HomeMy WebLinkAbout20140090 Ver 2_Aug 20 NPDES inspection_20150820Wetland Inspection Report
Project Num: 20140090 Version: 2 Status: Issued
Project Name: NCDOT- US 158 (U-2579B) Project Type: Road
County: Forsyth Region: �lanston Salem pair/improvemen
Location: NCDOT- US 158 (U-2579B)
Latitude: +36° 07' Longitude: -80° 07' 55"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 8�20/2015
Reason for Inspection Routine
Inspection Type: Records/File Review (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Title: Phone:
Facility Compliance Status: � Compliant ❑ Not Compliant
Program Areas: NPDES SW - Roadway (DOT)
Question Areas:
� SW Measures � Operation and Maintenance
Inspection Summary:
Phone: 336-776-9703
Erosion measures we in the process of being cleaned out from a week of 2- 4 inches of rain. NPDES paperwork was
complete. No sediment losses were reported for this week.
page: 1
Site Number: 20140090 Owner: Thorpe, Gregory
Inspection Date: 8/20/2015 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? �❑❑❑
Are the inlets located per the approved plans? �❑❑❑
Are the outlet structures located per the approved plans? �❑❑❑
Comment: We reviewed several skimmer basins at each Site we inspected (8 & 19). All were functioninq as
desiqned. One was discharqina turbid water. DOT planned to becain usina polvmers to pretreat water
enterinq the basins. Phil conducted bench tests to determine which polvmer was most efficacious.
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Are the inspection and maintenance records complete and available for review?
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
Comment: NPDES records were reveiwed and found to be complete and neatly orqanized. They are trying to limit the
number of SDOs entered on the paperwork since many listed on the forms are not truelv SDOs.
page: 2