Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6230502_Design Calculations_20231004
Storm wafer Management Report July 5, 2023 ,,",,,,,,,,,,,,,, Ducks Landing = SEAL 051571 Darroch Road = • /�y/59 Lillington , Harnett County, NC /,%% p E ?a \``\ • Prepared for: D&L Engineering , PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina , Ltd . 4006 Barrett Drive, Suite 104 Raleigh , NC 27609 (919) 553-6570 Firm#F- 1445 Bowman TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY-INFILTRATION BASIN SCM 1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY-INFILTRATION BASIN SCM 2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY-INFILTRATION BASIN SCM 3 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY-WET POND SCM 4 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY-WET POND SCM 5 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the residential project Ducks Landing on Darroch Road in Harnett County. The majority of the project site is currently undeveloped. There are currently residential structures on the project site. The proposed site consists of 109.668 acres. The proposed site is located in Flood Zone 'X' as shown on FEMA FIRM Panel 3720052600J with an effective date of 10/3/06. Flood zones are subject to change by FEMA. There are surface waters and wetland features on the proposed property. There are five proposed storm water management facilities (three infiltration basins and two wet ponds) outlined in this report and have been designed for post—development peak attenuation to treat the impervious areas of the development. The Infiltration Basin SCM 1 is designed to capture a drainage area of 12.96 ac with an impervious area of 2.88 ac. The Infiltration Basin SCM 2 is designed to capture a drainage area of 13.77 ac with an impervious area of 2.96 ac. The Infiltration Basin SCM 3 is designed to capture a drainage area of 6.00 ac with an impervious area of 0.88 ac. The Wet Pond SCM 4 is designed to capture a drainage area of 21 .05 ac with an impervious area of 5.34 ac. The Wet Pond SCM 5 is designed to capture a drainage area of 16.11 ac with an impervious area of 3.22 ac. The balance of the site is open space and will by—pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. Impervious Area Summary—Infiltration Basin SCM 1 Roadway _ 49,494 sf 1.14 ac Roof (19 lots @ 4,000 sf/lot) 76,000 sf 1.74 ac Total IA to Pond 125,494 sf 2.88 ac Impervious Area Summary—Infiltration Basin SCM 2 Roadway 24,952 sf 0.57 ac Roof(26 lots @ 4,000 sf/lot) 104,000 sf 2.39 ac Total IA to Pond 128,952 sf 2.96 ac Impervious Area Summary—Infiltration Basin SCM 3 Roadway _ 10,138 sf _ 0.23 ac Roof(7 lots @ 4,000 sf/lot) 28,000 sf _ 0.64 ac Total IA to Pond 38,138 sf 0.88 ac Impervious Area Summary—Wet Pond SCM 4 Roadway 52,735 sf 1.21 ac ' Roof(45 lots @ 4,000 sf/lot) 180,000 sf 4.13 ac Total IA to Pond 232,735 sf 5.34 ac Impervious Area Summary—Wet Pond SCM 5 Roadway 32,468 sf 0.74 ac Roof(27 lots @ 4,000 sf/lot) 108,000 sf 2.48 ac Total IA to Pond 140,468 sf 3.22 ac Impervious Area Summary—Total Roadway 169,787 sf 3.90 ac Roof (124 lots @ 4,000 sf/lot) 496,000 sf 11.39 ac Total IA to Pond 665,787 sf 15.29 ac Soils The County Soils Survey indicates that Bibb Soils, Blaney Loamy Sand, Gilead Loamy Sand and Roanoke Loam soils are present on the site. FIGURES Hydrologic Soil Group—Harnett County,North Carolina _� N S 688900 689000 689100 689200 689300 689400 689500 689600 689700 689800 689900 690000 690100 690200 690300 690400 690500 35°19'26"N 35°19'26"N 1 t 1 GaD a,a . Wh GaD '§ § Ro BB 4 1 416 � ' § ihtO. M I"°1 * ,. 1 ,'N. � 41I § 1 4I 4 , BnD D / -`~ 71,� l� _ BnB 1 '� .V. .I .4. .. - ,,,,, . ,- lie (§tn , , ,. . . 1 _I 8 , / - - .` • . § 1 1 BnD \ • c \t// § • Ro - t o I I 8 Vthdr, B , s , e 8 ° ~/ . 000 Gap may not eaDoc •�ab�� aO i 35°18'50"N I 35°18'50"N 688900 689300 6891W 689200 689300 689400 689500 689600 6897W 6898W 689900 69WW 690100 690200 690300 690400 690500 3 3 Map Scale:1:7EP, ,790 if printed on A landscape(11"x 8.5")sheet. Meters N 0 100 200 400 600 5 Feet 0 350 700 1400 2100 Map projection:Web Mercator Comer cooniinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 12/20/2022 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Harnett County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as ,. B/D of the version date(s)listed below. • r C Soil Survey Area: Harnett County, North Carolina Survey Area Data: Version 20,Sep 8,2022 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 24,2022—May Soil Rating Points 9,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 12/20/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Harnett County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Bb Bibb soils,frequently A/D 9.6 7.5% flooded BnB Blaney loamy sand,2 to C 76.8 60.4% 8 percent slopes BnD Blaney loamy sand,8 to C 18.7 14.7% 15 percent slopes GaB Gilead loamy sand,2 to C 10.5 8.3% 8 percent slopes GaD Gilead loamy sand,8 to C 0.3 0.2% 15 percent slopes Ro Roanoke loam, C/D 8.9 7.0% occasionally flooded W Water 1.3 1.0% Wh Wehadkee loam, B/D 1.1 0.9% frequently flooded Totals for Area of Interest 127.2 100.0% USDA Natural Resources Web Soil Survey 12/20/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Harnett County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 12/20/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 ''''.."%j* _u_ -) - 1-:'-- . . . - . -;.....„..:k. .. .II . _ _ • . _ . -,......• 4,,. to r. ,, 711._ 'I .-- - -L --_-____ 4_- _. -. _ WI Sefrl .' Ili .It . / i \ . O -. I•+ - j s-'- -may y y -;c<,‘ fIN' 10. i ) ,,\''- . 7 JF 1 i- _,--,'"7'7.-1 --. — CAfidt-r -j /\r % A',7 r -j-_--7 l /__if .7-1 figais-P' - -ik% ' _(fitta-....4 J - vg-f .,-41.7-A3-.) L. \ -. v *.-‘, Qt - ---AV w .#1. 1,‘‘ ,rs ,p7-r#,. - 2 . .• L--orviol . ( 4 ! . . fiip 1r rk 40 (. { rt,t. , (, 1 . nv i„looe‘ rAk 1 „,. ) - c,).-t.. ..„,:t:().,L:,,,".2- 1.1<kkit- r, L„. 4.tdik _ rs--, lig ih - 4...443AZ,.1 kf;-•") c ., ' N _Ncil! ilielk°,r91—flt, ‘, ille%%.*IT:t -$\ - 0 i., ,,- 1, "vyfti,c),T- 11 - li �� mil,1--� �PR E T ITE OJ C Stu`'y , ?/ " -- \--.. - 0 V t‘ # i • ,;:,,,A -„ 7„, N-,,„,r ,„, ;$ ._,. ---..7-41{ 4:0 ,',, ....- , -AP ' : 0 , ( miC, - -o-- -,. 1, __ - A ' A 4 1 r d i- ibq Anki t -._ - ,;:r. ipp 13 1 '\Sywf(.PunJ� 1 ,__\7.1/. ttl‘k / I National Flood Hazard Layer F I RMette 0 FEMA Legend 78°55'28"W 35°19'18"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT - ■ - # 4 Without Base Flood Elevation(BFE) Ifr: -4 '' fie 1• 1, ,A- Zone A.V.A99 f 17 With BFE or Depth Zone AE,AD.AR.VE,AR • • SPECIAL FLOOD p 1 i.1 0'r . +.Ji ! HAZARD AREAS Regulatory Floodway , Fide 0.2%Annual Chance Flood Hazard,Areas 1/ • + " ► of 1%annual chance flood with average e foot or h e r ,41n / / •to ,# areas of less thpth less thanan one square tmle zone X •• $ , Future Conditions 1%Annual •',,+i d t!I"- r ®` Chance Flood Hazard Zone X il Nal p" Area with Reduced Flood Risk due to la }- {4 OTHER AREAS OF Levee.See Notes.zone x FLOOD HAZARD �� Area with Flood Risk due to Leveezone o i d - t o NO SCREEN Area of Minimal Flood Hazard zonex • 1-1 Effective LOMRs + OTHER AREAS Area of Undetermined Flood Hazard zone o GENERAL -—-- Channel,Culvert,or Storm Sewer 1 t - V'' - STRUCTURES III 1 I I I Levee,Dike,or Floodwall I r I - r - ! _ 0 20.2 Cross Sections with 1%Annual Chance .4 17•s Water Surface Elevation HARNET�I'COU1T Y AREA OF MINIMAL FLOOD HAZARD - e- - - Coastal Transect liti �[ r -'I so Base Flood Elevation Line(BFE) ell. 10/31/006 iilne OTHER _ — Profile Baseline r1i41f11 ` +�' • I FEATURES /11:, + ..t ♦ •' i. + Hydrographic Feature A,,fig . a. r I , I : ► I t• Digital Data Available N t e `f(/ + t i I ii+, No Digital Data Available IL A 1 ' 4 t. , f 71 1 �} '!" . . ,: /! tl MAP PANELS Unmapped PROJECT SITE e The pin displayed on the map is an approximate + w , + point selected by the user and does not represent •• tl �I1 : Xi! an authoritative property location. le,6 • • . . • ' R I (. •` : ,-� � S This map complies with FEMA's standards for the use of +; 6 + . +f; digital flood maps if it is not void as described below. ��' ;` *i �1 t *. , --t + The basemap shown complies with FEMA's basemap " r R accuracy standards ` y 4 4 a - " +,• " W.01,, !y y +, " Y - f # The flood hazard information is derived directly from the , �.- r. , „ e +' ! +J , , * authoritative NFHL web services provided by FEMA.This map 3 j f a. ..rr iT �' was exported on 11/21/2022 at 1:36 PM and does not I 4 ;*.+ _: r $ r-P••• J o- Iliz f i reflect changes or amendments subsequent to this date and r f e 44 �1 L + 1' .+', time.The NFHL and effective information may change or Y' • '/ • `i� s r , 1 T become superseded by new data over time. y g Vio a_ .,p'• This map image is void if the one or more of the following map ILO .4 ► �_ elements do not appear:basemapimagery,flood zone labels, 1M r # 11, 1 •r Y pP g Y, a legend,scale bar,map creation date,community identifiers, + 78°54'S0"w 35°18'48"N FIRM panel number,and FIRM effective date.Map images for r Feet 1.G V 00o unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 \ v 2474 Darroch Rd,Lill... X CL 'BB \\f' Big Gully 00 00 --.-N\-------S 0® Surface Water Classifications: Stream Index: 18-20-(8) Stream Name: Upper Little River Up.el Little Rives / Description: From dam at Lake Trace to a o point 0.6 mile downstream ,D`h o ? a of Juniper Branch 'N Classification: C Fe° 0 y,cn Date of Class.: July 31,1998 ', µcRP What does this Class.mean? View River Basin: Cape Fear , 4PO - z' PROJECT SITE = .,,„ i .._,.....- 8tapch Ilk 1 f I,:, o. (1 of 2) • LCI x �` 0 C ?CL 12-Digit HUG(Subwatershed) 12-Digit Name: Walkers Creek-Upper Little River 12-Digit Code: 030300040205 q, 1. 