Loading...
HomeMy WebLinkAbout20150832 Ver 1_401 Application_20150815(000- 0AER Bright People. Right Solutions. August 12, 2015 Mr. Chester Bigelow USACE Washington Regulatory Field Office 2407 West Fifth Street Washington, North Carolina 27889 RE Winton solar site (Oak Villa) Dear Sir, 20150832 Kleinfelder is submitting a Pre - construction Notification for your consideration in issuing the 404 permit associated with a proposed solar array in Winton, Hertford County Jurisdictional stream impacts result from the replacement of an existing culvert that has ceased to function as designed We respectfully request your review and correspondence relating to this application at your earliest convenience. This application was prepared using the PCN format, with supplemental information provided as attachments Thank you in advance for your time and attention in this matter If you have any questions or need additional information, please contact Amy James at 919 - 755 -5011 ext 124 or amviames(o)kleinfelder.com Regards, W M10 Amy James, PWS Staff Professional II Joshua A Crumpler, PE Project Manager Attachments 1 — Pre - construction Notification 2 — Signed Agent Authorization Form 3 -- Jurisdictional Determination Plat 4 — Construction Plans cc: N 4®vision1 ofVBVatef ResourceslIVBSCPunit_ KLEINFELDER 3500 Gateway Centre Blvd , Suite 200, Morrisville, NC 27560 pl 919 755 5011 fl 919 755 1414 OF WArF9 Office Use Only Corps action ID no 1 "11 DWQ project no Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing J la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number. 3 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 1d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit because written approval is not required? Certification ® Yes ❑ No ❑ Yes ® No If Is payment into a mitigation bank or in -lieu fee program proposed for mitigation ❑ Yes ® No of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1g Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ® Yes ❑ No below 1h Is the protect located within a NC DCM Area of Environmental Concern (AEC)? I ❑ Yes ® No 2. Project Information 2a Name of project. Winton solar site I J 2b County I Hertford J 2c. Nearest municipality / town I Winton l 2d Subdivision name I not applicable 2e. NCDOT only, T I P or state project no. 3. Owner Information 1� 3a. Name(s) on Recorded Deed Oak Villa Farms 2015 3b Deed Book and Page No Deed Books 757 & 45, Pages 697 & 506 1 D^ Ord 7 3c Responsible Party (for LLC if I Chris Killenburg applicable) 3d Street address 1 403 N Main St J 3e City, state, zip I Winton, NC 27986 3f. Telephone no 3g Fax no I — 3h Email address I I 1 4. Applicant Information (if different from owner) 4a. Applicant is- ❑ Agent ® Other, specify: LLC holder 4b Name. Chris Killenberg 4c. Business name (if applicable) - Community Energy Solar, LLC 4d. Street address- 151 E. Rosemary St, Suite 202 4e City, state, zip Chapel Hill, NC 27515 4f. Telephone no.- 919 967.7063 4g Fax no 4h Email address chns killenberg @communityenergyinc com 5. Agent/Consultant Information (if applicable) 5a Name Amy James /Joshua Crumpler 5b. Business name (if applicable) Kleinfelder, Inc. 5c. Street address, 3500 Gateway Centre Blvd., Suite 200 5d City, state, zip- Morrisville, NC 27560 5e. Telephone no.: 919 - 755 -5011 ext 124 5f. Fax no: 919.755.1414 5g Email address amylames @kleinfelder.com 2 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID): 1b Site coordinates (in decimal degrees)* 1c Property size - 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to proposed project 2b Water Quality Classification of nearest receiving water Latitude 36.376264 Longitude. - 76.938389 (DD DDDDDD) ( -DD DDDDDD) 153 acres (88 3 acres in project limits) Deep Creek C,NSW 2c River basin I Chowan 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site is located just outside the small town of Winton and is currently being used for agriculture Land use in the project vicinity is primarily commercial timber land, agriculture, and low density residential development 3b List the total estimated acreage of all existing wetlands on the property. 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 930 linear ft 3d Explain the purpose of the proposed project The project's purpose is to install a ground- mounted solar photovoltaic array. 3e Describe the overall project in detail, including the type of equipment to be used - The proposed site improvements consist of installing ground - mounted, fixed -tilt solar panels, three concrete equipment/inverter pads and perimeter fencing Typically, for ground - mounted solar systems, the panels are installed 2' to 3' above grade and mounted on a steel -frame racking system supported by posts which are driven into the ground. Additionally, an existing culvert under the property's gravel access road is no longer functioning correctly, therefore, it will be replaced and lengthened slightly to mitigate problems in the future Typical equipment/machinery used for installation includes* • Pile drivers for the installation of the posts for the racking system, • Backhoes to dig the trenches for any underground electrical lines, • Concrete trucks to pour the concrete equipment/inverter pads; • Forklifts to move the racking system /solar equipment; • Dump trucks for aqgregate to be used on temporary construction entrances /permanent driveway entrances 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments. 4b. If the Corps made the jurisdictional determination, what type I El Preliminary ® Final e of determination was mad 4c If yes, who delineated the jurisdictional areas? I Agency /Consultant Company Terracon Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation July 7, 2015 (see attached plat) 3 S. Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b. If yes, explain M C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f. Wetland impact number — Type of impact Type of wetland Forested Type of jurisdiction Area of impact Permanent (P) or (if known) (acres) Temporary (T) Site 1 ❑ P ❑ T Choose One I ❑ Yes ❑ Corps 2g. Total wetland impacts X Permanent X Temporary 2h Comments ❑ No ❑ DWQ Site 2 ❑ P ❑ T I Choose One ❑ Yes ❑ No ❑ Corps ❑ DWQ Site 3 ❑ P ❑ T Choose One ❑ Yes ❑ Corps - - - ❑ No ❑ DWQ Site 4 ❑ P ❑ T Choose One ❑ Yes ❑ Corps Type of Average Impact length ❑ No ❑ DWQ Site 5 ❑ P ❑ T Choose One I ❑ Yes ❑ Corps (Corps - width ❑ No ❑ DWQ Site 6 ❑ P ❑ T Choose One ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts X Permanent X Temporary 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted - - - 3a. 3b 3c 3d. 3e 3f 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - width Temporary (T) (INT)? 404, 10 (feet) DWQ — non -404, other) Site 1 ® P ❑ T Fill UT to Deep Creek ® PER ❑ INT ® Corps ❑ DWQ 12 6 Site 2 ❑ P ® T Erosion Control /De- Watering I UT to Deep Creek ® PER ❑ INT El Corps ❑ DWQ 12 20 Site 3 ❑ P ❑ T I ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts I 6 Perm 20 Temp 5 31 Comments - 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary (T) 01 ❑P ❑T 02 ❑P ❑T F 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts X Permanent X Temporary 4g Comments* 5. Pond or Lake Construction If pond or ake construction proposed, then complete the chart below 5a 5b 5c. 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond F to Feodod Filled Excavated d Filled Excadvate Flooded e d P1 P2 5f. Total 5g. Comments: 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no: 51 Expected pond surface area (acres) 5j Size of pond watershed (acres). 