HomeMy WebLinkAboutSW6230502_Supplement-EZ Form_20231004 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name _ Ducks Landing
2 Project Area(ac) _ 109.668
3 Coastal Wetland Area(ac) -
4 Surface Water Area(ac) 2.494
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No
10 Is streambank stabilization proposed on this project? No
1i NUMBER AND TYPE OF SCMs:
11 Infiltration System 3
12 Bioretention Cell _ 0
13 Wet Pond 2
14 Stormwater Wetland 0
15 Permeable Pavement 0
16 Sand Filter 0
17 Rainwater Harvesting(RWH) 0
18 Green Roof 0
19 Level Spreader-Filter Strip(LS-FS) 0
20 Disconnected Impervious Surface(DIS) 0
21 Treatment Swale 0
22 Dry Pond 0
23 StormFilter 0
24 Silva Cell 0
25 Bayfilter 0
26 Filterra 0
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Carlo Pardo,PE
28 Organization: Bowman North Carolina,Ltd.
29 Street address: _ 4006 Barrett Drive,Suite 104
30 City,State,Zip: Raleigh,NC 27609
31 Phone number(s): 919-553-6570
32 Email: cpardo@bowman.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
�� �EESSIp�;9'yq
l '-. -.-- C9- 6.1"--:7;7-,"
SEAL _
Signature of Designer
051571
73
ii C 0 E P \\\• ` >�
�7iii111iiiuQkh° Date
DRAINAGE AREAS
1 I Is this a high density project? Yes _
2 If so, number of drainage areas/SCMs 5
3 Does this project have low density areas? No
4 If so, number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 3 4
•
4 Type of SCM - Infiltration Basin Wet Pond
5 Total drainage area (sq ft) 4777138 sf 261143 917130
6 Onsite drainage area (sq ft) 4777138 sf 261143 917130
7 Offsite drainage area (sq ft)
8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf
New BUA on subdivided lots (subject to permitting)
9 (sq ft) 496000 sf i 28000 sf 180000 sf
New BUA not on subdivided lots (subject to
10 permitting) (sf) 169787 sf 10138 sf 52735 sf
11 Offsite BUA (sq ft)
12 Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
- Sidewalk (sq ft)
- Roof (sq ft)
- Roadway (sq ft) 169787 sf 10138 sf 52735 sf
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft)
New infiltrating permeable pavement on subdivided
13 lots (sq ft)
New infiltrating permeable pavement not on
14 subdivided lots (sq ft)
Existing BUA that will remain (not subject to
15 permitting) (sq ft)
16 Existing BUA that is already permitted (sq ft)
17 Existing BUA that will be removed (sq ft)
18 Percent BUA 13.94% 14.6% 25.4%
19 Design storm (inches) _ 1.0 in 1.0 in
20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf
21 Calculation method for design volume Simple Method Simple Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s): _
There is 108,653 sf (2.494 ac) of surface water area.
DRAINAGE AREAS
1 I Is this a high density project? Yes _
2 If so, number of drainage areas/SCMs 5
3 Does this project have low density areas? No
4 If so, number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 5
•
4 Type of SCM - Wet Pond
5 Total drainage area (sq ft) 4777138 sf 701836
6 Onsite drainage area (sq ft) 4777138 sf 701836
7 Offsite drainage area (sq ft)
8 Total BUA in project (sq ft) 665787 sf 140468 sf
New BUA on subdivided lots (subject to permitting)
9 (sq ft) 496000 sf i 108000 sf
New BUA not on subdivided lots (subject to
10 permitting) (sf) 169787 sf 32468 sf
11 Offsite BUA (sq ft)
12 Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
- Sidewalk (sq ft)
- Roof (sq ft)
- Roadway (sq ft) 169787 sf 32468 sf
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft)
New infiltrating permeable pavement on subdivided
13 lots (sq ft)
New infiltrating permeable pavement not on
14 subdivided lots (sq ft)
Existing BUA that will remain (not subject to
15 permitting) (sq ft)
16 Existing BUA that is already permitted (sq ft)
17 Existing BUA that will be removed (sq ft)
18 Percent BUA 13.94% 20.0%
19 Design storm (inches) _ 1.0 in
20 Design volume of SCM (cu ft) _ 15571 cf
21 Calculation method for design volume Simple Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s): _
There is 108,653 sf (2.494 ac) of surface water area.