10-Digit Name: Upper Little River 5,"4 10-Digit Code: 0303000402 0 8-Digit Code: 03030004 -- • River Basin: Cape Fear / 12-Digit Area 28.498.05 (ac): PROJECT SITE Zoomto ,,t / c I ie Cr j N CU U him. mI m` NOAA Atlas 14, Volume 2, Version 3 Quo'"`""fc°4,4 Location name: Lillington, North Carolina, USA* ` - '" 1 v Latitude: 35.3175°, Longitude: -78.9192° _ _ l �P Q� Elevation: 258.17 ft** 0 �+rEfi�.1- *source:ESRI Maps '� „^ **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 10 _ 25 50 100 200 _ 500 1000 5-min 0.432 0.510 0.592 0.654 0.727 0.779 0.829 0.874 0.928 0.970 (0.393-0.480) (0.463-0.565) (0.538-0.656)I (0.593-0.724) (0.656-0.803) (0.702-0.860) (0.742-0.914) (0.778-0.963)_(0.818-1.02) (0.850-1.07) 10-min 0.691 0.815 0.948 1.05 1.16 1.24 1.32 1.39 1.47 1.53 (0.627-0.766) (0.741-0.904) (0.861-1.05) (0.949-1.16) (1.05-1.28) (1.12-1.37) (1.18-1.45) (1.23-1.53) (1.30-1.62) (1.34-1.68) 15-min 0.863 1.02 1.20 1.32 1.47 1.57 1.66 1.75 1.85 1.92 (0.784-0.958) (0.931-1.14) 1 (1.09-1.33) i (1.20-1.47) (1.33-1.62) (1.42-1.73)) (1.49-1.84) (1.56-1.93) (1.63-2.04) (1.68-2.11) 30-min 1.18 1.42 1.70 1.92 2.18 2.37 2.55 2.72 2.94 I 3.11 (1.08-1.31) (1.29-1.57) (1.55-1.89) (1.74-2.12) (1.96-2.40) (2.13-2.61) (2.28-2.81) (2.42-3.00) (2.59-3.24) (2.72-3.42) 60-min 1.48 1.78 2.18 2.50 2.90 3.21 3.51 3.82 4.22 4.53 (1.34-1.64) (1.61-1.97) (1.98-2.42) (2.26-2.77) (2.61-3.20) (2.89-3.54) (3.14-3.87) (3.40-4.20) (3.72-4.65)I (3.97-5.00) 2-hr 1.73 2.09 2.62 3.02 3.56 I 4.00 4.43 4.87 5.46 I 5.94 (1.56-1.95) (1.89-2.35) (2.35-2.93) (2.71-3.39) _ (3.18-3.99) (3.55-4.47) (3.91-4.95) (4.27-5.44) (4.74-6.10) (5.12-6.64) 3-hr 1.84 I 2.23 2.79 3.25 3.88 4.39 4.92 5.47 6.24 6.88 (1.66-2.07) (2.01-2.50) (2.51-3.13) (2.92-3.65) , (3.46-4.34) (3.89-4.91) (4.32-5.49) (4.78-6.11) (5.39-6.97) (5.87-7.68) 6-hr 2.19 2.65 3.33 3.89 4.65 5.29 5.94 6.64 7.62 8.42 (1.99-2.44) (2.41-2.95) (3.02-3.69) (3.52-4.30) (4.18-5.14) (4.71-5.83) (5.25-6.55) (5.81-7.30) (6.58-8.37) (7.19-9.27) 12-hr 2.59 3.13 3.95 4.63 5.58 6.38 7.22 8.12 9.41 10.5 (2.35-2.87) (2.84-3.47) _(3.58-4.39) (4.18-5.14) (4.99-6.17) (5.66-7.03) (6.35-7.94) (7.06-8.92) (8.05-10.3) (8.85-11.5) 24-hr 3.05 3.70 4.68 5.46 6.53 7.40 8.29 i 9.22 10.5 11.5 (2.83-3.31)j (3.42-4.00) (4.33-5.07) _ (5.04-5.91) (6.01-7.07) i (6.78-8.00) (7.58-8.96) (8.41-9.96) I (9.53-11.4) i (10.4-12.5)1 2-day 3.55 I 4.29 5.39 6.25 7.45 8.41 9.40 10.4 11.9 I 13.0 (3.29-3.83) (3.98-4.62) (4.99-5.81) (5.78-6.74) (6.86-8.03) (7.72-9.07) (8.60-10.1) (9.51-11.3) (10.7-12.8) (11.7-14.1) 3-day 3.77 4.54 _ 5.67 6.57 7.80 8.79 9.81 10.9 12.3 13.5 I (3.51-4.05)] (4.23-4.88) I (5.27-6.09) (6.09-7.05) (7.20-8.38) (8.09-9.44) (9.00-10.5) (9.93-11.7) (11.2-13.3) I (12.2-14.6) 4-day 3.99 4.80 5.96 6.89 8.16 9.17 10.2 11.3 12.8 I 14.0 (3.72-4.27) (4.48-5.14) (5.55-6.38) (6.40-7.36) (7.55-8.72) (8.46-9.81) (9.39-10.9) (10.4-12.1) (11.7-13.7) (12.7-15.0) 7-day 11 4.61 11 5.52 11 6.77 11 7.77 11 9.13 11 10.2 11 11.3 11 12.5 1 14.1 15.4 II (4.30-4.95) II (5.13-5.92) II (6.29-7.27) II (7.21-8.33) II (8.45-9.79) II (9.43-11.0) II (10.4-12.2) IL (11.5-13.4) II(12.9-15.2) I (14.0-16.6)I 10-day 5.26 6.28 7.59 8.61 10.00 11.1 I 12.2 I 13.3 I 14.8 16.0 (4.94-5.61) (5.89-6.69) (7.10-8.09) (8.05-9.17) (9.31-10.6) , (10.3-11.8) I (11.3-13.0) , (12.3-14.2) 1 (13.7-15.9), (14.7-17.2)1 20-day 7.09 I 8.39 9.98 11.2 12.9 14.2 15.5 1 16.9 18.7 20.1 (6.65-7.57) (7.87-8.96) (9.34-10.6) (10.5-12.0) (12.0-13.7) (13.2-15.1) (14.4-16.6) (15.6-18.0) (17.2-20.0) (18.5-21.5) 30-day 8.82 10.4 12.2 13.5 15.3 16.7 18.0 19.4 21.2 22.6 (8.29-9.40) i (9.78-11.1) (11.4-13.0) I (12.7-14.4) (14.3-16.3) I (15.6-17.8) I (16.8-19.2) I (18.0-20.7) (19.7-22.7) (20.9-24.2) 45-day 11.2 13.1 15.1 16.6 18.6 20.1 21.5 22.9 24.8 26.2 (10.6-11.9) (12.4-13.9) (14.3-16.0) (15.7-17.6) (17.5-19.7) (18.8-21.3) (20.2-22.8) (21.5-24.4) (23.1-26.4) (24.4-28.0) 60-day 13.4 15.7 17.9 19.5 21.7 23.3 24.8 26.4 28.4 29.9 (12.7-14.2) (14.9-16.6) I (16.9-18.9) (18.5-20.6) (20.5-22.9) (21.9-24.6) (23.4-26.3) (24.8-27.9) (26.5-30.1) (27.9-31.7) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based depth-duration-frequency (DDF) curves Latitude: 35.3175°, Longitude: -78.9192° 30 • 1 1 1 1 1 1 1 1 1 1 I I 1 I 1 1 1 Average recurrence 25 interval (years) - 1 20 - - 2 a) - 5 g 15 - -- - 10 m i• - 25 a - 50 3 10 - --- . • - - -, - 100 a) - 200 5 - - 500 - 1000 __1^fir ' : • 0 - 1- I I I I 1 I I I 1 I I 1 C C C C C 1 - - I I- >, >, >, >, >, >, >, >,>, C C E- 'C .C L L L .0 .0 10 40 40 N 46 46 /O 46 r u1 p O O rn N N A V 1` O O V O Duration 30 1 I I 1 1 1 1 1 25 - - c 20 Duration v — 5-rnn — 2-day o0 15 • •- - - — 10-min — 3-day , 15-min — 4-day -. 30-min — 7-day • a 10 - -•- --� - 60-Min - 10-day a, a — 2-hr — 20-day • — 3fir — 30-day 5 _ — 5fir — 45-day r_. — 12-hr — 60-day 0 — 1 t i 1 i l 1 i 24-br 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Mon Nov 21 18:32:25 2022 Back to Top Maps & aerials Small scale terrain -- • �Lr I • 3km 2mi Large scale terrain Kinston-Salem • • Durham Greensboro • • Rocky Mount Raleigh R T H C A R O L I N A I •Greenville 0 —•— •Charlotte Fayetteville) • Wilmington = u' • • Fi • Large scale map if inston� cm Greensboro iv o D rham Rocky Mount n Raleigh North Greenville Carolina I arlotte —•— I FaYettevi lle l f J iville l 100km Wilmington 60mi o rra Lar•e scale aerial Winston-Salem • • Greensboro Durham . Rocky Mount • Raleigh • Greenville North i. . • Carolina r.. Charlotte - Fayetteville la Mlle II 100km Wilmington • Cd 60mi • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 Double D Engineering, PLLC November 4,2022 Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines,NC 28387 Re: Seasonal High-Water Table Identification and Soil Infiltration Rates: Ducks Landing, Darroch Road, Lillington; Harnett County NC parcel 010527 0012 Soil conditions and infiltration rates were evaluated and measured on the above-referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C-1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High-Water Table(SHWT). SATURATED HYDRAULIC CONDUCTIVITY(Ksat) Soils evaluated on this property are typical of those within Blaney Soil series. These soils are moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of stormwater infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium was reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported for each proposed location in the tables below. BMP Device Site#1 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation _ground surface) 0-2' 2-4' 4-12' BMP Site 1 Not Observed N/A Sandy Loam Sandy Clay Clay/Sap with Elevation 208' within 12'of 10"/hour Loam wetness (lowest point) surface 5"/hour Not Measured Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 BMP Device Site#2 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) 0-4' 4-10' 10-12' BMP Site 2 Not Observed N/A Sandy Loam/ Saprolite with Saprolite Elevation 196' within 12'of Sandy Clay wetness Not Measured (lowest point) surface Loam Not Measured 8"/hour BMP Device Site#3 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) 0-4' 4-8' 8-12' BMP Site 3 Not Observed N/A Sandy Loam/ Saprolite with Saprolite Elevation 192' within 12'of Sandy Clay wetness Not Measured (lowest point) surface Loam Not Measured 8"/hour BMP Device Site#4 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) 0-3' 3-5' 8-12' BMP Site 4 Not Observed N/A Sandy Loam Sandy Clay Saprolite Elevation 188' within 10'of 10"/hour Loam/Sandy Not Measured (lowest point) surface Clay 2"/hour BMP Device Site#5 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) 0-2' 2-5' 5-12' BMP Site 5 Not Observed N/A Sandy Loam Sandy Clay SCL/Sap with Elevation 192' within 12'of 10"/hour Loam wetness (lowest point) surface 5"/hour Not Measured Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates;however,methods used to measure these rates can influence the results. Side walls of the bore hole are"smeared"by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench,it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on-site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, )....)c c..... L. Scott Cole eice ° le %ftANk4 4 North Carolina Licensed Soil Scientist 0 ° _, 0 ".4,} 4'vF 1263 4' F44*4m c ico I VZZ ZZZ 1 224 9ZZ • I �,---1 ZZZ 218 1 --- 1 1 102 /b' en ^ �� �_ . I C) •' N 16 �sI c'�1 j W c d ��� m a1)i 0 „' w � *i, ►. cb ° rnIl7Mri', ^� ./ v0 Qi \ r O II) r O j r o a r > R r \ 1 I O* *• R moo 3 3 y �m 8 i Si,41 • y OO N7 6z `� if 6 N J N N t9 1-j2 U 2 Q N r C d I / .a omu�- 6Z 0ZIoo7 1! -! / r CD Me ,co- ena`a)YYY cc mj) ° — 1 CD NU a Q woBo i h Z i / a)Z ip i O N 3• 7 p O 047 'a+ d c N /W 3 •a ns 2 x u)R N > V R 0 o u L. rn E • °e / a`a)YYY w 3 8 J O a r C * I/ N .0 NI. r E Z ` t ° ° Z a C a. N h / ys. •c •�.■" ac c L_ W L ° E y6U 3 ° N 8g d,°ct5 /r/ a. r Zi O N w ° J of a / e T. § ��/ r �,� 5ZUJivUio �L 3 N ° °rJN Mier `� i a-t Na+JUU 0i::.Del6 m > c =._ 212 .a Ov)m C-0•R +O+y L s 3 0 ��Z y Z c-m r Ess a.u) N N N of �- a 0/ OF:ON� �av)YYY-I 3 'in' )ZZ g off--a v o E N tZ -/ a.S N N N p 0 _10 ZZZ aIYYYJ 13 m Z it io N lin Mtiii4(iiM NItiZZ ♦,'� � O H O N M O # ■ --- pc-' 2 2 a `\i `. 36 a.•r .; Lt cn ci •',A;• co N tve cPc'c" ZEZ c° N (Po N— d Ngs ZSZ . WATER QUALITY/QUANTITY-INFILTRATION BASIN SCM 1 r- n n \A--ecik)o.-, T3z.,, 7) c:-...k.-}-1, 0 i . ., i --------,,:--...„ - ..._.-------_, _ ,_ • :::—-______--7.2-_-,_ :-.... ,-, ..-_________,___...yr ---- ;„. ip. 4 iy(ye-c,?)(r.--./.:,,.....,.77,..-,:r . , ,,--. , ....L_____: _...,.., --... ) ,,,,,,,,,.. . ______,„... .t.' \ / ( j . ; ) ) - (-, / _._,,.......,___ ---,----, ) , i _ __,„--_,...-„,,. \ ,,,, \ fi i -_-:-_------7-7't 1 -•"• ? \ \ , ? • \ ( . ( 1S5\\ '•0.°: -‘;-.1 ..'.." . - ',_,. \ \'' , , _...- so -,.-40, •.„.k.s. ,.. ...„._•:::. • • -----'1%- . t _-<-- ,..-,- 11;r00 Tes.....°,7_,.. \ r.8 ,.i ,_. ,..• _.......,- , -,; ,./ -11'-',- -- 1AV , ......-•."- 1000 _ 10 ---- i , ........--!.... ///1 il , , , e#,Triii '''`,(11,\ ) ‘\1; ) i" , ,Ii, \\,, \N‘h•- • 50%-,-- ....,----- 00'101 r)J-4 1 "\''‘) ) \--- -------k-:.`------1_\-----‘,'-- \'‘N........t.... s.... As..•..".. .,411411,44.,:_,„0.0.-- .-4 • \ k:\\ —.„ ---'-*-- ,.. _.,1,1..":. Nivh. •-.›.'-' __I 1 .--- -N^'''',•.1-'.s.•,...-•....,.