5k Method of construction, R 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar- Pamlico ❑Other Project is in which protected basin? I ❑ Catawba ❑ Randleman 6b 6c. 6d 6e. 6f 6g Buffer impact number — Reason for impact Buffer Permanent (P) or Stream name mitigation Temporary (T) required? B1 ❑P ❑T I El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 6i Comments i 7 Zone 1 impact Zone 2 impact (square feet) (square feet) D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Minimal grading is required on -site; additional culvert length is only 6 ft ; on the upstream end of the culvert, horseshoe inlet protection is proposed to mitigate any sedimentation build up. 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Stream banks will not be cleared of vegetation; all land disturbing activities will be conducted in accordance with NCDENR standards, at the culvert's downstream end, a temporary rock check dam will be used during construction for erosion control, grading and trenching for inverter pad on site will have temporary ground cover at the end of each work day 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S. or Waters of the State? If no, explain Due to minimal impacts, no mitigation is proposed for this project 2b If yes, mitigation is required by (check all that apply). ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank. not applicable 3b Credits Purchased (attach receipt and letter) 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation Type Quantity 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested* acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan ❑cold 5a If using a Permittee responsible mitigation plan, provide a description of the proposed mitigation plan 1 8 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d - 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 I I 3 (2 for Catawba) Zone 2 I 1 5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments I E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If not, explain why. Comments. 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No ❑ Yes ❑ No 1% ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why: The amount of impervious surface will not appreciably increase, as ground- mounted solar panels are considered pervious 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Not applicable ❑ Phase II 3b Which of the following locally- implemented stormwater management programs ❑ NSW apply (check all that apply) ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW (check all that apply) ❑ ORW ❑ Session Law 2006 -246 ❑ Other. 4b Has the approved Stormwater Management Plan with proof of approval been attached? Due to the negligible increase in impervious area, no stormwater ❑ Yes ® No (see comment) management plan is required 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the armropnate requirements? n V.. n rv. rwa 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A 10 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? 1■ - ► =m 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development, which could impact nearby downstream water quality? ® No 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description The proposed solar array will be restricted to the property boundaries and will not have an impact on development growth - patterns Therefore, a detailed indirect or cumulative effects study will not be necessary 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility N/A 11 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ 5c. If yes, indicate the USFWS Field Office you have contacted Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS county list, field reconnaissance. 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Fisheries EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Phase I Environmental Site Assessment, NCHPO GIS service (HPOweb) 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? I ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: Not Applicable 8c What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program — Digital Flood Maps Applicant/Agent's Printed Name � /� Z Joshua A Crumder, PE Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided ) 12 8/12/2015 Date AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: PARCEL ID: 6909 -71 -4688 & 6906 -61 -6059 STREET ADDRESS: 100 NC Hwv 45 South, Winton, NC, 27986 PROPERTY OWNER: Elizabeth Wilson Jones (Partner, Oak Villa Farms) PROPERTY OWNER: Margaret Newsome Jones (Partner, Oak Villa Farms) The undersigned, registered property owners of the above noted property, do hereby authorize Josh Crumpler, PE of Kleinfelder (Contractor / Agent) (Name of consulting firm) to act on our behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): 3 3 Tjjulvaep M ; rL; a, � 4vol /1. L 7--I-Y3 Telephone: q [q - S la a- 5-,1q,5 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Al zed Signature Date: Date: 'THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDIC71ON OF SECTION 404 t OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THIS DETERMINATION OF SECTION 404 1 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE YEARS FROM THIS DATE 1HIS DETERMINATION WAS MADE UTILIZING THE APPROPRIATE REGIONAL SUPPLEMENT TO THE 1987 CORR' ENGINEERS LANDS DEt1p�EgTtUN MANUAL." (NAME)- -_ __ ---- -- __± (TITLE)__- __+ -� -- - _60 - - -- - - \`' F- R/W (DA Ti.-)----- 5 2 W _ 2 �� L�-- - - - - -- 1, ROBIN L. LEE, PLS L -3759, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM A FIELD SURVEY MADE UNDER MY SUPERVISION, 1HIS MAP DOES NOT CONFORM TO GS. 47 -30, AND IS NOT INTENDED FOR RECORDATION DATES OF SURVEY WERE PERFOR 0 BET EN 1010612014 AND ►a��o1 ROBIN L. LEE, PLS L -3759 DATE ,� '40 I i I i t { i rr C 'a�Q4oFEssI S EAL L -3759 <q4'p R`1�y�Q 0 SU N43'51'46 'E 4 124.02' 4 /, j (Tit � �N56�9'33'W 43.52' — ,"CONTROL PT jJ I REBICAP NC GRID �NADg3 /11) N 961.8 0.63 E 2.605,521.91' SOIL PATH IV /F JANE J BAKER EST, FILE 06E/226 NC PIN # 6906 -60 -0247 0 04 i W lY U)m MU 7_ Cr' 1 ' \v F � Q P �a � Q511, �O `P�J� ♦ �� QP�� 1! % 24 "CMP ` . .1pov `t. `� p�GQ ro' /4 R Pt' , RtSDICT10N DITCH _J �0 �CP 2�, C25i STPSATCIVER E +.. P • WETLANDS +� , 6 / 0 6 a `N ,9/ FLAGS NIP o %"- 0 >r 3` � \\��° o\ /' D6RRY Q MANL ®, O� v ` \`t'�� N 512. pC E Y, e to/ 7BECIN JURISDICTIONAL IN 38J Cp DITCH PER 7ERRACON WETLAND MAP 02125114 ♦ LENGTH= +/- 930' WIDTH= t/- 12' N/F ® �u �\X\ l8 "RCP r� OAK VILLA J.._ y DB 757, PG 697 ♦ ,y DB 45, PG 506 ® r 1 6R NC PIN # 6906 -61 -6059 ♦ ��tl` fl a ZONED RA AREA = 69.901 ACRES J,044,902 SO FT o ♦ C p , �•, _ _--- CIL I -ARM PA IH h ,n • i . oA SI TE VICINITY MAP /W MON (N0-1 TO SCALE) N rR Na V T ae ,3"'�ss�aNM�s .- ZC+OO R/G 410 2 I00 n N/F z "s 1 B P ORDER OF ELKS OF WORLD DB 415, PG. 50 p MB 12, PG 11 7 { �. NC PIN # 6906 -83 -1640 U CONTROL PT y 2-°' REB /GAP NC GRID(NA083 111) N 960,745.72' E 2,606,36 7.11 WETLAND DATA PROJECT LIMITS AREA = 88.27 ACRES JURISDICTIONAL STREAM LENGTH = 930 L.F. WETLAND AREA WITHIN PROJECT LIMITS = 0 LEGEND ®_ CALCULATED POINT fC, POWER POLE CONTROL POINT REBAR /GAP IPF P A KN PIPE FOUND 00 on ow jt icemm 4 { dyv m ji 200 400 800 . 