre DA 2C Hydrograph type = SCS Runoff Peak discharge = 23.26 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 60,736 cuft Drainage area = 3.520 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.30 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 2 Pre DA 2C Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 107.10 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 285,348 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 16.710 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 2 Hydrograph type = SCS Runoff Peak discharge = 125.23 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 302,429 cuft Drainage area = 12.640 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 2 Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 140.00 140.00 - 120.00 120.00 100.00 I 100.00 80.00 80.00 60.00 60.00 40.00 40.00 - 20.00L__ 20.00 - 0.00 1 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 2 ROUTING Hydrograph type = Reservoir Peak discharge = 9.923 cfs Storm frequency = 100 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 188,612 cuft Inflow hyd. No. = 5 - Post Pond 2 Max. Elevation = 325.14 ft Reservoir name = SGW POND 2 Max. Storage = 197,273 cuft Storage Indication method used. POND 2 ROUTING Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 * 1 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 197,273 cuft 56 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 2 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833 (ft/hr) *0.0833 fUhr-From planting media information.Does not Top of treatment volume: Elev. = 322.90 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 319.50 pipe system.Runoff from the first 1"of rainfall must draw Number of increments = 13.00 (each) down between 2-5 days. Filter Pipe Information Runs Length Length of pipe(L) = 10.5 (ft) 4 300 Pipe diameter(d) = 0.5 (ft) Pipe invert elevation = 315.5 (ft) Depth of Filter Media(D) = 0.5 (ft) Width of Filter Media(W) = 100 (ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005 (ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAVG) Increm.(t) ft (ft') (ft') (ft) (I) (ft`) (ft'/hr) (ft'/hr) (hrs) 322.90 102501.3 7.15 14.30 1050 1250.7 12634.1 1215.8 10.4 322.50 89867.3 6.75 13.50 1050 1180.8 7818.4 1158.9 6.7 322.25 82048.8 6.5 13.00 1050 1137.0 7758.5 1115.2 7.0 322.00 74290.3' 6.25 12.50 1050 1093.3 7698.6 1071.4 7.2 321.751 66591.7 6 12.00 1050 1049.6 7638.7 1027.7 7.4 321.50 58953.0 5.75 11.50 1050 1005.8 7578.8 984.0 7.7 321.25 51374.2 5.5 11.00 1050 962.1 7518.9 940.2 8.0 321.00 43855.3 5.25 10.50 1050 918.4 7459.0 896.5 8.3 320.751 36396.3 5 10.00 1050 874.7 7399.1 852.8 8.7 320.50 28997.3 4.75 9.50 1050 830.9 7339.2 809.1 9.1 320.25 21658.1 4.5 9.00 1050 787.2 7279.3 765.3 9.5 320.00 14378.8 4.25 8.50 1050 743.5 7219.4 721.6 10.0 319.75 7159.5 4 8.00 1050 699.7 7159.5 677.9 10.6 319.50 0.0 3.75 7.50 1050 656.0 Pond Geometry Total Drawdown Time= 47.8 (hours) Side slopes: Horizontal: 3 Vertical: 1 Req.pipe capacity(inside dia)= 5.2 (inches) Bottom Area: 28518 square feet Pipe diameter to be used= 6 (inches) Bottom Perm: 319.5 feet Main line pipe slope= 0.005 (feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 2 Inside Area of Structure Length 10.00 ft Width 6.00 ft Total 60.00 sq.ft Outside Area of Structure Length 11.00 ft Width 7.00 ft Total 77.00 sq.ft. Total Area 17.00 sq.ft. Height of Riser 12.50 ft Volume of Riser 212.50 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 13260.00 lb Safety Factor 1.10 Required Anchor Weight 14586.00 lb/cu.ft. Volume of Concrete Required 166.51 cu.ft. Volume of Concrete Length 12.00 Width 8.00 Depth 2.00 Total Volume 192.00 cu.ft. Yards of Concrete 7.11 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 3 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 3 Pre-Dev DA-3A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 1.86 143.2 CN(weighted) =total product/total area Totals = 1.860 143.2 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 3 Pre-Dev DA-3B Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 3.71 285.7 CN(weighted) =total product/total area Totals = 3.710 285.7 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 3 Pre-Dev DA-3C Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 3.41 262.6 CN(weighted) =total product/total area Totals = 3.410 262.6 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 3 Post-Dev DA-3A Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 6.10 597.8 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 6.100 597.8 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 SUBMERGED GRAVEL WETLAND POND 3 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 6.10 AC Imp Area= 6.10 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd= 1 in Design Storm Rv= 0.95 Dv= 21,035.85 FT3 DA= 6.10 AC Vol. Provided = 42,859.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 21,035.85 FT3 Design Volume Ponding Depth Ponding Depth = 3.62 FT SA= 5,811.01 FT2 SA Provided = 11,605.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 3.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 8 TR-55 Tc Worksheet 9 Hydrograph No. 4, Combine, Pre-Dev Combined 10 Hydrograph No. 5, SCS Runoff, Post Pond 3 11 Hydrograph No. 6, Reservoir, POND 3 ROUTING 12 Pond Report - SGW POND 3 13 2 - Year Summary Report 14 Hydrograph Reports 15 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 15 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 16 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 17 Hydrograph No. 4, Combine, Pre-Dev Combined 18 Hydrograph No. 5, SCS Runoff, Post Pond 3 19 Hydrograph No. 6, Reservoir, POND 3 ROUTING 20 5 - Year Summary Report 21 Hydrograph Reports 22 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 22 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 23 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 24 Hydrograph No. 4, Combine, Pre-Dev Combined 25 Hydrograph No. 5, SCS Runoff, Post Pond 3 26 Hydrograph No. 6, Reservoir, POND 3 ROUTING 27 10 - Year Summary Report 28 Hydrograph Reports 29 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 29 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 30 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 31 Hydrograph No. 4, Combine, Pre-Dev Combined 32 Hydrograph No. 5, SCS Runoff, Post Pond 3 33 Hydrograph No. 6, Reservoir, POND 3 ROUTING 34 25 - Year Contents continued... SGW Pond 3.gpw Summary Report 35 Hydrograph Reports 36 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 36 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 37 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 38 Hydrograph No. 4, Combine, Pre-Dev Combined 39 Hydrograph No. 5, SCS Runoff, Post Pond 3 40 Hydrograph No. 6, Reservoir, POND 3 ROUTING 41 50 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 43 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 44 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 45 Hydrograph No. 4, Combine, Pre-Dev Combined 46 Hydrograph No. 5, SCS Runoff, Post Pond 3 47 Hydrograph No. 6, Reservoir, POND 3 ROUTING 48 100 - Year Summary Report 49 Hydrograph Reports 50 Hydrograph No. 1, SCS Runoff, Pond 3 Pre-DA 3A 50 Hydrograph No. 2, SCS Runoff, Pond 3 Pre-DA 3B 51 Hydrograph No. 3, SCS Runoff, Pond 3 Pre-DA 3C 52 Hydrograph No. 4, Combine, Pre-Dev Combined 53 Hydrograph No. 5, SCS Runoff, Post Pond 3 54 Hydrograph No. 6, Reservoir, POND 3 ROUTING 55 IDF Report 56 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 V V4 It) V Legend Hyd. Origin Description 1 SCS Runoff Pond 3 Pre-DA 3A 2 SCS Runoff Pond 3 Pre-DA 3B 3 SCS Runoff Pond 3 Pre-DA 3C 4 Combine Pre-Dev Combined 5 SCS Runoff Post Pond 3 6 Reservoir POND 3 ROUTING Project: SGW Pond 3.gpw Thursday, 08/24/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 2.499 3.640 5.425 6.910 8.961 10.61 12.29 Pond 3 Pre-DA 3A 2 SCS Runoff 4.306 6.314 9.455 12.05 15.63 18.51 21.46 Pond 3 Pre-DA 3B 3 SCS Runoff 3.957 5.803 8.691 11.08 14.37 17.02 19.72 Pond 3 Pre-DA 3C 4 Combine 1,2,3 10.73 15.76 23.54 29.97 38.84 45.95 53.24 Pre-Dev Combined 5 SCS Runoff 23.23 28.20 35.33 40.95 48.48 54.42 60.44 Post Pond 3 6 Reservoir 5 0.000 0.356 1.362 3.221 5.857 7.444 8.688 POND 3 ROUTING Proj. file: SGW Pond 3.gpw Thursday, 08/24/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.499 2 722 6,649 Pond 3 Pre-DA 3A 2 SCS Runoff 4.306 2 724 12,539 Pond 3 Pre-DA 3B 3 SCS Runoff 3.957 2 724 11,525 Pond 3 Pre-DA 3C 4 Combine 10.73 2 722 30,713 1,2,3 Pre-Dev Combined 5 SCS Runoff 23.23 2 716 53,953 Post Pond 3 6 Reservoir 0.000 2 n/a 0 5 325.62 53,953 POND 3 ROUTING SGW Pond 3.gpw Return Period: 1 Year Thursday, 08/24/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 2.499 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 6,649 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - .. '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 3 Pre-DA 3A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 4.00 0.00 0.00 Travel Time (min) = 10.46 + 0.00 + 0.00 = 10.46 Shallow Concentrated Flow Flow length (ft) = 202.00 0.00 0.00 Watercourse slope (%) = 7.43 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.40 0.00 0.00 Travel Time (min) = 0.77 + 0.00 + 0.00 = 0.77 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 10.20 0.00 0.00 Channel slope (%) = 10.50 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) =9.98 0.00 0.00 Flow length (ft) ({0})162.0 0.0 0.0 Travel Time (min) = 0.27 + 0.00 + 0.00 = 0.27 Total Travel Time, Tc 11.50 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 4.306 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 12,539 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 3 Pre-DA 3B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 155.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 3.87 0.00 0.00 Travel Time (min) = 15.05 + 0.00 + 0.00 = 15.05 Shallow Concentrated Flow Flow length (ft) = 223.00 0.00 0.00 Watercourse slope (%) = 11.21 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.40 0.00 0.00 Travel Time (min) = 0.69 + 0.00 + 0.00 = 0.69 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 11.00 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) =13.11 0.00 0.00 Flow length (ft) ({0})173.0 0.0 0.0 Travel Time (min) = 0.22 + 0.00 + 0.00 = 0.22 Total Travel Time, Tc 16.00 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 3.957 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 11,525 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 9 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 3 Pond 3 Pre-DA 3C Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 105.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 2.86 0.00 0.00 Travel Time (min) = 12.44 + 0.00 + 0.00 = 12.44 Shallow Concentrated Flow Flow length (ft) = 174.00 0.00 0.00 Watercourse slope (%) = 10.92 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.33 0.00 0.00 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 9.79 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) =12.37 0.00 0.00 Flow length (ft) ({0})286.0 0.0 0.0 Travel Time (min) = 0.39 + 0.00 + 0.00 = 0.39 Total Travel Time, Tc 13.40 min 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 10.73 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 30,713 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 23.23 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 53,953 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 24.00 24.00 20.00 O 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 325.62 ft Reservoir name = SGW POND 3 Max. Storage = 53,953 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 53,953 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Pond No. 1 - SGW POND 3 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=322.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 322.00 11,605 0 0 1.00 323.00 13,350 12,466 12,466 2.00 324.00 15,152 14,240 26,706 3.00 325.00 17,011 16,071 42,777 4.00 326.00 18,927 17,959 60,736 5.00 327.00 20,899 19,903 80,639 6.00 328.00 22,928 21,903 102,542 7.00 329.00 25,013 23,961 126,503 8.00 330.00 27,155 26,074 152,577 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 42.00 6.00 0.00 0.00 Crest Len(ft) = 24.00 0.00 0.00 0.00 Span(in) = 42.00 36.00 0.00 0.00 Crest El.(ft) = 329.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 317.00 325.75 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 144.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 322.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 12,466 323.00 75.15 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 26,706 324.00 75.15 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 42,777 325.00 75.15 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 60,736 326.00 75.15 oc 1.28 ic --- --- 0.00 --- --- --- --- --- 1.277 5.00 80,639 327.00 75.15 oc 7.22 ic --- --- 0.00 --- --- --- --- --- 7.222 6.00 102,542 328.00 75.15 oc 10.21 ic --- --- 0.00 --- --- --- --- --- 10.21 7.00 126,503 329.00 75.15 oc 12.51 ic --- --- 0.00 --- --- --- --- --- 12.51 8.00 152,577 330.00 75.15 oc 14.44 ic --- --- 79.92 --- --- --- --- --- 94.36 14 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.640 2 722 9,548 Pond 3 Pre-DA 3A 2 SCS Runoff 6.314 2 722 18,007 Pond 3 Pre-DA 3B 3 SCS Runoff 5.803 2 722 16,551 Pond 3 Pre-DA 3C 4 Combine 15.76 2 722 44,106 1,2,3 Pre-Dev Combined 5 SCS Runoff 28.20 2 716 66,153 Post Pond 3 6 Reservoir 0.356 2 1082 10,790 5 325.85 58,049 POND 3 ROUTING SGW Pond 3.gpw Return Period: 2 Year Thursday, 08/24/2023 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 3.640 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 9,548 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 6.314 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 18,007 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 7.00 7.00 6.00 6.00 I I 5.00 5.00 4.00 4.00 3.00 3.00 I 2.00 2.00 1.00 1.00 0.00 1 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 5.803 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 16,551 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 15.76 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 44,106 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 I 6.00 3.00 I ____ 3.00 L...........____ 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 28.20 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 66,153 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 — ___I— ...--- (----, ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 0.356 cfs Storm frequency = 2 yrs Time to peak = 18.03 hrs Time interval = 2 min Hyd. volume = 10,790 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 325.85 ft Reservoir name = SGW POND 3 Max. Storage = 58,049 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6 --2 Year Q (cfs) 30.00 I 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 58,049 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.425 2 720 14,102 Pond 3 Pre-DA 3A 2 SCS Runoff 9.455 2 722 26,594 Pond 3 Pre-DA 3B 3 SCS Runoff 8.691 2 722 24,443 Pond 3 Pre-DA 3C 4 Combine 23.54 2 722 65,139 1,2,3 Pre-Dev Combined 5 SCS Runoff 35.33 2 716 83,752 Post Pond 3 6 Reservoir 1.362 2 796 28,389 5 326.01 60,937 POND 3 ROUTING SGW Pond 3.gpw Return Period: 5 Year Thursday, 08/24/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 5.425 cfs Storm frequency = 5 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 14,102 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 i 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ` - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 9.455 cfs Storm frequency = 5 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 26,594 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 8.691 cfs Storm frequency = 5 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 24,443 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 10.00 10.00 8.00 - 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 23.54 cfs Storm frequency = 5 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 65,139 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 35.33 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 83,752 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 1.362 cfs Storm frequency = 5 yrs Time to peak = 13.27 hrs Time interval = 2 min Hyd. volume = 28,389 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 326.01 ft Reservoir name = SGW POND 3 Max. Storage = 60,937 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6 --5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 [ Total storage used = 60,937 cuft 28 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.910 2 720 17,914 Pond 3 Pre-DA 3A 2 SCS Runoff 12.05 2 722 33,783 Pond 3 Pre-DA 3B 3 SCS Runoff 11.08 2 722 31,052 Pond 3 Pre-DA 3C 4 Combine 29.97 2 722 82,749 1,2,3 Pre-Dev Combined 5 SCS Runoff 40.95 2 716 97,635 Post Pond 3 6 Reservoir 3.221 2 746 42,271 5 326.22 65,029 POND 3 ROUTING SGW Pond 3.gpw Return Period: 10 Year Thursday, 08/24/2023 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 6.910 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 17,914 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ME 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 12.05 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 33,783 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 11.08 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 31,052 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 29.97 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 82,749 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 1 5.00 II II 0.00 �` 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 40.95 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 97,635 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 3.221 cfs Storm frequency = 10 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 42,271 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 326.22 ft Reservoir name = SGW POND 3 Max. Storage = 65,029 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 65,029 cuft 35 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 8.961 2 720 23,254 Pond 3 Pre-DA 3A 2 SCS Runoff 15.63 2 722 43,853 Pond 3 Pre-DA 3B 3 SCS Runoff 14.37 2 722 40,307 Pond 3 Pre-DA 3C 4 Combine 38.84 2 722 107,414 1,2,3 Pre-Dev Combined 5 SCS Runoff 48.48 2 716 116,293 Post Pond 3 6 Reservoir 5.857 2 730 60,929 5 326.66 73,843 POND 3 ROUTING SGW Pond 3.gpw Return Period: 25 Year Thursday, 08/24/2023 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 8.961 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 23,254 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 11 6.00 4.00 4.00 2.00 2.00 0.00 - — . - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 15.63 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 43,853 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — N_ - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 14.37 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 40,307 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3--25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 38.84 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 107,414 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4--25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 I 10.00 10.00 �JI 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 48.48 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 116,293 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5--25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 5.857 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 60,929 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 326.66 ft Reservoir name = SGW POND 3 Max. Storage = 73,843 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6--25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 73,843 cuft 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.61 2 720 27,598 Pond 3 Pre-DA 3A 2 SCS Runoff 18.51 2 722 52,045 Pond 3 Pre-DA 3B 3 SCS Runoff 17.02 2 722 47,837 Pond 3 Pre-DA 3C 4 Combine 45.95 2 722 127,480 1,2,3 Pre-Dev Combined 5 SCS Runoff 54.42 2 716 131,017 Post Pond 3 6 Reservoir 7.444 2 728 75,653 5 327.06 82,016 POND 3 ROUTING SGW Pond 3.gpw Return Period: 50 Year Thursday, 08/24/2023 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 10.61 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 27,598 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 - . 