- 4 frit- :,:- , ''.7-,0--- ‘ \ '•-t,, .00% . /-----../- :7"....,"At.lt.'",--_,Z=.:„...q11/,-;,'S .,'- '\,\ . 00: . / \..1 k, I", ' . v /-b ',.\,,, i:}ki o: -.1 \\"\-`.---._ _. .j.<i. .-Y f-A--k-i..;.:--- - 7..1, 41: ...\\,N‘,'Viz \...:::.1,....:e„,..,4,),,,,j, // ' \ ....,- ie-TX-rv`-`1 SY) \\ --„,____,- / '1. r...-- , \--ett ki :P. . ' *NI'S ) I. \ , ii i , •• . ....••••••••••--...-'...''' \\ I \•,,'%:N.s\\ / '..') ------ti N\ . 1 I ,---- 1 .-Th .,.._ \------ i ' Q ) ,,---\ ' 1,41•4-1—:_ 1 (.:-14`‘. ---z;=---- - ..,„ ,4, e , 1 'N 1'i 1 1 II ' 1 1 1 -Oil ' ic:' \\ \.,-- V —.-C.-,: .I '." * — --- '11--_-,-;:„. i „ ., • \ 1 1 , 1 , 1J-- , ‘..A...- ------ Tr' • l iiiii ) .' . ltql",--- •% \ \ • , , , , , , „ ri, , 111111 11\ I I • I 1 l' /1,‘ 71\ I i •-•„ I I 'I I I I I, 1 - • \ k,..- -. .,.\.:%.,,,I\ILYIll ' i ' l ' t ,. ' 111 • •1. 1 II II ?--2`:--- - ---------)-‘ •' .: . , --- 1 I 1 1 I \ 1, ''.1t---t ., \iiii.l'ishf -'--1-'-' -- \ O'''::'''''''' 1 ri 111111-1 I 1, -11'-r----1-- ii96-__, ... . ....timmaireass "ir' -'' • I ---:.\° . _ • .r.. ...,....•••••. mii.,Th.- '-'1. ' .... 12.11.1.167. I..'""14116.1 -1 • - .=' ) 1 I .... v• , re-4e,,,,01'cm•:::;;.'' - ----,m,=----;...,..------!--- --- \ -- ---- . •.„.,'i„/'',',.'-'-N_\__L-_-_-_1,k„1\'k,v','\',•1-•\-.•-_-\,-‹-''4--'_,-`..-_1 Z:‘_sJ Z_,\__•__.,\..,. ,.;_..\,N\_...‘,'.,.,t.-?,---_r"a-%-(\.„-.._-.-,*%-e---f-:i,4..:.i,jp.7tffAri-p4xi!-1‘.1;i-'ti%-'a-:•e‘iAy."p\-ik-N--.\i-.1/4*\t\‘•4‘.\1.:\•0.0'\s\-.14;%_:, •\A,-//,*\.,,O,,,•.Il-.k ,\ , :, '''-/1 \ „ , ) "i ‘ . , , / \ \\\ \ ,-: , a .. ,\ / ,------__, k liN. V. \-,'‘ ', 1k,„ illkee /11;2 ,. , ,,\ z.‘.•' 1‘4 M.45--_____-':,4-411107, /. < ' ‘.v , •-- ko, _ii \. `") \ , z ‘•,,,..-.1,_.„------_______--. . \ ' \.\\ ''‘'.'14kIlib•- / iI •t L \ \sk\i____,.. N. -V_-_----------<,L---14-,,:- • 4. 1 . s., • • " • l \ ., ,,,,,,, V71, -....<_,----='-rd\IN:11.'. • ' • `k, . f • •' k 7 1 Nek. 110P • I \-‘\%N .V %.'...\--14:".N.------j:N) "---..-- \---.'""\::::.*"5..; ‘ '% -7-- .7- II •,... 48p 1, • •• --- s rY--,, <,, \--Th \ E_,.," ,e, \ ,1IV, • ' N /AO" ) \—1 4'. ( . .\_ 4------' L '\ .---\. - 1 '. 4L\ 4*..' \\: \ /. - 1 .1., ,_ . \. i \ u, • - -.--- 4+ A .. , ' %, ., • : 1 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Ducks Landing 2 Project Area(ac) _ 109.668 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 2.494 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No 1i NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bioretention Cell _ 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: _ 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �� �EESSIp�;9'yq l '-. -.-- C9- 6.1"--:7;7-," SEAL _ Signature of Designer 051571 73 ii C 0 E P \\\• ` >� �7iii111iiiuQkh° Date DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 • 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft) 4777138 sf 564434 599880 6 Onsite drainage area (sq ft) 4777138 sf 564434 599880 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 125494 sf 128952 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 76000 sf 104000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 49494 sf 24952 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 49494 sf 24952 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 22.2% 21.5% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 66388 cf 77080 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 4 • 4 Type of SCM - Infiltration Basin Wet Pond 5 Total drainage area (sq ft) 4777138 sf 261143 917130 6 Onsite drainage area (sq ft) 4777138 sf 261143 917130 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 28000 sf 180000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 10138 sf 52735 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 10138 sf 52735 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 14.6% 25.4% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 • 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 4777138 sf 701836 6 Onsite drainage area (sq ft) 4777138 sf 701836 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 140468 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 108000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 32468 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 32468 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 20.0% 19 Design storm (inches) _ 1.0 in 20 Design volume of SCM (cu ft) _ 15571 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. INFILTRATION SYSTEM 1 Drainage area number 1 2 3 2 Minimum required treatment volume(cu ft) 11764 cf I 12171 cf 3948 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical"for trenches)? 3:1 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No No No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes _ Yes _ Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 0% 0% 19 Are terraces or baffles provided? No T-- No No 20 Type of pretreatment: Forebay Forebay Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes Yes Yes 22 SHWT elevation(fmsl) 196.00 184.00 180.00 23 Depth to SHWT per soils report(in) 144 in _ 144 in 144 in 24 Ground elevation at boring in soils report(fmsl) 208.00 196.00 192.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A Yes Yes 26 Soil infiltration rate(in/hr) 5.00 4.00 4.00 27 Factor of safety(FS) (2 is recommended): 2.00 2.00 2.00 Elevations 29 Bottom elevation(fmsl) 208 ft 196 ft 192 ft 30 Storage elevation(fmsl) 213.ft 201.ft 195.ft 31 Bypass elevation(fmsl) 213 ft 201 ft 195 ft For Basins Only 32 Bottom surface area(ft2) 9970 ft I 11980 ft 8345 ft 1 33 Storage elevation surface area(ft2) 16815.ft 19080.ft 12075.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 66388 cf 77080 cf 30515 cf 45 Time to draw down hours 19.0 hrs 24.2 hrs 15.2 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0'/hr. A more conservative value of 5.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time.The soils report found the infiltration rate of the soil for DAs 2&3 to be 8.0'/hr.A more conservative value of 4.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time. Infiltration 1 1:19 PM 7/5/2023 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Infiltration Basin #1) Drainage Area(acres): 6.77 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 6.51 96% C GaB/GaD Gilead loamy Sand 0.26 4% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 6.01 74 65.8 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.73 70 7.5 Impervious Area 0.03 98 0.4 Cumulative Curve#= 73.7 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Post-Developed Conditions(Infiltration Basin #1) Drainage Area(acres): 12.96 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.33 3% C BnB/BnD Blaney loamy sand 12.35 95% C GaB/GaD Gilead loamy Sand 0.28 2% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 10.08 74 57.5 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.00 70 0.0 Impervious Area 2.88 98 21.8 Cumulative Curve#= 79.3 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin#1 Drainage Area(DA)= 12.96 Acres 564434 sf Impervious Area(IA)= 2.88 Acres 125494 sf Percent Impervious(I)= 22.2 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.25 in/in Water Quality Volume= 0.270 ac-ft Water Quality Volume= 11,764 cf Water Quality Volume= 0.250 inches of runoff NOAA 1-year,24-hour event= 3.05 inches Minimum Surface Area SA= (12*FS*DV)/(K*T) Factor of Safety(FS)= 2 Design Volume(DV)= 66388.0 cf Hydraulic Conductivity of Soil= 5.00 in/hr Max Dewatering Time= 72 hours SA= 4425.9 sf Drawdown Time T= FS*(DV*12)/(K*SA) Factor of Safety(FS)= Design Volume(DV)= 66388.0 cf Hydraulic Conductivity of Soil= 5.00 in/hr Surface Area Provided= 16815 sf Drawdown Time= 19.0 hours / ( ‘ - -‘ • i / ' j 'V , , ,-- . i 1 ‘‘ _‘ ' ,/, Aire y 7 , / . V / / / x f / _____- 1-1\--\ ,,, vo" ,,,.:' z Tit ,____ __, ./ z • 7 z z _____ I ii / / \./ / \ \--// /� �j� \ �•' INLET PIPE WITH /j / / / ; / / / / ,' �', 7 RIP-RAP APRON - // f i / `./ / / 1 �`� �`! / / /'�� -- r '' A : (DESIGNED BY /� / � / / � �.• � / / �� \ •t, / /'' / r OTHERS) %.0 / i / / / 6' �� �\ v' ,/ 1-- \ / /> / //t\' /-A% ‘.4 . -- - ,----z , / / , V // ) `,/ / /'.. y , / f , % A . / / / - 2 / ,- , .. __ _ f___ , / - .z , -,_ , f _ f / ,/ i_ __, ---, ,_.. 0 , \ ` \ OBSERVATION X` r• Ki 7 / / / / `. ♦ ♦ '� WELL TYP. ` , i.,/1), /,/ , ., V-sr,‘,----- IN - V / A _tio, i 7, zo-vo ____ -L_ _ , 7 - --- - . 7 i wim i 7 7 ---- ' '\ i-GRASS SPILLWAY I. / / / � ,�.� � \ / .�� Aio> — � / / ;� VA' / REFER TO DETAIL I . ��titypoo,8 000 �` / / THIS SHEETi ' ( : ,,./, , • lo / 17 J/ \ r \__ _ / // / , -/ , - - - ) \\ kv _v „ , , ...