1211 i 105/04/15 REVISION: DATE CHANGED TO MARCH 13, 2015 i • 1730 Varsity Drive, Suite 500 Raleigh, North Carohno 27606 Phone: (919)233 -8091, Fox. (919)233 -8031 NC FIRM# 1222 i Internet Site: http• / /www mckimcreed corn PROJECT LIMITS AREA = 88.27 ACRES �r B 3,845,266L SO FT (INCLUDING -P/W'S),, 5 "CPP ti �s /g F ♦ N/F ® OPAL CHAVIS AMOS DB 483, PG. 628 s PB 2, PG. 70 j NC PIN # { r �+ ° 6905- 79- 7557 y a c / NOTE- 1 JURISDICTONAL FEATURES EXIST OUTSIDE OF 1HE SURVEY /PROJECT LIMITS. Ob H 7AND DEI_WEATION SURVEY of TON SOLAR FARM, LLC FOR COMMUNITY ENERGY RENEWABLES, LLC DATE, MARCH 13, 2015 SCALE: 1" = 400' WINTON TOWNSHIP HERTFORD COUNTY NORTH CAROLINA PROJECT # 6627 -0004 PROJ SVYR RLL DRAWN 13Y RLL F,EL D 6K R0911 COMP FILE VWi01- 66270004_BND DWG SHEET # 1 OF 1 DWG. # : x r VICINITY MAP NTS PROPERTY OWNER OAK VILLA FARMS PIN 6906 -71 -4688 & 6906 -61 -6059 DEED BOOK 757 & 45 PAGE 697 & 506 EROSION CONTROL SELF INSPECTION 1 THE PURPOSE OF SELF INSPECTION IS TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED, INCLUDING THE INSTALLATION AND MAINTENANCE OF MEASURES, AND THE PROVISION OF GROUND COVER IN A TIMELY MANNER 2 ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED 3 A "SELF- INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A -54 V MUST BE COMPLETED AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE 4 THE SELF - INSPECTION REPORT FOR LAND- DISTURBING ACTIVITY IS TO BE COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS COMPLETE THESE PHASES MAY INCLUDE INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES, S CLEARING AND GRUBBING OF EXISTING GROUND COVER, COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS, INSTALLATION OF STORM DRAINAGE FACILITIES, °s COMPLETION OF CONSTRUCTION OR DEVELOPMENT, ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION 5 THE RECORDS MUST BE MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT THE SITE ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE ANY INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE 6 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NCDENR, NCDOT STANDARDS AND SPECIFICATIONS, AND ALL LOCAL, COUNTY, STATE AND FEDERAL - LAWS AND REQUIREMENTS INCLUDING OHSA (KL ADHR 21 FADEM ROAD ORIGINAL DRAWING SIZE IS 24 x 36 SPRINGFIELD, NEW JERSEY 07081 COVER WINTON SOLAR SITE 908 - 988 -4453 NC COUNTY, N WINTON, HERTFORD COUNTY, NORTH CAROLINA SHEET Bright People Right Solutions. 3500 GATEWAY CENTRE BLVD SUITE 200 COVER 21 GEHRLICH SOLAR AMERICA CORP 27 FADEM ROAD MORRISVILLE NC 27560 NSTRUCTION L "ONE 919-7555011 WWW KLEI91 E 5O R 11 21 FADEM ROAD ORIGINAL DRAWING SIZE IS 24 x 36 SPRINGFIELD, NEW JERSEY 07081 COVER WINTON SOLAR SITE 908 - 988 -4453 NC COUNTY, N WINTON, HERTFORD COUNTY, NORTH CAROLINA SHEET DESCRIPTION C-g1 COVER 21 GEHRLICH SOLAR AMERICA CORP 27 FADEM ROAD KLE /NFELOER C -2 EXISTING CONDITIONS PLAN SPRINGFIELD, NJ 07081 �\ Bright People Right Solutlons. C -3 SITE PLAN CONSTRUCTION 3500 MOO GATEWAY CENTER 27560 BLVD MORRISVILLE NC 27560 C-4 & C -5 GRADING, DRAINAGE, & EROSION CONTROL PLAN PROJECT NO 20161010 O 919- 755 -5011 F 919 - 755 -1414 cu„ NC LICENSE # F-1 143 C —b TREE CLEARING FLAN ISSUE LA fE U7 -76 -20151 C-7 & C —V DETAILS I CURRENT REVISION 3I C 1 I DESIGNED BY BMP I 'v" DRAWN BY IMP CHECKED BY CAL I APPROVED BY JBC I SHEET i of 8 N4 9915' �r EXISTING UTILITY POLE (TYP.) 1 D EXISTING 60' ROAD RIGHT OF WAY EXISTING PROPERTY BOUNDARY 'a EXISTING E OF PAVE& 9 EXIS 36" 1 CULL k$ a S i A NC HWY 45 S S22 °01'28 "W R 1-115.82' �4. S35 °14'33 E .. 2 9.45' - - N64 °36'42W RW _.S74 °20'36E - - - 144.95' 148.49' _� 47.79' S12 °04'14 "E 158.50' Bos�3F N36 °07'16"W � ELECTRIC OVERHEAD NE (7YP.) - `r`qq, Sig° 555 °0 Si 2)3 �37F i 0 "g9.21'E 289'1 �B dqi K EXISTING 1 ?�.�/ ? ?550• 5519 DISTRIBUTION f �- EXISTING -. \�\ POWER LINE n � - � � TREELfNE - , � NIQ O> Im 1 - 1 `1 EXISTING � -- N/F 24" C,1.1p - EXISTING . . ou vnu CULVERT " RCP PIN 6906 -71 - 46 S35 °79' > 6c CULVERT 757. Pc. 697 1 I y 1 1 f � 1 .. EXISTING PROPERTY JURISDICTIONAL � i - DC STREAM BOUNDARY (GIS) ' 1 �y 3 W �o s� - "s ,I-S50 °04'; 128.47' _ S37 °56'05 'E 3417.09' LINE NOI SURVEYED (PLOTTED FROM ISIS) I a 1 .13 1 NIA NSF to our V61A I hl D.B. 7857, PG 6978 / 0 EXISTING i 1 DITCH 1 a — EXISTING EXISTING LEASED � m DITCH ; Q AREA; . 1 EXISTING 18" RCP CULVERT TI — EXISTING DIRT �� ROAD (TYP.) N36319.51 "W 3124.96' - - I S77 °5425W 75.33' I - - _!- - S47 °02'15 "W - - - _ 138.36' EXISTING ADJACENT PROPERTY BOUNDARY (TYP. ) 1. EXISTING CONTOURS PROVIDED BY MCKIM & KL E /NFEL OER Bright People. Right Solutions. LEGEND - - -- - - -- EXISTING MAJOR CONTOUR (10') 05W(1ATEWAYCEN7REBLVD..SURE200 - - - -- -- EXISTING MINOR CONTOUR (2') MORRISVILLE, NC 27580 PHONE. 91 }1556011 — - - - - — EXISTING PROPERTY BOUNDARY WWM�ENFELDER.COM ------- - - - - -- EXISTING LEASE BOUNDARY 4. PARCEL INFORMATION: - - -- - - -- - - EXISTING ADJACENT PROPERTY BOUNDARY — — EXISTING PROPERTY BOUNDARY (NOT SURVEYED) EXISTING TREELINE PIN: 6906-71-4688 & 6906 -61 -6059 EXISTING PAVED ROAD — — — — — — EXISTING DIRT ROAD R/W EXISTING RIGHT OF WAY - • • — • • — - — - - EXISTING JURISDICTIONAL STREAM REVISIONS - — — — - EXISTING DITCH DSN CHK - — - OHE - — — -OW - - EXISTING OVERHEAD ELECTRIC LINE REV DESCRIPTION DATE DWN APP - - EXISTING DISTRIBUTION POWER LINE CLIENT COMMENTS AND w EXISTING UTILITY POLE 1 LOD ADJUSTMENrs 7- 70.2015 - EXISTING CULVERT CHAIN LINK FENCE AND GATE 2 DETAIL REVISION 7-31-2015 I 3 CLIENT COMMENTS &52015 GENERAL NOTES 4 FENCEIGATE REVISION 8-07 -2015 1. EXISTING CONTOURS PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY MCKIM & CREED, DATED 01-08 -2015. 3. CONTOURS OUTSIDE OF ARRAY AREA SUPPLEMENTED WITH NCDOT LIDAR. 4. PARCEL INFORMATION: PROPERTY OWNER: OAK VILLA FARMS PIN: 6906-71-4688 & 6906 -61 -6059 DEED BOOK: 757 & 45 PAGE: 697 & 506 SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1' I IF ITS NOT 1 INCH ON THIS SHEETADJUSTYOUR SCALES ACCORDINGLY 200 100 0 200 SCALE: 1 INCH = 200 FEET ORIGINAL DRAWING SIZE IS 24. 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON. HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD, NJ 07081 CONSTRUCTION PROJECTNO. 201610141 1 iSSUc DATE 07.i6.2015 j 1 CURRENTREVISION 3 1 DESIGNED BY BMP C 1 DRAWN BY BMP 1 CHECKED BY CAL 1 APPROVED BY JBC SHEET a of 6 EXISTING OVERHEAD I I ELECTRIC EXISTING UTILITY POLE PROPOSED UTILITY I .. EXISTING DISTRIBUTION POLE (TYP.) POWER LINE I 1 ``— EXISTING LEASED PROPOSED LIMITS I AREA, 86.27 ACRES OF DISURBANCE EXISTING - TREELINE I I I I a' NO TREES TO BE - CLEARED WITHIN PROPOSED 12' -WIDE ACCESS I JURISDICTIONAL PIPE 2 TO REPLACE EXISTING 20' ROAD WITH 6" GRAVEL BASE. I _ STREAM BANKS. CULVERT SEE SHEET C -5 FOR .- SEE SHEET C -7 DETAIL #7 I _ CALCULATION TABLE AND Il PROPOSED JURISDICTIONAL STREAM IMPACT INFORMATION TREELINE (TYP.) 1 1 ,� ` EXISTING DIRT _ — ROAD (TYP.) PIPE 1 SEE SHEET C -5 FOR - CALCULATION TABLE I% EXISTING •! Y�K�: _ _ -_ - - -� , PROPOSED DRIVEWAY JURISDICTIONAL STREAM ,� ENTRANCE. SEE SHEET � "$,¢ ^.'`3 ; -,,. C -7 DETAIL Its Sl�''.4 'n' �S- 5 ��1'l,Kr 12 ZA PROPOSED O EXISTING 60' ROAD LAYDOWN AREA '' 'w� - RIGHT OF WAY �5 4'0z�.r ' C a n ^fin EXITING PROPERTY PROPOSED 24' -WIDE BOUNDARY (GIS) ACCESS GATE, SEE SHEET C -7 DETAIL #3 i O $ D A D a EXISTING �\ a PROPERTY BOUNDARY \\ C 3 5 i� EXISTING EDGE OF PAVEMENT 8 3 3 PROPOSED PERMANENT FENCE MIN. 13' SETBACK ,� z• ask, FROM ARRAYS. SEE `2 i SHEET C -7 DETAIL #6p 3 vZx✓ EXISTING,"'' DITCH � 2 2� 0 14 101* 0 X. z �y '� r Kd PROPOSED SOLAR 'b ' !� ARRAY PV MODULES ON GROUND " MOUNTED RACKING .� SYSTEM (TYP.) a at; "h PROPOSED INVERTER LEGEND EXISTING PROPERTY BOUNDARY - -- EXISTING LEASE BOUNDARY EXISTING ADJACENT PROPERTY BOUNDARY - EXISTING PROPERTY BOUNDARY (NOT SURVEYED) EXISTING TREELINE - EXISTING PAVED ROAD - - - - - - - EXISTING DIRT ROAD - - - - EXISTING RIGHT OF WAY - EXISTING STREAM CENTER — • • — • • — • - — - • — EXISTING JURISDICTIONAL STREAM EXISTING DITCH EXISTING OVERHEAD ELECTRIC EXISTING DISTRIBUTION POWER LINE EXISTING UTILITY POLE EXISTING CULVERT — PROPOSED LIMIT OF DISTURBANCE �.❑ ❑ PROPOSED FENCE r. r r 1 r r 1 1. PROPOSED TREELINE PROPOSED UTILITY EASEMENT w PROPOSED UTILITY POLE ` PROPOSED ACCESS ROAD PROPOSED LAYDOWN AREA GENERAL NOTES 1. EXISTING CONTOURS PROVIDED BY MCKIM & CREED, DATED 01-08-2015. 