0.00 - — . - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 18.51 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 52,045 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 17.02 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 47,837 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 18.00 18.00 15.00 k 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - — •_ - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 45.95 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 127,480 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 50.00 50.00 40.00 i 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 54.42 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 131,017 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 7.444 cfs Storm frequency = 50 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 75,653 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 327.06 ft Reservoir name = SGW POND 3 Max. Storage = 82,016 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6-- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 82,016 cuft 49 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.29 2 720 32,093 Pond 3 Pre-DA 3A 2 SCS Runoff 21.46 2 722 60,522 Pond 3 Pre-DA 3B 3 SCS Runoff 19.72 2 722 55,628 Pond 3 Pre-DA 3C 4 Combine 53.24 2 722 148,244 1,2,3 Pre-Dev Combined 5 SCS Runoff 60.44 2 716 145,951 Post Pond 3 6 Reservoir 8.688 2 726 90,587 5 327.45 90,436 POND 3 ROUTING SGW Pond 3.gpw Return Period: 100 Year Thursday, 08/24/2023 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 3 Pre-DA 3A Hydrograph type = SCS Runoff Peak discharge = 12.29 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 32,093 cuft Drainage area = 1.860 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.50 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 1 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — — . — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 3 Pre-DA 3B Hydrograph type = SCS Runoff Peak discharge = 21.46 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 60,522 cuft Drainage area = 3.710 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 -1 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - - '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 3 Pre-DA 3C Hydrograph type = SCS Runoff Peak discharge = 19.72 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 55,628 cuft Drainage area = 3.410 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.40 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 3 Pre-DA 3C Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 53.24 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 148,244 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 8.980 ac Pre-Dev Combined Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 I 20.00 10.00 10.00 \IL_ II 0.00 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Post Pond 3 Hydrograph type = SCS Runoff Peak discharge = 60.44 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 145,951 cuft Drainage area = 6.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 3 Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 I 50.00 40.00 40.00 30.00 30.00 20.00 20.00 II 10.00IL_ 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Time (hrs) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 POND 3 ROUTING Hydrograph type = Reservoir Peak discharge = 8.688 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 90,587 cuft Inflow hyd. No. = 5 - Post Pond 3 Max. Elevation = 327.45 ft Reservoir name = SGW POND 3 Max. Storage = 90,436 cuft Storage Indication method used. POND 3 ROUTING Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 ^ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 6 Hyd No. 5 1111111 Total storage used = 90,436 cuft 56 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 3 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833(ft/hr) *0.0833 ftlhr-From planting media information.Does not Top of treatment volume: Elev. = 325.62 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 322.00 pipe system.Runoff from the first 1"of rainfall must draw down between 2-5 days. Number of increments = 13.00(each) Filter Pipe Information Runs Length Length of pipe(L) = 7.75(ft) 4 300 Pipe diameter(d) = 0.333(ft) Pipe invert elevation = 317(ft) Depth of Filter Media(D) = 0.5(ft) Width of Filter Media(W) = 46(ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005(ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAvo) Increm.(t) ft (ft) (ft) (ft) (I) (ft2) (ft3/hr) (ft3/hr) (hrs) _ 325.62 48339.5 - 8.4535 16.91 356.5 502.1 1805.3 = * Ilr 498.5 3.6 325.50 46534.3 8.3335 16.67 356.5 495.0 3716.3 487.5 7.6 325.25 42817.9 8.0835 16.17 356.5 480.1 3655.9 472.7 7.7 325.00 39162.0 7.8335 15.67 356.5 465.3 3595.6 457.8 7.9 324.75 35566.4 7.5835 15.17 356.5 450.4 3535.2 443.0 8.0 324.50 32031.3 7.3335 14.67 356.5 435.6 3474.8 428.1 8.1 324.25 28556.4 7.0835 14.17 356.5 420.7 3414.4 413.3 8.3 324.00 25142.0 6.8335 13.67 356.5 405.9 3354.1 398.4 8.4 323.75 21787.9 6.5835 13.17 356.5 391.0 3293.7 383.6 8.6 323.50 18494.3 6.3335 12.67 356.5 376.2 3233.3 368.7 8.8 323.25 15260.9 6.0835 12.17 356.5 361.3 3172.9 353.9 9.0 323.00 12088.0 _ 5.8335 11.67 356.5 346.5 3112.6 339.0 9.2 322.75 8975.4 5.5835 11.17 356.5 331.6 3052.2 324.2 9.4 322.50 5923.3 5.3335 10.67 356.5 316.8 2991.8 309.3 9.7 322.25 2931.4 5.0835 10.17 356.5 301.9 2931.4 294.5 10.0 322.00 0.0 i 4.8335 9.67 356.5 287.1 Pond Geometry Total Drawdown Time= 47.2(hours) Side slopes: Horizontal:3 Vertical: 1 Req.pipe capacity(inside dia)= 3.6(inches) Bottom Area: 11605 square feet Pipe diameter to be used= 6(inches) Bottom Perm: 322 feet Main line pipe slope= 0.005(feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 3 Inside Area of Structure Length 6.00 ft Width 6.00 ft Total 36.00 sq.ft Outside Area of Structure Length 7.00 ft Width 7.00 ft Total 49.00 sq.ft. Total Area 13.00 sq.ft. Height of Riser 12.00 ft Volume of Riser 156.00 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 9734.40 lb Safety Factor 1.10 Required Anchor Weight 10707.84 lb/cu.ft. Volume of Concrete Required 122.24 cu.ft. Volume of Concrete Length 8.00 Width 8.00 Depth 2.00 Total Volume 128.00 cu.ft. Yards of Concrete 4.74 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 4 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 4 Pre-Dev DA-4A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 6.62 509.7 CN(weighted) =total product/total area Totals = 6.620 509.7 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 4 Pre-Dev DA-4B Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 3.07 236.4 CN(weighted) =total product/total area Totals = 3.070 236.4 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 4 Post-Dev DA-4A Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 14.72 1442.6 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 14.720 1442.6 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0_ Service, June 1986 SUBMERGED GRAVEL WETLAND POND 4 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 14.72 AC Imp Area= 14.72 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd = 1 in Design Storm Rv= 0.95 Dv= 50,761.92 FT3 DA= 14.72 AC Vol. Provided = 130,195.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 50,761.92 FT3 Design Volume Ponding Depth Ponding Depth = 2.77 FT SA= 18,325.60 FT2 SA Provided = 43,292.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 4.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, Combine, Pre-Dev Combined 8 Hydrograph No. 4, SCS Runoff, Post Pond 4 9 Hydrograph No. 5, Reservoir, Pond Routing 10 Pond Report - SGW Pond 4 11 2 - Year Summary Report 12 Hydrograph Reports 13 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 13 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 14 Hydrograph No. 3, Combine, Pre-Dev Combined 15 Hydrograph No. 4, SCS Runoff, Post Pond 4 16 Hydrograph No. 5, Reservoir, Pond Routing 17 5 - Year Summary Report 18 Hydrograph Reports 19 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 19 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 20 Hydrograph No. 3, Combine, Pre-Dev Combined 21 Hydrograph No. 4, SCS Runoff, Post Pond 4 22 Hydrograph No. 5, Reservoir, Pond Routing 23 10 - Year Summary Report 24 Hydrograph Reports 25 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 25 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 26 Hydrograph No. 3, Combine, Pre-Dev Combined 27 Hydrograph No. 4, SCS Runoff, Post Pond 4 28 Hydrograph No. 5, Reservoir, Pond Routing 29 25 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 31 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 32 Contents continued... SGW Pond 4.gpw Hydrograph No. 3, Combine, Pre-Dev Combined 33 Hydrograph No. 4, SCS Runoff, Post Pond 4 34 Hydrograph No. 5, Reservoir, Pond Routing 35 50 - Year Summary Report 36 Hydrograph Reports 37 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 37 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 38 Hydrograph No. 3, Combine, Pre-Dev Combined 39 Hydrograph No. 4, SCS Runoff, Post Pond 4 40 Hydrograph No. 5, Reservoir, Pond Routing 41 100 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pond 4 Pre-DA 4A 43 Hydrograph No. 2, SCS Runoff, Pond 4 Pre-DA 4B 44 Hydrograph No. 3, Combine, Pre-Dev Combined 45 Hydrograph No. 4, SCS Runoff, Post Pond 4 46 Hydrograph No. 5, Reservoir, Pond Routing 47 IDF Report 48 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 4 V3 1111 Legend Hyd. Origin Description 1 SCS Runoff Pond 4 Pre-DA 4A 2 SCS Runoff Pond 4 Pre-DA 4B 3 Combine Pre-Dev Combined 4 SCS Runoff Post Pond 4 5 Reservoir Pond Routing Project: SGW Pond 4.gpw Tuesday, 09/ 12/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 6.434 9.475 14.22 18.18 23.66 28.07 32.59 Pond 4 Pre-DA 4A 2 SCS Runoff 3.255 4.774 7.173 9.158 I 11.90 14.11 16.37 Pond 4 Pre-DA 4B 3 Combine 1,2 9.617 14.21 21.34 27.24 35.40 41.95 48.67 Pre-Dev Combined 4 SCS Runoff 56.05 68.04 85.26 98.81 116.99 131.32 145.84 Post Pond 4 5 Reservoir 4 0.000 0.571 2.019 4.414 7.693 9.725 11.46 Pond Routing Proj. file: SGW Pond 4.gpw Tuesday, 09/ 12/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.434 2 728 23,358 Pond 4 Pre-DA 4A 2 SCS Runoff 3.255 2 726 10,642 Pond 4 Pre-DA 4B 3 Combine 9.617 2 726 34,000 1,2 Pre-Dev Combined 4 SCS Runoff 56.05 2 716 130,195 Post Pond 4 5 Reservoir 0.000 2 n/a 0 4 341.77 130,195 Pond Routing SGW Pond 4.gpw Return Period: 1 Year Tuesday, 09/ 12/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 6.434 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 23,358 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 7.00 7.00 6.00 ) 6.00 5.00 5.00 4.00 4.00 3.00 3.00 I 2.00 2.00 1.00 1.00 0.00 . -- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 4 Pre-DA 4A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 215.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 4.19 0.00 0.00 Travel Time (min) = 18.94 + 0.00 + 0.00 = 18.94 Shallow Concentrated Flow Flow length (ft) = 198.00 0.00 0.00 Watercourse slope (%) = 10.10 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.13 0.00 0.00 Travel Time (min) = 0.64 + 0.00 + 0.00 = 0.64 Channel Flow X sectional flow area (sqft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 6.32 0.00 0.00 Channel slope (%) = 5.04 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =5.80 0.00 0.00 Flow length (ft) ({0})417.0 0.0 0.0 Travel Time (min) = 1.20 + 0.00 + 0.00 = 1.20 Total Travel Time, Tc 20.80 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 3.255 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 10,642 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 4 Pre-DA 4B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 179.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 3.35 0.00 0.00 Travel Time (min) = 17.89 + 0.00 + 0.00 = 17.89 Shallow Concentrated Flow Flow length (ft) = 140.00 0.00 0.00 Watercourse slope (%) = 16.43 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =6.54 0.00 0.00 Travel Time (min) = 0.36 + 0.00 + 0.00 = 0.36 Channel Flow X sectional flow area (sqft) = 12.00 0.00 0.00 Wetted perimeter (ft) = 12.65 0.00 0.00 Channel slope (%) = 7.92 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =11.56 0.00 0.00 Flow length (ft) ({0})240.0 0.0 0.0 Travel Time (min) = 0.35 + 0.00 + 0.00 = 0.35 Total Travel Time, Tc 18.60 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 9.617 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 34,000 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 56.05 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 130,195 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 .1 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 341.77 ft Reservoir name = SGW Pond 4 Max. Storage = 130,195 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 5 Hyd No. 4 II I I I I I Total storage used = 130,195 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Pond No. 1 - SGW Pond 4 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=339.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 339.00 43,292 0 0 1.00 340.00 45,846 44,558 44,558 2.00 341.00 48,457 47,141 91,699 3.00 342.00 51,124 49,780 141,479 4.00 343.00 53,848 52,475 193,954 5.00 344.00 56,629 55,227 249,181 6.00 345.00 59,466 58,036 307,217 7.00 346.00 62,359 60,901 368,117 8.00 347.00 65,309 63,822 431,939 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 60.00 6.00 0.00 0.00 Crest Len(ft) = 34.00 0.00 0.00 0.00 Span(in) = 60.00 48.00 0.00 0.00 Crest El.(ft) = 346.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 334.00 342.00 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 0.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 339.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 44,558 340.00 149.47 ic 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 91,699 341.00 149.47 ic 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 141,479 342.00 149.47 ic 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 193,954 343.00 149.47 ic 8.34 ic --- --- 0.00 --- --- --- --- --- 8.340 5.00 249,181 344.00 149.47 ic 12.74 ic --- --- 0.00 --- --- --- --- --- 12.74 6.00 307,217 345.00 149.47 ic 15.97 ic --- --- 0.00 --- --- --- --- --- 15.97 7.00 368,117 346.00 149.47 ic 18.65 ic --- --- 0.00 --- --- --- --- --- 18.65 8.00 431,939 347.00 149.47 ic 20.99 ic --- 113.22 --- --- --- --- --- 134.21 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.475 2 728 33,543 Pond 4 Pre-DA 4A 2 SCS Runoff 4.774 2 726 15,283 Pond 4 Pre-DA 4B 3 Combine 14.21 2 726 48,826 1,2 Pre-Dev Combined 4 SCS Runoff 68.04 2 716 159,636 Post Pond 4 5 Reservoir 0.571 2 1320 18,145 4 342.12 147,658 Pond Routing SGW Pond 4.gpw Return Period: 2 Year Tuesday, 09/ 12/2023 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 9.475 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 33,543 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 4.774 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 15,283 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 14.21 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 48,826 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 1 3.00 3.00 0.00 1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 68.04 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 159,636 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 0.571 cfs Storm frequency = 2 yrs Time to peak = 22.00 hrs Time interval = 2 min Hyd. volume = 18,145 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 342.12 ft Reservoir name = SGW Pond 4 Max. Storage = 147,658 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 W Mil 0.00 1111111111, 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 147,658 cuft 18 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.22 2 726 49,539 Pond 4 Pre-DA 4A 2 SCS Runoff 7.173 2 724 22,571 Pond 4 Pre-DA 4B 3 Combine 21.34 2 726 72,110 1,2 Pre-Dev Combined 4 SCS Runoff 85.26 2 716 202,104 Post Pond 4 5 Reservoir 2.019 2 868 60,613 4 342.28 156,095 Pond Routing SGW Pond 4.gpw Return Period: 5 Year Tuesday, 09/ 12/2023 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 14.22 cfs Storm frequency = 5 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 49,539 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 15.00 15.00 1 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 7.173 cfs Storm frequency = 5 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 22,571 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 -• I 1L."'-------- 2.