HomeMy WebLinkAbout20230773 Ver 1_More Info Received_20231005Baker, Caroline D
From: Lauren Norris -Heflin <Lauren.Norris-Heflin@timmons.com>
Sent: Thursday, October 5, 2023 2:06 PM
To: 'Dailey, Samantha J CIV USARMY CESAW (USA)'; Goss, Stephanie
Cc: Kate Hefner
Subject: [External] Fairhaven Glen - upland area changes; SAW-2021-01424, DWR ID 20230773
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon,
On behalf of our client, we would like to make you aware that site plans have changed to remove the aboveground
stormwater pond north of existing wetlands and direct all site storm runoff to an underground detention structure. This
does not directly alter jurisdictional impacts, but removes the need to directionally bore beneath one stream location
and further maintains existing hydrology up -slope of two wetland features.
This is being sent in case it is helpful for your records.
Thank you,
Lauren Norris -Heflin, PWS (she/her)
Environmental Project Manager
•
TI V' ' O S GROUP
IRGINEERING. I DESIGN I TECKNOl4GY
TIMMONS GROUP www.timmons.com
5410 Trinity Rd, Suite 102 Raleigh, NC 27607
Office: 919.866.4943 1 Cell: 919.607.1723 1 Fax: 919.859.5663
Lauren.Norris-Heflin@timmons.com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
1