-- / / 7 z , , „ i \ ;/' STORMWATER 7`� 1 I °\/ f , / \ # \ \ C I V / 7 / / ( �� ® - ��� •, / / �/ / / / ,'`\ MANAGEMENT I �` \ tam ® / / \ ,� I TOP OF / / \. �. \ EASEMENT ` i \ �/, / - EMBANKMENT / / ''\\ ,� c RIP RAP DISS 9ATER \ N \ � i / ' / / /I' I 'AD #10 ) k S \ ‘ W DTH=9 \ / /\/ / \ ,A‘ \ \ 1 LEN CT-11 ' \ \ '' \‘‘‘ \ ` I THICKNESS-18 I / \ 1 1 / / �/ \ \ N� 1 `�I RIP RAP CLASS=3 `�` 1 I I I -� 1 / GRAPHIC SCALE 50 0 25 50 100 200 PLAN VIEW ( IN FEET ) 1 inch = 50 ft. J STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 208.0 9970 0 0 1.0 209.0 11225 10598 10598 2.0 210.0 12535 11880 22478 3.0 211.0 13905 13220 35698 4.0 212.0 15330 14618 50315 5.0 213.0 16815 16073 66388 (WQV) 6.0 214.0 18350 17583 83970 7.0 215.0 19945 19148 103118 STORMWATER MANAGEMENT DESIGN INFILTRATION SYSTEM #1 : IVR 3ASI\: CAPE FEAR DECEIVING STHAN: UPPED LITTLE IVR STEAM INDEX: 18-20-(8) STEAM CLASS: C HUC: 0303000402 PROJECT COORDINATES: 35.316452°\, -78.919260°W POND DESIGN SUVMAY PAI\AGE AREA TO PO\D: 12.96 ACES SITE IVPRVIOUS AREA TO POND: 2.88 ACES OFF-SITE DESIGN IMPERVIOUS AREA TO PO\D: 0.0 ACRES TOTAL DESIGN IVPHVIOUS AREA TO POND: 2.88 ACES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 6.77 AC 12.96 AC CURVE \UV=R: 73.7 79.3 TIME OF CONCENTRATION: 20.5 YIN 5.0 MIN 1 .0" STOW EVENT: 0.282 CFS 0.000 CFS 1 -YEAR STORM EVENT: 6.231 CFS 27.39 CFS 0.000 CFS 2-YEA STOW EVENT: 9.506 CFS 38.13 CFS 0.000 CFS 10-YEAS STOW EVENT: 19.52 CFS 69.90 CFS 5.687 CFS 100-YEAS STORM EVENT: 37.27 CFS 122.71 CFS 89.36 CFS J RIP-RAP PRE-TREATMENT FOREBAY AT PIPE INLETS SEE DETAIL THIS SHEET TOP OF EMBANKMENT = 215.0 100-YEAR STORM ELEVATION = 214.43 id 04 I a A' 10-YEAR STORM ELEVATION = 213.23 GRASS SOD SPILLWAY ELEVATION = 213.0 FILTER FABRIC AT BOTTOM AND SIDES OF CLEAN SAND 2-YEAR STORM ELEVATION = 211.31 J i 7'Att44I W .ate 1-YEAR STORM ELEVATION = 210.29 1'-0" CLEAN SAND0M\)M 404 �_1 //— 1.0" RAINFALL ELEVATION = 208.15 EXISTING GRADE = 208.0 BOTTOM OF BASIN = 208.0 440 i FILTER MIXTURE(Fxau me) 1'-0" OF CLEAN ASTM C-33 � z SAND (MEDIUM AGGREGATE SAND cq WITH A SIZE RANGE OF 0.02-INCH jo� ouo��j `` TO 0.04-INCH DIAMETER) �� a LAYER OF GEOTEXTILE PERMEABLE N. FILTER FABRIC (MIRAFI N-SERIES csi OR EQUIVALENT) z FILTER FABRIC v 1'-0" MIN. UNDISTURBED IN-SITU N SOIL o W o Z r v m m 22 iv I SEASONAL HIGH WATER TABLE = 196.0 INFILTRATION BASIN TYPICAL SECTION NTS SPILLWAY FLOW *LO\G H 3 W SS CHA\\EL LI\I\G TOP OF EM3A\ <ME\T SPILLWAY ELEVATIO\ Q( Oi�) SLOPE(%) ELEVATIO\ I\FIL-RATIO\ 89.36 CFS 33.33% 2.0' 20.0' 32.0' 3: 1 STRAW WITH \ET \AG 215.0 213.0 SPILLWAY SHOHMAX W/ P550 *LONGITUDINAL SLOPE - � W 3: 1 BACK SLOPE FROM EMBANKMENT EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=215.0 H LINING SS /CHANNEL SPILLWAY ELEVATION=213.0 MATTING SHALL BE AS NOTED H OR APPROVED EQUAL. H 3 GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 89.36 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 106,499 cuft Inflow hyd. No. = 2 - SCM Post-DeveloOelservoir name = BMP Pond Max. Elevation = 214.43 ft Max. Storage = 92,286 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.90 107.60 213.38 12.30 2.014 12.30 11.93 122.71 << 213.95 48.01 2.114 48.01 11.97 119.16 214.30 77.38 2.180 77.38 12.00 93.77 214.43 << 89.36 2.204 89.36 12.03 59.04 214.36 82.57 2.190 82.57 12.07 32.53 214.17 65.77 2.155 65.77 12.10 20.21 213.96 48.84 2.116 48.84 12.13 16.63 213.78 35.90 2.085 35.90 12.17 15.93 213.66 27.93 2.063 27.93 12.20 15.27 213.58 22.93 2.049 22.93 12.23 14.60 213.52 19.62 2.039 19.62 12.27 13.94 213.48 17.29 2.031 17.29 12.30 13.27 213.45 15.56 2.025 15.56 12.33 12.59 213.42 14.15 2.021 14.15 12.37 11.92 213.40 12.98 2.017 12.98 12.40 11.24 213.38 12.05 2.013 12.05 12.43 10.56 213.36 11.19 2.010 11.19 12.47 9.878 213.34 10.38 2.007 10.38 12.50 9.194 213.32 9.608 2.004 9.608 12.53 8.563 213.31 8.865 2.001 8.865 Continues on next page... 11 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.57 8.090 213.29 8.226 1.998 8.226 12.60 7.794 213.28 7.691 1.996 7.691 12.63 7.604 213.27 7.225 1.993 7.225 12.67 7.450 213.26 6.828 1.992 6.828 12.70 7.297 213.25 6.489 1.990 6.489 12.73 7.142 213.24 6.194 1.989 6.194 12.77 6.988 213.23 5.932 1.988 5.932 12.80 6.832 213.23 5.695 1.986 5.695 12.83 6.677 213.22 5.478 1.985 5.478 12.87 6.522 213.22 5.275 1.985 5.275 12.90 6.366 213.21 5.084 1.984 5.084 12.93 6.210 213.21 4.901 1.983 4.901 12.97 6.054 213.20 4.725 1.982 4.725 13.00 5.896 213.20 4.573 1.981 4.573 13.03 5.747 213.19 4.437 1.980 4.437 13.07 5.620 213.19 4.300 1.980 4.301 13.10 5.517 213.18 4.168 1.979 4.168 13.13 5.428 213.18 4.043 1.978 4.043 13.17 5.345 213.18 3.925 1.977 3.925 13.20 5.261 213.17 3.813 1.977 3.813 13.23 5.176 213.17 3.707 1.976 3.707 13.27 5.092 213.17 3.605 1.976 3.605 13.30 5.008 213.16 3.506 1.975 3.506 13.33 4.924 213.16 3.410 1.974 3.410 13.37 4.839 213.16 3.317 1.974 3.317 13.40 4.755 213.15 3.225 1.973 3.225 13.43 4.670 213.15 3.135 1.973 3.135 13.47 4.586 213.15 3.045 1.972 3.045 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.50 4.501 213.14 2.957 1.972 2.957 13.53 4.418 213.14 2.870 1.971 2.870 13.57 4.343 213.14 2.784 1.971 2.784 13.60 4.276 213.14 2.701 1.970 2.701 13.63 4.214 213.13 2.622 1.970 2.622 13.67 4.154 213.13 2.546 1.969 2.546 13.70 4.093 213.13 2.473 1.969 2.473 13.73 4.032 213.13 2.402 1.968 2.403 13.77 3.972 213.12 2.334 1.968 2.334 13.80 3.911 213.12 2.267 1.968 2.267 13.83 3.850 213.12 2.201 1.967 2.201 13.87 3.789 213.12 2.136 1.967 2.136 13.90 3.728 213.11 2.072 1.966 2.072 13.93 3.668 213.11 2.009 1.966 2.009 13.97 3.606 213.11 1.946 1.966 1.946 14.00 3.545 213.11 1.884 1.965 1.883 14.03 3.489 213.11 1.822 1.965 1.822 14.07 3.443 213.10 1.762 1.965 1.762 14.10 3.412 213.10 1.706 1.964 1.706 14.13 3.388 213.10 1.656 1.964 1.656 14.17 3.367 213.10 1.625 1.964 1.625 14.20 3.346 213.10 1.601 1.963 1.601 14.23 3.325 213.10 1.577 1.963 1.576 14.27 3.304 213.09 1.552 1.963 1.553 14.30 3.283 213.09 1.529 1.963 1.529 14.33 3.262 213.09 1.506 1.962 1.506 14.37 3.241 213.09 1.483 1.962 1.483 14.40 3.220 213.09 1.460 1.962 1.460 Continues on next page... 13 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.43 3.199 213.09 1.438 1.962 1.437 14.47 3.178 213.09 1.415 1.961 1.415 14.50 3.157 213.08 1.393 1.961 1.393 14.53 3.136 213.08 1.371 1.961 1.371 14.57 3.115 213.08 1.349 1.961 1.349 14.60 3.094 213.08 1.327 1.961 1.327 14.63 3.072 213.08 1.305 1.960 1.305 14.67 3.051 213.08 1.284 1.960 1.284 14.70 3.030 213.08 1.262 1.960 1.262 14.73 3.009 213.08 1.241 1.960 1.241 14.77 2.987 213.07 1.219 1.959 1.219 14.80 2.966 213.07 1.198 1.959 1.198 14.83 2.945 213.07 1.176 1.959 1.176 14.87 2.924 213.07 1.155 1.959 1.155 14.90 2.903 213.07 1.134 1.958 1.134 14.93 2.881 213.07 1.113 1.958 1.112 14.97 2.860 213.07 1.091 1.958 1.091 15.00 2.839 213.07 1.070 1.958 1.070 15.03 2.818 213.06 1.049 1.957 1.049 15.07 2.796 213.06 1.028 1.957 1.028 15.10 2.775 213.06 1.006 1.957 1.006 15.13 2.753 213.06 0.985 1.957 0.985 15.17 2.732 213.06 0.964 1.957 0.964 15.20 2.711 213.06 0.943 1.956 0.943 15.23 2.689 213.06 0.922 1.956 0.922 15.27 2.668 213.05 0.901 1.956 0.901 Peak Flow Period ...End 15.27hr-11 .90hr = 3.37 hr - Use 4.0 hr 7/5/23, 11:01 AM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway#1 Name Grass Spillway#1 Discharge 89.36 Peak Flow Period 4 Channel Slope 0.3333 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 89.36 cfs 15.11 ft/s 0.29 ft 0.025 8.5 Ibs/ft2 6.06 Ibs/ft2 1.4 STABLE G P550 Unvegetated Underlying Straight 89.36 cfs 15.11 ft/s 0.29 ft 0.025 8.05 Ibs/ft2 5.91 Ibs/ft2 1.36 STABLE F Substrate Shoremax w/ Straight 89.36 cfs 15.58 ft/s 0.28 ft 0.023 14 Ibs/ft2 5.87 Ibs/ft2 2.38 STABLE F P550 Reinforced Vegetation Underlying Straight 89.36 cfs 15.58 ft/s 0.28 ft 0.023 8.5 Ibs/ft2 5.73 Ibs/ft2 1.48 STABLE F Substrate https://ecmds.com/project/151829/spillway-analysis/247776/show# 1/1 Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=208.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 208.00 9,970 0 0 1.00 209.00 11,225 10,598 10,598 2.00 210.00 12,535 11,880 22,478 3.00 211.00 13,905 13,220 35,698 4.00 212.00 15,330 14,618 50,315 5.00 213.00 16,815 16,073 66,388 6.00 214.00 18,350 17,583 83,970 7.00 215.00 19,945 19,148 103,118 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) Inactive Inactive Inactive Inactive Crest Len(ft) = 20.00 0.00 0.00 0.00 Span(in) = 0.00 0.00 0.00 0.00 Crest El.(ft) = 213.00 0.00 0.00 0.00 No.Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 5.000(by Contour) Multi-Stage = n/a No Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 8.00 216.00 6.00 214.00 4.00 212.00 2.00 210.00 0.00 208.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 Total Q Discharge(cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.231 2 728 23,122 SCM Pre-Developed 2 SCS Runoff 27.39 2 718 54,853 SCM Post-Developed 3 Reservoir 0.000 2 1214 0 2 210.29 26,296 Post Through SCM 5 SCS Runoff 0.282 2 154 3,261 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 300 0 5 208.15 1,610 1.0inPost Through SCM Infiltration 1.gpw Return Period: 1 Year Wednesday, 07/5/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 6.231 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 23,122 cuft Drainage area = 6.770 ac Curve number = 73.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.50 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 ---- 5.00 4.00 ---- I 4.00 3.00 ---- ' 3.00 2.00 ---- 2.00 1.00 ---- 1.00 0.00 �� I ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 27.39 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 54,853 cuft Drainage area = 12.960 ac Curve number = 79.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 % — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1214 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 210.29 ft Reservoir name = BMP Pond Max. Storage = 26,296 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 28.00 - 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 -1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 3 Hyd No. 2 TTTTTT II Total storage used = 26,296 cuft 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.282 cfs Storm frequency = 1 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 3,261 cuft Drainage area = 12.960 ac Curve number = 79.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 \r" 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - I ,_ 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 300 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIAMIax. Elevation = 208.15 ft Reservoir name = BMP Pond Max. Storage = 1,610 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 A 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 • I liii 11111 I������� 0.10 0.05 0.05 0.00 - - 0.00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 1,610 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.506 2 728 34,032 SCM Pre-Developed 2 SCS Runoff 38.13 2 718 76,953 SCM Post-Developed 3 Reservoir 0.000 2 1472 0 2 211.31 40,245 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 208.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 2 Year Wednesday, 07/5/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 9.506 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 34,032 cuft Drainage area = 6.770 ac Curve number = 73.