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 21.34 cfs Storm frequency = 5 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 72,110 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 85.26 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 202,104 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ------•""°/*-------- 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 2.019 cfs Storm frequency = 5 yrs Time to peak = 14.47 hrs Time interval = 2 min Hyd. volume = 60,613 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 342.28 ft Reservoir name = SGW Pond 4 Max. Storage = 156,095 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 90.00 1 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 imiL 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 156,095 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 18.18 2 726 62,932 Pond 4 Pre-DA 4A 2 SCS Runoff 9.158 2 724 28,672 Pond 4 Pre-DA 4B 3 Combine 27.24 2 726 91,604 1,2 Pre-Dev Combined 4 SCS Runoff 98.81 2 716 235,605 Post Pond 4 5 Reservoir 4.414 2 780 94,115 4 342.47 166,179 Pond Routing SGW Pond 4.gpw Return Period: 10 Year Tuesday, 09/ 12/2023 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 18.18 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 62,932 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 21.00 21.00 18.00 i 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 9.158 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 28,672 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 27.24 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 91,604 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 98.81 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 235,605 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 4.414 cfs Storm frequency = 10 yrs Time to peak = 13.00 hrs Time interval = 2 min Hyd. volume = 94,115 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 342.47 ft Reservoir name = SGW Pond 4 Max. Storage = 166,179 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 166,179 cuft 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 23.66 2 726 81,689 Pond 4 Pre-DA 4A 2 SCS Runoff 11.90 2 724 37,218 Pond 4 Pre-DA 4B 3 Combine 35.40 2 726 118,908 1,2 Pre-Dev Combined 4 SCS Runoff 116.99 2 716 280,629 Post Pond 4 5 Reservoir 7.693 2 752 139,138 4 342.89 188,101 Pond Routing SGW Pond 4.gpw Return Period: 25 Year Tuesday, 09/ 12/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 23.66 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 81,689 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 11.90 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 37,218 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 i ............._ 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 35.40 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 118,908 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3--25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ^� 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 116.99 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 280,629 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4--25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 7.693 cfs Storm frequency = 25 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 139,138 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 342.89 ft Reservoir name = SGW Pond 4 Max. Storage = 188,101 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5--25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 11 1 1 1 1 1 [ Total storage used = 188,101 cuft 36 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 28.07 2 726 96,950 Pond 4 Pre-DA 4A 2 SCS Runoff 14.11 2 724 44,171 Pond 4 Pre-DA 4B 3 Combine 41.95 2 726 141,121 1,2 Pre-Dev Combined 4 SCS Runoff 131.32 2 716 316,159 Post Pond 4 5 Reservoir 9.725 2 748 174,667 4 343.27 208,890 Pond Routing SGW Pond 4.gpw Return Period: 50 Year Tuesday, 09/ 12/2023 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 28.07 cfs Storm frequency = 50 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 96,950 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 -. - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 14.11 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 44,171 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 41.95 cfs Storm frequency = 50 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 141,121 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 I 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 131.32 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 316,159 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 140.00 140.00 - 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 - 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 9.725 cfs Storm frequency = 50 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 174,667 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 343.27 ft Reservoir name = SGW Pond 4 Max. Storage = 208,890 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 ` 0.00 - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 208,890 cuft 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 32.59 2 726 112,741 Pond 4 Pre-DA 4A 2 SCS Runoff 16.37 2 724 51,366 Pond 4 Pre-DA 4B 3 Combine 48.67 2 726 164,107 1,2 Pre-Dev Combined 4 SCS Runoff 145.84 2 716 352,196 Post Pond 4 5 Reservoir 11.46 2 746 210,705 4 343.67 230,706 Pond Routing SGW Pond 4.gpw Return Period: 100 Year Tuesday, 09/ 12/2023 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 1 Pond 4 Pre-DA 4A Hydrograph type = SCS Runoff Peak discharge = 32.59 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 112,741 cuft Drainage area = 6.620 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.80 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 I 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 2 Pond 4 Pre-DA 4B Hydrograph type = SCS Runoff Peak discharge = 16.37 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 51,366 cuft Drainage area = 3.070 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 4 Pre-DA 4B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 48.67 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 164,107 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 9.690 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 50.00 J 50.00 • 40.00 40.00 30.00 30.00 TI 20.00 1 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 4 Post Pond 4 Hydrograph type = SCS Runoff Peak discharge = 145.84 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 352,196 cuft Drainage area = 14.720 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 4 Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 160.00 160.00 140.00 I 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 ----- (-------_, - 0.00 - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 11.46 cfs Storm frequency = 100 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 210,705 cuft Inflow hyd. No. = 4 - Post Pond 4 Max. Elevation = 343.67 ft Reservoir name = SGW Pond 4 Max. Storage = 230,706 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 i� 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 230,706 cuft 48 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Tuesday,09/12/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 4 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833(ft/hr) *0.0833 ftlhr-From planting media information.Does not Top of treatment volume: Elev. = 341.77 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 339.00 pipe system.Runoff from the first 1"of rainfall must draw down between 2-5 days. Number of increments = 12.00(each) Filter Pipe Information Runs Length Length of pipe(L) = 2.3(ft) 4 300 Pipe diameter(d) = 0.5(ft) Pipe invert elevation = 317(ft) Depth of Filter Media(D) = 0.5(ft) Width of Filter Media(W) = 133(ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005(ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAvo) Increm.(t) ft (ft3) (ft) (ft) (i) (ft2) (ft3/hr) (ft3/hr) (hrs) _ 341.77 123820.5 - 24.52 49.04 305.9 1249.6 12412.4 • Ilr * Ilr 1242.7 10.0 341.50 111408.1 24.25 48.50 305.9 1235.9 11426.8 1229.5 9.3 341.25 99981.3 24 48.00 305.9 1223.1 11363.3 1216.7 9.3 341.00 88618.0 23.75 47.50 305.9 1210.4 11299.7 1204.0 9.4 340.75 77318.3 23.5 47.00 305.9 1197.6 11236.2 1191.3 9.4 340.50 66082.1 23.25 46.50 305.9 1184.9 11172.6 1178.5 9.5 340.25 54909.5 23 46.00 305.9 1172.1 11109.0 1165.8 9.5 340.00 43800.5 22.75 45.50 305.9 1159.4 11045.5 1153.0 9.6 339.75 32755.0 22.5 45.00 305.9 1146.7 10981.9 1140.3 9.6 339.50 21773.1 22.25 44.50 305.9 1133.9 10918.3 1127.6 9.7 339.25 10854.8 22 44.00 305.9 1121.2 10854.8 1114.8 9.7 339.00 0.0 21.75 43.50 305.9 1108.4 3 Pond Geometry Total Drawdown Time= 48.2(hours) Side slopes: Horizontal:3 Vertical: 1 Req.pipe capacity(inside dia)= 5.2(inches) Bottom Area: 43292 square feet Pipe diameter to be used= 6(inches) Bottom Perm: 339 feet Main line pipe slope= 0.005(feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 4 Inside Area of Structure Length 11.00 ft Width 6.00 ft Total 66.00 sq.ft Outside Area of Structure Length 12.00 ft Width 7.00 ft Total 84.00 sq.ft. Total Area 18.00 sq.ft. Height of Riser 12.00 ft Volume of Riser 216.00 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 13478.40 lb Safety Factor 1.10 Required Anchor Weight 14826.24 lb/cu.ft. Volume of Concrete Required 169.25 cu.ft. Volume of Concrete Length 13.00 Width 8.00 Depth 2.00 Total Volume 208.00 cu.ft. Yards of Concrete 7.70 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 5 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 5 Pre-Dev DA-5A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.0 Woods, Poor Condition C 77 3.15 242.6 CN(weighted) =total product/total area Totals = 3.150 242.6 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 5 Pre-Dev DA-5B Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.0 Woods, Poor Condition C 77 7.58 583.7 CN(weighted) =total product/total area Totals = 7.580 583.7 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0_ Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 5 Pre-Dev DA-5C Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.94 92.1 Woods, Poor Condition C 77 0.0 CN(weighted) =total product/total area Totals = 0.940 92.1 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 5 Pre-Dev DA-5D3 Checked: Date: 28-Aug-23 Circle one: 141=11b Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 2.39 234.2 Woods, Poor Condition C 77 0.0 CN(weighted) =total product/total area Totals = 2.390 234.2 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 5 Post-Dev DA-5A Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 11.84 1160.3 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 11.840 1160.3 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 SUBMERGED GRAVEL WETLAND POND 5 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 7.42 AC Imp Area= 7.42 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd= 1 in Design Storm Rv= 0.95 Dv= 40,830.24 FT3 DA= 11.84 AC Vol. Provided = 90,441.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 40,830.24 FT3 Design Volume Ponding Depth Ponding Depth = 3.40 FT SA= 12,008.89 FT2 SA Provided = 34,199.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 5.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 8 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 9 Hydrograph No. 5, Combine, Pre-Dev Combined 10 Hydrograph No. 6, SCS Runoff, Post Pond 5 11 Hydrograph No. 7, Reservoir, POND 5 ROUTING 12 Pond Report - SGW Pond 5 13 2 - Year Summary Report 14 Hydrograph Reports 15 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 15 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 16 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 17 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 18 Hydrograph No. 5, Combine, Pre-Dev Combined 19 Hydrograph No. 6, SCS Runoff, Post Pond 5 20 Hydrograph No. 7, Reservoir, POND 5 ROUTING 21 5 - Year Summary Report 22 Hydrograph Reports 23 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 23 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 24 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 25 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 26 Hydrograph No. 5, Combine, Pre-Dev Combined 27 Hydrograph No. 6, SCS Runoff, Post Pond 5 28 Hydrograph No. 7, Reservoir, POND 5 ROUTING 29 10 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 31 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 32 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 33 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 34 Hydrograph No. 5, Combine, Pre-Dev Combined 35 Contents continued... SGW Pond 5.gpw Hydrograph No. 6, SCS Runoff, Post Pond 5 36 Hydrograph No. 7, Reservoir, POND 5 ROUTING 37 25 - Year Summary Report 38 Hydrograph Reports 39 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 39 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 40 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 41 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 42 Hydrograph No. 5, Combine, Pre-Dev Combined 43 Hydrograph No. 6, SCS Runoff, Post Pond 5 44 Hydrograph No. 7, Reservoir, POND 5 ROUTING 45 50 - Year Summary Report 46 Hydrograph Reports 47 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 47 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 48 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 49 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 50 Hydrograph No. 5, Combine, Pre-Dev Combined 51 Hydrograph No. 6, SCS Runoff, Post Pond 5 52 Hydrograph No. 7, Reservoir, POND 5 ROUTING 53 100 - Year Summary Report 54 Hydrograph Reports 55 Hydrograph No. 1, SCS Runoff, Pond 5 Pre-DA 5A 55 Hydrograph No. 2, SCS Runoff, Pond 5 Pre--DA 5B 56 Hydrograph No. 3, SCS Runoff, Pond 5 Pre-DA 5C 57 Hydrograph No. 4, SCS Runoff, Pond 5 Pre-DA 5D 58 Hydrograph No. 5, Combine, Pre-Dev Combined 59 Hydrograph No. 6, SCS Runoff, Post Pond 5 60 Hydrograph No. 7, Reservoir, POND 5 ROUTING 61 IDF Report 62 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 isjj eiso 51115 Cda Legend Hvd• Origin Description 1 SCS Runoff Pond 5 Pre-DA 5A 2 SCS Runoff Pond 5 Pre--DA 5B 3 SCS Runoff Pond 5 Pre-DA 5C 4 SCS Runoff Pond 5 Pre-DA 5D 5 Combine Pre-Dev Combined 6 SCS Runoff Post Pond 5 7 Reservoir POND 5 ROUTING Project: SGW Pond 5.gpw Thursday, 08/24/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 4.733 6.848 10.12 12.86 16.64 19.68 22.78 Pond 5 Pre-DA 5A 2 SCS Runoff 10.19 14.83 22.11 28.16 36.52 43.23 50.09 Pond 5 Pre--DA 5B 3 SCS Runoff 3.579 4.345 5.445 6.310 I 7.471 8.386 9.313 Pond 5 Pre-DA 5C 4 SCS Runoff 9.100 11.05 13.84 16.04 19.00 21.32 23.68 Pond 5 Pre-DA 5D 5 Combine 1,2,3, 25.73 34.89 48.83 60.21 75.84 88.34 101.11 Pre-Dev Combined 4 6 SCS Runoff 45.08 54.73 68.58 79.48 94.10 105.62 117.30 Post Pond 5 7 Reservoir 6 0.000 0.665 2.400 5.252 8.538 10.60 12.29 POND 5 ROUTING Proj. file: SGW Pond 5.gpw Thursday, 08/24/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.733 2 720 10,919 Pond 5 Pre-DA 5A 2 SCS Runoff 10.19 2 722 27,097 Pond 5 Pre--DA 5B 3 SCS Runoff 3.579 2 716 8,314 Pond 5 Pre-DA 5C 4 SCS Runoff 9.100 2 716 21,139 Pond 5 Pre-DA 5D 5 Combine 25.73 2 718 67,470 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 45.08 2 716 104,722 Post Pond 5 7 Reservoir 0.000 2 n/a 0 6 353.40 104,722 POND 5 ROUTING SGW Pond 5.gpw Return Period: 1 Year Thursday, 08/24/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 4.733 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 10,919 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ` '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 5 Pre-DA 5A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 102.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 7.87 0.00 0.00 Travel Time (min) = 8.11 + 0.00 + 0.00 = 8.11 Shallow Concentrated Flow Flow length (ft) = 161.00 0.00 0.00 Watercourse slope (%) = 13.04 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.83 0.00 0.00 Travel Time (min) = 0.46 + 0.00 + 0.00 = 0.46 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 10.20 0.00 0.00 Channel slope (%) = 6.13 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =6.54 0.00 0.00 Flow length (ft) ({0})326.0 0.0 0.0 Travel Time (min) = 0.83 + 0.00 + 0.00 = 0.83 Total Travel Time, Tc 9.40 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 10.19 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 27,097 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — ` - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 5 Pre--DA 5B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 103.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 6.80 0.00 0.00 Travel Time (min) = 8.66 + 0.00 + 0.00 = 8.66 Shallow Concentrated Flow Flow length (ft) = 195.00 0.00 0.00 Watercourse slope (%) = 11.28 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =5.42 0.00 0.00 Travel Time (min) = 0.60 + 0.00 + 0.00 = 0.60 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 3.98 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =6.76 0.00 0.00 Flow length (ft) ({0})603.0 0.0 0.0 Travel Time (min) = 1.49 + 0.00 + 0.00 = 1.49 Total Travel Time, Tc 10.70 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 3.579 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 8,314 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 _ - J_ _ 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 9.100 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 21,139 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 10.00 10.00 8.00 I 8.00 6.00 6.00 4.00 4.00 2.00r--- **----. 2.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 25.73 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 67,470 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 i 20.00 16.00 16.00 12.00 12.00 8.00 ; 8.00 4.00 1 4.00 _ J _ 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 45.08 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 104,722 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 r*. 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 353.40 ft Reservoir name = SGW Pond 5 Max. Storage = 104,722 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 [ Total storage used = 104,722 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Pond No. 1 - SGW Pond 5 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=350.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 350.00 26,234 0 0 1.00 351.00 28,820 27,514 27,514 2.00 352.00 31,462 30,128 57,642 3.00 353.00 34,161 32,799 90,441 4.00 354.00 36,916 35,526 125,968 5.00 355.00 39,728 38,310 164,277 6.00 356.00 42,596 41,150 205,427 7.00 357.00 45,521 44,046 249,473 8.00 358.00 48,503 46,999 296,472 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 60.00 6.00 0.00 0.00 Crest Len(ft) = 32.00 0.00 0.00 0.00 Span(in) = 60.00 48.00 0.00 0.00 Crest El.(ft) = 357.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 345.00 353.50 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 44.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 350.