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 3. CONTOURS OUTSIDE OF ARRAY AREA SUPPLEMENTED WITH NCDOT LIDAR. 4. PARCEL INFORMATION: PROPERTY OWNER: OAK VILLA FARMS PIN: 6906 - 714688 & 6906 -61 -6059 DEED BOOK: 757 & 45 PAGE: 697 & 506 SUMMARY INFORMATION DEVELOPMENT NAME: WINTON SOLAR SITE DEVELOPER: STREET ADDRESS: 100 NC HWY 45 S GEHRLICHER SOLAR AMERICA CORP. PIN: 6906 -71 -4688 & 6909 -81 -6059 21 FADEM ROAD TOTAL PARCEL ACREAGE: 153.15 ACRES SPRINGFIELD, NJ 07081 TOTAL LEASED ACREAGE: 88.27 ACRES (906) 988-0453 EXISTING USE: VACANT LAND ENGINEER: PROPOSED USE: POWER GENERATION FACILITY KLEINFELDER, INC. PROPOSED IMPERVIOUS AREA: 1.05 ACRES 3500 GATEWAY CENTRE BLVD. SUITE 200 - 007 -2015 MORRISVILLE, NC 27560 (919) 755 -5011 EXISTING DITCH PROPOSED PERMANENT 4' PEDESTRIAN GATE; SEE SHEET C-7 DETAIL #4 KL E /NFEL OER Bright People. Right Solutions. 3500 GATEWAY CENTRE BLVD 200 MORRISVILLE NC 27580 PHONE 914 555811 YNNY EINFELDER.COM REVISIONS DSN CHK REV DESCRIPTION DATE DWN APP 1 CLIENT COMMENTS AND 770 -2015 LOD ADJUSTMENTS CHAIN LINK FENCE AND GATE 2 7 -31 -2015 DETAIL REVISION 3 CLIENT COMMENTS 8. 5-2015 4 FENCEIGATE REVISION - 007 -2015 SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 I If I TS NOT 1 INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY 100 J%j(rI 0 100 SCALE: 1 INCH = 100 FEET ORIGINAL DRAWING SIZE IS 24 x 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON, HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD, NJ 07081 CONSTRUCTION PROJECT NO 20181014 iuSUE GATE 07- 162015 CURRENT REVISION 3 DESIGNED BY BMP c_# DRAWN BY BMP CHECKED BY CAL APPROVED BY JBC SHEET • of 6 5 f 0 d -SF LEGEND f NOTIFICATION OF COMBINED SELF - MONITORING - EXISTING MAJOR CONTOUR (10•) ? KLE /NFELOER + PROPOSED UTILITY -- EXISTING MINOR CONTOUR (2') Bright People. Right Solutions. L EASEMENT AND SELF - INSPECTION FORM: a EXISTING PROPERTY BOUNDARY EXISTING OVERHEAD 1 THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO - EXISTING ADJACENT PROPERTY BOUNDARY ` ( ELECTRIC 35DD r4 AY CENTRE BLVD.. SLITS iO 1 REQUIRE THAT PERSONS RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES EXISTING PROPERTY BOUNDARY (NOT SURVEYED) MORMSVIL E.W21 INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT - - EXISTING TREELINE PHDNE 913 TS 11 THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING WYnv ,LENEEWU COM EXISTING UTILITY POLE FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS _ EXISTING PAVED ROAD t TOOK EFFECT OCTOBER 1, 2010. EXISTING DIRT ROAD ail _ EXISTING RIGHT OF WAY EXISTING DISTRIBUTION 'Lj - TO SIMPLIFY DOCUMENTATION OF SELF- INSPECTION REPORTS AND NPDES — — — — — EXISTING JURISDICTIONAL STREAM POWER LINE ; `.11 SELF- MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. EXISTING DITCH THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY - .I SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR - EXISTING OVERHEAD ELECTRIC N" EXISTING DISTRIBUTION POWER LINE PROPOSED LIMITS i CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF- INSPECTION REPORT IS OF DISURBANCE {[ 3 THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION — - -- - - - - -- - -- -- PROPOSED LIMIT OF DISTURBANCE 1' CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS PROPOSED FENCE REVISIONS 111 SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT. AND CONTINUED PROPOSED UTILITY EASEMENT DS" CHK UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE I REV DESCRIPTION DATE ACCESSEDAT: HTTPY /PORTAL.NCDENR.ORGIWEBILR /EROSION PROPOSED TREELINE OWN APP EXISTING SF — SF PROPOSED SILT FENCE CLIENT COMMENTS -11 1 i TREELINE IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE PROPOSED CULVERT t LOD ADJUSTMENTS 30 -2075 PROPOSED SILT m ` RALEIGH REGIONAL OFFICE AT (919) 791 -4200. ■ PROPOSED RIP RAP ENERGY DISSIPATER I CHAIN LINK FENCE AND GATE FENCE t 2 DETAIL REVISION �-3t -2(115 I PROPOSED HORSESHOE INLET PROTECTION 1 o PROPOSED SILT FENCE OUTLET 3 CLIENT COMMENTS B -52015 1 EXISTING UTILITY POLE PIPE 1 9 i EXISTING CULVERT a F FJ ENCGATE REVISION 6- oT -mts SEE INSET A I SHEET C -5 PROPOSED UTILITY POLE 1 1 _ 1 PROPOSED ACCESS ROAD w PROPOSED 24'X 100' ROCK PROPOSED CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCE, I 1 PIPE 2 - PROPOSED SILT FENCE PROPOSED LAYDOWN AREA SEE SHEET C -7 DETAIL #8 4 m SEE INSET B OUTLET (TYP.). SEE `�^ 1 SHEET C-5 EXISTING DIRT SHEET C -7 DETAIL #2 - 1 ROAD (TYP.) - - _ - GENERAL NOTES _ -- PROVIDED 8 C & S iS - - -- - - - - _ 1. EXISTING CONTOURS PROVI E Y M KIM 1 EXISTING JURISDICTIONAL) h fir JS iS �S js iS JS — CREED, DATED 01 -05 2015. WETLAND STREAM BANKS NOT I ;k �� n' "` - - — - - - - -- iS 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY fEXISTING ROAD TO BE CLEARED; SEE INSET B - _ , a� - MCKIM 8 CREED, DATED 01 -08 -2015. RIGHT OF WAY ON SHEET C -5 FOR STREAM IMPACT LENGTHS -. '1 ��� 5.. �y-� ✓ % - 3. CONTOURS OUTSIDE OF ARRAY AREA "�y i f x - �� SUPPLEMENTED WITH NCDOT LIDAR. 'L , ,�� EXISTING fyp� F,xp"Y r `� '�-- �; -ti 4. PARCEL INFORMATION: JURISDICTIONAL STREAM 1 v (f'��'�,*'''t�s - ',�,' h' _ y PROPERTY OWNER: OAK VILLA FARMS y PIN: 6906 -71 4688 & 6906 -61 -6059 PROPOSED 1 < -��� ilk �r '� ' ' ' � DEED BOOK: 757 & 45 PAGE: 697 & 506 LAYDOWN AREA �I <� " r� I. EXITING PROPERTY PROPOSED �" yJ� `.� „ h •�' c ira "� UTILITY POLE 'i' •"+^ PROPOSED 12 NIDE ?' BOUNDARY (GIS) ' >' ACCESS ROAD�� �;• •- CONSTRUCTION SEQUENCE - PROPOSED 24' -WIDE ACCESS GATE, SEE O .is 1 1. OBTAIN NCDENR LAND DISTURBANCE PERMIT AND SCHEDULE A O EXISTING 60' ROAD SHEET C -T DETAIL #3 - k" 4 y -. °� PRECONSTRUCTION MEETING WITH LAND QUALITY INSPECTOR. x. RIGHT OF WAY 2. INSTALL CONSTRUCTION ENTRANCE, AND WHEN COMPLETE, INSTALL THE SCALE VERIFICATION '_ tT. PERIMETER SILT FENCE. UPON COMPLETION OF INSTALLATION. IMMEDIATELY kry _ THIS BAR IS 1 INCH IN LENGTH PROPOSED PERMANENT r >y R �• ,u SEED, MULCH. AND ANCHOR EROSION AND SEDIMENTATION CONTROL r' Yt £ airy j F ON ORIGINAL DRAWING FENCE MIN. 13' SETBACK ;' �,F',. �r'C" �E rr. -`3 'x.• MEASURES. D t > FROM ARRAYS, SEE - _ ^\\.� > rs., '� '` �'� --'' I SHEET C -7 DETAIL #7 �� >r` ""T1` `� rr ° ?� :a ='� EXISTING 3. BEGIN CLEARING AND ROUGH GRADING OF SITE. ALL EXCAVATIONS EXISTING PROPERTY i� ' - - ' - PERFORMED SHALL BE BACKFILLED WITHIN THE SAME DAY, WITH SPOIL IF IT'S NOT 1 INCH ON THIS 4,,k .�- �� DITCH PLACEMENT ON UPSLOPE SIDE. SHEET AwDSr YOUR BOUNDARY :i 1�.'YJ•` / ' r � SCALES ACCORDINGLY _ PROPOSED SOLAR f - ARRAY PV MODULES 4. BEGIN FINISHED GRADING, FILLING, AND COMPACTION OF SITE. F! PROPOSED SILT FENCE (TYPE), ON GROUND RACKING 5. INVERTER PAD GRADING AND TRENCHING WILL HAVE TEMPORARY GROUND 100 50 0 too 1e 5r SYSTEM COVER AT THE END OF EACH WORK DAY. SCALE: 1 INCH = 100 FEET SEE SHEET C -7 DETAIL #1 ,t` c,` tra * (TYP.) ORIGINAL DRAWING SIZE IS 24 n 36 Z A- PROPOSED PERMANENT I 6. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH 4' PEDESTRIAN GATE; VEGETATION, STONE BASE COURSE, CONCRETE, ETC. SEE SHEET C-6 DETAIL 9 SEE SHEET C -7 DETAIL #4 N FOR SEEDING SCHEDULE 7. AFTER ESTABLISHMENT OF PERMANENT VEGETATION, REMOVE SILT FENCE WINTON SOLAR SITE ` * `t O I AND ANY REMAINING EROSION CONTROL MEASURES. EXISTING `✓t'•' `fi > �,,. 100 NC HWY 45 S. DITCH r - WINTON, HERTFORD COUNTY, NORTH CAROLINA 8. ALL DISTURBED AREAS TO BE STABILIZED AND GROUNDCOVER SHOULD BE ACHIEVED WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OR /v .x�-r• �, �' I DEVELOPMENT, PER NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG010000. EXISTING EDGE VPROPOSED N EROSION CONTROL NOTES NVERTER OF PAVEMENT ,'- _ 5� (TyP) 2, I 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH GEHRLICHER SOLAR AMERICA CORP. LLt NCDENR STANDARDS. 