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.50 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 - - - 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 38.13 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 76,953 cuft Drainage area = 12.960 ac Curve number = 79.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 40.00 I 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1472 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 211 .31 ft Reservoir name = BMP Pond Max. Storage = 40,245 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) — Hyd No. 3 Hyd No. 2 MITI II Total storage used = 40,245 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 19.52 2 726 67,770 SCM Pre-Developed 2 SCS Runoff 69.90 2 716 142,471 SCM Post-Developed 3 Reservoir 5.687 2 740 17,901 2 213.23 70,372 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 208.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 10 Year Wednesday, 07/5/2023 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 19.52 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 67,770 cuft Drainage area = 6.770 ac Curve number = 73.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.50 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 21.00 21.00 18.00 i 18.00 15.00 15.00 12.00 I 12.00 I 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 69.90 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 142,471 cuft Drainage area = 12.960 ac Curve number = 79.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 70.00 I 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 5.687 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 17,901 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 213.23 ft Reservoir name = BMP Pond Max. Storage = 70,372 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 I — 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 70,372 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.27 2 726 128,832 SCM Pre-Developed 2 SCS Runoff 122.71 2 716 256,430 SCM Post-Developed 3 Reservoir 89.36 2 720 106,499 2 214.43 92,286 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 208.00 0.000 1.0inPost Through SCM Infiltration 1.gpw Return Period: 100 Year Wednesday, 07/5/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 37.27 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 128,832 cuft Drainage area = 6.770 ac Curve number = 73.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.50 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 I 30.00 30.00 20.00 I 20.00 I 10.00 ....0; 10.00 0.00 _ - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 122.71 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 256,430 cuft Drainage area = 12.960 ac Curve number = 79.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 I I 80.00 80.00 60.00 60.00 40.00 40.00 I 20.00 I 20.00 AL 0.00 -, 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 89.36 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 106,499 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 214.43 ft Reservoir name = BMP Pond Max. Storage = 92,286 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 92,286 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60`V V=1.49R'r'S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Te, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 TcTOTu Tc(minimUm) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec rnin Flow Area ft^2 ft ft ft ft/ft s min (min) (10 min) 0.6'Tc(hrs) 1 100 252.0 250.9 0.011 3.70 0.24 16.86 789 250.9 208 0.05437 Unpaved 3.66 3.59 20.45 20.45 0.20 1 1/20R02310:03 PM G:WYDRO9ralscls\TIMECONC_Ducks Landing.XLS WATER QUALITY/QUANTITY-INFILTRATION BASIN SCM 2 rt O ia,,, -26s; 'v 'C.'-t .,kX\�•. �l 1 .� J T , - JJ +ram 191 �: 1 - —+���1 I I �s ram- �� l , , N.. \ -'---::, ' ---.,yam 1 \ 1 I{ - 1 ititilts Es_ „. vill,, ,. " . _ _,..,..... ...... 7.4.76,05:4211. ___ usemilail,_•_.. •r_..... .....__...i.....____ _...:...: _ r... 1,......._._.=........... .... :.:....._.._.._. ..._T____.__.___... ...._:x..__________ ;� ---u-- -. T-i.-ii - r_k_ ________:___--- =._____...__..._.. ... ,____.__. __ • —ems-' 7, "„, 4i.10-41-ifirev), . \ '.i ,_, \\4Ve#, * 1 , IL, ----, '1".,. . .„)S\, 4 016 4, t 1, ) k -ittNN.,. „ \ 4.4i0° 1" IIMI°."1' °.. ."Ii' l ::,.._5_-.19,. V \IN, / .. -Is OickvviMit rt -nal" :7-- A.& ‘\.\*':No/ • '\ ,,N sio,1 _,,,.., „. .-ib, ,.., , .,- . ......._ _. vo: s4.,.; ,, ..,,,/:,:alo i _ _\_ JioN \ .... 1 L'•111 ' 1.14111141‘ \ 1 'Ll, riC - .-... ,1/4,\ \\‘‘,.., ,4",,, At, .,... \ v ' ., \\N„..,_ _., ,.. \ )40,\:,\ :.'\ ,.4, .,7-„-ir 4#0, ,_----==_-\\ vti,- , i . . . N. -'4 \ ''‘ \•ilZileP/VN _ \‘!! ' , illmililir ., '.\,,,___." NX_ \At•N• ,. "----\\\\ ..,,,,, ,,),,,,,,,:,:,\Iti\ 414 . _. ..„....:____...„. ,,,,,,,.:...„.... rn c ._...___. ..\ \ ,.. .k .lki„,5:7_,„),1„...„, . .,ic a ..______ ...,:,,,,,, „." I ,,7„..."--,V., 4401\\----- , N.—. • \''// >-', N -Ns, ,.--- ...--pm--,:p- 1 , . 1 .„. ,.. ve,..„." ,,,,,.. .„ ,. ,...,......._1 ,,, ,41,..14,0; ....0., k 1 I 1 C' s. , _ die-,,e,05-_,;„-: . .....,. -;:,......,-- - _,..--7.7.. .7 joy._ \I. w 4 \. , ) 4— 1 , 1 _.i.... --I.:::- .1.'''',1.!.,, , °'\'/ \--4:: 1 ..',.,4, -ti7t VeN,„----,„ il ._,, ' i 1 0) -..\. ‘_,___.,-,:i � ta 1.\\\ \01. j/iNN,...k...z. .-e,ilklo*/ - ,., A -/ 1. \ _._,‘k . i i i . 1,1',, �. ,�r�_Z'n , Po C ' *-\\N.' .1.:= . 7- }1Zrj . - / 11. rj , , t, `� 1.- .„. ` � � ; =====Th ; ! " ..- :-Atkvati\ < - . 1 1. 1 atYt-7 ' „gar • • '---;:1—,,,k)-‘,4'.0. j i /) 1 '--//.\\‘\------- ( :\—N. -•••••'....i i A400) )._____-_,":1/I : : • •• •..•‘..'.-''‘L•••-•\'•:- — ks-e- i ?1 ' 1 ___/-\ --/•-\\ ' ., .. :_,:54/,40, ir , ,;:: : • :,,.---).., \\\ .L....", . ii---,--L,._,_ : , 7%- ,-./2i;i, ...e-4* •• - --,,./. i./.. i �` �.—. t � C 1 '7 ( 1. \, , . SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Ducks Landing 2 Project Area(ac) _ 109.668 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 2.494 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No 1i NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bioretention Cell _ 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: _ 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �� �EESSIp�;9'yq l '-. -.-- C9- 6.1"--:7;7-," SEAL _ Signature of Designer 051571 73 ii C 0 E P \\\• ` >� �7iii111iiiuQkh° Date DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 • 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft) 4777138 sf 564434 599880 6 Onsite drainage area (sq ft) 4777138 sf 564434 599880 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 125494 sf 128952 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 76000 sf 104000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 49494 sf 24952 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 49494 sf 24952 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 22.2% 21.5% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 66388 cf 77080 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 4 • 4 Type of SCM - Infiltration Basin Wet Pond 5 Total drainage area (sq ft) 4777138 sf 261143 917130 6 Onsite drainage area (sq ft) 4777138 sf 261143 917130 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 28000 sf 180000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 10138 sf 52735 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 10138 sf 52735 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 14.6% 25.4% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 • 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 4777138 sf 701836 6 Onsite drainage area (sq ft) 4777138 sf 701836 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 140468 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 108000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 32468 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 32468 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 20.0% 19 Design storm (inches) _ 1.0 in 20 Design volume of SCM (cu ft) _ 15571 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. INFILTRATION SYSTEM 1 Drainage area number 1 2 3 2 Minimum required treatment volume(cu ft) 11764 cf I 12171 cf 3948 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical"for trenches)? 3:1 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No No No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes _ Yes _ Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 0% 0% 19 Are terraces or baffles provided? No T-- No No 20 Type of pretreatment: Forebay Forebay Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes Yes Yes 22 SHWT elevation(fmsl) 196.00 184.00 180.00 23 Depth to SHWT per soils report(in) 144 in _ 144 in 144 in 24 Ground elevation at boring in soils report(fmsl) 208.00 196.00 192.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A Yes Yes 26 Soil infiltration rate(in/hr) 5.00 4.00 4.00 27 Factor of safety(FS) (2 is recommended): 2.00 2.00 2.00 Elevations 29 Bottom elevation(fmsl) 208 ft 196 ft 192 ft 30 Storage elevation(fmsl) 213.ft 201.ft 195.ft 31 Bypass elevation(fmsl) 213 ft 201 ft 195 ft For Basins Only 32 Bottom surface area(ft2) 9970 ft I 11980 ft 8345 ft 1 33 Storage elevation surface area(ft2) 16815.ft 19080.ft 12075.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 66388 cf 77080 cf 30515 cf 45 Time to draw down hours 19.0 hrs 24.2 hrs 15.2 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0'/hr. A more conservative value of 5.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time.The soils report found the infiltration rate of the soil for DAs 2&3 to be 8.0'/hr.A more conservative value of 4.