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 27,514 351.00 57.35 oc 0.00 --- 0.00 --- --- --- --- --- 0.000 2.00 57,642 352.00 57.35 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 90,441 353.00 57.35 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 125,968 354.00 57.35 oc 4.81 ic --- --- 0.00 --- --- --- --- --- 4.815 5.00 164,277 355.00 57.35 oc 10.77 ic --- --- 0.00 --- --- --- --- --- 10.77 6.00 205,427 356.00 57.35 oc 14.44 ic --- --- 0.00 --- --- --- --- --- 14.44 7.00 249,473 357.00 57.35 oc 17.36 ic --- --- 0.00 --- --- --- --- --- 17.36 8.00 296,472 358.00 57.35 oc 19.85 ic --- --- 106.56 --- --- --- --- --- 126.41 14 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.848 2 720 15,681 Pond 5 Pre-DA 5A 2 SCS Runoff 14.83 2 722 38,913 Pond 5 Pre--DA 5B 3 SCS Runoff 4.345 2 716 10,194 Pond 5 Pre-DA 5C 4 SCS Runoff 11.05 2 716 25,919 Pond 5 Pre-DA 5D 5 Combine 34.89 2 718 90,707 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 54.73 2 716 128,403 Post Pond 5 7 Reservoir 0.665 2 1096 20,190 6 353.63 112,815 POND 5 ROUTING SGW Pond 5.gpw Return Period: 2 Year Thursday, 08/24/2023 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 6.848 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 15,681 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 7.00 i 7.00 6.00 6.00 5.00 5.00 1 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ` - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 14.83 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 38,913 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 4.345 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 10,194 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 11.05 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 25,919 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 34.89 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 90,707 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 _ / 1,\ 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 54.73 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 128,403 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 0.665 cfs Storm frequency = 2 yrs Time to peak = 18.27 hrs Time interval = 2 min Hyd. volume = 20,190 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 353.63 ft Reservoir name = SGW Pond 5 Max. Storage = 112,815 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 Total storage used = 112,815 cuft 22 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.12 2 718 23,159 Pond 5 Pre-DA 5A 2 SCS Runoff 22.11 2 720 57,470 Pond 5 Pre--DA 5B 3 SCS Runoff 5.445 2 716 12,906 Pond 5 Pre-DA 5C 4 SCS Runoff 13.84 2 716 32,814 Pond 5 Pre-DA 5D 5 Combine 48.83 2 718 126,349 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 68.58 2 716 162,562 Post Pond 5 7 Reservoir 2.400 2 806 54,349 6 353.81 119,338 POND 5 ROUTING SGW Pond 5.gpw Return Period: 5 Year Thursday, 08/24/2023 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 10.12 cfs Storm frequency = 5 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 23,159 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — ` - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 22.11 cfs Storm frequency = 5 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 57,470 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 5.445 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 12,906 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 6.00 6.00 I 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 --- (----- 1.00 0.00 — --L- - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 13.84 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 32,814 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 14.00 14.00 12.00 I 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 48.83 cfs Storm frequency = 5 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 126,349 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 50.00 I 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 68.58 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 162,562 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6 --5 Year Q (cfs) 70.00 70.00 60.00 60.00 I I 50.00 50.00 40.00 40.00 30.00 30.00 20.00 I 20.00 I I - 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 2.400 cfs Storm frequency = 5 yrs Time to peak = 13.43 hrs Time interval = 2 min Hyd. volume = 54,349 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 353.81 ft Reservoir name = SGW Pond 5 Max. Storage = 119,338 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7 --5 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - — — 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 Total storage used = 119,338 cuft 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.86 2 718 29,420 Pond 5 Pre-DA 5A 2 SCS Runoff 28.16 2 720 73,006 Pond 5 Pre--DA 5B 3 SCS Runoff 6.310 2 716 15,045 Pond 5 Pre-DA 5C 4 SCS Runoff 16.04 2 716 38,254 Pond 5 Pre-DA 5D 5 Combine 60.21 2 718 155,725 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 79.48 2 716 189,509 Post Pond 5 7 Reservoir 5.252 2 752 81,296 6 354.05 127,867 POND 5 ROUTING SGW Pond 5.gpw Return Period: 10 Year Thursday, 08/24/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 12.86 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 29,420 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — ` - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 28.16 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 73,006 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 — ` '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 6.310 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 15,045 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 16.04 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 38,254 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 18.00 18.00 15.00I 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 1---- (----.J 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 60.21 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 155,725 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 II 30.00 30.00 20.00 20.00 10.00 10.00 Ii 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 79.48 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 189,509 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 80.00 l 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 5.252 cfs Storm frequency = 10 yrs Time to peak = 12.53 hrs Time interval = 2 min Hyd. volume = 81,296 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 354.05 ft Reservoir name = SGW Pond 5 Max. Storage = 127,867 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7-- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 [ Total storage used = 127,867 cuft 38 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 16.64 2 718 38,188 Pond 5 Pre-DA 5A 2 SCS Runoff 36.52 2 720 94,766 Pond 5 Pre--DA 5B 3 SCS Runoff 7.471 2 716 17,921 Pond 5 Pre-DA 5C 4 SCS Runoff 19.00 2 716 45,564 Pond 5 Pre-DA 5D 5 Combine 75.84 2 718 196,439 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 94.10 2 716 225,723 Post Pond 5 7 Reservoir 8.538 2 742 117,510 6 354.54 146,535 POND 5 ROUTING SGW Pond 5.gpw Return Period: 25 Year Thursday, 08/24/2023 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 16.64 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 38,188 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - — -. - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 36.52 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 94,766 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 7.471 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 17,921 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3--25 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 - 1-7 -"----- 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 19.00 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 45,564 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4--25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 • 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 75.84 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 196,439 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5--25 Year Q (cfs) 80.00 I 80.00 70.00 70.00 I 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 li 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 94.10 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 225,723 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6--25 Year Q (cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ..---• *----- 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 8.538 cfs Storm frequency = 25 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 117,510 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 354.54 ft Reservoir name = SGW Pond 5 Max. Storage = 146,535 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7--25 Year Q (cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 L._ 0.00 - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 [ Total storage used = 146,535 cuft 46 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 19.68 2 718 45,322 Pond 5 Pre-DA 5A 2 SCS Runoff 43.23 2 720 112,469 Pond 5 Pre--DA 5B 3 SCS Runoff 8.386 2 716 20,189 Pond 5 Pre-DA 5C 4 SCS Runoff 21.32 2 716 51,333 Pond 5 Pre-DA 5D 5 Combine 88.34 2 718 229,314 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 105.62 2 716 254,301 Post Pond 5 7 Reservoir 10.60 2 738 146,089 6 354.96 162,861 POND 5 ROUTING SGW Pond 5.gpw Return Period: 50 Year Thursday, 08/24/2023 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 19.68 cfs Storm frequency = 50 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 45,322 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 21.00 I I i 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 I 6.00 3.00 3.00 0.00 I '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 43.23 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 112,469 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 1 30.00 30.00 20.00 20.00 10.00 10.00 0.00 '- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 8.386 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 20,189 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 10.00 10.00 8.00 I 8.00 6.00 6.00 4.00 4.00 2.00 /...--*. 2.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 21.32 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 51,333 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 88.34 cfs Storm frequency = 50 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 229,314 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 105.62 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 254,301 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6-- 50 Year Q (cfs) 120.00 120.00 100.00 100.00 1 80.00 80.00 60.00 60.00 40.00 40.00 20.00 * 20.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 10.60 cfs Storm frequency = 50 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 146,089 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 354.96 ft Reservoir name = SGW Pond 5 Max. Storage = 162,861 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7-- 50 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 Total storage used = 162,861 cuft 54 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 22.78 2 718 52,704 Pond 5 Pre-DA 5A 2 SCS Runoff 50.09 2 720 130,789 Pond 5 Pre--DA 5B 3 SCS Runoff 9.313 2 716 22,491 Pond 5 Pre-DA 5C 4 SCS Runoff 23.68 2 716 57,184 Pond 5 Pre-DA 5D 5 Combine 101.11 2 718 263,168 1,2,3, Pre-Dev Combined 4 6 SCS Runoff 117.30 2 716 283,288 Post Pond 5 7 Reservoir 12.29 2 736 175,075 6 355.38 179,894 POND 5 ROUTING SGW Pond 5.gpw Return Period: 100 Year Thursday, 08/24/2023 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 5 Pre-DA 5A Hydrograph type = SCS Runoff Peak discharge = 22.78 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 52,704 cuft Drainage area = 3.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.40 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 5 Pre--DA 5B Hydrograph type = SCS Runoff Peak discharge = 50.09 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 130,789 cuft Drainage area = 7.580 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.70 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre--DA 5B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 4' 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pond 5 Pre-DA 5C Hydrograph type = SCS Runoff Peak discharge = 9.313 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 22,491 cuft Drainage area = 0.940 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5C Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Pond 5 Pre-DA 5D Hydrograph type = SCS Runoff Peak discharge = 23.68 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 57,184 cuft Drainage area = 2.390 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 5 Pre-DA 5D Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00r-- **'----- 4.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 101.11 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 263,168 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 14.060 ac Pre-Dev Combined Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - -- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 6 Post Pond 5 Hydrograph type = SCS Runoff Peak discharge = 117.30 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 283,288 cuft Drainage area = 11.840 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 5 Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 ....- (`----. 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 7 POND 5 ROUTING Hydrograph type = Reservoir Peak discharge = 12.29 cfs Storm frequency = 100 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 175,075 cuft Inflow hyd. No. = 6 - Post Pond 5 Max. Elevation = 355.38 ft Reservoir name = SGW Pond 5 Max. Storage = 179,894 cuft Storage Indication method used. POND 5 ROUTING Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 �-- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 7 Hyd No. 6 1111111 [ Total storage used = 179,894 cuft 62 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 5 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833(ft/hr) *0.0833 ftlhr-From planting media information.Does not Top of treatment volume: Elev. = 353.40 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 350.00 pipe system.Runoff from the first 1"of rainfall must draw down between 2-5 days. Number of increments = 12.00(each) Filter Pipe Information Runs Length Length of pipe(L) = 10.9(ft) 4 300 Pipe diameter(d) = 0.5(ft) Pipe invert elevation = 345(ft) Depth of Filter Media(D) = 0.5(ft) Width of Filter Media(W) = 72(ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005(ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAvo) Increm.(t) ft (ft3) (ft) (ft) (i) (ft2) (ft3/hr) (ft3/hr) (hrs) _ 353.40 95264.E - 8.15 16.30 784.8 1065.6 4458.8 T * Ir lil 1055.8 4.2 353.25 90805.8 81 16.00 784.8 1046.0 7378.8 980.6 7.5 353.00 83427.0 7.75 15.50 784.8 1013.3 7313.2 997.0 7.3 352.75 76113.8 7.5 15.00 784.8 980.6 7247.6 964.3 7.5 352.50 68866.3 7.25 14.50 784.8 947.9 7181.9 931.6 7.7 352.25 61684.3 7 14.00 784.8 915.2 7116.3 898.9 7.9 352.00 54568.0 6.75 13.50 784.8 882.5 7050.7 866.2 8.1 351.75 47517.3 6.5 13.00 784.8 849.9 6985.1 833.5 8.4 351.50 40532.3 6.25 12.50 784.8 817.2 6919.4 800.8 8.6 351.25 33612.8 6 12.00 784.8 784.5 6853.8 768.1 8.9 351.00 26759.0 5.75 11.50 784.8 751.8 6788.2 735.5 9.2 350.75 19970.8 5.5 11.00 784.8 719.1 6722.6 702.8 9.6 350.50 13248.3 5.25 10.50 784.8 686.4 6656.9 670.1 9.9 350.25 6591.3 5 10.00 784.8 653.7 6591.3 637.4 10.3 350.00 0.0 _ 4.75 9.50 784.8 621.1 Pond Geometry Total Drawdown Time= 48.0(hours) Side slopes: Horizontal:3 Vertical: 1 Req.pipe capacity(inside dia)= 4.9(inches) Bottom Area: 26234 square feet Pipe diameter to be used= 6(inches) Bottom Perm: 350 feet Main line pipe slope= 0.005(feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 5 Inside Area of Structure Length 10.00 ft Width 6.00 ft Total 60.00 sq.ft Outside Area of Structure Length 11.00 ft Width 7.00 ft Total 77.00 sq.ft. Total Area 17.00 sq.ft. Height of Riser 12.00 ft Volume of Riser 204.00 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 12729.60 lb Safety Factor 1.10 Required Anchor Weight 14002.56 lb/cu.ft. Volume of Concrete Required 159.85 cu.ft. Volume of Concrete Length 12.00 Width 8.00 Depth 2.00 Total Volume 192.00 cu.ft. Yards of Concrete 7.11 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 6 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 6 Pre-Dev DA-6A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 9.42 725.3 CN(weighted) =total product/total area Totals = 9.420 725.3 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 6 Post-Dev DA-6A Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 6.51 638.0 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 6.510 638.0 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0_ Service, June 1986 SUBMERGED GRAVEL WETLAND POND 6 SIMPLE METHOD FOR RUNOFF VOLUME Rv= 0.05+0.9 la DA= Drainage Area R„= 0.95 DA= 6.51 AC Imp Area= 6.51 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd Rv DA Rd= 1 in Design Storm Rv= 0.95 Dv= 22,449.74 FT3 DA= 6.51 AC Vol. Provided = 57,579.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ D„= 22,449.74 FT3 Design Volume Ponding Depth Ponding Depth = 4.11 FT SA= 5,462.22 FT2 SA Provided = 10,970.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 6.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, Combine, Pre-Dev Combined 8 Hydrograph No. 4, SCS Runoff, Post Pond 6 9 Hydrograph No. 5, Reservoir, Pond Routing 10 Pond Report - SGW Pond 6 11 2 - Year Summary Report 12 Hydrograph Reports 13 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 13 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 14 Hydrograph No. 3, Combine, Pre-Dev Combined 15 Hydrograph No. 4, SCS Runoff, Post Pond 6 16 Hydrograph No. 5, Reservoir, Pond Routing 17 5 - Year Summary Report 18 Hydrograph Reports 19 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 19 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 20 Hydrograph No. 3, Combine, Pre-Dev Combined 21 Hydrograph No. 4, SCS Runoff, Post Pond 6 22 Hydrograph No. 5, Reservoir, Pond Routing 23 10 - Year Summary Report 24 Hydrograph Reports 25 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 25 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 26 Hydrograph No. 3, Combine, Pre-Dev Combined 27 Hydrograph No. 4, SCS Runoff, Post Pond 6 28 Hydrograph No. 5, Reservoir, Pond Routing 29 25 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 31 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 32 Contents continued... SGW Pond 6.gpw Hydrograph No. 3, Combine, Pre-Dev Combined 33 Hydrograph No. 4, SCS Runoff, Post Pond 6 34 Hydrograph No. 5, Reservoir, Pond Routing 35 50 - Year Summary Report 36 Hydrograph Reports 37 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 37 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 38 Hydrograph No. 3, Combine, Pre-Dev Combined 39 Hydrograph No. 4, SCS Runoff, Post Pond 6 40 Hydrograph No. 5, Reservoir, Pond Routing 41 100 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pond 6 Pre-DA 6A 43 Hydrograph No. 2, SCS Runoff, Pond 6 Pre-DA 6B 44 Hydrograph No. 3, Combine, Pre-Dev Combined 45 Hydrograph No. 4, SCS Runoff, Post Pond 6 46 Hydrograph No. 5, Reservoir, Pond Routing 47 IDF Report 48 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk,Inc.v2021 corm! 2 4 3 V Legend Hyd. Origin Description 1 SCS Runoff Pond 6 Pre-DA 6A 2 SCS Runoff Pond 6 Pre-DA 6B 3 Combine Pre-Dev Combined 4 SCS Runoff Post Pond 6 5 Reservoir Pond Routing Project: SGW Pond 6.gpw Thursday, 08/24/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 7.204 10.67 16.06 20.52 26.75 31.77 36.92 Pond 6 Pre-DA 6A 2 SCS Runoff 2.692 3.964 5.949 7.606 9.900 11.75 13.64 Pond 6 Pre-DA 6B 3 Combine 1,2 9.557 14.15 21.29 27.21 35.47 42.12 48.95 Pre-Dev Combined 4 SCS Runoff 24.79 30.09 37.71 43.70 51.74 58.08 64.50 Post Pond 6 5 Reservoir 4 0.000 0.382 1.485 3.602 6.344 7.984 9.328 Pond Routing Proj. file: SGW Pond 6.gpw Thursday, 08/24/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 7.204 2 734 33,062 Pond 6 Pre-DA 6A 2 SCS Runoff 2.692 2 728 9,774 Pond 6 Pre-DA 6B 3 Combine 9.557 2 732 42,836 1,2 Pre-Dev Combined 4 SCS Runoff 24.79 2 716 57,579 Post Pond 6 5 Reservoir 0.000 2 n/a 0 4 339.61 57,579 Pond Routing SGW Pond 6.gpw Return Period: 1 Year Thursday, 08/24/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 7.204 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 33,062 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 • 0.00 - — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 6 Pre-DA 6A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 257.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.38 0.00 0.00 Land slope (%) = 2.33 0.00 0.00 Travel Time (min) = 27.79 + 0.00 + 0.00 = 27.79 Shallow Concentrated Flow Flow length (ft) = 283.00 0.00 0.00 Watercourse slope (%) = 4.95 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.59 0.00 0.00 Travel Time (min) = 1.31 + 0.00 + 0.00 = 1.31 Channel Flow X sectional flow area (sqft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 6.32 0.00 0.00 Channel slope (%) = 3.97 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =5.15 0.00 0.00 Flow length (ft) ({0})731.0 0.0 0.0 Travel Time (min) = 2.37 + 0.00 + 0.00 = 2.37 Total Travel Time, Tc 31.50 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 2.692 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 9,774 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 2 Pond 6 Pre-DA 6B Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 164.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.38 0.00 0.00 Land slope (%) = 2.44 0.00 0.00 Travel Time (min) = 19.05 + 0.00 + 0.00 = 19.05 Shallow Concentrated Flow Flow length (ft) = 249.00 0.00 0.00 Watercourse slope (%) = 7.63 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.46 0.00 0.00 Travel Time (min) = 0.93 + 0.00 + 0.00 = 0.93 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 6.35 0.00 0.00 Manning's n-value = 0.035 0.015 0.015 Velocity (ft/s) =8.54 0.00 0.00 Flow length (ft) ({0})252.0 0.0 0.0 Travel Time (min) = 0.49 + 0.00 + 0.00 = 0.49 Total Travel Time, Tc 20.50 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 9.557 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 42,836 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 24.79 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 57,579 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 339.61 ft Reservoir name = SGW Pond 6 Max. Storage = 57,579 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 28.00 28.00 I ' 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 57,579 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Pond No. 1 - SGW Pond 6 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=335.