HomeMy WebLinkAbout20231363 Ver 1_Riparian Buffer Authorization Request_20230930Original Submittal 9/30/2023
A. Owner/Applicant Information
General Information Q
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Primary Contact Email: * daniel.kuefler@wetlands-epg.com
Please list the contact person's email for questions or payment on this project if needed.
Who is submitting the application?* ❑ Owner
❑ Applicant other than Owner
p Agent
1. Property Owner Information:
1a. Name on Recorded Deed:*
MT LAND LLC
1b. Responsible Party:
Charles Myers
(for Corporations)
1c. Mailing Address:*
Street Address
141 Providence Road
Address Line 2
City
State / Province / Region
Charlotte
NC
Postal / Zip Code
Country
28207-1217
U S
1d. Telephone:* (704)778-6002
le. Email Address:*
charles.n.myers@gmail.com
3. Agent Information:
3a. Name:
3b. Company Affiliation:
3c. Mailing Address: Street Address
Address Line 2
City State / Province / Region
Postal / Zip Code Country
3d. Telephone: 3e. Email Address:
3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document
authorization form. PDF only
................................................................... .........
B. Project Information and Prior Project History
1. Project Information
...........................................................
1a. Name of Project:* Redhawk
(Subdivision, facility, or establishment name)
1b. Is this a publicly -funded transportation project?*
1d. Subdivision Name: Redhawk
le. Nearest Municipality: Cramerton
1f. Property Size: 480.00
acres
1g. County (or Counties) where the project is located: *
1h. Property ID#
307646
Tax PIN or Parcel id
Tax PIN or Parcel id
1 i. Deed Information
Type of Book
Date of Purchase
Book#IF Page#
_= 1
Deed 5403 1271
Map
1j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach document
Phase 1 Subdivision Boundary (MB 98 PG
162.99KB
75)_shrunk.pdf
Phase 2 Subdivision Boundary (MB 98 PG
184.23KB
76)_shrunk.pdf
PDF only
1 k. How would you like to provide the Latitude and Longitude information?
Address Lookup
Manually
Latitude* 35.205179 Longitude*-81.064279
11. Is the project located in any of North Carolina's twenty coastal counties?* Yes No
2. Surface Waters
2a. Name of the nearest body of water to proposed project: * S Fork Catawba River
2b. Water Quality Classification of nearest receiving water: WS-IV;CA
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
14,952
(linear feet only)
3. Project Description:
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
The site is located just east of Hwy 279, S. New Hope Road, and just west of South Fork Catawba River. The topography consists of
moderate slopes and drainages with the elevation ranging from 700 to 580 ft. The site is partially wooded, with large areas having
been recently timbered at the time of evaluation. The study area also includes the road corridor along S. New Hope Road north to the
intersection of Stowe Road.
3b. Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Click the upload button or drag and drop files here to attach document
usgs.pdf 246.73KB
PDF only
3c. Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site.
Click the upload button or drag and drop files here to attach document
Soil Manuscript.pdf 812.95KB
PDF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:
The proposed site will include impacts to the Catawba Buffer for site grading for BMPs and the installation of a ConSpan bottomless
culvert. Fill and grading of the site will use standard equipment, excavator, dump truck, track hoe, etc.
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach document
Buffer Impact Exhibit_20230912.pdf 1.21MB
PDF only
5. Jurisdictional Determinations
........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Q.......
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project
(including all prior phases) in the past?*
Yes
No
5b. Who did the determination on the jurisdictional areas?
Who did the determination?
List name if known
Date
Attach
Corps
Amanda Jones
(Name if known)
10/06/2021
11. 2021-
01343_PJD_File.pdf
12.52M6
pdf only
*** Please include the date of the determination and upload a copy of the determination.
Comments:
6. Project History
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?
j Yes
Q No
7. Future Project Plans
.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
7a. Is this project a phased project?* Yes No
7b. If yes, explain*
All buffer impacts to the site are included in this application.
C. Proposed Impacts Inventory
Buffer Impacts 6
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Project is in which protected Basin?*
Neuse River Basin (15A NCAC 02B.0233)
Catawba River Basin (15A NCAC 02B.0243)
O Randleman Lake Watershed (15A NCAC 0213.0250)
O Tar -Pamlico River Basin (15A NCAC 026.0259)
O Jordan Lake Watershed (15A NCAC 02B.0267)
O Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# -Reason I Stream Name Buffer Impact* Impact Type Zone 1 Zone 2
11 i �
61 (Road Crossing)
Lake Wylie/S Fork
Permanent (P)
Allowable
0.09
0.00
Map label (e.g. Road Crossing 1)
Catawba River
Perm or Temp
Square Feet
Square Feet
B2 (Road Crossing)
Lake Wylie/S Fork
Permanent (P)
Allowable
0.00
0.13
Map label (e.g. Road Crossing 1)
Catawba River
Perm or Temp
Square Feet
Square Feet
B3 (Site Grading)
Lake Wylie/S Fork
Permanent (P)
Allowable
0.00
0.28
Map label (e.g. Road Crossing 1)
Catawba River
Perm or Temp
Square Feet
Square Feet
Total Zone 1 Impacts: 0.09
Total Zone 2 Impacts: 0.41
Total Buffer Impacts: 0.50
Comments:
The total impacts to the site for the road crossing and BMP, respectively, are below mitigation thresholds per 15A NCAC 02B .0614,
thus no mitigation is proposed.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
The proposed road crossing is designed to be perpendicular to the stream. The proposed grading for the BMP has been limited to the
extent possible and impacts to Zone 1 have been avoided.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction techniques will implement approved erosion control methods to avoid/minimize impacts to onsite/adjacent offsite
receiving conveyances. Where possible, 2:1 slopes and the maximum allowable headwalls will be used to minimize crossing impacts.
E. Diffuse Flow Plan
la. What type of SCM are you providing? *
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Proposed project will not create concentrated stormwater flow through the buffer
Other SCM that removed minimum of 30% nitrogen
1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document
Diffuse Flow Documentation _Redhawk.pdf 177.88KB
PDF only
F. Supplementary Information
Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes
No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface
Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
2b. Is this an after -the -fact buffer authorization application?
Yes
No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: Click the upload button or drag and drop files here to attach document
PDF only
Additional Comments:
H. Sign and Submit
................................................................................................................................................................................................................................................................................................................
By digitally signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions
Act')
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
o I intend to electronically sign and submit the application form."
Print Name:* Daniel Kuefler
Signature
Submission Date: 9/30/2023
(Auto populated field)
Initial Review
Is this accepted into the review process?*
Is this project a public transportation project?*
ID#*
Version:
Select Reviewer:
Select Reviewing Office*
Has payment been received?*
Yes No
Yes No
20231363
1
Andrew Pitner:andrew.pitner
Mooresville Regional Office - (704) 663-1699
No Payment Needed
Fee Received
Need Fee - send electronic notification