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time. Infiltration 1 1:19 PM 7/5/2023 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Infiltration Basin #2) Drainage Area(acres): 6.70 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 3.13 47% C GaB/GaD Gilead loamy Sand 3.57 53% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 4.91 74 54.2 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 1.79 70 18.7 Impervious Area 0.00 98 0.0 Cumulative Curve#= 72.9 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Post-Developed Conditions(Infiltration Basin #2) Drainage Area(acres): 13.77 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 8.51 62% C GaB/GaD Gilead loamy Sand 5.26 38% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 10.81 74 58.1 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.00 70 0.0 Impervious Area 2.96 98 21.1 Cumulative Curve#= 79.2 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin#2 Drainage Area(DA)= 13.77 Acres 599880 sf Impervious Area(IA)= 2.96 Acres 128952 sf Percent Impervious(I)= 21.5 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.24 in/in Water Quality Volume= 0.279 ac-ft Water Quality Volume= 12,171 cf Water Quality Volume= 0.243 inches of runoff NOAA 1-year,24-hour event= 3.05 inches Minimum Surface Area SA= (12*FS*DV)/(K*T) Factor of Safety(FS)= 2 Design Volume(DV)= 77080.0 cf Hydraulic Conductivity of Soil= 4.00 in/hr Max Dewatering Time= 72 hours SA= 6423.3 sf Drawdown Time T= FS*(DV*12)/(K*SA) Factor of Safety(FS)= Design Volume(DV)= 77080.0 cf Hydraulic Conductivity of Soil= 4.0 in/hr Surface Area Provided= 19080 sf Drawdown Time= 24.2 hours 0 ) ( ' \ ,N) 2 ) ) I / \ \j , ) , , i / / �\/ I \ \ - -,- 1 / , / i - „-, / 1 _, --- \-' _1 \ \ \ / / - , - , 1 / \ T / / \ . „ , \ v /,, \/ I - \ \ - /J / � I11\ \ \ \ \ \ N - G �\ \- � � \/ ,L ) / / \ \ \ -\ \ \o � \ i % \ „-- ,iimmek \ \ N_ \ \ :\, _\ ,,,, N,--- — (_ ____, _ NN-\\\ 73\/. N JI STORMWATER � � \ ( _ _) I I \ 0 '.-- :® \\--� \ \ � \ 1 � MANAGEMENT `- \ \ \ -\ C EASEMENT / ' I I ® ° ) \ \ 1 I \ OBSERVATO\ \ ___�___� � .�� � 1 � � N` � WELL TY� \ \\� �.�`r a ()skip° 1 i 0 i /0 / SO \ - } ____• , _ _ ____ ____ L-1_*_ ____ ____ — — ,, III ;/1,7 i rji // /1 ) \ 1 r\r -__- j-- 1 I / 1 / \ \' -4- 6 / ), ''/ / 7 // r / 7 ) / 7/ I \\Y -- / INLET PIPE WITH / I / / I RIP RAP APRON / / / ' / / J I —� - (DESIGNED BY OTHERS) / r ` / I \ / / ` / / R RAP DISSIPATER / S \S 1� '' ' 0 C / lii , / ( PAD #11 r ) WIDTH 20 ; %P ftimiiii � r � \ \ r LENGTH=23' I / / \ / 4 — — TOP OF \ \ I I THICKNESS=36 — — RIP RAP CLASS=2 GR ILLWAY — —f— / EMBANKMENT 1 i 1 ( \ \ DETAIL / I ` / ELEV=203.0 — i ) 1 ) I THIS SHEET i I \ , 1 1 ; 1 ) I 1 GRAPHIC SCALE 50 0 25 50 1 00 200 PLAN VIEW ( IN FEET ) 1 inch = 50 ft. 11 J STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 196.0 11980 0 0 1 .0 197.0 13285 12633 12633 2.0 198.0 14650 13968 26600 3.0 199.0 16070 15360 41960 4.0 200.0 17545 16808 58768 5.0 201 .0 19080 18313 77080 (WQV) 6.0 202.0 20670 19875 96955 7.0 203.0 22320 21495 118450 " TORM WATER MANAGEMENT DESIGN INFILTRATION SYSTEM #2: IVR 3ASI\: CAPE FEAR ECEIVI\G STHAv1: UPPED LITTLE IVR STHAN I\DEX: 18-20-(8) STHAN CLASS: C HUC: 030300C402 PROJECT COODI\AYES: 35.316452°\, -78.919261W PO\D DESIG\ SUvIMAY PAI\AGE AREA TO PO\D: 13.77 ACES SITE IvPHVIOUS AREA TO PO\D: 2.96 ACES OFF-SITE DESIG\ IvPHVIOUS AREA TO PO\D: 0. D ACES TOTAL DESIG\ Iv1PRVIOUS AREA TO PO\D: 2.96 ACES PEE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO PO\D THROUGH POND PAI\AGE AREA: 6.70 AC 13.77 AC CURVE \Uv13R: 72.9 79.2C TIvE OF CO\CE\ RATIO\: 15.9 NI\ 5.0 v11\ 1 .0" STORN EVENT: 0.284 CFS 0.000 CFS 1 -YEAS STORM EVE\T: 7.022 CFS 28.96 CFS 0.0_0 CFS 2-YEA STOW EVE\T: 10.72 CFS 40.36 CFS O.000 CFS 10-YEAS STO�U EVE\T: 22.26 CFS 74.07 CFS 3.971 CFS �0-YEAS STORvI EVE\T: 42.63 CFS 13116 CFS 84.98 CFS RIP-RAP PRE-TREATMENT FOREBAY AT PIPE INLETS SEE DETAIL THIS SHEET TOP OF EMBANKMENT = 203.0 100-YEAR STORM ELEVATION = 202.39 ut0 o 44°44 10-YEAR STORM ELEVATION = 201.18 GRASS SOD SPILLWAY ELEVATION = 201.0 ' FILTER FABRIC AT BOTTOM AND SIDES OF CLEAN SAND 2-YEAR STORM ELEVATION = 199.14 4 /1_0" CLEAN SAND 4` ' 1-YEAR STORM ELEVATION = 198.15 M��'� 1.0" RAINFALL ELEVATION = 196.15 � EXISTING GRADE = 196.0 BOTTOM OF BASIN = 196.0 r0 440 40"� FILTER MIXTURE(FROM Tor) )11 1'-0n OF CLEAN ASTM C-33 SAND (MEDIUM AGGREGATE SAND )4",..` WITH A SIZE RANGE OF 0.02-INCH oL �� c- TO 0.04-INCH DIAMETER) ,. a LAYER OF GEOTEXTILE PERMEABLE FILTER FABRIC (MIRAFI N-SERIES o OR EQUIVALENT) z ? FILTER FABRIC v i 1'-0" MIN. UNDISTURBED IN-SITU SOIL omo Pow ZZ N SEASONAL HIGH WATER TABLE = 184.0 INFILTRATION BASIN TYPICAL SECTION NTS SPILLWAY FLOW *L N N O\G H 3 W SS CHA\\EL LI\I\G TOP OF E3A\EE\T SPILLWAY ELEVATIO\ Q( 00) SLOPE(%) ELEVATIO\ I\FIL-RATIO\ STRAW WITH \ET \AG g4.98 CFS 33.33% 2.0' 2�.0' 32.0' 3: 1 293. 9 201 . E SPILLWAY SHOHNAX W/ P550 *LONGITUDINAL SLOPE - -. W 3: 1 BACK SLOPE FROM EMBANKMENT EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=203.0 H /CHANNEL LINING SS, cc) I( SPILLWAY ELEVATION=201.0 MATTING SHALL BE AS NOTED H OR APPROVED EQUAL. H 3 GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 84.98 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 114,260 cuft Inflow hyd. No. = 2 - SCM Post-DeveloOelservoir name = BMP Pond Max. Elevation = 202.39 ft Max. Storage = 105,277 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%of Qp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.90 114.12 201.14 2.856 1.787 2.856 11.93 130.16 << 201.75 34.17 1.878 34.17 11.97 126.42 202.19 67.87 1.944 67.87 12.00 99.50 202.39 << 84.98 1.973 84.98 12.03 62.65 202.36 82.60 1.969 82.60 12.07 34.52 202.20 68.35 1.944 68.35 12.10 21.45 202.01 52.62 1.915 52.62 12.13 17.65 201.84 39.79 1.890 39.79 12.17 16.91 201.71 31.40 1.872 31.40 12.20 16.20 201.63 26.01 1.859 26.01 12.23 15.50 201.57 22.32 1.850 22.32 12.27 14.79 201.52 19.64 1.843 19.64 12.30 14.08 201.49 17.61 1.838 17.61 12.33 13.37 201.46 16.05 1.834 16.05 12.37 12.65 201.43 14.72 1.830 14.72 12.40 11.93 201.41 13.56 1.827 13.56 12.43 11.21 201.39 12.59 1.824 12.59 12.47 10.48 201.37 11.72 1.821 11.72 12.50 9.758 201.35 10.88 1.818 10.88 12.53 9.089 201.33 10.08 1.816 10.08 Continues on next page... 11 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.57 8.586 201.32 9.334 1.813 9.334 12.60 8.272 201.30 8.670 1.811 8.670 12.63 8.071 201.29 8.167 1.809 8.167 12.67 7.908 201.28 7.749 1.808 7.749 12.70 7.745 201.27 7.386 1.806 7.385 12.73 7.581 201.26 7.064 1.805 7.064 12.77 7.417 201.25 6.775 1.804 6.776 12.80 7.252 201.25 6.514 1.803 6.514 12.83 7.088 201.24 6.273 1.802 6.273 12.87 6.922 201.24 6.048 1.801 6.048 12.90 6.757 201.23 5.836 1.801 5.835 12.93 6.591 201.23 5.633 1.800 5.633 12.97 6.426 201.22 5.439 1.799 5.439 13.00 6.259 201.22 5.250 1.798 5.250 13.03 6.101 201.21 5.068 1.798 5.068 13.07 5.966 201.21 4.893 1.797 4.893 13.10 5.856 201.20 4.729 1.796 4.729 13.13 5.762 201.20 4.594 1.796 4.594 13.17 5.673 201.19 4.482 1.795 4.482 13.20 5.584 201.19 4.374 1.795 4.374 13.23 5.495 201.19 4.269 1.794 4.269 13.27 5.405 201.18 4.167 1.794 4.167 13.30 5.316 201.18 4.067 1.793 4.067 13.33 5.226 201.18 3.969 1.793 3.969 13.37 5.137 201.17 3.873 1.792 3.873 13.40 5.047 201.17 3.777 1.792 3.777 13.43 4.958 201.17 3.683 1.791 3.683 13.47 4.868 201.16 3.590 1.791 3.590 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.50 4.777 201.16 3.497 1.790 3.497 13.53 4.690 201.16 3.405 1.790 3.405 13.57 4.610 201.16 3.314 1.790 3.314 13.60 4.539 201.15 3.226 1.789 3.226 13.63 4.473 201.15 3.142 1.789 3.141 13.67 4.409 201.15 3.060 1.788 3.060 13.70 4.345 201.14 2.981 1.788 2.982 13.73 4.280 201.14 2.906 1.788 2.906 13.77 4.216 201.14 2.831 1.787 2.832 13.80 4.151 201.14 2.759 1.787 2.759 13.83 4.087 201.13 2.688 1.786 2.688 13.87 4.022 201.13 2.619 1.786 2.618 13.90 3.958 201.13 2.549 1.786 2.549 13.93 3.893 201.13 2.481 1.785 2.481 13.97 3.828 201.13 2.414 1.785 2.414 14.00 3.764 201.12 2.347 1.785 2.347 14.03 3.703 201.12 2.280 1.784 2.280 14.07 3.655 201.12 2.216 1.784 2.216 14.10 3.622 201.12 2.156 1.784 2.156 14.13 3.597 201.12 2.101 1.784 2.101 14.17 3.575 201.11 2.051 1.783 2.051 14.20 3.552 201.11 2.006 1.783 2.006 14.23 3.530 201.11 1.965 1.783 1.965 14.27 3.508 201.11 1.927 1.783 1.927 14.30 3.486 201.11 1.891 1.783 1.891 14.33 3.463 201.11 1.858 1.782 1.858 14.37 3.441 201.11 1.827 1.782 1.827 14.40 3.418 201.11 1.797 1.782 1.797 Continues on next page... 13 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.43 3.396 201.10 1.768 1.782 1.768 14.47 3.374 201.10 1.741 1.782 1.741 14.50 3.351 201.10 1.714 1.782 1.714 14.53 3.329 201.10 1.688 1.782 1.688 14.57 3.306 201.10 1.663 1.781 1.663 14.60 3.284 201.10 1.641 1.781 1.641 14.63 3.262 201.10 1.627 1.781 1.627 14.67 3.239 201.10 1.612 1.781 1.612 14.70 3.217 201.10 1.596 1.781 1.596 14.73 3.194 201.10 1.580 1.781 1.580 14.77 3.171 201.10 1.563 1.781 1.563 14.80 3.149 201.09 1.546 1.780 1.546 14.83 3.127 201.09 1.528 1.780 1.528 14.87 3.104 201.09 1.510 1.780 1.510 14.90 3.082 201.09 1.491 1.780 1.491 14.93 3.059 201.09 1.472 1.780 1.472 14.97 3.036 201.09 1.453 1.780 1.453 15.00 3.014 201.09 1.433 1.779 1.433 15.03 2.991 201.09 1.413 1.779 1.413 15.07 2.969 201.08 1.393 1.779 1.393 15.10 2.946 201.08 1.373 1.779 1.373 15.13 2.923 201.08 1.352 1.779 1.352 15.17 2.900 201.08 1.331 1.779 1.332 15.20 2.878 201.08 1.311 1.778 1.311 15.23 2.855 201.08 1.289 1.778 1.290 15.27 2.832 201.08 1.268 1.778 1.268 15.30 2.810 201.08 1.247 1.778 1.247 15.33 2.787 201.07 1.225 1.778 1.226 Continues on next page... 14 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.37 2.764 201.07 1.204 1.777 1.204 15.40 2.741 201.07 1.182 1.777 1.182 15.43 2.719 201.07 1.161 1.777 1.161 15.47 2.696 201.07 1.139 1.777 1.139 15.50 2.673 201.07 1.117 1.777 1.117 15.53 2.650 201.07 1.095 1.776 1.095 15.57 2.627 201.07 1.073 1.776 1.073 15.60 2.605 201.06 1.051 1.776 1.051 15.63 2.582 201.06 1.029 1.776 1.029 15.67 2.559 201.06 1.007 1.776 1.007 15.70 2.536 201.06 0.985 1.775 0.985 15.73 2.513 201.06 0.962 1.775 0.962 15.77 2.490 201.06 0.940 1.775 0.940 15.80 2.468 201.06 0.918 1.775 0.918 15.83 2.445 201.05 0.895 1.775 0.895 15.87 2.422 201.05 0.873 1.774 0.873 15.90 2.399 201.05 0.851 1.774 0.851 ...End Peak Flow Period 15.90hr-11 .90hr = 4.0 hr - Use 4.5 hr 7/5/23, 11:20 AM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway#2 Name Grass Spillway#2 Discharge 84.98 Peak Flow Period 4.5 Channel Slope 0.3333 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 84.98 cfs 14.79 ft/s 0.28 ft 0.025 8.5 lbs/ft2 5.89 lbs/ft2 1.44 STABLE F P550 Unvegetated Underlying Straight 84.98 cfs 14.79 ft/s 0.28 ft 0.025 8.05 Ibs/ft2 5.75 lbs/ft2 1.4 STABLE F Substrate Shoremax w/ Straight 84.98 cfs 15.17 ft/s 0.28 ft 0.024 14 lbs/ft2 5.73 lbs/ft2 2.44 STABLE F P550 Reinforced Vegetation Underlying Straight 84.98 cfs 15.17 ft/s 0.28 ft 0.024 8.5 lbs/ft2 5.59 lbs/ft2 1.52 STABLE F Substrate https://ecmds.com/project/151829/spillway-analysis/247776/show 1/1 Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=196.