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 335.50 10,970 0 0 1.00 336.50 12,389 11,671 11,671 2.00 337.50 13,864 13,118 24,789 3.00 338.50 15,395 14,621 39,411 4.00 339.50 16,983 16,181 55,592 5.00 340.50 18,628 17,797 73,389 6.00 341.50 20,329 19,470 92,859 7.00 342.50 22,087 21,200 114,059 8.00 343.50 23,901 22,986 137,045 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 42.00 6.00 0.00 0.00 Crest Len(ft) = 24.00 0.00 0.00 0.00 Span(in) = 42.00 36.00 0.00 0.00 Crest El.(ft) = 342.50 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 331.00 339.75 0.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 72.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 335.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 11,671 336.50 64.95 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 24,789 337.50 64.95 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.00 39,411 338.50 64.95 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.00 55,592 339.50 64.95 oc 0.00 --- --- 0.00 --- --- --- --- --- 0.000 5.00 73,389 340.50 64.95 oc 5.11 ic --- --- 0.00 --- --- --- --- --- 5.107 6.00 92,859 341.50 64.95 oc 8.85 ic --- --- 0.00 --- --- --- --- --- 8.846 7.00 114,059 342.50 64.95 oc 11.42 ic --- --- 0.00 --- --- --- --- --- 11.42 8.00 137,045 343.50 93.43 oc 13.51 ic --- --- 79.92 --- --- --- --- --- 93.43 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.67 2 734 47,479 Pond 6 Pre-DA 6A 2 SCS Runoff 3.964 2 728 14,035 Pond 6 Pre-DA 6B 3 Combine 14.15 2 732 61,515 1,2 Pre-Dev Combined 4 SCS Runoff 30.09 2 716 70,600 Post Pond 6 5 Reservoir 0.382 2 1078 11,433 4 339.86 61,924 Pond Routing SGW Pond 6.gpw Return Period: 2 Year Thursday, 08/24/2023 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 10.67 cfs Storm frequency = 2 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 47,479 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 3.964 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 14,035 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 14.15 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 61,515 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 30.09 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 70,600 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 I 25.00 20.00IL_ 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 0.382 cfs Storm frequency = 2 yrs Time to peak = 17.97 hrs Time interval = 2 min Hyd. volume = 11,433 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 339.86 ft Reservoir name = SGW Pond 6 Max. Storage = 61,924 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 MW MI ii" 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 61,924 cuft 18 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 16.06 2 734 70,121 Pond 6 Pre-DA 6A 2 SCS Runoff 5.949 2 726 20,729 Pond 6 Pre-DA 6B 3 Combine 21.29 2 732 90,850 1,2 Pre-Dev Combined 4 SCS Runoff 37.71 2 716 89,382 Post Pond 6 5 Reservoir 1.485 2 792 30,215 4 340.02 64,932 Pond Routing SGW Pond 6.gpw Return Period: 5 Year Thursday, 08/24/2023 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 16.06 cfs Storm frequency = 5 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 70,121 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 18.00 18.00 15.00H — 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - �.- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 5.949 cfs Storm frequency = 5 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 20,729 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1 1.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 21.29 cfs Storm frequency = 5 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 90,850 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 37.71 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 89,382 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4 --5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 _ _ 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 1.485 cfs Storm frequency = 5 yrs Time to peak = 13.20 hrs Time interval = 2 min Hyd. volume = 30,215 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 340.02 ft Reservoir name = SGW Pond 6 Max. Storage = 64,932 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5 --5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 64,932 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 20.52 2 734 89,078 Pond 6 Pre-DA 6A 2 SCS Runoff 7.606 2 726 26,332 Pond 6 Pre-DA 6B 3 Combine 27.21 2 732 115,410 1,2 Pre-Dev Combined 4 SCS Runoff 43.70 2 716 104,198 Post Pond 6 5 Reservoir 3.602 2 746 45,031 4 340.26 69,107 Pond Routing SGW Pond 6.gpw Return Period: 10 Year Thursday, 08/24/2023 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 20.52 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 89,078 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 �- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 7.606 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 26,332 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 27.21 cfs Storm frequency = 10 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 115,410 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 43.70 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 104,198 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 3.602 cfs Storm frequency = 10 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 45,031 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 340.26 ft Reservoir name = SGW Pond 6 Max. Storage = 69,107 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 69,107 cuft 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 26.75 2 732 115,629 Pond 6 Pre-DA 6A 2 SCS Runoff 9.900 2 726 34,181 Pond 6 Pre-DA 6B 3 Combine 35.47 2 730 149,810 1,2 Pre-Dev Combined 4 SCS Runoff 51.74 2 716 124,109 Post Pond 6 5 Reservoir 6.344 2 730 64,943 4 340.77 78,687 Pond Routing SGW Pond 6.gpw Return Period: 25 Year Thursday, 08/24/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 26.75 cfs Storm frequency = 25 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 115,629 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — 1 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 9.900 cfs Storm frequency = 25 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 34,181 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 10.00 ( 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 35.47 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 149,810 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3--25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 51.74 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 124,109 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4--25 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 6.344 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 64,943 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 340.77 ft Reservoir name = SGW Pond 6 Max. Storage = 78,687 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5--25 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 [ Total storage used = 78,687 cuft 36 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 31.77 2 732 137,229 Pond 6 Pre-DA 6A 2 SCS Runoff 11.75 2 726 40,566 Pond 6 Pre-DA 6B 3 Combine 42.12 2 730 177,796 1,2 Pre-Dev Combined 4 SCS Runoff 58.08 2 716 139,823 Post Pond 6 5 Reservoir 7.984 2 728 80,656 4 341.22 87,456 Pond Routing SGW Pond 6.gpw Return Period: 50 Year Thursday, 08/24/2023 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 31.77 cfs Storm frequency = 50 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 137,229 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 — I 20.00 20.00 15.00 15.00 1 10.00 10.00 5.00 5.00 __WjW --*------------------- 0.00 1 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 11.75 cfs Storm frequency = 50 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 40,566 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 42.12 cfs Storm frequency = 50 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 177,796 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 58.08 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 139,823 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 ...-- (--... 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 7.984 cfs Storm frequency = 50 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 80,656 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 341.22 ft Reservoir name = SGW Pond 6 Max. Storage = 87,456 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 87,456 cuft 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 36.92 2 732 159,582 Pond 6 Pre-DA 6A 2 SCS Runoff 13.64 2 726 47,174 Pond 6 Pre-DA 6B 3 Combine 48.95 2 730 206,756 1,2 Pre-Dev Combined 4 SCS Runoff 64.50 2 716 155,760 Post Pond 6 5 Reservoir 9.328 2 726 96,594 4 341.67 96,431 Pond Routing SGW Pond 6.gpw Return Period: 100 Year Thursday, 08/24/2023 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 1 Pond 6 Pre-DA 6A Hydrograph type = SCS Runoff Peak discharge = 36.92 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 159,582 cuft Drainage area = 9.420 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.50 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 — 1 \ -------. - 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 2 Pond 6 Pre-DA 6B Hydrograph type = SCS Runoff Peak discharge = 13.64 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 47,174 cuft Drainage area = 2.770 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 6 Pre-DA 6B Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 14.00 I, 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 3 Pre-Dev Combined Hydrograph type = Combine Peak discharge = 48.95 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 206,756 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 12.190 ac Pre-Dev Combined Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 50.00 J 50.00 40.00 40.00 V: 30.00 30.00 I 20.00 20.00 --It10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 1 Hyd No. 2 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 4 Post Pond 6 Hydrograph type = SCS Runoff Peak discharge = 64.50 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 155,760 cuft Drainage area = 6.510 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 6 Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Time (hrs) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Hyd. No. 5 Pond Routing Hydrograph type = Reservoir Peak discharge = 9.328 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 96,594 cuft Inflow hyd. No. = 4 - Post Pond 6 Max. Elevation = 341.67 ft Reservoir name = SGW Pond 6 Max. Storage = 96,431 cuft Storage Indication method used. Pond Routing Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 I 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 lLN.I.,....._7____ 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 5 Hyd No. 4 1111111 Total storage used = 96,431 cuft 48 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Thursday,08/24/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 6 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833(ft/hr) *0.0833 ftlhr-From planting media information.Does not Top of treatment volume: Elev. = 338.18 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 335.50 pipe system.Runoff from the first 1"of rainfall must draw down between 2-5 days. Number of increments = 12.00(each) Filter Pipe Information Runs Length Length of pipe(L) = 5.64(ft) 4 300 Pipe diameter(d) = 0.333(ft) Pipe invert elevation = 330.5(ft) Depth of Filter Media(D) = 0.5(ft) Width of Filter Media(W) = 59(ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005(ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAvo) Increm.(t) ft (ft3) (ft) (ft) (i) (ft2) (ft3/hr) (ft3/hr) (hrs) 338.18 33014.1 - 7.5135 15.03 332.76 416.5 2443.8 or _ * 411.5 5.9 338.00 30570.3 7.3335 14.67 332.76 406.6 3340.1 399.6 8.4 337.75 27230.2 7.0835 14.17 332.76 392.7 3277.2 385.8 8.5 337.50 23953.0 6.8335 13.67 332.76 378.8 3214.3 371.9 8.6 337.25 20738.7 6.5835 13.17 332.76 365.0 3151.4 358.0 8.8 337.00 17587.3 6.3335 12.67 332.76 351.1 3088.5 344.2 9.0 336.75 14498.8 6.0835 12.17 332.76 337.3 3025.6 330.3 9.2 336.50 11473.3 5.8335 11.67 332.76 323.4 2962.7 316.5 9.4 336.25 8510.6 5.5835 11.17 332.76 309.5 2899.8 302.6 9.6 336.00 5610.8 5.3335 10.67 332.76 295.7 2836.9 288.7 9.8 335.75 2774.0 5.0835 10.17 332.76 281.8 2774.0 274.9 10.1 335.50 0.0 4.8335 9.67 332.76 268.0 i i in Pond Geometry Total Drawdown Time= 48.0(hours) Side slopes: Horizontal:3 Vertical: 1 Req.pipe capacity(inside dia)= 3.4(inches) Bottom Area: 10970 square feet Pipe diameter to be used= 4(inches) Bottom Perm: 335.5 feet Main line pipe slope= 0.005(feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 6 Inside Area of Structure Length 6.00 ft Width 6.00 ft Total 36.00 sq.ft Outside Area of Structure Length 7.00 ft Width 7.00 ft Total 49.00 sq.ft. Total Area 13.00 sq.ft. Height of Riser 11.50 ft Volume of Riser 149.50 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 9328.80 lb Safety Factor 1.10 Required Anchor Weight 10261.68 lb/cu.ft. Volume of Concrete Required 117.14 cu.ft. Volume of Concrete Length 8.00 Width 8.00 Depth 2.00 Total Volume 128.00 cu.ft. Yards of Concrete 4.74 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 SGS POND 7 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 7 Pre-Dev DA-7A Checked: Date: 28-Aug-23 Circle one: 4221110 Developed FN: CNPRE.XLS Runoff Curve Number(CN) Pavement 98 0.00 0.0 Woods, Poor Condition C 77 10.72 825.4 CN(weighted) =total product/total area Totals = 10.720 825.4 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 77.0 Service, June 1986 Runoff Curve Numbers Project: RDU PE 3 EXPANSION By: TSK Date: 28-Aug-23 Location: Pond 1 Post-Dev DA-1 Checked: Date: 28-Aug-23 Circle one: Present 6veloped FN: CNPOST.XLS Runoff Curve Number(CN) Pavement 98 15.27 1496.5 Grass C (Grass Cover> 75%) 74 0.0 CN(weighted) =total product/total area Totals = 15.270 1496.5 References: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Use CN= 98.0 Service, June 1986 SUBMERGED GRAVEL WETLAND POND 7 SIMPLE METHOD FOR RUNOFF VOLUME R„= 0.05+0.9 la DA= Drainage Area Rv= 0.95 DA= 15.27 AC Imp Area= 15.27 AC la= Impervious Fraction la= Impervious Area Drainage Area la= 1.00 DESIGN VOLUME REQUIRED D„= 3,630 Rd R„DA Rd = 1 in Design Storm Rv= 0.95 Dv= 52,658.60 FT3 DA= 15.27 AC Vol. Provided = 135,060.00 FT3 VOLUME PROVIDED ADEQUATE OK SURFACE AREA REQUIRED FOR DESIGN VOLUME SA= D„ Dv= 52,658.60 FT3 Design Volume Ponding Depth Ponding Depth = 3.09 FT SA= 17,041.62 FT2 SA Provided = 48,302.00 FT2 SURFACE AREA PROVIDED ADEQUATE OK Raleigh-Durham Airport Authority PE3 Expansion August 2023 Hydraflow Table of Contents SGW Pond 7.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Post Pond 7 6 Hydrograph No. 3, Reservoir, POND ROUTING 7 Pond Report - SGW POND 7 8 2 - Year Summary Report 9 Hydrograph Reports 10 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 10 Hydrograph No. 2, SCS Runoff, Post Pond 7 11 Hydrograph No. 3, Reservoir, POND ROUTING 12 5 - Year Summary Report 13 Hydrograph Reports 14 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 14 Hydrograph No. 2, SCS Runoff, Post Pond 7 15 Hydrograph No. 3, Reservoir, POND ROUTING 16 10 - Year Summary Report 17 Hydrograph Reports 18 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 18 Hydrograph No. 2, SCS Runoff, Post Pond 7 19 Hydrograph No. 3, Reservoir, POND ROUTING 20 25 - Year Summary Report 21 Hydrograph Reports 22 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 22 Hydrograph No. 2, SCS Runoff, Post Pond 7 23 Hydrograph No. 3, Reservoir, POND ROUTING 24 50 - Year Summary Report 25 Hydrograph Reports 26 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 26 Hydrograph No. 2, SCS Runoff, Post Pond 7 27 Hydrograph No. 3, Reservoir, POND ROUTING 28 Contents continued... SGW Pond 7.gpw 100 - Year Summary Report 29 Hydrograph Reports 30 Hydrograph No. 1, SCS Runoff, Pond 7 Pre-DA 7A 30 Hydrograph No. 2, SCS Runoff, Post Pond 7 31 Hydrograph No. 3, Reservoir, POND ROUTING 32 IDF Report 33 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Legend Hvd. Origin Description 1 SCS Runoff Pond 7 Pre-DA 7A 2 SCS Runoff Post Pond 7 3 Reservoir POND ROUTING Project: SGW Pond 7.gpw Wednesday, 08/30/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 8.198 12.14 18.27 23.35 30.44 36.15 42.01 Pond 7 Pre-DA 7A 2 SCS Runoff 58.14 70.58 88.45 102.50 121.36 136.22 151.29 Post Pond 7 3 Reservoir 2 0.000 0.684 2.421 5.106 8.363 11.14 16.45 POND ROUTING Proj. file: SGW Pond 7.gpw Wednesday, 08/30/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 8.198 2 734 37,625 Pond 7 Pre-DA 7A 2 SCS Runoff 58.14 2 716 135,060 Post Pond 7 3 Reservoir 0.000 2 n/a 0 2 343.09 135,060 POND ROUTING SGW Pond 7.gpw Return Period: 1 Year Wednesday, 08/30/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 8.198 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 37,625 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pond 7 Pre-DA 7A Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.42 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 28.27 + 0.00 + 0.00 = 28.27 Shallow Concentrated Flow Flow length (ft) = 266.00 0.00 0.00 Watercourse slope (%) = 8.27 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.64 0.00 0.00 Travel Time (min) = 0.96 + 0.00 + 0.00 = 0.96 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 9.49 0.00 0.00 Channel slope (%) = 3.30 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) =7.18 0.00 0.00 Flow length (ft) ({0})795.0 0.0 0.0 Travel Time (min) = 1.85 + 0.00 + 0.00 = 1.85 Total Travel Time, Tc 31.10 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 58.14 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 135,060 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 60.00 60.00 50.00 I 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 343.09 ft Reservoir name = SGW POND 7 Max. Storage = 135,060 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 3 Hyd No. 2 II I I I I I Total storage used = 135,060 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Pond No. 1 - SGW POND 7 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=340.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 340.00 38,834 0 0 1.00 341.00 41,930 40,368 40,368 2.00 342.00 45,081 43,492 83,860 3.00 343.00 48,289 46,671 130,531 4.00 344.00 51,552 49,907 180,438 5.00 345.00 54,872 53,198 233,636 6.00 346.00 58,248 56,546 290,181 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 60.00 6.00 0.00 0.00 Crest Len(ft) = 30.00 4.00 0.00 0.00 Span(in) = 60.00 48.00 0.00 0.00 Crest El.(ft) = 345.00 344.50 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 335.50 343.25 0.00 0.00 Weir Type = 1 Rect --- --- Length(ft) = 130.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 340.