21 FADEM ROAD `N SPRINGFIELD, NJ 07081 ''' '�lV 6r .k. `� .r. 5" w $.r �. .� I � Kw a� r 2. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED IN PROPER I WORKING CONDITION DURING THE PERIOD OF CONSTRUCTION. m',M, pry xy CONSTRUCTION - '�.-'� 3. PLACE SILT FENCE OUTLETS AT LOW POINTS ALONG SILT FENCE AS NECESSARY. - •` , , � �( F f. � Y 4 POSED PROJECT NO. u2016<014 L .;w I I ISsuF DATE OT-1a.20151 - - - - -" - MEASURES MAY BE .y.� M NECESSARY DEPENDING ON ACTUAL SITE CONDITIONS. CURRENT REVISION 3 . ADDITIONAL EROSION CONTROL MEASURES AND /OR MODIFICATIONS TO PRO I DESIGNED BY BMP I 5. THE TOTAL DISTURBED AREA IS 35.31 ACRES. DRAWN BY BMP CHECKED BY CAL - - -'- 6. SEE C-6 & C -7 FOR EROSION CONTROL MEASURE DETAILS. — – _ APPROVED BY JBC I SHEET N of 6 "s e S S INSET A 20 10 0 20 SCALE: 1 INCH = 20 FEET - EXISTING MAJOR CONTOUR (10') \`\ PROPOSED RIP RAP s PROPOSED GRUBBING IS TO TAKE PLACE WITHIN THE ENERGY DISSIPATER BANKS OF THE ,' WIDTH: 3.75' \ LIMITS OF WETLAND STREAM DISTURBANCE _ LENGTH: 5' Cc (INLET) 0TOTAL Q FLOW FLOW SLOPE DtheD (in) SIZE (in) THICKNESS: 9" LENGTH PROPOSED TEMPORARY CHECK DAM, s SEE SHEET C -8 DETAIL #12 CLASS A RIP RAP TOP EL (ft) PIPE CULVERT / i (In/hr) (AREA) 25 RADII / (ft/sec) % PROVIDE MINIMUM 1' OF COVER OVER PIPE. / (ft) ACCESS ACROSS l D DITCHIOVER PIPE TO 0.30 - EXISTING J JURISDICTIONAL \\ / BE PROVIDED FOR / ( MAINTENANCE. PROPOSED TEMPORARY PIPE 2 72.94 HORSESHOE INLETS 0.30 PROPOSED PROTECTION (TYP.), SEE - '� - 15 "FES SHEET C-8 DETAIL #10 - RCP PROPOSED ON VARYING TIME OF CONCENTRATIONS. PIPE 1 To = 10 MIN; PIPE 2 To = 52 MIN. WHERE To WAS DETERMINED USING THE KIRPICH �a F PIPE 1 5F 8 LF OF PERMANENT IMPACTS NEW 36" FES AND 20 LF OF / TEMPORARY IMPACTS FOR - EROSION CONTROL MEASURES - -- %\ r ` \ _ _ - _ 1 PROPOSED 24'X 100' ROCK CONSTRUCTION ENTRANCE, SEE SHEET C-7 DETAIL 98J, / i ,n EXISTING BYROAD <\ RIGHT OF WAY s * A \ INSET A 20 10 0 20 SCALE: 1 INCH = 20 FEET INSET B 20 10 0 20 SCALE: 1 INCH = 20 FEET - EXISTING MAJOR CONTOUR (10') \`\ NO CLEARING OR s PROPOSED GRUBBING IS TO TAKE PLACE WITHIN THE ._TREELINE BANKS OF THE ,' JURISDICTIONAL \ LIMITS OF WETLAND STREAM DISTURBANCE _ I INTENSITY' Cc (INLET) 0TOTAL Q FLOW FLOW SLOPE DtheD (in) SIZE (in) VfUII LENGTH PROPOSED TEMPORARY CHECK DAM, s SEE SHEET C -8 DETAIL #12 LOWER INVERT TOP EL (ft) PIPE CULVERT (ac) (In/hr) (AREA) () (CfS) (wft) (ft/sec) (ft) (ft) (ft) MATERIAL l D 6.25 0.30 - EXISTING J JURISDICTIONAL \\ / 2.35 STREAM -� ,", PROPOSED ' I 36" FES 37.00 - RCP PIPE 2 72.94 2.85 I 0.30 62.37 62.37 0.01 33.63 36.00 PROPOSED PIPE 2 TO 20.00 REPLACE EXISTING CULVERT OF SAME LENGTH (20 LF) 29.25 - RCP ' INTENSITY IS BASED ON VARYING TIME OF CONCENTRATIONS. PIPE 1 To = 10 MIN; PIPE 2 To = 52 MIN. WHERE To WAS DETERMINED USING THE KIRPICH �a F 1�66� 5F 8 LF OF PERMANENT IMPACTS NEW 36" FES AND 20 LF OF TEMPORARY IMPACTS FOR - EROSION CONTROL MEASURES - -- %\ AND DEWATERING- :C ` \ _ _ - _ 1 INSET B 20 10 0 20 SCALE: 1 INCH = 20 FEET GENERAL NOTES 1. EXISTING CONTOURS PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 3. CONTOURS OUTSIDE OF ARRAY AREA SUPPLEMENTED WITH NCDOT LIDAR. 4. PARCEL INFORMATION: PROPERTY OWNER: OAK VILLA FARMS PIN: 6906 - 71.4688 & 6906-61 -6059 DEED BOOK: 757 & 45 PAGE: 697 & 506 CONSTRUCTION SEQUENCE; FOR PIPE IN JURISDICTIONAL STREAM 1. OBTAIN ALL REQUIRED LOCAL, STATE AND FEDERAL PERMITS. 2. HAVE ALL REQUIRED MATERIALS ON SITE PRIOR TO STARTING THE CULVERT REPLACEMENT. 3. INSTALL NECESSARY EROSION CONTROL AND DEWATERING MEASURES. 4. EXCAVATE AND REMOVE EXISTING CULVERT. 5. INSTALL PROPOSED REPLACEMENT CULVERT, FLARED END SECTION AND BACKFILL OVER CULVERT (PROVIDE AT LEAST 1' OF COVER OVER PROPOSED CULVERT). 6. STABILIZE AREA, AND REMOVE DEWATERING MEASURES. 7. EROSION CONTROL MEASURES SHOULD REMAIN UNTIL THE SITE IS STABILIZED AND PER THE OVERALL PLAN CONSTRUCTION SEQUENCE ON THIS SHEET. NOTIFICATION OF COMBINED SELF - MONITORING AND SELF - INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF - INSPECTION REPORTS AND NPDES SELF - MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF- INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: // PORTAL .NCDENR.ORG /WEB /LRIEROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE RALEIGH REGIONAL OFFICE AT (919) 791 -4200. LEGEND -- - - EXISTING MAJOR CONTOUR (10') - -- -- EXISTING MINOR CONTOUR (2') WINTON SOLAR SITE STORM DRAINAGE COMPUTATIONS -- EXISTING PROPERTY BOUNDARY - - - - - -- EXISTING ADJACENT PROPERTY BOUNDARY - - - - EXISTING PROPERTY BOUNDARY (NOT SURVEYED) ACCESS ROAD INLETAREA I INTENSITY' Cc (INLET) 0TOTAL Q FLOW FLOW SLOPE DtheD (in) SIZE (in) VfUII LENGTH UPPER INVERT LOWER INVERT TOP EL (ft) PIPE CULVERT (ac) (In/hr) (AREA) () (CfS) (wft) (ft/sec) (ft) (ft) (ft) MATERIAL PIPE 1 1.23 6.25 0.30 2.31 2.31 0.01 9.77 15.00 2.35 40.00 37.50 37.00 - RCP PIPE 2 72.94 2.85 I 0.30 62.37 62.37 0.01 33.63 36.00 9.15 20.00 29.50 29.25 - RCP ' INTENSITY IS BASED ON VARYING TIME OF CONCENTRATIONS. PIPE 1 To = 10 MIN; PIPE 2 To = 52 MIN. WHERE To WAS DETERMINED USING THE KIRPICH METHOD. 1�66� PROPOSED CONSTRUCTION ENTRANCE GENERAL NOTES 1. EXISTING CONTOURS PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 3. CONTOURS OUTSIDE OF ARRAY AREA SUPPLEMENTED WITH NCDOT LIDAR. 4. PARCEL INFORMATION: PROPERTY OWNER: OAK VILLA FARMS PIN: 6906 - 71.4688 & 6906-61 -6059 DEED BOOK: 757 & 45 PAGE: 697 & 506 CONSTRUCTION SEQUENCE; FOR PIPE IN JURISDICTIONAL STREAM 1. OBTAIN ALL REQUIRED LOCAL, STATE AND FEDERAL PERMITS. 2. HAVE ALL REQUIRED MATERIALS ON SITE PRIOR TO STARTING THE CULVERT REPLACEMENT. 3. INSTALL NECESSARY EROSION CONTROL AND DEWATERING MEASURES. 4. EXCAVATE AND REMOVE EXISTING CULVERT. 5. INSTALL PROPOSED REPLACEMENT CULVERT, FLARED END SECTION AND BACKFILL OVER CULVERT (PROVIDE AT LEAST 1' OF COVER OVER PROPOSED CULVERT). 6. STABILIZE AREA, AND REMOVE DEWATERING MEASURES. 7. EROSION CONTROL MEASURES SHOULD REMAIN UNTIL THE SITE IS STABILIZED AND PER THE OVERALL PLAN CONSTRUCTION SEQUENCE ON THIS SHEET. NOTIFICATION OF COMBINED SELF - MONITORING AND SELF - INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF - INSPECTION REPORTS AND NPDES SELF - MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF- INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: // PORTAL .NCDENR.ORG /WEB /LRIEROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE RALEIGH REGIONAL OFFICE AT (919) 791 -4200. LEGEND -- - - EXISTING MAJOR CONTOUR (10') - -- -- EXISTING MINOR CONTOUR (2') - - -- EXISTING PROPERTY BOUNDARY - - - - - -- EXISTING ADJACENT PROPERTY BOUNDARY - - - - EXISTING PROPERTY BOUNDARY (NOT SURVEYED) ' EXISTING TREELINE - - - - EXISTING PAVED ROAD - - - -- EXISTING DIRT ROAD - - - - - - - EXISTING RIGHT OF WAY - - - - - EXISTING JURISDICTIONAL STREAM 2 - EXISTING DITCH - -- - - - - - " -.. -- EXISTING OVERHEAD ELECTRIC --- _ P-...r -- ---- PROPOSED LIMIT OF DISTURBANCE -- ., -- - PROPOSED FENCE - - - - - -- PROPOSED UTILITY EASEMENT 40 PROPOSED MAJOR CONTOUR (10') 38 PROPOSED MINOR CONTOUR (2') ' ._. ' _' PROPOSED TREELINE 5F SF PROPOSED SILT FENCE - - -- - - - - -- PROPOSED CULVERT • PROPOSED RIP RAP ENERGY DISSIPATER PROPOSED HORSESHOE INLET PROTECTION o PROPOSED SILT FENCE OUTLET -- EXISTING UTILITY POLE - EXISTING CULVERT PROPOSED UTILITY POLE -!^ PROPOSED ACCESS ROAD 1�66� PROPOSED CONSTRUCTION ENTRANCE PROPOSED LAYDOWN AREA CONSTRUCTION SEQUENCE 1. OBTAIN NCDENR LAND DISTURBANCE PERMIT AND SCHEDULE A PRECONSTRUCTION MEETING WITH LAND QUALITY INSPECTOR. 