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 196.00 11,980 0 0 1.00 197.00 13,285 12,633 12,633 2.00 198.00 14,650 13,968 26,600 3.00 199.00 16,070 15,360 41,960 4.00 200.00 17,545 16,808 58,768 5.00 201.00 19,080 18,313 77,080 6.00 202.00 20,670 19,875 96,955 7.00 203.00 22,320 21,495 118,450 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) Inactive Inactive Inactive Inactive Crest Len(ft) = 20.00 0.00 0.00 0.00 Span(in) = 0.00 0.00 0.00 0.00 Crest El.(ft) = 201.00 0.00 0.00 0.00 No.Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 4.000(by Contour) Multi-Stage = n/a No Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 8.00 204.00 6.00 202.00 4.00 200.00 2.00 198.00 0.00 196.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 Total Q Discharge(cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 7.022 2 724 20,942 SCM Pre-Developed 2 SCS Runoff 28.96 2 718 57,990 SCM Post-Developed 3 Reservoir 0.000 2 1284 0 2 198.15 28,909 Post Through SCM 5 SCS Runoff 0.284 2 154 3,406 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 298 0 5 196.15 1,915 1.0inPost Through SCM Infiltration 2.gpw Return Period: 1 Year Wednesday, 07/5/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 7.022 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 20,942 cuft Drainage area = 6.700 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.90 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 28.96 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 57,990 cuft Drainage area = 13.770 ac Curve number = 79.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1284 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 198.15 ft Reservoir name = BMP Pond Max. Storage = 28,909 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 I 15.00 - 15.00 10.00 - 10.00 5.00 - 5.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 28,909 cuft 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.284 cfs Storm frequency = 1 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 3,406 cuft Drainage area = 13.770 ac Curve number = 79.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 — I ,. 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharc e = 0.000 cfs Storm frequency = 1 yrs Time to peak = 298 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIAMIax. Elevatio = 196.15 ft Reservoir name = BMP Pond Max. Storage = 1,915 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 11111111111111111111111 0.05 11111111111111111111 0.00 iiiiiiiiiiiiiiiiiiiiiiiid — 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 1,915 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.72 2 724 31,057 SCM Pre-Developed 2 SCS Runoff 40.36 2 718 81,419 SCM Post-Developed 3 Reservoir 0.000 2 1552 0 2 199.14 44,387 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 196.00 0.000 1.0inPost Through SCM Infiltration 2.gpw Return Period: 2 Year Wednesday, 07/5/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 10.72 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 31,057 cuft Drainage area = 6.700 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.90 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - ‘ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 40.36 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 81,419 cuft Drainage area = 13.770 ac Curve number = 79.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 50.00 , , 50.00 40.00 40.00 30.00 30.00 1 20.00 20.00 10.00 10.00 0.00 — _ _ _ —........ II I — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1552 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 199.14 ft Reservoir name = BMP Pond Max. Storage = 44,387 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 - 20.00 10.00 - 10.00 0.00 - - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 44,387 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 22.26 2 722 62,546 SCM Pre-Developed 2 SCS Runoff 74.07 2 716 150,925 SCM Post-Developed 3 Reservoir 3.971 2 750 16,194 2 201.18 80,605 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 196.00 0.000 1.0inPost Through SCM Infiltration 2.gpw Return Period: 10 Year Wednesday, 07/5/2023 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 22.26 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 62,546 cuft Drainage area = 6.700 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.90 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 24.00 I 24.00 20.00 20.00 16.00 I 16.00 12.00 12.00 8.00 8.00 4.00 4.00 J . 0.00 - \ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 74.07 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 150,925 cuft Drainage area = 13.770 ac Curve number = 79.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 J _ 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 3.971 cfs Storm frequency = 10 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 16,194 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 201.18 ft Reservoir name = BMP Pond Max. Storage = 80,605 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 80,605 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 42.63 2 722 119,892 SCM Pre-Developed 2 SCS Runoff 130.16 2 716 271,900 SCM Post-Developed 3 Reservoir 84.98 2 720 114,260 2 202.39 105,277 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 196.00 0.000 1.0inPost Through SCM Infiltration 2.gpw Return Period: 100 Year Wednesday, 07/5/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 42.63 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 119,892 cuft Drainage area = 6.700 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.90 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 _ _ ' %--- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 130.16 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 271,900 cuft Drainage area = 13.770 ac Curve number = 79.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 II 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 AL 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 84.98 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 114,260 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 202.39 ft Reservoir name = BMP Pond Max. Storage = 105,277 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 160.00 40.00 I 40.00 20.00 I 20.00 III \411 .. 0.00 - ` 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 105,277 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60"V V=1.49R°S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Ts, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V Tn Tmorni Tc(minimum) Tlag Basin (ft) (ftttt) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s rrTn (min) (10 min) 0.6'Tc(hrs) 2 100 240.5 237.5 0.030 3.70 0.24 11.28 962 237.5 190.6 0.04875 Unpaved 3.48 4.61 15.89 15.89 0.16 2 1/20R02310:25 PM G:v1YDRO0ralscls\MMECONC_Ducks Landing.XLS WATER QUALITY/QUANTITY-INFILTRATION BASIN SCM 3 ii— s,4fv\(:)-1 '-r ,ss < 0 m�i i q c Aim. -- 6. c:; L It _ , 1 ::::::::: 1 ---, -- ', :' 1 \ ,�``` \ , ' 1 1 Cr` ``''-. ��\ \�\`1 !y, t 1 ! ''','‘‘:,\,,,N\\.,\\Vs\t\\:<\,:..T\ --''j\s.. s I-, -:,,,, \ ,.,____,.. Ntt% �., ' -'---/ , s,t .'''\'' ))1: \SoIrk ,1 ,\______:<:5-- //:''')Al\--1,,,i__7( , �•.an oak �`~�'� om--—, :',. .,-- •'� was .!` ' , 7 , / s,C1 �', f0a i6g 111"NIE-.N111..oMmmI11N.m11g.11..1m.m"1mn1—E111sl1111.1l 1.:11.D..1u11i1ii1ilsl01 I.IIioI8iI.s4ImsII.Ni1II1oI11omlII1.rI1m1s1•ii1f•gmni•iH•1s1i•i1O1l11'sM1R r1.1 I..I1.1"I11111.1.I1.6:1ili l,:Ni.aI:eIr.1.I116 e".*"•.":/'-\-..:-.\\,•\‘.-,-••'s\\\'N'I ;••%..\)•Li•?r•%°\--‘l..(15-:f•1,'"-\-I-'i:(:_\-':1.1:._1;*:/,i\_:...:".1''i.,'-°,•...' \4‘\.;.°.-,.,..-t_-,--.-...-%.". r i' i I < 1 ._r \\�� t\` 11.1 11 L r T1i.Is •, J_• ,, \ -..ri.I.i4..:.'' UM- �� ' ' ��l \ �� "' S 1 4� 1 ' i i > 1 r // ` ' r pt .ram/' � ` • --- 1 ` • \\R�-/�r /� I lli II . :,, ••:,/,—""117;///,.-/ .:)../ 7.1 is."...:::.;.,..1:::::-.-----1;:-.-.-:,..--'-•:;,..,e)-,:. .: '‘.s::,.ii,......;.' .,.)13:—..:./i.:r;;;.,„I/11.•.; 1 1{ 1 )i ; c 1 , .,,,,,..ji,. , .c...t.,i,,,,. :4:: . ... ...;..,_ ,:-.,. .,‘ .,,,,,,,..ii_____ .(.7,,(iy,/ ] 1 • r j .0. e 1 l' .i , i f\.%,. :;›,.., 1....../::::......f:... WAni 1. '-: ..,........"--- IL( .• ' ‘S 7 't 5\ ‘. V\ _ ' s y\P V1 11 I 1 1! I I, I'i rii i o''. i—,_ \\.._. 1 ! (1*- ° '- r c's:‘ 0✓m tCL.a) k.4 1,----) v_ SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Ducks Landing 2 Project Area(ac) _ 109.668 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 2.494 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No 1i NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bioretention Cell _ 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: _ 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �� �EESSIp�;9'yq l '-. -.