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.00 40,368 341.00 88.24 oc 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.00 83,860 342.00 88.24 oc 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 3.00 130,531 343.00 88.24 oc 0.00 --- 0.00 0.00 --- --- --- --- 0.000 4.00 180,438 344.00 88.24 oc 6.81 ic --- --- 0.00 0.00 --- --- --- --- 6.809 5.00 233,636 345.00 88.24 oc 11.79 ic --- --- 0.00 4.71 --- --- --- --- 16.50 6.00 290,181 346.00 139.60 oc 15.23 ic --- --- 99.90 24.47 --- --- --- --- 139.60 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.14 2 734 54,032 Pond 7 Pre-DA 7A 2 SCS Runoff 70.58 2 716 165,601 Post Pond 7 3 Reservoir 0.684 2 1182 25,056 2 343.38 149,654 POND ROUTING SGW Pond 7.gpw Return Period: 2 Year Wednesday, 08/30/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 12.14 cfs Storm frequency = 2 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 54,032 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 70.58 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 165,601 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.42 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.007--- *--------- 10.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 0.684 cfs Storm frequency = 2 yrs Time to peak = 19.70 hrs Time interval = 2 min Hyd. volume = 25,056 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 343.38 ft Reservoir name = SGW POND 7 Max. Storage = 149,654 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 - 30.00 20.00 - 20.00 10.00 - 10.00 0.00 — e'lp--- - 0.00 0 6 12 18 24 30 36 42 48 54 60 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 [ Total storage used = 149,654 cuft 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 18.27 2 734 79,798 Pond 7 Pre-DA 7A 2 SCS Runoff 88.45 2 716 209,655 Post Pond 7 3 Reservoir 2.421 2 836 69,111 2 343.56 158,693 POND ROUTING SGW Pond 7.gpw Return Period: 5 Year Wednesday, 08/30/2023 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 18.27 cfs Storm frequency = 5 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 79,798 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 --5 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 88.45 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 209,655 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 --5 Year Q (cfs) 90.00 90.00 80.00 1 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ...----- *----a 10.00 0.00 - - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 2.421 cfs Storm frequency = 5 yrs Time to peak = 13.93 hrs Time interval = 2 min Hyd. volume = 69,111 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 343.56 ft Reservoir name = SGW POND 7 Max. Storage = 158,693 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3 --5 Year Q (cfs) 90.00 - 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 158,693 cuft 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 23.35 2 734 101,371 Pond 7 Pre-DA 7A 2 SCS Runoff 102.50 2 716 244,408 Post Pond 7 3 Reservoir 5.106 2 772 103,863 2 343.79 169,732 POND ROUTING SGW Pond 7.gpw Return Period: 10 Year Wednesday, 08/30/2023 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 23.35 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 101,371 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 �- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 102.50 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 244,408 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 5.106 cfs Storm frequency = 10 yrs Time to peak = 12.87 hrs Time interval = 2 min Hyd. volume = 103,863 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 343.79 ft Reservoir name = SGW POND 7 Max. Storage = 169,732 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 169,732 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 30.44 2 732 131,586 Pond 7 Pre-DA 7A 2 SCS Runoff 121.36 2 716 291,114 Post Pond 7 3 Reservoir 8.363 2 750 150,569 2 344.25 194,000 POND ROUTING SGW Pond 7.gpw Return Period: 25 Year Wednesday, 08/30/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 30.44 cfs Storm frequency = 25 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 131,586 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 I 20.00 20.00 15.00 15.00 I 10.00 10.00 5.00 5.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 121.36 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 291,114 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.84 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 I 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 8.363 cfs Storm frequency = 25 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 150,569 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 344.25 ft Reservoir name = SGW POND 7 Max. Storage = 194,000 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3--25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 -_- 40.00 20.00 20.00 W- 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 [ Total storage used = 194,000 cuft 25 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 36.15 2 732 156,168 Pond 7 Pre-DA 7A 2 SCS Runoff 136.22 2 716 327,972 Post Pond 7 3 Reservoir 11.14 2 746 187,427 2 344.65 215,044 POND ROUTING SGW Pond 7.gpw Return Period: 50 Year Wednesday, 08/30/2023 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 36.15 cfs Storm frequency = 50 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 156,168 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 136.22 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 327,972 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 140.00 - - _I 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 - 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 11.14 cfs Storm frequency = 50 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 187,427 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 344.65 ft Reservoir name = SGW POND 7 Max. Storage = 215,044 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 215,044 cuft 29 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 42.01 2 732 181,605 Pond 7 Pre-DA 7A 2 SCS Runoff 151.29 2 716 365,355 Post Pond 7 3 Reservoir 16.45 2 736 224,811 2 345.00 233,473 POND ROUTING SGW Pond 7.gpw Return Period: 100 Year Wednesday, 08/30/2023 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 1 Pond 7 Pre-DA 7A Hydrograph type = SCS Runoff Peak discharge = 42.01 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 181,605 cuft Drainage area = 10.720 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 31.10 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pond 7 Pre-DA 7A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 50.00 50.00 40.00j .,......, 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 2 Post Pond 7 Hydrograph type = SCS Runoff Peak discharge = 151.29 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 365,355 cuft Drainage area = 15.270 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Pond 7 Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Hyd. No. 3 POND ROUTING Hydrograph type = Reservoir Peak discharge = 16.45 cfs Storm frequency = 100 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 224,811 cuft Inflow hyd. No. = 2 - Post Pond 7 Max. Elevation = 345.00 ft Reservoir name = SGW POND 7 Max. Storage = 233,473 cuft Storage Indication method used. POND ROUTING Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Time (hrs) Hyd No. 3 Hyd No. 2 1111111 [ Total storage used = 233,473 cuft 33 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,08/30/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. name: P:\2021 Projects\21-065-RDU Parking Expansion_RSH\Design\_Pond Design\21-065-RDU Precip Data.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.83 3.42 0.00 4.27 4.94 5.84 6.55 7.27 SCS 6-Hr 0.00 0.00 0.00 2.99 0.00 4.08 4.58 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Incremental Method for Calculating Drawdown Time for Vertical Filter Systems Using Darcy's Equation Submerged Gravel Wetland Drawdown Calculations Project Name: RDU PE3 Pond 7 Project Number: 21-065 Basin Information Filter permeability(k)* = 0.0833(ft/hr) *0.0833 ft/hr-From planting media information.Does not Top of treatment volume: Elev. = 343.09 account for#57 washed stone encircling the underdrain Bottom of treatment volume: Elev. = 338.00 pipe system.Runoff from the first 1"of rainfall must draw down between 2-5 days. Number of increments = 12.00(each) Filter Pipe Information Runs Length Length of pipe(L) = 11.75(ft) 4 300 Pipe diameter(d) = 0.5(ft) Pipe invert elevation = 335.5(ft) Depth of Filter Media(D) = 0.5(ft) Width of Filter Media(W) = 88(ft) Mannings"n" = 0.01 unitless Slope(ft per ft) = 0.005(ft per ft) Average Drawdown Storage Change in Hydraulic Average Filter Instantaneous Discharge Per Time Per Elevation Storage Increment(V) Elevation(H) Gradient Flow Area(A) Discharge(Q) Increm.(QAVG) Increm.(t) ft (ft3) (ft3) (ft) (I) (ft2) (ft3/hr) (ft3/hr) (hrs) 343.09 124866.6 7.34 14.68 1034 1264.4 3774.6 I r I 1256.7 3.0 343.00 121092.0 7.25 14.50 1034 1248.9 10441.6 1227.4 8.5 342.75 110650.4 7 14.00 1034 1205.9 10377.9 1184.3 8.8 342.50 100272.5 6.75 13.50 1034 1162.8 10314.1 1141.3 9.0 342.25 89958.4 6.5 13.00 1034 1119.7 10250.4 1184.3 8.7 342.00 79708.0 6.25 12.50 1034 1076.7 10186.6 1055.1 9.7 341.75 69521.4 6 12.00 1034 1033.6 10122.9 1012.1 10.0 341.50 59398.5 5.75 11.50 1034 990.5 10059.1 969.0 10.4 341.25 49339.4 5.5 11.00 1034 947.5 9995.4 925.9 10.8 341.00 39344.0 5.25 10.50 1034 904.4 9931.6 882.9 11.2 340.75 29412.4 5 10.00 1034, 861.3 9867.9 839.8 11.8 340.50 19544.5 4.75 9.50 1034 818.3 9804.1 796.7_ 12.3 340.25 9740.4 4.5 9.00 1034 775.2 9740.4 753.7_ 12.9 340.00 0.0_ 4.25 8.50 1034 732.1 Pond Geometry Total Drawdown Time= 48.2(hours) Side slopes: Horizontal:3 Vertical: 1 Req.pipe capacity(inside dia)= 5.2(inches) Bottom Area: 38834 square feet Pipe diameter to be used= 6(inches) Bottom Perm: 340 feet Main line pipe slope= 0.005(feet/foot) Raleigh-Durham Airport Authority PE3 Expansion August 2023 ANTI-FLOTATION CALCULATIONS SGW Pond 7 Inside Area of Structure Length 9.00 ft Width 6.00 ft Total 54.00 sq.ft Outside Area of Structure Length 10.00 ft Width 7.00 ft Total 70.00 sq.ft. Total Area 16.00 sq.ft. Height of Riser 11.50 ft Volume of Riser 184.00 cu.ft. Weight of Concrete 150.00 lb/cu.ft. Weight of Water 62.40 lb/cu.ft. Amount of Water Displaced 11481.60 lb Safety Factor 1.10 Required Anchor Weight 12629.76 lb/cu.ft. Volume of Concrete Required 144.18 cu.ft. Volume of Concrete Length 12.00 Width 8.00 Depth 2.00 Total Volume 192.00 cu.ft. Yards of Concrete 7.11 cu. Yd. RDU PE3 21-065 Parking Lot Expansion 8/28/2023 STORM DRAINAGE DESIGN PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 347.31 346.59 0.09 0.06% 1.51 2.68 0.000 K=0.0 S-114 Inlet S-113 144 RCP 0.95 0.40 0.38 7.04 2.68 2.68 351.45 0.50 348.31 347.59 18 0.013 3.14 0.021 K=0.6 _ 346.81 346.09 0.72 0.50% 4.20 7.43 0.021 - 346.29 344.47 0.21 0.22% 2.76 4.88 0.000 K=0.0 S-113 Inlet S-112 97 RCP 0.95 0.33 0.31 7.04 2.21 4.88 350.60 0.50 347.29 345.47 18 0.013 3.31 0.071 K=0.6 345.79 343.97 1.82 1.88% 8.15 14.40 0.071 341.59 341.37 0.22 0.30% 3.25 5.75 0.000 K=0.0 S-112 Inlet S-102 72 RCP 0.95 0.13 0.12 7.04 0.87 5.75 350.02 0.50 341.38 339.58 18 0.013 8.64 0.099 K=0.6 339.88 338.08 1.80 2.50% 9.40 16.61 0.099 342.31 341.53 0.29 0.18% 3.09 9.70 0.000 K=0.0 S-111 Inlet S-110 157 RCP 0.95 1.45 1.38 7.04 9.70 9.70 346.76 1.00 343.31 342.53 24 0.013 3.45 0.089 K=0.6 341.31 340.53 0.79 0.50% 5.09 16.00 0.089 341.28 340.75 0.16 0.15% 3.26 15.98 0.000 K=0.0 S-110 Inlet S-109 105 RCP 0.95 0.94 0.89 7.04 6.29 15.98 347.61 1.25 342.53 342.00 30 0.013 5.09 0.099 K=0.6 340.03 339.50 0.53 0.50% 5.91 29.00 0.099 340.25 338.83 0.36 0.13% 3.37 23.81 0.000 K=0.0 S-109 Inlet S-108 284 RCP 0.95 1.17 1.11 7.04 7.82 23.81 348.17 1.25 342.00 340.58 36 0.013 6.17 0.106 K=0.6 339.00 337.58 1.42 0.50% 6.67 47.16 0.106 338.88 338.30 0.19 0.16% 3.78 26.75 0.000 K=0.0 S-108 Inlet S-107 116 RCP 0.95 0.44 0.42 7.04 2.94 26.75 350.32 1.50 340.38 339.80 36 0.013 9.94 0.134 K=0.6 337.38 336.80 0.58 0.50% 6.67 47.16 0.134- - 337.80 337.32 0.10 0.10% 3.33 32.04 0.000 K=0.0 S-107 Inlet S-106 96 RCP 0.95 0.79 0.75 7.04 5.28 32.04 348.36 1.50 339.80 339.32 42 0.013 8.56 0.103 K=0.6 336.30 335.82 0.48 0.50% 7.39 71.14 0.103 337.12 335.92 0.25 0.11% 3.41 32.77 0.000 K=0.0 S-106 Inlet S-104 240 RCP 0.95 0.11 0.10 7.04 0.74 I 32.77 351.98 1.50 339.12 337.92 42 0.013 12.86 0.108 K=0.6 335.62 334.42 1.20 0.50% 7.39 71.14 0.108 335.58 334.62 0.27 0.14% 3.90 37.49 0.000 K=0.0 S-105 Inlet S-104 193 RCP 0.95 0.67 0.67 7.04 4.72 37.49 350.28 1.50 337.58 336.62 42 0.013 12.70 0.142 K=0.6 334.08 333.12 0.97 0.50% 7.39 71.14 0.142 334.29 333.51 0.26 0.17% 4.26 41.03 0.000 K=0.0 S-104 Inlet S-103 156 RCP 0.95 0.53 0.50 7.04 3.54 41.03 348.74 1.50 336.29 335.51 42 0.013 12.46 0.170 K=0.6 332.79 332.01 0.78 0.50% 7.39 71.14 0.170 333.42 332.93 0.22 0.22% 4.93 47.39 0.000 K=0.0 S-103 Inlet S-102 97 RCP 0.95 0.95 0.90 7.04 6.35 47.39 347.50 1.75 335.17 334.68 42 0.013 12.34 0.226 K=0.6 331.67 331.18 0.49 0.50% 7.39 71.14 0.226 325.83 325.55 0.18 0.28% 5.56 53.54 0.000 K=0.0 S-102 Inlet S-101 65 RCP 0.95 0.06 0.06 7.04 0.40 53.54 347.50 1.75 327.58 326.93 42 0.013 19.93 0.289 K=0.6 324.08 323.43 0.65 1.00% 10.46 100.61 0.289 325.26 325.13 0.13 0.28% 5.56 53.54 0.000 K=0.0 S-101 JB S-100 45 RCP 0.95 0.00 0.00 7.04 0.00 53.54 331.41 1.75 326.73 326.50 42 0.013 4.69 0.385 K=0.8 323.23 323.00 0.23 0.50% 7.39 71.14 0.385 S-100 HW 7.97 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall , to TOP Total(ft) 348.52 346.66 0.02 0.02% 0.65 0.80 0.000 K=0.0 S-124 Inlet S-121 118 RCP 0.95 0.12 0.11 7.04 0.80 0.80 352.30 0.63 349.14 347.28 15 0.013 3.16 0.004 K=0.6 347.89 346.03 1.86 1.58% 6.62 8.12 0.004 346.53 345.27 0.05 0.07% 1.63 2.88 0.000 K=0.0 S-123 Inlet S-122 65 RCP 0.95 0.31 0.29 7.04 2.07 2.88 350.99 0.75 347.28 346.00 18 0.013 3.71 0.025 K=0.6 345.78 344.50 1.28 1.97% 8.34 14.74 0.025 345.00 344.48 0.02 0.06% 1.75 5.48 0.000 K=0.0 S-122 Inlet S-118 36 RCP 0.95 0.39 0.37 7.04 2.61 5.48 349.99 1.00 346.00 345.45 24 0.013 3.99 0.028 K=0.6 344.00 343.45 0.55 1.52% 8.88 27.89 0.028 346.25 344.82 0.11 0.09% 1.78 3.14 0.000 K=0.0 S-121 Inlet S-120 122 RCP 0.95 0.47 0.45 7.04 3.14 3.14 350.00 0.75 347.00 345.54 18 0.013 3.00 0.030 K=0.6 345.50 344.04 1.46 1.20% 6.51 11.51 0.030 344.29 343.82 0.04 0.11% 2.74 13.44 0.000 K=0.0 S-120 Inlet S-119 36 RCP 0.95 1.54 1.46 7.04 10.30 13.44 349.00 1.25 345.54 345.00 30 0.013 3.46 0.070 K=0.6 343.04 342.50 0.54 1.50% 10.23 50.24 0.070 343.42 340.84 0.23 0.13% 3.04 14.91 0.000 K=0.0 S-119 Inlet S-118 175 RCP 0.95 0.22 0.21 7.04 1.47 14.91 349.22 1.25 344.67 342.00 30 0.013 4.55 0.086 K=0.6 342.17 339.50 2.67 1.53% 10.32 50.65 0.086 340.50 338.59 0.31 0.10% 3.01 21.27 0.000 K=0.0 S-118 Inlet S-117 305 RCP 0.95 0.13 0.12 7.04 0.87 21.27 349.30 1.50 342.00 340.00 36 0.013 7.30 0.084 K=0.6 339.00 337.00 2.00 0.66% 7.64 53.98 0.084 337.98 328.61 0.31 0.10% 3.01 21.27 0.000 K=0.0 S-117 JB S-116 302 RCP 0.95 0.00 0.00 7.04 0.00 21.27 347.68 1.50 339.48 330.00 36 0.013 8.20 0.113 K=0.8 I 336.48 327.00 9.48 3.14% 16.72 118.19 0.113 324.77 324.61 0.05 0.10% 3.01 21.27 0.000 K=0.0 S-116 JB S-115 54 RCP 0.95 0.00 0.00 7.04 0.00 21.27 334.00 1.50 326.27 326.00 36 0.013 7.73 0.113 K=0.8 323.27 323.00 0.27 0.50% 6.67 47.16 0.113 S-115 HW 3.18 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr i Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 338.41 338.28 0.02 0.08% 1.98 6.22 0.000 S-225 Inlet S-222 24 RCP 0.95 0.93 0.88 7.04 6.22 6.22 343.52 0.75 339.66 339.49 24 0.013 3.86 0.037 337.66 337.49 0.17 0.69% 5.98 18.79 0.037 342.25 340.27 0.07 0.07% 1.36 1.67 0.000 S-224 Inlet S-223 99 RCP 0.95 0.25 0.24 7.04 1.67 1.67 345.60 1.50 342.00 340.00 15 0.013 3.60 0.017 340.75 338.75 2.00 2.02% 7.48 9.18 0.017 339.50 339.06 0.05 0.15% 2.81 8.83 0.000 S-223 Inlet S-222 35 RCP 0.95 0.14 0.13 7.04 0.94 8.83 343.31 1.50 340.00 339.49 24 0.013 3.31 0.074 338.00 337.49 0.51 1.45% 8.67 27.24 0.074 338.40 336.90 1.49 0.81% 6.47 20.33 0.000 S-222 Inlet S-221 185 RCP 0.95 1 0.79 0.75 7.04 5.28 20.33 342.65 1.00 338.49 337.51 24 0.013 4.16 0.391 336.49 335.51 0.98 0.53% 5.24 16.47 0.391 337.10 335.40 1.69 1.34% 8.35 26.22 0.000 S-221 Inlet S-220 126 RCP 0.95 0.88 0.84 7.04 5.89 26.22 344.45 0.75 337.20 336.00 24 0.013 7.25 0.649 335.20 334.00 1.20 0.95% 7.02 22.05 0.649 334.42 333.90 0.21 0.18% 4.05 28.62 0.000 S-220 Inlet S-219 114 RCP 0.95 0.36 0.34 7.04 2.41 28.62 343.61 0.75 336.67 336.00 36 0.013 6.94 0.153 333.67 333.00 0.67 0.59% 7.25 51.23 0.153 333.25 332.84 0.06 0.11% 3.40 32.70 0.000 S-219 Inlet S-218 53 RCP 0.95 0.61 0.58 7.04 4.08 32.70 342.66 0.75 336.00 335.49 42 0.013 6.66 0.108 332.50 331.99 0.51 0.97% 10.30 99.09 0.108 332.41 331.74 0.13 0.11% 3.46 33.31 0.000 S-218 Inlet S-206 115 RCP 0.95 0.09 0.09 7.04 0.60 33.31 341.60 0.75 335.16 334.38 42 0.013 6.44 0.112 331.66 330.88 0.78 0.68% 8.62 82.96 0.112 337.04 336.14 0.12 0.19% 2.29 2.81 0.000 S-217 Inlet S-216 64 RCP 0.95 0.42 0.40 7.04 2.81 2.81 343.08 0.75 337.54 336.59 15 0.013 5.54 0.049 336.29 335.34 0.95 1.48% 6.40 7.86 0.049 335.34 330.63 0.13 0.09% 2.19 6.89 0.000 S-216 Inlet S-215 137 RCP 0.95 0.61 0.58 7.04 4.08 6.89 340.66 0.75 336.59 331.84 24 0.013 4.07 0.045 334.59 329.84 4.75 3.47% 13.41 42.14 0.045 330.12 328.31 0.05 0.11% 2.72 13.38 0.000 S-215 Inlet S-202 51 RCP 0.95 0.97 0.92 7.04 6.49 13.38 335.48 0.75 331.87 330.00 30 0.013 3.61 0.069 329.37 327.50 1.87 3.67% 16.01 78.59 0.069 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. O (ft) Entrance Losses Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses (cfs) (ft) Up End Dn End Fall to TOP Total(ft) 338.25 337.86 0.02 0.03% 1.10 1.94 0.000 S-214 Inlet S-212 62 RCP 0.95 0.29 0.28 7.04 1.94 1.94 342.61 0.75 339.00 338.60 18 0.013 3.61 0.011 337.50 337.10 0.40 0.65% 4.79 8.47 0.011 339.33 338.08 0.02 0.02% 0.76 0.94 0.000 S-213 Inlet S-212 108 RCP 0.95 0.14 0.13 7.04 0.94 0.94 342.98 1.00 339.58 338.33 15 0.013 3.40 0.005 338.33 337.08 1.25 1.16% 5.67 6.96 0.005 337.33 336.39 0.03 0.05% 1.84 9.03 0.000 S-212 Inlet S-205 53 RCP 0.95 0.92 0.87 7.04 6.15 9.03 342.51 1.50 338.33 337.36 30 0.013 4.18 0.032 335.83 334.86 0.97 1.83% 11.30 55.49 0.032 343.63 340.05 0.15 0.13% 2.12 3.75 0.000 S-210 Inlet S-209 121 RCP 0.95 0.56 0.53 7.04 3.75 3.75 346.72 1.50 343.63 340.00 18 0.013 3.09 0.042 342.13 338.50 3.63 3.00% 10.30 18.19 0.042 339.05 336.77 0.04 0.05% 1.64 5.15 0.000 S-209 Inlet S-204 82 RCP 0.95 0.21 0.20 7.04 1.40 5.15 343.66 0.75 340.30 337.99 24 0.013 3.36 0.025 338.30 335.99 2.31 2.82% 12.09 37.99 0.025 337.45 337.14 0.03 0.11% 2.38 7.49 0.000 S-208 Inlet S-207 28 RCP 0.95 1.12 1.06 7.04 7.49 7.49 342.09 0.75 338.70 338.33 24 0.013 3.39 0.053 336.70 336.33 0.37 1.32% 8.27 25.99 0.053 336.56 335.80 0.10 0.19% 3.17 9.97_ 0.000 S-207 Inlet S-206 52 RCP 0.95 0.37 0.35 7.04 2.47 9.97 341.72 0.25 338.31 337.46 24 0.013 3.41 0.094 336.31 335.46 0.86 1.65% 9.25 29.06 0.094 330.63 328.87 0.27 0.11% 3.74 46.95 0.000 S-206 Inlet S-205 250 RCP 0.95 0.55 0.52 7.04 3.68 46.95 341.00 0.25 334.38 332.49 48 0.013 6.63 0.130 330.38 328.49 1.89 0.76% 9.93 124.81 0.130 328.74 328.04 0.11 0.09% 3.66 58.25 0.000 S-205 Inlet S-204 125 RCP 0.95 0.34 0.32 7.04 2.27 58.25 341.50 0.75 332.49 331.66 54 0.013 9.01 0.125 327.99 327.16 0.83 0.66% 10.04 159.76 0.125 328.58 327.40 0.22 0.11% 4.07 64.67 0.000 S-204 Inlet S-203 205 RCP 0.95 0.19 0.18 7.04 1.27 64.67 341.66 1.75 331.33 330.00 54 0.013 10.33 0.154 326.83 325.50 1.33 0.65% 9.97 158.54 0.154 327.18 325.56 0.24 0.12% 4.20 66.75_ 0.000 S-203 Inlet S-202 210 RCP 0.95 0.31 0.29 7.04 2.07 66.75 339.05 2.00 329.68 327.90 54 0.013 9.37 0.164 325.18 323.40 1.79 0.85% 11.40 181.30 0.164 322.78 322.53 0.11 0.12% 4.62 90.76 0.000 S-202 Inlet S-201 88 RCP 0.95 1.59 1.51 7.04 10.63 90.76 334.10 2.00 325.78 