INFILTRATION SYSTEM
1 Drainage area number 1 2 3
2 Minimum required treatment volume(cu ft) 11764 cf I 12171 cf 3948 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes
4 Is the SCM located away from contaminated soils? Yes Yes Yes
5 What are the side slopes of the SCM(H:V or enter"Vertical"for
trenches)? 3:1 3:1 3:1
6 Does the SCM have retaining walls,gabion walls or other
engineered side slopes? No No No
7 Are the inlets,outlets,and receiving stream protected from erosion
(10-year storm)? Yes _ Yes _ Yes
8 Is there an overflow or bypass for inflow volume in excess of the
design volume? Yes Yes Yes
9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes Yes Yes
11 Does the maintenance access comply with General MDC(8)? Yes _ Yes Yes
12 Does the drainage easement comply with General MDC(9)? Yes Yes Yes
13 If the SCM is on a single family lot,does(will?)the plat comply with
General MDC(10)? N/A N/A N/A
14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes
16 Does the SCM follow the device specific MDC? Yes Yes Yes
17 Was the SCM designed by an NC licensed professional? Yes Yes Yes
INFILTRATION SYSTEM MDC FROM 02H.1051
18 Proposed slope of the subgrade surface(%) 0% 0% 0%
19 Are terraces or baffles provided? No T-- No No
20 Type of pretreatment: Forebay Forebay Forebay
Soils Data
21 Was the soil investigated in the footprint and at the elevation of the
infiltration system? Yes Yes Yes
22 SHWT elevation(fmsl) 196.00 184.00 180.00
23 Depth to SHWT per soils report(in) 144 in _ 144 in 144 in
24 Ground elevation at boring in soils report(fmsl) 208.00 196.00 192.00
25 Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet? N/A Yes Yes
26 Soil infiltration rate(in/hr) 5.00 4.00 4.00
27 Factor of safety(FS) (2 is recommended): 2.00 2.00 2.00
Elevations
29 Bottom elevation(fmsl) 208 ft 196 ft 192 ft
30 Storage elevation(fmsl) 213.ft 201.ft 195.ft
31 Bypass elevation(fmsl) 213 ft 201 ft 195 ft
For Basins Only
32 Bottom surface area(ft2) 9970 ft I 11980 ft 8345 ft 1
33 Storage elevation surface area(ft2) 16815.ft 19080.ft 12075.ft
For Trenches Only
34 Length(ft)
35 Width(ft)
36 Perforated pipe diameter,if applicable(inches)
37 Number of laterals
38 Total length of perforated piping
39 Stone type,if applicable
40 Stone porosity(%)
41 Is stone free of fines?
42 Is the stone wrapped in geotextile fabric?
43 Has at least one inspection port been provided?
Volumes/Drawdown
44 Design volume of SCM(cu ft) 66388 cf 77080 cf 30515 cf
45 Time to draw down hours 19.0 hrs 24.2 hrs 15.2 hrs
ADDITIONAL INFORMATION
46 Please use this space to provide any additional information about
the infiltration system(s):
Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0'/hr.
A more conservative value of 5.0'/hr was used in the calculations,to account for
clogging of the soils that will happen over time.The soils report found the infiltration
rate of the soil for DAs 2&3 to be 8.0'/hr.A more conservative value of 4.0'/hr was
used in the calculations,to account for clogging of the soils that will happen over
time.
Infiltration 1 1:19 PM 7/5/2023
WET POND
1 Drainage area number 4 5 I
2 Minimum required treatment volume(Cu ft) 21277 cf 13459 cf
'GENERAL MDC FROM 02H.1050
31 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes
4'Is the SCM located away from contaminated soils? Yes Yes
5 What are the side slopes of the SCM(H:V)? 3:1 3:1
6 Does the SCM have retaining walls,gabion walls or other No No
engineered side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes
design volume? _
9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes _ Yes
11 Does the maintenance access comply with General MDC(8)? Yes _ Yes
12 Does the drainage easement comply with General MDC(9)? Yes Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 N/A N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes
16 Does the SCM follow the device specific MDC? Yes _ Yes
17 Was the SCM designed by an NC licensed professional? Yes Yes
WET POND MDC FROM 02H.1053
18 Sizing method used SA/DA SA/DA
19 Has a stage/storage table been provided in the calculations? Yes Yes
20 Elevation of the excavated main pool depth(bottom of sediment 179.00 204.00
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 180.00 205.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 184.50 209.50
23 Elevation of the permanent pool(fmsl) 185.00 210.00
24 Elevation of the top of the vegetated shelf(fmsl) 185.50 210.50
25 Elevation of the temporary pool(fmsl) 185.70 210.50
26 Surface area of the main permanent pool(square feet) 24370 22680
27 Volume of the main permanent pool(cubic feet) 101055 cf 93535 cf
28 Average depth of the main pool(feet) 4.47 ft 4.45 ft
29 Average depth equation used Equation 3 Equation 3
30 If using equation 3,main pool perimeter(feet) 630.0 ft 602.0 ft
31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft
32 Volume of the forebay(cubic feet) 18360 cf 17178 cf
33 Is this 15-20%of the volume in the main pool? Yes Yes
34 Clean-out depth for forebay(inches) 12 in 12 in
35 Design volume of SCM(cu ft) 23500 cf 15571 cf
36 Is the outlet an orifice or a weir? Orifice Orifice
37 If orifice,orifice diameter(inches) 2.00 in 2.00 in
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the temporary pool(days) 3.81 2.66
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? Yes Yes
43 Depth of forebay at entrance(inches) 48 in 48 in
44 Depth of forebay at exit(inches) 42 in 42 in
45 Does water flow out of the forebay in a non-erosive manner? Yes Yes
46 Width of the vegetated shelf(feet) 6 ft 6 ft
47 Slope of vegetated shelf(H:V) 6:1 6:1
48 Does the orifice drawdown from below the top surface of the Yes Yes
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes
yr,24-hr storm?
50 Are fountains proposed?(If Y,please provide documentation that No No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? Yes Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes
53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda_
54 Has a planting plan been provided for the vegetated shelf? Yes Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
55 the wet pond(s):
Wet Pond 1 2:38 PM 7/5/2023