Loading...
HomeMy WebLinkAboutNCG140218 DMR SW (13)STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Susan Bostian COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 598-0456 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: June Monitoring event DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall , (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-92 1002,3 _ _ _ - 001 No Discharge y 16 CENTRAI FILES DWR SK TION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2