325.34 60 0.013 8.33 0.199 320.78 320.34 0.44 0.50% 9.38 184.16 0.199 322.30 322.27 0.03 0.12% 4.62 90.76 0.000 S-201 JB S-200 27 RCP 0.95 0.00 0.00 7.04 0.00 90.76 327.50 2.00 325.14 325.00 60 0.013 2.37 0.266 320.14 320.00 0.14 0.50% 9.38 184.16 0.266 S-200 HW 12.64 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 332.39 328.65 0.27 0.10% 1.63 2.01 0.000 K=0.0 S-307 Inlet S-301 285 RCP 0.95 0.30 0.29 7.04 2.01 2.01 336.16 0.63 333.01 326.72 15 0.013 3.15 0.025 K=0.6 331.76 325.47 6.30 2.21% 7.83 9.60 0.025 329.58 329.01 0.08 0.08% 1.53 1.87 0.000 K=0.0 S-306 Inlet S-305 92 RCP 0.95 0.28 0.27 7.04 1.87 1.87 333.62 0.63 330.20 329.63 15 0.013 3.42 0.022 K=0.6 328.95 328.38 0.57 0.62% 4.14 5.09 0.022 328.63 326.83 0.41 0.24% 3.56 11.17 0.000 K=0.0 S-305 Inlet S-304 168 RCP 0.95 1.39 1.32 7.04 9.30 11.17 332.81 1.00 329.63 327.83 24 0.013 3.18 0.118 K=0.6 327.63 325.83 1.80 1.07% 7.45 23.40 0.118 326.58 325.85 0.24 0.16% 3.38 16.59 0.000 K=0.0 S-304 Inlet S-303 147 RCP 0.95 0.81 0.77 7.04 5.42 16.59 331.34 1.25 327.83 327.10 30 0.013 3.51 0.106 K=0.6 _ 325.33 324.60 0.74 0.50% 5.91 29.00 0.106 325.35 324.88 0.10 0.11% 3.39 32.64 0.000 K=0.0 S-303 Inlet S-302 94 RCP 0.95 2.40 2.28 7.04 16.05 32.64 330.05 1.75 327.10 326.63 42 0.013 2.96 0.107 K=0.6 323.60 323.13 0.47 0.50% 7.39 71.14 0.107 324.68 324.23 0.12 0.13% 3.80 36.52 0.000 K=0.0 S-302 Inlet S-301 90 RCP 0.95 0.58 0.55 7.04 3.88 36.52 330.00 1.75 326.43 325.98 42 0.013 3.58 0.134 K=0.6 322.93 322.48 0.45 0.50% 7.39 71.14 0.134 324.06 323.97 0.09 0.16% 4.24 40.80 0.000 K=0.0 S-301 Inlet S-300 55 RCP 0.95 0.34 0.32 7.04 2.27 40.80 330.00 1.75 325.78 325.50 42 0.013 4.23 0.224 K=0.8 322.28 322.00 0.28 0.50% 7.39 71.14 0.224 S-300 HW 6.10 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 349.31 346.85 0.08 0.21% 3.32 10.43 0.000 K=0.0 S-446 Inlet S-437 36 RCP 0.95 1.56 1.48 7.04 10.43 10.43 354.01 0.75 350.56 348.00 24 0.013 3.45 0.103 K=0.6 _ 348.56 346.00 2.56 7.10% 19.19 60.28 0.103 - 346.25 343.17 0.09 0.09% 2.56 12.57 0.000 K=0.0 S-437 Inlet S-401 95 RCP 0.95 0.32 0.30 7.04 2.14 12.57 353.40 0.75 348.00 344.86 30 0.013 5.40 0.061 K=0.6 345.50 342.36 3.14 3.31% 15.20 74.62 0.061 350.49 347.04 0.00 0.00% 0.33 0.40 0.000 K=0.0 S-425 Inlet S-419 120 RCP 0.95 0.06 0.06 7.04 0.40 0.40 354.68 0.75 350.99 347.54 15 0.013 3.69 0.001 K=0.6 349.74 346.29 3.44 2.87% 8.92 10.94 0.001 351.66 351.11 0.06 0.10% 1.63 2.01 0.000 K=0.0 S-424 Inlet S-423 66 RCP 0.95 0.30 0.29 7.04 2.01 2.01 355.52 0.75 352.16 351.58 15 0.013 3.36 0.025 K=0.6 350.91 350.33 0.57 0.87% 4.91 6.03 0.025 350.83 349.81 0.43 0.22% 2.76 4.88 0.000 K=0.0 S-423 Inlet S-422 199 RCP 0.95 0.43 0.41 7.04 2.88 4.88 355.27 0.75 351.58 350.49 18 0.013 3.69 0.071 K=0.6 350.08 348.99 1.09 0.55% 4.41 7.79 0.071 349.24 346.79 0.22 0.08% 2.09 6.55 0.000 K=0.0 S-422 Inlet S-421 257 RCP 0.95 0.25 0.24 7.04 1.67 6.55 356.02 0.75 350.49 348.00 24 0.013 5.53 0.041 K=0.6 348.49 346.00 2.49 0.97% 7.09 22.28 0.041 349.42 348.79 0.08 0.08% 2.09 6.55 0.000 K=0.0 S-421 Inlet S-420 90 RCP 0.95 0.98 0.93 7.04 6.55 6.55 354.53 0.75 350.67 350.00 24 0.013 3.86 0.041 K=0.6 _ 348.67 348.00 0.68 0.75% 6.24 19.59 0.041 - 345.75 345.34 0.02 0.06% 2.36 16.65 0.000 K=0.0 S-420 Inlet S-419 39 RCP 0.95 0.53 0.50 7.04 3.54 16.65 355.04 0.75 348.00 347.54 36 0.013 7.04 0.052 K=0.6 345.00 344.54 0.46 1.17% 10.21 72.15 0.052 345.29 344.53 0.04 0.07% 2.52 17.79 0.000 K=0.0 S-419 Inlet S-401 51 RCP 0.95 0.11 0.10 7.04 0.74 17.79 354.54 0.75 347.54 346.73 36 0.013 7.00 0.059 K=0.6 344.54 343.73 0.82 1.60% 11.94 84.37 0.059 341.11 340.87 0.06 0.09% 3.16 30.36 0.000 K=0.0 S-401 JB S-400 71 RCP 0.95 0.00 0.00 7.04 0.00 30.36 349.10 1.75 342.86 342.50 42 0.013 6.25 0.124 K=0.8 339.36 339.00 0.36 0.50% 7.39 71.14 0.124 1 S-400 HW 4.54 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall , to TOP Total(ft) 355.00 354.02 0.03 0.05% 1.60 5.02 0.000 K=0.0 S-471 Inlet S-470 60 RCP 0.95 0.75 0.71 7.04 5.02 5.02 359.83 1.00 356.00 355.00 24 0.013 3.83 0.024 K=0.6 354.00 353.00 1.00 1.67% 9.31 29.23 0.024 353.75 352.02 0.04 0.05% 1.66 5.22 0.000 K=0.0 S-470 Inlet S-463 73 RCP 0.95 0.03 0.03 7.04 0.20 5.22 358.56 1.00 354.75 353.00 24 0.013 3.81 0.026 K=0.6 352.75 351.00 1.75 2.40% 11.16 35.05 0.026 344.00 343.38 0.05 0.06% 1.25 1.54 0.000 K=0.0 S-469 Inlet S-467 87 RCP 0.95 0.23 0.22 7.04 1.54 1.54 348.00 0.63 344.62 344.00 15 0.013 3.38 0.015 K=0.6 343.37 342.75 0.63 0.72% 4.47 5.48 0.015 344.80 342.05 0.03 0.02% 0.76 0.94 0.000 K=0.0 S-468 Inlet S-467 138 RCP 0.95 0.14 0.13 7.04 0.94 0.94 352.31 0.63 345.43 342.67 15 0.013 6.89 0.005 K=0.6 344.18 341.42 2.76 2.00% 7.44 9.14 0.005 341.92 341.51 0.09 0.10% 1.89 3.34 0.000 K=0.0 S-467 Inlet S-465 87 RCP 0.95 0.13 0.12 7.04 0.87 3.34 349.72 0.75 342.67 342.23 18 0.013 7.06 0.033 K=0.6 341.17 340.73 0.44 0.50% 4.20 7.43 0.033 346.00 345.03 0.01 0.07% 1.87 5.89 0.000 K=0.0 S-466 Inlet S-465 20 RCP 0.95 0.88 0.84 7.04 5.89 5.89 350.71 1.00 347.00 346.00 24 0.013 3.71 0.033 K=0.6 _ 345.00 344.00 1.00 5.01% 16.12 50.64 0.033 _ 341.78 341.01 0.12 0.07% 2.28 11.17 0.000 K=0.0 S-465 Inlet S-461 163 RCP 0.95 0.29 0.28 7.04 1.94 I 11.17 350.32 1.25 343.03 342.22 30 0.013 7.29 0.048 K=0.6 340.53 339.72 0.82 0.50% 5.91 29.00 0.048 348.26 341.51 0.12 0.13% 2.12 3.75 0.000 K=0.0 S-464 Inlet S-461 96 RCP 0.95 0.56 0.53 7.04 3.75 3.75 357.51 0.75 349.01 342.22 18 0.013 8.50 0.042 K=0.6 347.51 340.72 6.80 7.08% 15.82 27.95 0.042 351.76 350.03 0.02 0.06% 1.79 5.62 0.000 K=0.0 S-463 Inlet S-462 36 RCP 0.95 0.06 0.06 7.04 0.40 5.62 357.31 1.00 352.76 351.00 24 0.013 4.55 0.030 K=0.6 350.76 349.00 1.76 4.88% 15.91 49.97 0.030 346.08 343.04 0.07 0.09% 2.21 6.96 0.000 K=0.0 S-462 Inlet S-461 76 RCP 0.95 0.20 0.19 7.04 1.34 6.96 354.64 1.00 347.08 344.00 24 0.013 7.56 0.046 K=0.6 345.08 342.00 3.09 4.06% 14.51 45.58 0.046 340.72 340.62 0.05 0.11% 3.09 21.87 0.000 K=0.0 S-461 JB S-460 43 RCP 0.95 0.00 0.00 7.04 0.00 21.87 347.31 1.50 342.22 342.00 36 0.013 5.10 0.119 K=0.8 339.22 339.00 0.22 0.50% 6.67 47.16 0.119 S-460 HW 3.27 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall , to TOP Total(ft) 349.09 347.34 0.04 0.10% 2.28 7.16 0.000 K=0.0 S-436 Inlet S-426 36 RCP 0.95 1.07 1.02 7.04 7.16 7.16 353.83 0.75 350.34 348.54 24 0.013 3.49 0.048 K=0.6 348.34 346.54 1.80 4.99% 16.09 50.53 0.048 348.78 347.28 0.12 0.08% 1.70 3.01 0.000 K=0.0 S-435 Inlet S-434 150 RCP 0.95 0.45 0.43 7.04 3.01 3.01 352.86 0.75 349.53 348.00 18 0.013 3.33 0.027 K=0.6 348.03 346.50 1.53 1.02% 6.00 10.61 0.027 346.75 346.67 0.08 0.22% 3.34 10.50 0.000 K=0.0 S-434 Inlet S-427 36 RCP 0.95 1.12 1.06 7.04 7.49 10.50 350.79 0.75 348.00 347.82 24 0.013 2.79 0.104 K=0.6 346.00 345.82 0.18 0.50% 5.09 16.00 0.104 345.94 344.61 0.25 0.09% 2.49 12.24 0.000 K=0.0 S-427 Inlet S-426 278 RCP 0.95 0.26 0.25 7.04 1.74 12.24 349.71 0.75 347.69 346.30 30 0.013 2.02 0.058 K=0.6 345.19 343.80 1.39 0.50% 5.91 29.00 0.058 344.05 343.10 0.19 0.09% 2.87 20.26 0.000 K=0.0 S-426 Inlet S-483 206 RCP 0.95 0.13 0.12 7.04 0.87 20.26 352.62 0.75 346.30 345.27 36 0.013 6.32 0.077 K=0.6 343.30 342.27 1.03 0.50% 6.67 47.16 0.077 344.33 344.01 0.04 0.07% 1.36 1.67 0.000 K=0.0 S-487 Inlet S-485 67 RCP 0.95 0.25 0.24 7.04 1.67 1.67 346.61 1.50 344.08 343.75 15 0.013 2.53 0.017 K=0.6 342.83 342.50 0.34 0.50% 3.72 4.57 0.017 343.91 343.55 0.01 0.01% 0.49 0.60 0.000 K=0.0 S-486 Inlet S-485 73 RCP 0.95 0.09 0.09 7.04 0.60 0.60 348.74 1.00 344.16 343.80 15 0.013 4.58 0.002 K=0.6 342.91 342.55 0.37 0.50% 3.72 4.57 0.002 343.80 343.58 0.04 0.09% 1.78 3.14 0.000 K=0.0 S-485 Inlet S-484 48 RCP 0.95 0.13 0.12 7.04 0.87 3.14 347.04 1.50 343.80 343.56 18 0.013 3.25 0.030 K=0.6 342.30 342.06 0.24 0.50% 4.20 7.43 0.030 342.56 341.85 0.20 0.13% 2.58 8.09 0.000 K=0.0 S-484 Inlet S-482 153 RCP 0.95 0.74 0.70 7.04 4.95 8.09 347.52 0.75 343.81 343.04 24 0.013 3.72 0.062 K=0.6 341.81 341.04 0.77 0.50% 5.09 16.00 0.062 341.90 341.48 0.10 0.10% 3.56 44.68 0.000 K=0.0 S-483 Inlet S-482 106 RCP 0.95 0.62 0.59 7.04 4.15 44.68 351.03 0.63 345.27 344.74 48 0.013 5.76 0.118 K=0.6 341.27 340.74 0.53 0.50% 8.08 101.57 0.118 341.17 340.34 0.30 0.15% 4.45 55.91 0.000 K=0.0 S-482 Inlet S-481 201 RCP 0.95 0.47 0.45 7.04 3.14 55.91 349.59 0.63 344.54 343.54 48 0.013 5.05 0.185 K=0.6 340.54 339.54 1.01 0.50% 8.08 101.57 0.185 341.10 341.00 0.10 0.15% 4.45 55.91 0.000 K=0.0 S-481 JB S-480 67 RCP 0.95 0.00 0.00 7.04 0.00 55.91 351.09 1.75 343.34 343.00 48 0.013 7.76 0.246 K=0.8 _ 339.34 339.00 0.34 0.50% 8.08 101.57 0.246 S-480 HW I 5.33 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 8.72 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 364.10 362.34 0.15 0.15% 2.77 8.70 0.000 K=0.0 S-517 Inlet S-516 99 RCP 0.95 1.05 1.00 8.72 8.70 8.70 369.42 0.63 365.47 363.64 24 0.013 3.95 0.071 K=0.6 363.47 361.64 1.83 1.85% 9.79 30.77 0.071 356.75 351.19 0.13 0.16% 3.38 16.57 0.000 K=0.0 S-516 Inlet S-501 82 RCP 0.95 0.95 0.90 8.72 7.87 16.57 369.79 0.75 358.50 352.84 30 0.013 11.29 0.106 K=0.6 356.00 350.34 5.67 6.91% 21.97 107.82 0.106 360.51 358.63 0.41 0.32% 3.38 5.96 0.000 K=0.0 S-515 Inlet S-514 128 RCP 0.95 0.72 0.68 8.72 5.96 5.96 364.92 0.63 361.38 359.39 18 0.013 3.54 0.106 K=0.6 359.88 357.89 1.98 1.55% 7.40 13.08 0.106 357.91 356.11 0.19 0.15% 3.26 15.99 0.000 K=0.0 S-514 Inlet S-513 125 RCP 0.95 1.21 1.15 8.72 10.02 15.99 362.89 1.00 359.41 357.51 30 0.013 3.48 0.099 K=0.6 356.91 355.01 1.90 1.52% 10.30 50.57 0.099 355.76 353.72 0.26 0.17% 3.90 27.59 0.000 K=0.0 S-513 Inlet S-512 151 RCP 0.95 1.40 1.33 8.72 11.60 27.59 360.92 1.25 357.51 355.33 36 0.013 3.41 0.142 K=0.6 354.51 352.33 2.19 1.45% 11.36 80.32 0.142 353.25 352.64 0.41 0.25% 4.73 33.47 0.000 K=0.0 S-512 Inlet S-511 163 RCP 0.95 0.71 0.67 8.72 5.88 33.47 357.96 1.25 355.00 354.18 36 0.013 2.97 0.209 K=0.6 352.00 351.18 0.82 0.50% 6.67 47.16 0.209 352.28 352.11 0.16 0.25% 4.73 33.47 0.000 K=0.0 S-511 JB S-501 65 RCP 0.95 0.00 0.00 8.72 0.00 33.47 358.91 1.25 353.98 353.66 36 0.013 4.93 0.209 K=0.6 350.98 350.66 0.33 0.50% 6.67 47.16 0.209 - 351.91 351.84 0.08 0.25% 5.20 50.04 0.000 K=0.0 S-501 JB S-500 31 RCP 0.95 0.00 0.00 8.72 0.00 50.04 358.00 1.50 353.66 353.50 42 0.013 4.35 0.336 K=0.8 350.16 350.00 0.16 0.50% 7.39 71.14 0.336 S-500 HW 6.04 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 8.72 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall , to TOP Total(ft) 356.74 355.86 0.54 0.28% 3.14 5.55 0.000 K=0.0 S-510 Inlet S-509 195 RCP 0.95 0.67 0.64 8.72 5.55 5.55 358.00 1.25 356.99 356.02 18 0.013 1.01 0.092 K=0.6 355.49 354.52 0.98 0.50% 4.20 7.43 0.092 354.65 353.98 0.19 0.13% 2.61 8.20 0.000 K=0.0 S-509 Inlet S-508 145 RCP 0.95 0.32 0.30 8.72 2.65 8.20 357.36 0.63 356.02 355.29 24 0.013 1.35 0.064 K=0.6 354.02 353.29 0.73 0.50% 5.09 16.00 0.064 353.55 353.26 0.08_ 0.11% 2.77 13.59 0.000 K=0.0 S-508 Inlet S-504 72 RCP 0.95 0.65 0.62 8.72 5.38 13.59 356.94 0.75 355.30 354.94 30 0.013 1.64 0.071 K=0.6 352.80 352.44 0.36 0.50% 5.91 29.00 0.071 362.50 358.48 0.27 0.21% 2.43 2.98 0.000 K=0.0 S-507 Inlet S-506 126 RCP 0.95 0.36 0.34 8.72 2.98 2.98 366.09 1.25 362.50 358.43 15 0.013 3.60 0.055 K=0.6 361.25 357.18 4.07 3.23% 9.46 11.61 0.055 358.22 355.11 0.16 0.15% 2.80 8.78 0.000 K=0.0 S-506 Inlet S-505 108 RCP 0.95 0.70 0.67 8.72 5.80 8.78 362.10 1.75 358.47 355.29 24 0.013 3.63 0.073 K=0.6 356.47 353.29 3.18 2.94% 12.35 38.79 0.073 354.04 353.86 0.14 0.20% 4.23 29.91 0.000 K=0.0 S-505 Inlet S-504 70 RCP 0.95 2.55 2.42 8.72 21.12 29.91 358.53 1.75 355.29 354.94 36 0.013 3.24 0.167 K=0.6 352.29 351.94 0.35 0.50% 6.67 47.16 0.167 352.94 352.51 0.29 0.22% 4.94 47.55 0.000 K=0.0 S-504 Inlet S-503 131 RCP 0.95 0.49 0.47 8.72 4.06 47.55 358.91 1.50 354.94 354.29 42 0.013 3.97 0.228 K=0.6 351.44 350.79 0.66 0.50% 7.39 71.14 0.228 352.09 351.81 0.27 0.23% 4.99 48.05 0.000 K=0.0 S-503 Inlet S-502 117 RCP 0.95 0.06 0.06 8.72 0.50 48.05 360.67 1.50 354.09 353.50 42 0.013 6.59 0.310 K=0.8 350.59 350.00 0.59 0.50% 7.39 71.14 0.310 S-502 HW I 5.80 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 343.96 343.35 0.05 0.05% 1.64 5.15 0.000 K=0.0 S-617 Inlet S-616 92 RCP 0.95 0.77 0.73 7.04 5.15 5.15 349.28 0.75 345.21 344.58 24 0.013 4.07 0.025 K=0.6 343.21 342.58 0.63 0.69% 5.98 18.79 0.025 342.99 341.17 0.25 0.15% 2.75 8.63 0.000 K=0.0 S-616 Inlet S-615 170 RCP 0.95 0.52 0.49 7.04 3.48 8.63 348.82 0.75 344.24 342.35 24 0.013 4.58 0.070 K=0.6 342.24 340.35 1.89 1.11% 7.59 23.83 0.070 340.62 339.21 0.39 0.22% 3.92 19.26 0.000 K=0.0 S-615 Inlet S-611 178 RCP 0.95 1.06 1.01 7.04 7.09 19.26 347.97 0.75 342.37 340.82 30 0.013 5.60 0.144 K=0.6 339.87 338.32 1.55 0.87% 7.79 38.26 0.144 343.10 342.30 0.13 0.11% 2.01 3.54 0.000 K=0.0 S-614 Inlet S-615 114 RCP 0.95 0.53 0.50 7.04 3.54 3.54 346.39 0.75 343.85 343.01 18 0.013 2.54 0.038 K=0.6 342.35 341.51 0.84 0.74% 5.11 9.04 0.038 340.21 340.05 0.03 0.08% 2.04 6.42 0.000 K=0.0 S-613 Inlet S-612 39 RCP 0.95 0.96 0.91 7.04 6.42 6.42 345.05 1.00 341.21 341.01 24 0.013 3.84 0.039 K=0.6 339.21 339.01 0.20 0.50% 5.09 16.00 0.039 340.01 339.24 0.09 0.06% 1.99 9.76 0.000 K=0.0 S-612 Inlet S-611 162 RCP 0.95 0.50 0.48 7.04 3.34 9.76 345.31 1.50 341.01 340.20 30 0.013 4.30 0.037 K=0.6 338.51 337.70 0.81 0.50% 5.91 29.00 0.037 338.82 337.55 0.01 0.01% 1.01 9.76 0.000 K=0.0 S-611 Inlet S-601 132 RCP 0.95 0.00 0.00 7.04 0.00 9.76 344.12 1.50 340.82 339.54 42 0.013 3.30 0.010 K=0.6 _ 337.32 336.04 1.28 0.97% 10.30 99.09 0.010 - 351.86 350.94 0.04 0.02% 0.76 0.94 0.000 K=0.0 S-610 Inlet S-609 178 RCP 0.95 0.14 0.13 7.04 0.94 0.94 355.04 1.50 351.61 350.69 15 0.013 3.43 0.005 K=0.6 350.36 349.44 0.93 0.52% 3.80 4.66 0.005 349.98 349.32 0.09 0.07% 1.36 1.67 0.000 K=0.0 S-609 Inlet S-608 133 RCP 0.95 0.11 0.10 7.04 0.74 1.67 355.26 0.75 350.48 349.80 15 0.013 4.78 0.017 K=0.6 349.23 348.55 0.68 0.51% 3.76 4.61 0.017 349.05 348.29 0.16 0.13% 2.12 3.75 0.000 K=0.0 S-608 Inlet S-607 122 RCP 0.95 0.31 0.29 7.04 2.07 3.75 355.00 0.75 349.80 348.99 18 0.013 5.20 0.042 K=0.6 348.30 347.49 0.81 0.66% 4.83 8.53 0.042 1 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End Dn End Fall to TOP Total(ft) 347.74 346.47 0.42 0.21% 2.72 4.82 0.000 K=0.0 S-607 Inlet S-603 201 RCP 0.95 0.16 0.15 7.04 1.07 4.82 356.01 0.25 348.99 347.65 18 0.013 7.02 0.069 K=0.6 347.49 346.15 1.35 0.67% 4.87 8.60 0.069 353.59 351.26 0.05 0.02% 0.71 0.87 0.000 K=0.0 S-606 Inlet S-605 300 RCP 0.95 0.13 0.12 7.04 0.87 0.87 358.32 0.25 354.59 352.25 15 0.013 3.73 0.005 K=0.6 353.34 351.00 2.34 0.78% 4.65 5.71 0.005 351.50 350.74 0.05 0.07% 1.55 2.74 0.000 K=0.0 S-605 Inlet S-604 68 RCP 0.95 0.28 0.27 7.04 1.87 2.74 358.50 0.75 352.25 351.47 18 0.013 6.25 0.022 K=0.6 350.75 349.97 0.79 1.16% 6.40 11.31 0.022 351.72 347.89 0.29 0.08% 1.70 3.01 0.000 K=0.0 S-604 Inlet S-603 353 RCP 0.95 0.04 0.04 7.04 0.27 3.01 358.90 1.75 351.47 347.62 18 0.013 7.43 0.027 K=0.6 349.97 346.12 3.85 1.09% 6.21 10.97 0.027 347.12 345.53 0.09 0.05% 1.91 9.36 0.000 K=0.0 S-603 Inlet S-602 174 RCP 0.95 0.23 0.22 7.04 1.54 9.36 357.01 2.00 347.62 346.00 30 0.013 9.39 0.034 K=0.6 345.12 343.50 1.62 0.93% 8.06 39.56 0.034 343.80 340.12 0.09 0.12% 2.89 14.18 0.000 K=0.0 S-602 Inlet S-601 78 RCP 0.95 0.72 0.68 7.04 4.82 14.18 352.04 2.00 344.30 340.54 30 0.013 7.74 0.078 K=0.6 341.80 338.04 3.76 4.82% 18.35 90.05 0.078 337.84 337.68 0.03 0.06% 2.49 23.94 0.000 K=0.0 S-601 JB S-600 48 RCP 0.95 0.00 0.00 7.04 0.00 23.94 344.04 2.00 339.34 339.10 42 0.013 4.70 0.077 K=0.8 _ 335.84 335.60 0.24 _ 0.50% 7.39 71.14 0.077 S-600 HW I 6.46 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall to TOP Total(ft) 346.94 345.89 0.07 0.09% 2.21 6.96 0.000 K=0.0 S-724 Inlet S-705 73 RCP 0.95 1.04 0.99 7.04 6.96 6.96 351.70 1.00 347.94 346.84 24 0.013 3.76 0.046 K=0.6 345.94 344.84 1.10 1.50% 8.82 27.71 0.046 343.59 342.37 0.06 0.08% 2.00 6.29 0.000 K=0.0 S-723 Inlet S-706 84 RCP 0.95 0.94 0.89 7.04 6.29 6.29 349.72 1.00 344.59 343.33 24 0.013 5.13 0.037 K=0.6 342.59 341.33 1.26 1.50% 8.82 27.71 0.037 360.50 359.81 0.11 0.09% 2.58 12.64 0.000 K=0.0 S-722 Inlet S-721 118 RCP 0.95 1.89 1.80 7.04 12.64 12.64 365.38 1.25 361.75 360.99 30 0.013 3.63 0.062 K=0.6 359.25 358.49 0.76 0.64% 6.68 32.81 0.062 359.49 358.57 0.08 0.09% 2.76 19.53 0.000 K=0.0 S-721 Inlet S-708 97 RCP 0.95 1.03 0.98 7.04 6.89 19.53 365.17 1.50 360.99 359.99 36 0.013 4.18 0.071 K=0.6 357.99 356.99 1.00 1.03% 9.58 67.69 0.071 368.79 368.25 0.07 0.06% 1.79 5.62 0.000 K=0.0 S-720 Inlet S-710 114 RCP 0.95 0.84 0.80 7.04 5.62 5.62 373.04 1.00 369.79 369.22 24 0.013 3.25 0.030 K=0.6 367.79 367.22 0.57 0.50% 5.09 16.00 0.030 374.08 373.18 0.19 0.20% 2.34 2.88 0.000 K=0.0 S-719 Inlet S-711 95 RCP 0.95 0.43 0.41 7.04 2.88 2.88 378.95 0.63 374.70 373.75 15 0.013 4.25 0.051 K=0.6 373.45 372.50 0.95 1.00% 5.26 6.46 0.051 381.79 376.30 0.28 0.16% 2.35 4.15 0.000 K=0.0 S-716 Inlet S-714 180 RCP 0.95 0.62 0.59 7.04 4.15 4.15 385.76 0.75 382.54 377.00 18 0.013 3.22 0.051 K=0.6 381.04 375.50 5.54 3.08% 10.43 18.44 0.051 376.41 376.01 0.02 0.04% 1.04 1.27 0.000 K=0.0 S-715 JB S-714 39 RCP 0.95 0.19 0.18 7.04 1.27 1.27 380.00 1.00 376.66 376.25 15 0.013 3.34 0.010 K=0.6 375.41 375.00 0.41 1.06% 5.42 6.65 0.010 375.26 372.57 0.15 0.07% 1.96 6.15 0.000 K=0.0 S-714 Inlet S-713 199 RCP 0.95 0.11 0.10 7.04 0.74 6.15 380.67 1.00 376.26 373.53 24 0.013 4.41 0.036 K=0.6 374.26 371.53 2.73 1.37% 8.43 26.48 0.036 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End Dn End Fall to TOP Total(ft) 372.29 370.80 0.12 0.08% 2.41 11.84 0.000 K=0.0 S-713 Inlet S-712 146 RCP 0.95 0.85 0.81 7.04 5.68 11.84 377.25 1.25 373.54 372.00 30 0.013 3.71 0.054 K=0.6 371.04 369.50 1.55 1.06% 8.60 42.23 0.054 370.42 369.34 0.20 0.16% 3.32 16.32 0.000 K=0.0 S-712 Inlet S-708 125 RCP 0.95 0.67 0.64 7.04 4.48 16.32 376.03 1.24 371.68 370.50 30 0.013 4.35 0.103 K=0.6 369.18 368.00 1.18 0.94% 8.10 39.77 0.103 368.99 367.14 0.09 0.09% 2.77 19.60 0.000 K=0.0 S-711 Inlet S-710 108 RCP 0.95 0.06 0.06 7.04 0.40 19.60 378.14 1.50 370.49 368.57 36 0.013 7.65 0.072 K=0.6 367.49 365.57 1.92 1.78% 12.59 88.99 0.072 366.75 365.04 0.30 0.15% 3.60 25.41 0.000 K=0.0 S-710 Inlet S-709 210 RCP 0.95 0.03 0.03 7.04 0.20 25.41 376.45 1.50 368.25 366.42 36 0.013 8.20 0.121 K=0.6 365.25 363.42 1.83 0.87% 8.80 62.21 0.121 _364.59 360.16 0.33 0.15% 3.60 25.41 0.000 K=0.0 S-709 MH S-708 229 RCP 0.95 0.00 0.00 7.04 0.00 25.41 373.31 1.50 366.09 361.53 36 0.013 7.22 0.121 K=0.6 363.09 358.53 4.56 1.99% 13.31 94.09 0.121 357.99 356.14 0.06 0.12% 3.94 49.49 0.000 K=0.0 S-708 Inlet S-707 51 RCP 0.95 0.68 0.65 7.04 4.55 49.49 365.10 2.00 359.99 358.00 48 0.013 5.11 0.145 K=0.6 355.99 354.00 2.00 3.92% 22.63 284.40 0.145 355.67 344.16 0.41 0.13% 4.09 51.36 0.000 K=0.0 S-707 Inlet S-706 317 RCP 0.95 0.28 0.27 7.04 1.87 51.36 365.32 2.00 357.67 346.00 48 0.013 7.65 0.156 K=0.6 353.67 342.00 11.67 3.68% 21.93 275.56 0.156 343.08 342.93 0.05 0.09% 3.81 60.53 0.000 K=0.0 S-706 Inlet S-705 58 RCP 0.95 0.43 0.41 7.04 2.88 60.53 350.50 2.25 345.33 345.04 54 0.013 5.17 0.135 K=0.6 340.83 340.54 0.29 0.50% 8.74 139.05 0.135 342.59 342.50 0.09 0.13% 4.51 71.76 0.000 K=0.0 S-705 Inlet 5-700B 68 RCP 0.95 0.64 0.61 7.04 4.28 71.76 351.03 2.25 344.84 344.50 54 0.013 6.19 0.253 K=0.8 340.34 340.00 0.34 0.50% 8.74 139.05 0.253 S-700B HW 10.73 PROJECT RDU PE3 Storm Drainage PROJECT# 21-065 DATE 3/9/23 DESIGN STORM 10 YR 7.04 in/hr 25 YR 7.76 in/hr Type Type Top or Calc. Elev. of H.G. Pipe Cover Head Loss Up of Down Length of Rational Area Sum i Runoff Total Grate Normal Crown El. Diam n Slope Vel. Q (ft) Entrance Losses Head Loss Structure Structure Structure (Ft) Line C (Acres) (C*A) (cfs) Runoff Elev. Depth