2. INSTALL CONSTRUCTION ENTRANCE, AND WHEN COMPLETE, INSTALL THE PERIMETER SILT FENCE. UPON COMPLETION OF INSTALLATION, IMMEDIATELY SEED, MULCH, AND ANCHOR EROSION AND SEDIMENTATION CONTROL MEASURES. 3. BEGIN CLEARING AND ROUGH GRADING OF SITE. ALL EXCAVATIONS PERFORMED SHALL BE BACKFILLED WITHIN THE SAME DAY, WITH SPOIL PLACEMENT ON UPSLOPE SIDE. 4. BEGIN FINISHED GRADING, FILLING, AND COMPACTION OF SITE. 5. INVERTER PAD GRADING AND TRENCHING WILL HAVE TEMPORARY GROUND COVER AT THE END OF EACH WORK DAY. B. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE WITH VEGETATION, STONE BASE COURSE, CONCRETE, ETC. SEE SHEET C-6 DETAIL 9 FOR SEEDING SCHEDULE 7. AFTER ESTABLISHMENT OF PERMANENT VEGETATION, REMOVE SILT FENCE AND ANY REMAINING EROSION CONTROL MEASURES. B. ALL DISTURBED AREAS TO BE STABILIZED AND GROUNDCOVER SHOULD BE ACHIEVED WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OR DEVELOPMENT, PER NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG010000. EROSION CONTROL NOTES 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH NCDENR STANDARDS. 2. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED IN PROPER WORKING CONDITION DURING THE PERIOD OF CONSTRUCTION. 3. PLACE SILT FENCE OUTLETS AT LOW POINTS ALONG SILT FENCE AS NECESSARY. 4. ADDITIONAL EROSION CONTROL MEASURES AND /OR MODIFICATIONS TO PROPOSED MEASURES MAY BE NECESSARY DEPENDING ON ACTUAL SITE CONDITIONS. 5. THE TOTAL DISTURBED AREA IS 35.31 ACRES. 6. SEE C-6 & C -7 FOR EROSION CONTROL MEASURE DETAILS. (OK�LINF-,ELDAER Bright People. Right Solutions. ]500 DA1A1 CENTRE BLVD.. SD ITE 200 MORRISVILLE, NC 27580 PHONE: 91 &7565011 W VAY.KLEINFELDER.COM SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 r I IF ITS NOT I INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY 100 SD 0 100 SCALE: 1 INCH = 100 FEET ORIGINAL DRAWING SIZE IS 24. 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON, HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD. NJ 07081 CONSTRUCTION PROJECT NO. 20761014 ISSUE DATE 07- 162015 CURRENT REVISION 3 DESIGNED BY BMP C DRAWN BY BMP CHECKED BY CAL APPROVED BY JBC I SHEET #.1 6 REVISIONS DEN CMK REV DESCRIPTION DWN APP DATE 7 CLIENTCOMMENTSAND 130 -2015 LODADJUSTMENTS 2 CHAIN LINK FENCE AND GATE 731 -2075 DETAIL REVISION 3 CLIENT COMMENTS 8 -52015 4 FENCE/GATE REVISION &07 -2015 IT I SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 r I IF ITS NOT I INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY 100 SD 0 100 SCALE: 1 INCH = 100 FEET ORIGINAL DRAWING SIZE IS 24. 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON, HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD. NJ 07081 CONSTRUCTION PROJECT NO. 20761014 ISSUE DATE 07- 162015 CURRENT REVISION 3 DESIGNED BY BMP C DRAWN BY BMP CHECKED BY CAL APPROVED BY JBC I SHEET #.1 6 - ! PROPOSED UTILITY EASEMENT LEGEND - - EXISTING PROPERTY BOUNDARY EXISTING ADJACENT PROPERTY BOUNDARY EXISTING PROPERTY BOUNDARY (NOT SURVEYED) EXISTING TREELINE ! I •YYY -1 PROPOSED TREELINE EXISTING PAVED ROAD EXISTING DIRT ROAD EXISTING RIGHT OF WAY — EXISTING JURISDICTIONAL STREAM EXISTING DITCH EXISTING OVERHEAD ELECTRIC EXISTING DISTRIBUTION POWER LINE - -- - -- PROPOSED LIMIT OF DISTURBANCE -- PROPOSEDFENCE PROPOSED UTILITY EASEMENT EXISTING UTILITY POLE EXISTING CULVERT PROPOSED UTILITY POLE PROPOSED ACCESS ROAD PROPOSED TREE CLEARING AREA PROPOSED LAYDOWN AREA GENERAL NOTES 1. EXISTING CONTOURS PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 2. CONTOURS WITHIN ARRAY AREA PROVIDED BY MCKIM & CREED, DATED 01 -08 -2015. 3. CONTOURS OUTSIDE OF ARRAY AREA SUPPLEMENTED WITH NCDOT LIDAR. 4. PARCEL INFORMATION: PROPERTY OWNER: OAK VILLA FARMS PIN: 6906- 71A688 & 6906 -61 -6059 DEED BOOK: 757 & 45 PAGE: 697 & 506 KL E /NFEL OER Bright People. Right Solutions. 3500 GATEWAY CENTRE 6LYD. SUITE 200 MOlIWSVILLE, NC 2!560 PHONE 914!886011 W W W .KLEINFELOER.COM SCALE VERIFICATION THIS BAR S 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 I IF ITS NOT 11NCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY 100 50 0 100 SCALE: 1 INCH • 1D0 FEET ORIGINAL DRAWING SIZE IS 24 a 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON, HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP 21 FADEM ROAD SPRINGFIELD, NJ 07081 REVISIONS PROJECT NO. 20161014 ISSUE DATE DSN CHK REV DESCRIPTION DATE DWN APP 1 CLIENT COMMENTS ANO 7- 30.2015 JBC SHEET 0 al 6 LOD ADJUSTMENTS 2 CHAIN LINK FENCE AND GATE 7.31.2015 DETAIL REVISION 3 CLIENT COMMENTS &12015 6 I FENC -GATE REVISION 807 -2015 SCALE VERIFICATION THIS BAR S 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 I IF ITS NOT 11NCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY 100 50 0 100 SCALE: 1 INCH • 1D0 FEET ORIGINAL DRAWING SIZE IS 24 a 36 WINTON SOLAR SITE 100 NC HWY 45 S. WINTON, HERTFORD COUNTY, NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP 21 FADEM ROAD SPRINGFIELD, NJ 07081 CONSTRUCTION PROJECT NO. 20161014 ISSUE DATE 07- 16- <015 CURRENT REVISION 3 DESIGNED BY BMP DRAWN BY SMP CHECKED BY CAL APPROVED BY JBC SHEET 0 al 6 a c Wa 0 i = NOTES 1 USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 114 ACRE AND NEVER- IN AREAS OF CONCENTRATED FLOW. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3 64SPEGT SILT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 4 REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT 5. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED O MMNTENANCE INSPECT SEDIMEYT FENCES AT LEAST ONCE A W EEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REWIRED REPAIRS IMMEDIATELY SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE. YEAR DECOMPOSE, OR BECOME INEFFECTIVE. REPLACE IT PROMPTLY REMOVE THE SEDIMEW DEPOSI'S AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE WE TO AVOID JNDERMI INGTI- EFENCEDURINGCLEN4I, REMOVEALL FENCING MATERIALS AND UNS-ABLE SEDIMENT DEPOSITS AND BRING TILE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA INS BEEN PROPERLY STABILIZED. STEEL POST STONE BASE IT W� WIRE FENCE O.D. SRT FENCE GEOT TLE FABRIC PIPE FRAME IIXT.JL STRENGTH F 4 STEEL LINE WIRES i POST SPAC'ND IS JSEO) STONF ETON E g ••IR •B'F'I. ' ��� 01 .4t.�•R•O`�0: •141' _ IUPSLOPE SIDE, NO 57 WASHED $TONE. ON GROUND f FOR ANCHOR WHEN SILT 1E TFE.- FENCE IS PROTECTING FRONT VIEW CATCH BASIN. MMNTENANCE INSPECT SEDIMEYT FENCES AT LEAST ONCE A W EEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REWIRED REPAIRS IMMEDIATELY SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE. YEAR DECOMPOSE, OR BECOME INEFFECTIVE. REPLACE IT PROMPTLY REMOVE THE SEDIMEW DEPOSI'S AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE WE TO AVOID JNDERMI INGTI- EFENCEDURINGCLEN4I, REMOVEALL FENCING MATERIALS AND UNS-ABLE SEDIMENT DEPOSITS AND BRING TILE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA INS BEEN PROPERLY STABILIZED. STEEL POST STONE BASE T KT WOVEN VwRE FABRIC IF4 SPACING IS USED O.D. SRT FENCE GEOT TLE FABRIC PIPE FRAME IIXT.JL STRENGTH F 4 STEEL II i POST SPAC'ND IS JSEO) STONF ETON E g RL. SLOP=_ OR FOR REPAIR OF SILT ExRrNG GRADE FENCE FAILURES. USE _ IUPSLOPE SIDE, NO 57 WASHED $TONE. ON GROUND f FOR ANCHOR WHEN SILT • •' GRADE FENCE IS PROTECTING ` CATCH BASIN. TURN FILTER FABRIC ^ WIRE FENCE INTO TRENCH OPTIONAL IF B' STEEL B —OUL T.RENCHANO POST SPACING IS USED C--T THOROUGHty �?-- la•WIDEGB'JEEP MIN. SIDE VIEW TEMPORARY SILT FENCE NO SCALE FABRIC AREA - - TAR 3) STRANDS OF (FABRIC NOT SHORN N TAB . IX t' wTE POST COI95RNC 6 z r AEItnCAL RML A STRAND LINE BBE PAST / •/ 1Pi B— 7 �F LATpI ,- ^ .C- ONAL a ma id RAL `GUV.nIZm FT1+OnG REST 1 + I' caacrE SIDE VIEW FRONT VIEW NOTES 1. FOONRG RKDTH TO BE (I)x POST ININ. Axn OEPIN TO BE ]5 -. OPENING Z. WT6 YAY BE MANUALLY W ELECIN Y OPERATED I 1HR000N 2A.