Invert El. (in.) (%) (fps) (cfs) Ground Bend Losses Coefficients (cfs) (ft) Up End I Dn End I Fall , to TOP Total(ft) 354.76 353.77 0.00 0.00% 0.00 0.00 0.000 K=0.0 S-726 Inlet S-725 61 RCP 0.95 0.79 0.75 7.04 0.00 0.00 360.07 1.75 354.51 353.52 18 0.013 5.56 0.000 K=0.6 353.01 352.02 0.99 1.63% 7.59 13.41 0.000 353.77 346.78 0.00 0.00% 0.00 0.00 0.000 K=0.0 S-725 Inlet S-703 282 RCP 0.95 1.50 1.43 7.04 0.00 0.00 359.15 1.75 353.52 346.53 18 0.013 5.63 0.000 K=0.6 352.02 345.03 6.99 2.48% 9.36 16.54 0.000 345.67 345.09 0.03 0.05% 1.68 5.28 0.000 K=0.0 S-704 Inlet S-701 60 RCP 0.95 0.79 0.75 7.04 5.28 5.28 351.73 1.75 345.92 345.32 24 0.013 5.82 0.026 K=0.6 343.92 343.32 0.60 1.00% 7.20 22.62 0.026 345.78 345.01 0.09 0.06% 2.04 10.03 0.000 K=0.0 S-703 Inlet S-702 154 RCP 0.95 1.50 1.43 7.04 10.03 10.03 350.02 1.75 346.53 345.72 30 0.013 3.49 0.039 K=0.6 344.03 343.22 0.80 0.52% 6.03 29.58 0.039 344.47 343.06 0.10 0.06% 2.36 16.65 0.000 K=0.0 S-702 Inlet S-701 158 RCP 0.95 0.99 0.94 7.04 6.62 16.65 350.73 1.75 345.72 344.26 36 0.013 5.01 0.052 K=0.6 342.72 341.26 1.47 0.93% 9.10 64.32 0.052 342.07 341.87 0.06 0.09% 3.16 30.36 0.000 K=0.0 S-701 Inlet S-700A 63 RCP 0.95 1.26 1.20 7.04 8.43 30.36 351.45 1.75 343.82 343.50 42 0.013 7.63 0.124 K=0.8 _ 340.32 340.00 0.32 0.50% 7.39 71.14 0.124 S-700A HW I 4.54 RDU PE3 EXPANSION SGW POND 1 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY: 4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS)_ (CFSL SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# S-112 0.13 0.98 0.51 0.69 0.61 0.0230 N/A 3.33 0.08 N/A N/A N/A OK 0.88 S-113 0.33 0.98 1.29 1.42 0.60 0.0230 21.5 8.28 0.19 1.36 0.18 S-112 OK 1.54 S-114 0.40 0.98 1.57 1.57 0.60 0.0230 21.5 8.60 0.20 1.45 0.12 S-113 OK 1.57 S-103 0.10 0.98 0.39 0.39 0.80 0.0215 21.5 5.06 0.11 N/A N/A N/A OK 0.39 S-104 0.17 0.98 0.67 0.67 0.80 0.0215 21.5 6.17 0.13 0.74 0.00 S-103 OK 0.67 5-105 0.20 0.98 0.78 0.78 0.80 0.0215 21.5 6.56 0.14 0.82 0.00 S-104 OK 0.78 S-107 0.79 0.98 3.10 4.03 5.00 0.0200 21.5 8.99 0.18 N/A N/A N/A OK 4.03 S-106 0.11 0.98 0.43 0.43 5.00 0.0200 21.5 3.89 0.08 0.30 0.13 S-107 OK 0.43 S-108 0.44 0.98 1.72 1.72 1.67 0.0170 21.5 8.89 0.15 0.92 0.80 S-107 OK 1.72 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]3/8 D=T x ST QCAP=K(D)5/3 For Sag: D=[Q/(3.3xP)]23 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 1 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 1 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY: 4 IN/HR DB S-111 1.45 0.98 5.68 7.03 0.50 0.0300 17.0 13.24 0.36 N/A N/A N/A OK 7.03 DB 5-110 0.94 0.98 3.68 5.34 0.50 0.0300 17.0 11.94 0.36 3.99 1.35 DB S-111 OK 5.34 DB 5-109 1.17 0.98 4.59 4.59 0.55 0.0246 16.0 12.54 0.31 2.93 1.66 DB S-110 OK 4.59 DB S-120 1.54 0.98 6.04 6.72 0.50 0.0300 14.0 13.01 0.35 N/A N/A N/A OK 6.72 DB S-122 0.39 0.98 1.53 1.76 0.50 0.0300 14.0 7.87 0.24 1.64 0.12 DB S-120 OK 1.76 5-123 0.31 0.98 1.22 1.22 0.53 0.0300 14.0 6.78 0.20 0.98 0.23 DB S-122 OK 1.22 5-121 0.47 0.98 1.84 1.84 0.53 0.0300 14.0 7.92 0.24 1.28 0.57 DB S-120 OK 1.84 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]3/8 D=T x ST QCAP=K(D)5/3 For Sag: D=[Q/(3.3xP)]213 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 2 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 2 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# DB S-202 1.59 0.98 6.23 7.38 0.00 0.0410 N/A 9.03 0.37 N/A N/A N/A OK 7.65 DB S-203 0.31 0.98 1.22 1.22 2.36 0.0410 26.0 4.22 0.17 1.81 0.27 DB S-202 OK 2.09 DB S-215 0.97 0.98 3.80 4.34 3.77 0.0410 26.0 6.22 0.26 3.47 0.87 DB S-202 OK 4.34 S-216 0.61 0.98 2.39 2.39 3.67 0.0410 26.0 5.00 0.21 1.85 0.54 DB S-215 OK 2.39 S-217 0.42 0.98 1.65 1.65 2.11 0.0411 26.0 4.82 0.20 1.75 0.00 S-216 OK 1.65 S-204 0.19 0.98 0.74 0.74 0.00 0.0410 N/A 1.96 0.08 N/A N/A N/A OK 0.74 S-205 0.34 0.98 1.33 1.40 0.67 0.0410 17.0 5.62 0.23 1.47 0.00 S-204 OK 1.46 S-206 0.55 0.98 2.16 2.16 0.52 0.0410 17.0 6.94 0.28 2.09 0.06 S-205 OK 2.16 S-218 0.09 0.98 0.35 0.35 1.84 0.0250 25.0 3.78 0.09 0.49 0.00 S-206 OK I 0.35 S-209 0.21 0.98 0.82 0.82 0.70 0.0243 37.0 6.34 0.15 1.64 0.00 S-204 OK 0.82 S-210 0.56 0.98 2.20 2.20 0.70 0.0263 37.0 8.72 0.23 3.18 0.00 S-209 OK 2.20 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]3/8 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 3 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 2 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA I C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH (D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) I BYPASS TO INLET# S-212 0.92 0.98 3.61 3.72 0.00 0.0320 N/A 7.33 0.23 N/A N/A N/A OK 3.72 S-213 I 0.14 0.98 0.55 0.55 0.44 0.0244 16.0 5.93 0.14 0.64 0.00 S-212 OK 0.55 _ S-214 0.29 0.98 1.14 1.14 0.16 0.0320 10.0 7.95 0.25 1.02 0.12 S-212 OK 1.14 S-219 0.61 0.98 2.39 2.63 0.00 0.0323 N/A 5.76 0.19 N/A N/A N/A OK 2.87 S-220 0.36 0.98 1.41 1.41 0.88 0.0323 17.0 6.23 0.20 1.17 0.24 S-219 OK 1.41 S-222 0.79 0.98 3.10 4.59 0.00 0.0313 N/A 8.63 0.27 N/A N/A N/A OK 6.09 S-221 0.88 0.98 3.45 3.45 0.97 0.0313 17.0 8.72 0.27 1.95 1.50 S-222 OK 3.45 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]3/8 D=TxST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 4 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 3 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR - DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# DB S-303 2.40 0.98 9.41 11.17 0.00 0.0368 N/A 13.27 0.49 N/A N/A N/A ERROR 11.17 S-302 0.58 0.98 2.27 2.27 0.05 0.0480 10.0 9.95 0.48 3.79 0.00 DB S-303 OK 2.27 S-301 0.34 0.98 1.33 1.33 5.83 0.0614 27.0 2.86 0.18 1.93 0.00 S-302 OK 1.33 DB S-304 0.81 0.98 3.18 4.96 0.88 0.0300 17.0 10.44 0.31 3.19 1.76 DB S-303 OK 4.96 S-305 1.39 0.98 5.45 5.50 0.88 0.0345 17.0 9.95 0.34 3.72 1.78 DB S-304 OK 5.50 S-306 0.28 0.98 1.10 1.10 0.88 0.0345 17.0 5.44 0.19 1.05 0.05 S-305 OK 1.10 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 5 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 4 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY: 4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# S-421 0.98 0.98 3.84 6.43 0.00 0.0173 N/A 19.54 0.34 N/A N/A N/A OK 6.65 DB S-420 0.53 0.98 2.08 2.08 0.23 0.0188 15.0 12.98 0.24 1.86 0.22 S-421 OK 2.08 S-446 1.56 0.98 6.12 6.53 1.56 0.0330 21.0 9.80 0.32 4.16 2.37 S-421 OK 6.53 S-463 0.06 0.98 0.24 0.24 1.58 0.0385 20.0 2.55 0.10 0.42 0.00 S-446 OK 0.24 S-437 0.32 0.98 1.25 1.36 0.57 0.0233 N/A 5.16 0.12 N/A N/A N/A OK 1.48 S-462 0.20 0.98 0.78 1.44 2.00 0.0400 21.5 4.71 0.19 1.33 0.11 S-437 OK 1.44 S-464 0.56 0.98 2.20 2.20 1.30 0.0258 22.0 7.86 0.20 1.54 0.66 S-437 OK 2.20 S-419 0.11 0.98 0.43 0.43 0.10 0.0192 11.0 8.31 0.16 0.52 0.00 S-464 OK 0.43 S-425 0.06 0.98 0.24 0.24 0.10 0.0192 11.0 6.62 0.13 0.35 0.00 S-464 OK 0.24 S-427 I 0.26 0.98 1.02 1.02 0.00 0.0293 N/A 3.38 0.10 N/A N/A N/A OK 1.02 S-426 0.13 0.98 0.51 0.51 1.04 0.0293 19.5 4.38 0.13 0.64 0.00 S-427 OK 0.51 Q=CIA T=[Qn/(.56 X ST513 X SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 6 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 4 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# S-469 0.23 0.98 0.90 1.08 0.00 0.0157 N/A 6.53 0.10 N/A N/A N/A OK 1.25 S-467 0.13 0.98 0.51 0.77 1.75 0.0135 27.0 7.53 0.10 0.60 0.17 S-469 OK 0.77 S-468 0.14 0.98 0.55 0.55 0.67 0.0104 14.0 9.34 0.10 0.29 0.26 S-469 OK 0.55 S-484 0.47 0.98 1.84 3.16 1.36 0.0280 N/A 7.52 0.21 N/A N/A N/A OK 4.48 S-482 0.62 0.98 2.43 3.43 1.36 0.0280 22.0 8.75 0.25 2.11 1.32 S-484 OK 3.43 S-483 0.74 0.98 2.90 2.90 1.36 0.0280 22.0 8.22 0.23 1.90 1.00 S-484 OK 2.90 S-485 0.13 0.98 0.51 0.51 0.00 0.0476 N/A 1.31 0.06 N/A N/A N/A OK 0.51 S-486 0.09 0.98 0.35 0.35 4.39 0.0435 32.0 2.27 0.10 0.68 0.00 S-485 OK 0.35 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 7 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 5 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# I DB S-508 0.65 1 0.98 2.55 11.53 0.00 0.0284 N/A 17.56 0.50 N/A N/A N/A ERROR 13.47 DB S-509 0.32 0.98 1.25 2.65 0.33 0.0411 10.0 8.15 0.33 2.10 1.94 DB S-508 OK 4.04 DB S-510 0.67 0.98 2.63 2.63 0.35 0.0182 10.0 13.37 0.24 1.23 1.39 DB S-509 OK 2.63 _ _ S-504 0.49 0.98 1.92 1.92 1.34 0.0313 21.5 6.59 0.21 1.55 0.37 DB S-508 OK 1.92 S-503 0.06 0.98 0.24 0.24 1.34 0.0313 21.5 3.00 0.09 0.42 0.00 S-504 OK 0.24 S-505 2.55 0.98 10.00 11.03 3.32 0.0313 27.0 10.70 0.34 4.36 6.67 S-503 OK 11.03 S-506 0.70 0.98 2.74 2.95 3.32 0.0313 27.0 6.53 0.20 1.91 1.04 5-505 OK 2.95 S-507 0.36 0.98 1.41 1.41 3.32 0.0313 27.0 4.95 0.15 1.21 0.20 S-506 OK 1.41 DB S-512 0.71 0.98 2.78 4.39 0.00 0.0500 N/A 5.24 0.26 N/A N/A N/A OK 5.99 DB S-513 1.41 0.98 5.53 7.94 1.58 0.0358 27.0 10.00 0.36 6.34 1.61 DB S-512 OK 7.94 S-514 1.21 0.98 4.74 5.48 1.59 0.0370 21.0 8.51 0.31 3.06 2.41 DB S-512 OK 5.48 S-515 0.72 0.98 2.82 2.82 2.35 0.0317 27.0 6.80 0.22 2.09 0.73 DB S-513 OK 2.82 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 8 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 6 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY: 4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# DB S-613 0.96 0.98 3.76 6.07 0.00 0.0316 N/A 10.29 0.33 N/A N/A N/A ERROR 6.67 S-612 0.50 0.98 1.96 1.96 0.84 0.0316 16.0 7.20 0.23 1.36 0.60 DB S-613 OK 1.96 DB S-614 0.53 0.98 2.08 5.46 1.39 0.0316 21.0 9.62 0.30 3.75 1.70 DB S-613 OK 5.46 DB S-615 1.06 0.98 4.16 6.34 0.50 0.0366 10.0 11.25 0.41 2.96 3.38 S-612 OK 6.34 S-616 0.52 0.98 2.04 3.71 0.50 0.0330 10.0 9.82 0.32 1.53 2.19 DB S-614 OK 3.71 S-617 0.77 0.98 3.02 3.02 0.50 0.0330 10.0 9.08 0.30 1.34 1.68 DB S-615 OK 3.02 S-607 0.16 0.98 0.63 0.78 0.00 0.0220 N/A 3.76 0.08 N/A N/A N/A OK 0.93 S-603 0.23 0.98 0.90 0.90 0.70 0.0220 17.0 6.98 0.15 0.75 0.15 S-607 OK 0.90 S-608 0.31 0.98 1.22 1.26 0.00 0.0133 N/A 8.56 0.11 N/A N/A N/A OK 1.30 S-609 0.11 0.98 0.43 0.43 0.32 0.0133 15.0 8.40 0.11 0.39 0.04 S-608 OK 0.43 S-605 0.28 0.98 1.10 1.10 0.00 0.0233 N/A 4.46 0.10 N/A N/A N/A OK 1.10 S-604 0.04 0.98 0.16 0.16 0.55 0.0233 16.0 3.66 0.09 0.26 0.00 S-605 OK 0.16 Q=CIA T=[Qn/(.56 x ST513 x SL 1/2)]3/8 D=TxST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2i3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 9 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 7 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# S-720 0.84 0.98 3.29 4.78 0.00 0.0396 N/A 7.01 0.28 N/A N/A N/A OK 4.82 S-710 0.03 0.98 0.12 0.12 2.91 0.0300 26.0 2.05 0.06 0.25 0.03 S-720 OK 0.28 S-711 0.06 0.98 0.24 0.93 0.85 0.0245 17.0 6.38 0.16 0.77 0.16 S-710 OK 0.93 S-719 0.43 0.98 1.69 1.69 0.84 0.0200 17.0 9.06 0.18 0.99 0.70 S-720 OK 1.69 S-712 0.67 0.98 2.63 4.23 0.84 0.0416 17.0 8.09 0.34 2.77 1.46 S-719 OK 4.23 S-713 0.85 0.98 3.33 3.33 0.82 0.0245 17.0 10.35 0.25 1.73 1.61 S-712 OK 3.33 S-714 0.11 0.98 0.43 0.43 2.88 0.0337 26.0 3.11 0.10 0.61 0.00 S-713 OK 0.43 DB S-703 1.50 0.98 5.88 7.77 0.00 0.0335 N/A 11.44 0.38 N/A N/A N/A OK 9.66 DB S-702 0.99 0.98 3.88 5.46 0.50 0.0335 14.0 11.24 0.38 3.57 1.89 DB S-703 OK I 5.46 DB S-701 1.26 0.98 4.94 4.94 0.50 0.0335 14.0 10.82 0.36 3.36 1.58 DB S-703 OK 4.94 DB S-704 0.79 0.98 3.10 3.10 0.50 0.0476 16.0 7.29 0.35 3.57 0.00 DB S-702 OK 3.10 Q=CIA T=[Qn/(.56 x ST513 X SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 10 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls RDU PE3 EXPANSION SGW POND 7 STORM STRUCTURES CATCH BASIN CAPACITIES PROJECT NAME: RDU PE3 Expansion COMPUTED BY: TSK PROJECT NUMBER: 21-065 DATE: August 25, 2023 STORM INTENSITY:4 IN/HR DRAINAGE SURFACE Q BASIN BASIN# AREA C SUB TOTAL LONG. TRANSV. K SPREAD(T) DEPTH(D) Q CAP Q BYP COMMENT (AC) (CFS) (CFS) SLOPE(%) SLOPE (FT) (FT) (CFS) (CFS) BYPASS TO INLET# DB S-723 0.94 0.98 3.68 4.41 0.00 0.0476 N/A 5.52 0.26 N/A N/A N/A OK 5.13 DB S-706 0.43 0.98 1.69 2.93 0.90 0.0476 16.0 6.40 0.30 2.21 0.72 DB S-723 OK 2.93 DB S-705 0.64 0.98 2.51 3.87 0.90 0.0476 16.0 7.11 0.34 2.63 1.25 DB S-723 OK 3.87 DB S-724 1.04 0.98 4.08 4.08 0.90 0.0476 16.0 7.24 0.34 2.71 1.36 DB S-706 OK 4.08 Q=CIA T=[Qn/(.56 x ST5/3 x SL 1/2)]318 D=T x ST QcnP=K(D)5/3 For Sag: D=[Q/(3.3xP)]2/3 where P=6.94,single grate P=9.92,double grate T=D/St PAGE 11 OF 11 21-065-RDU PE3 Storm Drain Spread_Cals_NCDOT_TSK.xls OUTLET PROTECTION Riprap Outlet Protection Hydraulic Analysis Report Project Title: Raleigh-Durham International Airport PE3 Expansion Designer: Timothy S. Kennerly, PE Project Date: Thursday, August 3, 2023 Project Units: U.S. Customary Units Riprap Analysis: HW S-100 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 66.32 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 217.445 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS II Riprap Class Order:2 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 457.20 mm D85: 330.20 mm D50: 241.30 mm D15: 177.80 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 2.6125 ft Apron Width (at end): 19.8333 ft Riprap Analysis: HW S-115 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 21.27 cfs Culvert Diameter: 3 ft Normal Depth in Culvert: 1.5 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.2 ft Culvert Diameter Used in Computations: 3 ft Computed D50: 68.3999 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 12 ft Apron Depth: 1.89583 ft Apron Width (at end): 17 ft Riprap Analysis: HW S-200 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 90.76 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 2 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 143.74 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 1.89583 ft Apron Width (at end): 28.3333 ft Riprap Analysis: HW S-300 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 40.8 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 113.772 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: HW S-400 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 30.36 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 76.717 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: HW S-460 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 21.87 cfs Culvert Diameter: 3 ft Normal Depth in Culvert: 1.5 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.2 ft Culvert Diameter Used in Computations: 3 ft Computed D50: 70.9845 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 12 ft Apron Depth: 1.89583 ft Apron Width (at end): 17 ft Riprap Analysis: HW S-480 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 55.91 cfs Culvert Diameter: 4 ft Normal Depth in Culvert: 2 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.6 ft Culvert Diameter Used in Computations: 4 ft Computed D50: 126.812 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 16 ft Apron Depth: 1.89583 ft Apron Width (at end): 22.6667 ft Riprap Analysis: HW S-500 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 20.2 cfs Culvert Diameter: 3 ft Normal Depth in Culvert: 1.5 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.2 ft Culvert Diameter Used in Computations: 3 ft Computed D50: 63.8509 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 12 ft Apron Depth: 1.89583 ft Apron Width (at end): 17 ft Riprap Analysis: HW S-502 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 29.43 cfs Culvert Diameter: 3 ft Normal Depth in Culvert: 1.5 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.2 ft Culvert Diameter Used in Computations: 3 ft Computed D50: 105.459 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 12 ft Apron Depth: 1.89583 ft Apron Width (at end): 17 ft Riprap Analysis: HW S-600 Input Parameters Riprap Type: Culvert Outlet Protection Flow: 23.94 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 55.8884 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: HW S-700A Input Parameters Riprap Type: Culvert Outlet Protection Flow: 30.36 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 76.717 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: HW S-700B Input Parameters Riprap Type: Culvert Outlet Protection Flow: 71.76 cfs Culvert Diameter: 4.5 ft Normal Depth in Culvert: 2.25 ft Tailwater Depth: 0 ft If tailwater is unknown, use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.8 ft Culvert Diameter Used in Computations: 4.5 ft Computed D50: 134.378 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 18 ft Apron Depth: 1.89583 ft Apron Width (at end): 25.5 ft Riprap Analysis: Pond 1 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 92.66 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2.5 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 2 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 147.766 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:l The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 1.89583 ft Apron Width (at end): 28.3333 ft Riprap Analysis: Pond 2 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 112.41 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2.5 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 2 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 191.187 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS II Riprap Class Order:2 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 457.20 mm D85: 330.20 mm D50: 241.30 mm D15: 177.80 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 2.6125 ft Apron Width (at end): 28.3333 ft Riprap Analysis: Pond 3 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 40.53 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 112.769 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:l The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: Pond 4 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 133.95 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2.5 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 2 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 241.532 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS Ill Riprap Class Order:3 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 609.60 mm D85: 431.80 mm D50: 317.50 mm D15: 228.60 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 3.4375 ft Apron Width (at end): 28.3333 ft Riprap Analysis: Pond 5 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 61.47 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.6 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 143.899 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 1.89583 ft Apron Width (at end): 28.6667 ft Riprap Analysis: Pond 6 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 29.66 cfs Culvert Diameter: 3.5 ft Normal Depth in Culvert: 1.75 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 1.4 ft Culvert Diameter Used in Computations: 3.5 ft Computed D50: 74.3677 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS I Riprap Class Order:1 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 304.80 mm D85: 228.60 mm D50: 165.10 mm D15: 114.30 mm Layout Recommendations Apron Length: 14 ft Apron Depth: 1.89583 ft Apron Width (at end): 19.8333 ft Riprap Analysis: Pond 7 Riprap Outlet Protection Input Parameters Riprap Type: Culvert Outlet Protection Flow: 126.5 cfs Culvert Diameter: 5 ft Normal Depth in Culvert: 2.5 ft Tailwater Depth: 0 ft If tailwater is unknown,use 0.4D flow is sbcritical Result Parameters Tailwater Depth Used in Computations: 2 ft Culvert Diameter Used in Computations: 5 ft Computed D50: 223.789 mm Riprap Class Riprap shape should be angular Riprap Class Name:CLASS II Riprap Class Order:2 The following values are an 'average' of the size fraction range for the selected riprap class. D100: 457.20 mm D85: 330.20 mm D50: 241.30 mm D15: 177.80 mm Layout Recommendations Apron Length: 20 ft Apron Depth: 2.6125 ft Apron Width (at end): 28.3333 ft