- IQ" - C CANTILEVERED SLIDING GATE DETAIL NO SCALE C GRAVEL ACCESS ROAD SECTION NO SCALE �m.a/RML dAGQ1Al RAIL ail u STONE BASE EXISTING SUBGRADE C GRAVEL ACCESS ROAD SECTION NO SCALE �m.a/RML dAGQ1Al RAIL ail u 1 INSPECT SILT FENCES OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL . MAKEANY REQUIRED REPAIRS IMMEDIATELY 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I TOP Of SIT FENCE 1 BEAT ABC LEAST I PRO ' VE TMETOPOG THE WASHED STONE ( I EACH VwILT�i S a�r+n WIREOREPaRSiLwEEKANDAI z .:_.—I. AR NE AARY TO-1. A0EgMTE 1CRMGE uOLUME —YNE NEXT RNN AND TO-1. PRESSURE Cn THEE —E. —CARE TOMM UNDERMNPRG ME FENCE DUANG CL- 3 REMDVEAU.S-RNCEOLTIE AAYER- '- .UNBTN3lFSEDI — DEPOORSANO BR:NO THE AREA TO GRADE ANC STNIL'ZE 1AFTER TAE CONTRIBUTING —NAGE AREA W 9 BEEN PRCPER"' B =ABI'ZEO LOCKABLE FORK LATCH 1 =i CONIC. ENCASEMENT (TYP.) BS�ti1EYi CAT OPENING SYSTEM Br: UNEAP-OSCO MWEL HAC _ CALL SOC MKINC R -3000/ Aw3adEAi 6 - NNI -NEr BY TYP g Ex NOTE: 2 114' (11.5 GA.) GALVANIZED FENCING MESH SHALL BE USED. PEDESTRIAN GATE POSTS SHALL BE SCHEDULE 20 GALVANIZED STEEL POST NO WINDSCREENS OR PRIVACY SLATS SHALL BE INSTALLED. C MAN GATE DETAIL NO SCALE 1 SARS WIRE 1 - r1- 511111 TOP RAIL (TYP) 3 STRANDS ITYP) 1' -0• {'_ ± - - - I - I� --BARB W E MOUNTING ARMS TO BE TILTED OUTWARD AT Sp A WANGLE (TYP) CJt" GALVANIZED 7 GA. COILED FENCING MESH I TENSION WIRE LINE POST(2') > BRACE RAIL m TERMINAL POST (2 1f2-) 10' TO BE PLACED EVERY 300' 7 GA- COILED -, TENSION WIRE 2• LINE POST) 3000 PSI CONIC. TO BE DRIVEN ENCASEMENT INTO SOIL - (TYP') _ NOTE. 2 1/4- (11 5 GA.) GALVANIZED FENCING MESH SHALL BE USED DOUBLE GATE POSTS SMALL BE SCHEDULE 40 GALVANIZED STEEL PIPE. TERMINAL POSTS SMALL BE SCHEDULE 2U GALVANIZED STEEL PIPE. LINE PUS TS SHALL BE 065 GALVANIZED STEEL 7 GA. COILED TENSION WIRE TO BE INSTALLED ON TOP AND BOTTOM. NO PEDESTRAfN GATES SHALL BE INSTALLED. NO WINDSCREENS OR PRIVACY SLATS SHALL BE INSTALLED, O PERMANENT FENCE DETAIL NO SCALE - 5'EEI FENCE POST HIRE FENCE HAROwARE CLOTH \ , KL E /HEEL OER O.D. 2.5• GATE POST PIPE FRAME FILTER ,•D R II FEN. GR. I _ STONF ETON E g 1 INSPECT SILT FENCES OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL . MAKEANY REQUIRED REPAIRS IMMEDIATELY 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 3. REMOVE ALL SILT FENCE OUTLET MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I TOP Of SIT FENCE 1 BEAT ABC LEAST I PRO ' VE TMETOPOG THE WASHED STONE ( I EACH VwILT�i S a�r+n WIREOREPaRSiLwEEKANDAI z .:_.—I. AR NE AARY TO-1. A0EgMTE 1CRMGE uOLUME —YNE NEXT RNN AND TO-1. PRESSURE Cn THEE —E. —CARE TOMM UNDERMNPRG ME FENCE DUANG CL- 3 REMDVEAU.S-RNCEOLTIE AAYER- '- .UNBTN3lFSEDI — DEPOORSANO BR:NO THE AREA TO GRADE ANC STNIL'ZE 1AFTER TAE CONTRIBUTING —NAGE AREA W 9 BEEN PRCPER"' B =ABI'ZEO LOCKABLE FORK LATCH 1 =i CONIC. ENCASEMENT (TYP.) BS�ti1EYi CAT OPENING SYSTEM Br: UNEAP-OSCO MWEL HAC _ CALL SOC MKINC R -3000/ Aw3adEAi 6 - NNI -NEr BY TYP g Ex NOTE: 2 114' (11.5 GA.) GALVANIZED FENCING MESH SHALL BE USED. PEDESTRIAN GATE POSTS SHALL BE SCHEDULE 20 GALVANIZED STEEL POST NO WINDSCREENS OR PRIVACY SLATS SHALL BE INSTALLED. C MAN GATE DETAIL NO SCALE 1 SARS WIRE 1 - r1- 511111 TOP RAIL (TYP) 3 STRANDS ITYP) 1' -0• {'_ ± - - - I - I� --BARB W E MOUNTING ARMS TO BE TILTED OUTWARD AT Sp A WANGLE (TYP) CJt" GALVANIZED 7 GA. COILED FENCING MESH I TENSION WIRE LINE POST(2') > BRACE RAIL m TERMINAL POST (2 1f2-) 10' TO BE PLACED EVERY 300' 7 GA- COILED -, TENSION WIRE 2• LINE POST) 3000 PSI CONIC. TO BE DRIVEN ENCASEMENT INTO SOIL - (TYP') _ NOTE. 2 1/4- (11 5 GA.) GALVANIZED FENCING MESH SHALL BE USED DOUBLE GATE POSTS SMALL BE SCHEDULE 40 GALVANIZED STEEL PIPE. TERMINAL POSTS SMALL BE SCHEDULE 2U GALVANIZED STEEL PIPE. LINE PUS TS SHALL BE 065 GALVANIZED STEEL 7 GA. COILED TENSION WIRE TO BE INSTALLED ON TOP AND BOTTOM. NO PEDESTRAfN GATES SHALL BE INSTALLED. NO WINDSCREENS OR PRIVACY SLATS SHALL BE INSTALLED, O PERMANENT FENCE DETAIL NO SCALE - 5'EEI FENCE POST HIRE FENCE HAROwARE CLOTH \ , KL E /HEEL OER SEDIMENT ON SITE CROSS SEl T ION Bright People. Right Solutions. FILTER ,•D R i (SURGE STONE OR RAILROAD \ STONF ETON E g / 0 SF:LTERFABRNC 35W GA TE'NAY CENTRE BLVD. SUITE 200 O •00 $5�R"�EQ� ON GROUND f MORRISVILLE. NC 21550 E 8 W W W E NFELDESOI I PHON NIFELDE C BURY WIRE FENCE ANC HARDWARE CLOTH WASHED. OR TRACKED ONTO PUBLIC ROADWAYS. BURY 5' OF IP ER EDGE OF LITER FABRIC IN TRENCH < VIN - SIT FENCE { {I{ { {I} I 1 SECTION VIEW + { I REVISION$ r +l' DSN CHK 1 REV I DESCRIPTION DWN APP DATE 1 I - 1 CLIENT COMMENTS AND 7_30 -2015 LOD I I LOD ADJUSTMENTS I i I CHAIN LIMN FENCE AND GATE 2 T -31 -2015 1 I DETAIL REVISION 3 I CLIENT COMMENTS &121115 FRONT VIEW �BUxr NWRE FENCE 4 FENC&GATE REVISION B-0T -2015 FILTER GABRIC AND HARDWARE - -- STEEL FENCE POSi CLOTHNTRENCN ylSEt YAx ZAPART r ___ —_ -- AIN. 1F N=O SOUO GROUND SILT FENCE OUTLET - -. -- NO SCALE Dfrcm rroArwNNT i F cETc 1 / o us= NW Is•vr.x ,. zaa3NC..RnAU I R�o-w�3lRllo.e°i. MORE 'i ... SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING TYP. DRIVEWAY DETAIL ° 5 I I NO SCALE IF ITS NOT 1 INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY EXISTING ROADWAY tOO MIN. BUT SUFFICIENT TO KEEP FABRIC UNDER STONE SEDIMENT ON SITE CROSS SEl T ION T-3-'STONE TO BE USED EXISTING i (SURGE STONE OR RAILROAD ROADWAY BALLAST) `. THIS MAY REQUIRE PERIODIC 24' OR WIDTH OF PLAN EXISTING ROADWAY 70' MIN. 30' MIN. NEW CONSTRUCTION / 6 " MIN . NOTES FABRIC UNDER STONE 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP CROSS SEl T ION TO ENSURE CONSTRUCTION ENTRANCE IS USED. Q STANDARD CONSTRUCTION ENTRANCE 2. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC 24' OR WIDTH OF TOPDRESSING WITH 2 -INCH STONE. PROPOSED STREET, IMMEDIATELY REMOVE ALL WHICHEVER IS OBJECTIONABLE MATERIALS SPILLED, GREATER. WASHED. OR TRACKED ONTO PUBLIC ROADWAYS. 70' MIN. 30' MIN. NEW CONSTRUCTION / 6 " MIN . 17 MIN. FABRIC UNDER STONE CROSS SEl T ION Q STANDARD CONSTRUCTION ENTRANCE NO SCALE ( ORIGINAL DRAWING SIZE IS 24. 36 1 I WINTON SOLAR SITE 100 NEC HWY 45 S. i- WINTON. HERTFORD COUNTY. NORTH CAROLINA GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPFONGFIELD, NJ 07081 CONSTRUCTION PROJECT NO ;0164014 7 i 1$$lIE DATE 07- 16.2015 ' CURRENT REVISION 3 DESIGNED BY BMP C DRAWN BY SNIP CHECKEDBY CAL APPROVED BY - JBC SHEET 0 0/ 6 LENGTH (La) MAINTENANCE INSPECT PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH S*NIFICJINT (1!21HCH OR GREATER) RAINFALL EVENT TO SEE IF ANY EROI AROUND OR BELOW THE RIFPAP HAS TAKEN PLACE. OR IF THE STONES HAVE BEEN H DISLODGED IMMEDWTFLY MAKE ALL NEEDED REPAIRS TO G PREVElI1 FURTHER -GE I FILTER BLANKET SECTION RIP RAP ENERGY DISSIPATER DETAIL NO SCALE OUTLET Do 3Do La W RIP RAP 0 PIPE I 3' I 375' I F I 175' I LASS I 9" Y a / CLASS i RIP RAP (SEE SECTION THRU BASIN BELOW) HEADWALL _ K WASHED STONE. Tor THICK: 3'-P HIGH MINIMUM MAINTENANCE: INSPECT PIPE INLET PROTECTION AT LEAST W EEKLY AND AFTER R IMMEDSIGNIFICANT ATE TY REMOVE SEDIMENT D GREATER) RESTO E THE ANO REPAIR PERSPECT� EVIEW AREA IT OREMOVE NSIOS. CHECK S-UTUREFOR STORAGE / ill�f MEA TO IS ORIGINAL DIMENSIONS. CHECK THE OE MU TIRE FOR DAMAGE ANY / Po EO DISPLACED FROM THE STONE HORSESHOE G AR BE REPLACED 114MEDMTELYAFTER ALL THE MOVE HTFRIUCTURG AREAS BEEN PERMANENTLY SABITHE A REMOVE THE STRUCTURE AND AL. THE UNSTABLE SEDIMENT SMOOTHTHEM.EA TO BLEND 'N'.TH THE AD,.OINING 0.RE/u AND AREAS TO BE D5TIM9ED SEDIMENT STORAGE PROVIDE PERMANENT GRWND COVER. (CUT FILL,\ �FL000 STORAGE LONE RIP RAP HEPOWALL �T PIPE NATURAL GROUND INVERT Ls, ___ ____________ CLASS I RIP -PAP MAAIMUM SEDIMENT DEPTH (CLEAN OUT Po j AS WASHED STONE SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE NO SCALE 10 STANDARD HORSESHOE PROTECTION NO SCALE MAINTENANCE INSPECT CHECK DAM PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1)2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENTAND RESTORE THE SEDIMENT STORAGE AREA TO IT ORIGINAL DIMENSIONS. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY AFTER ALL THE SEDIMENT - PRODUCING AREAS HAVE BEEN PERMANENTLY STABIUZEDAEMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. _TOV ELEVATION OF STORMWATER_ _ _ _ _ _ 45 WASHED 1MAX STONE EXISTING SLOPE gap P.9 Ir At RIV.RgP VARIES SIDE VIEW KEYED RIP PAP FRONT VIEW NOTE. REMOVE SEDIMENT ACCUMUL N ' ATIOFROM BEHND CHECK DAMS TO PREVENT DAMAGE TO CRANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. 12 TEMPORARY ROCK CHECK DAM 0 NO SCALE CONSTRUCTION NOTES. HEIGHT d WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED KEY RIP RAP INTO THE DAM FOR STABILIZATION COSTING GRODryD STEP SEQUENCE ( 0 KL E/NF-,EL OER Bright People. Right Solutions. TEWAY CENTRE BLVD_ SUITE 200 MORM ILLS. NC 27550 PHONE. 91}755 oil YAY'1Y KLE INFELDER COM REVISIONS REV DESCRIPTION DSN I CHK DATE OWN APP CLIENT COMMENTS AND 1 LOD ADJUSTMENTS 7.30 -2015 CHAIN LINK FENCE AND GATE 2 DETAIL REVISION 7.31 -2015 3 CLIENT COMMENTS 8.5.2015 4 FENCEIGATE REVISION 54 -2015 W—H mI II SCALE VERIFICATION THIS BAR IS 1 INCH;N LENGTH ON ORIGINAL DRAWING 0 1' I IF ITS NOT 1 INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY ORIGINAL DRAWING SIZE IS 24 z 36 DETAILS WINTON SOLAR SITE 100 INC HWY 45 S. WINTON HERTFORD COUNTY. NORTH CAROLINA Gehrlicher mumm, 0 GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD, NJ 07081 CONSTRUCTION PROJECT NO. 20161014 I ISSUE DATE 07 .16.20;5 CURRENT REVISION 3I DESIGNED BY BMP c_# DRAWN BY SMP CHECKED BY CAL I APPROVED BY JBC I SHEET IF of 6 WDITCHES. SEEDBED PREPARATION: SHOULDERS. 5 SLOPES (MAX. 3.11 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE DATE TYPE PLANTING RATE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. AUG. 15 NOV. 1 TALL FESCUE 200 LBSJACRE 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP NOV 1 _ MAR.1 TALL FESCUE MAR .1 _ APR 15 TALLFESCUE 200 LBSJACRE 200 LBSJACRE 3 REMOVE ALL LOOSE ROCK. ROOTS, AND OTHER MR. 15 - JUN. 30 HULLED COMMON BERMUDAGRASS 15 LBSJACRE OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME. FERTILIZER AN PERMANENT j�EDING - SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL SLOPES (3:1 T 2'1) (SEE BELOW) AUG. 15 -NOVA TALL FESCUE 200 LBSJACRE 5 CONTINUE LAGE UNTIL WELL- PULVERIZED. FIRM AND SERICEA LESPEDEZA (UNHULLED. UNSCARIFIED) 60 TO 70 LBSJACRE REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO NOV 14AAR 1 TALL FESCUE 200 LBSJACRE SIX INCHES DEEP. AND SERICEA LESPEDEZA(UNHULLEO. UNSCARIFIED) 60 TO TO LBSJACRE 6, SEED ON A FRESHLY PREPARED SEEDBED AND COVER MAR. 14UNE 1 TALL FESCUE 200 LBSJACRE SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK ANO SERICEA LESPEDEZA (SCARIFIED) 40 TO 50 LBSACRE AFTER SEEDING. MAR. I54UNE 30 SERICEA LESPEDEZA (SCARIFIED) 40 TO 50 LBSACRE 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MAR 15-JUNE 30 HULLED COMMON BERMUDAGRASS 15 LBSACRE MULCH AND SERICEA LESPEDEZA (SCARIFIED) 40 TO 50 LBSACRE - B. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY TEMPORARY SEEDING REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON JUNE 1 SEPT. 1 BROWNTOP MILLET • INURSE CROP) 35L SACRE IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED. RE -ESTABLISH FOLLOWING THE ORIGINAL LIME. FERTILIZER OR SORGHUM -SUDAN HYBRIDS yNURSE CROP( 30 LBSACRE AND SEEDING RATES. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR •APPLY. AGRICULTURAL LIMESTONE- 2 TON &ACRE MINIMUM AFD INFORMATION CONCERNING OTHER ALTERNATIVES OR PER SOIL TEST ARE OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL ENURE R UNDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. 2 FERTILIZER - 10A ANALYSIS Q 90D LBSACRE -NURSE CRORTEMPORARY RESEED ACCORDING TO SEASON FOR DESIRED SUPERPHOSPHA TE E - 500 LBSACRE OF ZO %ANALYSIS MULCH - 2 TONS 1"- BO SALES) STRAWACRE - OPTIMUM PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 17 O ANCHOR- USE LIQUID ASPHALT a 400 GALS/ACRE IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT, A OR EMULSIFIED ASPHALT @ 300 GALSIACRE GROUND STABILIZATION (DWO) SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME S PERIMETER DIKES 7DAYS NONE SCALES, DITCHES. AND SLOPES a HIGH QUALITY 7 DAYS NONE WATER (HOW) 5 ZONES SLOPES STEEPER 7 DAYS IF SLOPES ARE IV OR THAN 3:1 LESS IN LENGTH AND ARE NO STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES 3 FLATTER GREATER THAN 50' IN LENGTH 3 ALL OTHER AREAS 14 DAYS NONE (EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4.1 AND HOW ZONES) i7 y SEEDING SCHEDULE 11 Y a / CLASS i RIP RAP (SEE SECTION THRU BASIN BELOW) HEADWALL _ K WASHED STONE. Tor THICK: 3'-P HIGH MINIMUM MAINTENANCE: INSPECT PIPE INLET PROTECTION AT LEAST W EEKLY AND AFTER R IMMEDSIGNIFICANT ATE TY REMOVE SEDIMENT D GREATER) RESTO E THE ANO REPAIR PERSPECT� EVIEW AREA IT OREMOVE NSIOS. CHECK S-UTUREFOR STORAGE / ill�f MEA TO IS ORIGINAL DIMENSIONS. CHECK THE OE MU TIRE FOR DAMAGE ANY / Po EO DISPLACED FROM THE STONE HORSESHOE G AR BE REPLACED 114MEDMTELYAFTER ALL THE MOVE HTFRIUCTURG AREAS BEEN PERMANENTLY SABITHE A REMOVE THE STRUCTURE AND AL. THE UNSTABLE SEDIMENT SMOOTHTHEM.EA TO BLEND 'N'.TH THE AD,.OINING 0.RE/u AND AREAS TO BE D5TIM9ED SEDIMENT STORAGE PROVIDE PERMANENT GRWND COVER. (CUT FILL,\ �FL000 STORAGE LONE RIP RAP HEPOWALL �T PIPE NATURAL GROUND INVERT Ls, ___ ____________ CLASS I RIP -PAP MAAIMUM SEDIMENT DEPTH (CLEAN OUT Po j AS WASHED STONE SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE NO SCALE 10 STANDARD HORSESHOE PROTECTION NO SCALE MAINTENANCE INSPECT CHECK DAM PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1)2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENTAND RESTORE THE SEDIMENT STORAGE AREA TO IT ORIGINAL DIMENSIONS. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY AFTER ALL THE SEDIMENT - PRODUCING AREAS HAVE BEEN PERMANENTLY STABIUZEDAEMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. _TOV ELEVATION OF STORMWATER_ _ _ _ _ _ 45 WASHED 1MAX STONE EXISTING SLOPE gap P.9 Ir At RIV.RgP VARIES SIDE VIEW KEYED RIP PAP FRONT VIEW NOTE. REMOVE SEDIMENT ACCUMUL N ' ATIOFROM BEHND CHECK DAMS TO PREVENT DAMAGE TO CRANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. 12 TEMPORARY ROCK CHECK DAM 0 NO SCALE CONSTRUCTION NOTES. HEIGHT d WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED KEY RIP RAP INTO THE DAM FOR STABILIZATION COSTING GRODryD STEP SEQUENCE ( 0 KL E/NF-,EL OER Bright People. Right Solutions. TEWAY CENTRE BLVD_ SUITE 200 MORM ILLS. NC 27550 PHONE. 91}755 oil YAY'1Y KLE INFELDER COM REVISIONS REV DESCRIPTION DSN I CHK DATE OWN APP CLIENT COMMENTS AND 1 LOD ADJUSTMENTS 7.30 -2015 CHAIN LINK FENCE AND GATE 2 DETAIL REVISION 7.31 -2015 3 CLIENT COMMENTS 8.5.2015 4 FENCEIGATE REVISION 54 -2015 W—H mI II SCALE VERIFICATION THIS BAR IS 1 INCH;N LENGTH ON ORIGINAL DRAWING 0 1' I IF ITS NOT 1 INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY ORIGINAL DRAWING SIZE IS 24 z 36 DETAILS WINTON SOLAR SITE 100 INC HWY 45 S. WINTON HERTFORD COUNTY. NORTH CAROLINA Gehrlicher mumm, 0 GEHRLICHER SOLAR AMERICA CORP. 21 FADEM ROAD SPRINGFIELD, NJ 07081 CONSTRUCTION PROJECT NO. 20161014 I ISSUE DATE 07 .16.20;5 CURRENT REVISION 3I DESIGNED BY BMP c_# DRAWN BY SMP CHECKED BY CAL I APPROVED BY JBC I SHEET IF of 6