-- C9- 6.1"--:7;7-," SEAL _ Signature of Designer 051571 73 ii C 0 E P \\\• ` >� �7iii111iiiuQkh° Date DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 • 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft) 4777138 sf 564434 599880 6 Onsite drainage area (sq ft) 4777138 sf 564434 599880 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 125494 sf 128952 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 76000 sf 104000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 49494 sf 24952 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 49494 sf 24952 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 22.2% 21.5% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 66388 cf 77080 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 4 • 4 Type of SCM - Infiltration Basin Wet Pond 5 Total drainage area (sq ft) 4777138 sf 261143 917130 6 Onsite drainage area (sq ft) 4777138 sf 261143 917130 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 28000 sf 180000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 10138 sf 52735 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 10138 sf 52735 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 14.6% 25.4% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 • 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 4777138 sf 701836 6 Onsite drainage area (sq ft) 4777138 sf 701836 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 140468 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 108000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 32468 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 32468 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 20.0% 19 Design storm (inches) _ 1.0 in 20 Design volume of SCM (cu ft) _ 15571 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. INFILTRATION SYSTEM 1 Drainage area number 1 2 3 2 Minimum required treatment volume(cu ft) 11764 cf I 12171 cf 3948 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical"for trenches)? 3:1 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No No No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes _ Yes _ Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 0% 0% 19 Are terraces or baffles provided? No T-- No No 20 Type of pretreatment: Forebay Forebay Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes Yes Yes 22 SHWT elevation(fmsl) 196.00 184.00 180.00 23 Depth to SHWT per soils report(in) 144 in _ 144 in 144 in 24 Ground elevation at boring in soils report(fmsl) 208.00 196.00 192.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A Yes Yes 26 Soil infiltration rate(in/hr) 5.00 4.00 4.00 27 Factor of safety(FS) (2 is recommended): 2.00 2.00 2.00 Elevations 29 Bottom elevation(fmsl) 208 ft 196 ft 192 ft 30 Storage elevation(fmsl) 213.ft 201.ft 195.ft 31 Bypass elevation(fmsl) 213 ft 201 ft 195 ft For Basins Only 32 Bottom surface area(ft2) 9970 ft I 11980 ft 8345 ft 1 33 Storage elevation surface area(ft2) 16815.ft 19080.ft 12075.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 66388 cf 77080 cf 30515 cf 45 Time to draw down hours 19.0 hrs 24.2 hrs 15.2 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0'/hr. A more conservative value of 5.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time.The soils report found the infiltration rate of the soil for DAs 2&3 to be 8.0'/hr.A more conservative value of 4.0'/hr was used in the calculations,to account for clogging of the soils that will happen over time. Infiltration 1 1:19 PM 7/5/2023 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Infiltration Basin #3) Drainage Area(acres): 2.42 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.35 14% C BnB/BnD Blaney loamy sand 2.07 86% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 1.74 74 53.4 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.67 70 19.5 Impervious Area 0.00 98 0.0 Cumulative Curve#= 72.9 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Post-Developed Conditions(Infiltration Basin #3) Drainage Area(acres): 6.00 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.71 12% C BnB/BnD Blaney loamy sand 5.29 88% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 5.12 74 63.2 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.00 70 0.0 Impervious Area 0.88 98 14.3 Cumulative Curve#= 77.5 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin#3 Drainage Area(DA)= 6.00 Acres 261143 sf Impervious Area(IA)= 0.88 Acres 38138 sf Percent Impervious(I)= 14.6 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.18 in/in Water Quality Volume= 0.091 ac-ft Water Quality Volume= 3,948 cf Water Quality Volume= 0.181 inches of runoff NOAA 1-year,24-hour event= 3.05 inches Minimum Surface Area SA= (12*FS*DV)/(K*T) Factor of Safety(FS)= 2 Design Volume(DV)= 30515.0 cf Hydraulic Conductivity of Soil= 4.00 in/hr Max Dewatering Time= 72 hours SA= 2542.9 sf Drawdown Time T= FS*(DV*12)/(K*SA) Factor of Safety(FS)= 2 Design Volume(DV)= 30515.0 cf Hydraulic Conductivity of Soil= 4.0 in/hr Surface Area Provided= 12075 sf Drawdown Time= 15.2 hours c I -1 ' I \ �\' - .- - / %jam i,;7 ,- / J ' i \ I I1 r r / / INLET PIPE WITH ''''� v v v / I / �- -. f t I 5 RIP RAP DISSIPATER RIP-RAP APRON %' �'� . � ' „ / / / PAD #13 (DESIGNED BY OTHERS) �� - � ' / f I \ > WIDTH=11- - - ) \ _ � ; / j / / Z LENGTH=13 / _ ,,,. /,.. - / \ 1 THICKNESS=24" - " / � ( \ RIP RAP CLASS=1T/0 f / `- \ _ - , '----- / I I \ \ ` \ \ \ / ���E� ��.< STOR N WAT-R `-. ( \ \ -,� OBSERVATION N / i/ gg ` \ \ \��r VANAGIENT -AS-N-\T \ WELL (TYP.) , . /� �AOt, `\ \\ /�\ 1 ►,, / \ \ \ \ / ) �� ., A‘6, - 1 -NI ._. N. \\\ o — \ )\\ / I / I i \ \ .� \ `\\ - `\ � 1'1 / ) J / J ,�� \ � � N \ � �'\ \\ � � � � \ �� \\ . k �� / / / / / / �,i \ N.\� N. / �� `� \ \� �� TOP OF /,' X\�/ �l _ \ \ V \ �\� \ ` EMBANKMENT �7 \ \ \ /�l ^ ✓ L \ .- ���\ \ \ \ \I �� ELEV=196.5 / �� \ \ 7 z \ \ i \\ \\40:a... / I /1 / \ /vii, y I \ / / �i� a \ \ \- N m \ \ ' -.110.00110!iti::I:iiii;i4 --- \‘j / N ' - -1 \''\ \'' ''\ N ----- -- PEA J / / r"--- X GRASS SPILLWAY , / , -\,/ L \ \ / \ \j \ -A ,A, _ _ _ _-� -= REFER TO DETAIL r I \ ` \, / / \ \ \ \ \ \ / Ihk THIS SHEET / / l --\) \ �- f ' ( / / �l 1 \ 1 \ -� / \ 1 / / 9 u ,, „--- , \- \ -,\ _< r / / ./- A \ \ \ VA / i �. ( -\_._-v / GRAPHIC SCA]L H 50 0 25 50 100 200 PLAN VIEW ( IN FEET ) 1 inch = 50 ft. J STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 192.0 8345 0 0 1.0 193.0 9530 8938 8938 2.0 194.0 10775 10153 19090 3.0 195.0 12075 11425 30515 (WQV) 4.0 196.0 13430 12753 43268 4.5 196.5 14130 6890 50158 STORM WATER MANAGEMENT DESIGN INFILTRATION SYSTEM #3: RIVER BASIN: CAPE FEAR RECEIVING STREAv : UPPER LITTLE R VIP STREAv INDEX: 18-20—(8) S-REAV CLASS: C HUC: 0303000402 PROJECT COORDINATES: 35.316452°N, —78.919260°W BOND DESIGN SUMMARY DRAINAGE AREA TO POND: 6.00 ACES SITE IMPERVIOUS AREA TO POND: 0.88 ACRES OFF—SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 AGES TOTAL DESIGN IMPERVIOUS AREA TO POND: 0.88 ACES PRE—DEVELOPED POST—DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 2.42 AC 6.00 AC CURVE NUd3ER: 72.9 77.5 TIvE OF CONCENTRATION: 30.8 NIN 5.0 vIIN 1 .0" STThN EVENT: 0.094 CFS 0.000 CFS 1 —YEAR STORY EVENT: 1 .646 CFS 11 .59 CFS 0.000 CFS 2—YEAR STORM EVENT: 2.563 CFS 16.43 CFS 0.000 CFS 10—YEAR STORv EVENT: 5.379 CFS 30.78 CFS 1 .569 CFS \ 100—YEAR STORY EVENT: 10.41 CFS 55.12 CFS 40.21 CFS RIP-RAP PRE-TREATMENT FOREBAY AT PIPE INLETS SEE DETAIL THIS SHEET TOP OF EMBANKMENT = 196.5 44 100-YEAR STORM ELEVATION = 195.84 0 10-YEAR STORM ELEVATION = 195.10 GRASS SOD SPILLWAY ELEVATION = 195.0 FILTER FABRIC AT BOTTOM AND SIDES OF CLEAN SAND 2-YEAR STORM ELEVATION = 193.69 Moii 1-YEAR STORM ELEVATION = 193.12 /10" CLEAN SAND 1.0" RAINFALL ELEVATION = 192.07 EXISTING GRADE = 192.0 BOTTOM OF BASIN = 192.0 r6- 40; FILTER MIXTURE(FROM TOP) 1 -0" OF CLEAN ASTM C-33 SAND (MEDIUM AGGREGATE SAND WITH A SIZE RANGE OF 0.02-INCH TO 0.04-INCH DIAMETER) LAYER OF GEOTEXTILE PERMEABLE FILTER FABRIC (MIRAFI N-SERIES OR EQUIVALENT) Z Z FILTER FABRIC 0 1'-0" MIN. UNDISTURBED IN-SITU "' "' SOIL omo rom Zz C/1 SEASONAL HIGH WATER TABLE = 180.0 INFILTRATION BASIN TYPICAL SECTION NTS * TOP OF EM3A\ < VIE\ T SPILLWAY FLOW L \� H 3 W SS CHA\\EL LI\I\G SPILLWAY ELEVATIO\ Q, 00) SLOPE' ELEVATIO\ \FIL-RATIO\ STRAW WITH \ET \AG 40.21 CFS 33.33% 1 . 5' 20.0' 29.0' 3: 1 196.5 195.0 SPILLWAY SHOKN AX W/ P300 *LONGITUDINAL SLOPE - W 3: 1 BACK SLOPE FROM EMBANKMENT EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=196.5 H CHANNEL LINING SS CDC) SPILLWAY ELEVATION=195.0 MATTING SHALL BE AS NOTED OR APPROVED EQUAL. B GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 40.21 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 42,847 cuft Inflow hyd. No. = 2 - SCM Post-DeveloOelservoir name = BMP Pond Max. Elevation = 195.84 ft Max. Storage = 41,248 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.90 48.17 195.11 2.011 1.132 2.011 11.93 55.12 << 195.49 18.02 1.180 18.02 11.97 53.67 195.75 33.82 1.212 33.82 12.00 42.32 195.84 << 40.21 1.224 40.21 12.03 26.69 195.79 36.73 1.218 36.73 12.07 14.72 195.67 28.53 1.202 28.53 12.10 9.153 195.54 20.64 1.186 20.64 12.13 7.532 195.44 15.15 1.173 15.15 12.17 7.219 195.37 11.77 1.164 11.77 12.20 6.920 195.32 9.677 1.159 9.677 12.23 6.621 195.29 8.270 1.155 8.270 12.27 6.321 195.27 7.356 1.152 7.356 12.30 6.017 195.25 6.632 1.150 6.632 12.33 5.713 195.24 6.039 1.148 6.039 12.37 5.408 195.22 5.535 1.146 5.536 12.40 5.102 195.21 5.094 1.145 5.094 12.43 4.794 195.20 4.695 1.143 4.695 12.47 4.484 195.19 4.389 1.142 4.389 12.50 4.174 195.18 4.091 1.141 4.091 12.53 3.888 195.17 3.794 1.140 3.794 Continues on next page... 11 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.57 3.673 195.16 3.508 1.138 3.508 12.60 3.540 195.15 3.250 1.137 3.250 12.63 3.454 195.15 3.030 1.136 3.030 12.67 3.384 195.14 2.845 1.136 2.845 12.70 3.315 195.13 2.688 1.135 2.688 12.73 3.245 195.13 2.554 1.134 2.554 12.77 3.175 195.13 2.435 1.134 2.435 12.80 3.105 195.12 2.329 1.133 2.329 12.83 3.034 195.12 2.231 1.133 2.232 12.87 2.964 195.12 2.141 1.133 2.141 12.90 2.893 195.11 2.056 1.132 2.056 12.93 2.823 195.11 1.974 1.132 1.974 12.97 2.752 195.11 1.895 1.132 1.895 13.00 2.681 195.11 1.818 1.131 1.818 13.03 2.613 195.10 1.743 1.131 1.743 13.07 2.555 195.10 1.671 1.131 1.671 13.10 2.509 195.10 1.621 1.130 1.621 13.13 2.469 195.10 1.584 1.130 1.583 13.17 2.431 195.09 1.546 1.130 1.546 13.20 2.393 195.09 1.508 1.130 1.508 13.23 2.354 195.09 1.470 1.129 1.470 13.27 2.316 195.09 1.432 1.129 1.432 13.30 2.278 195.08 1.394 1.129 1.394 13.33 2.240 195.08 1.356 1.128 1.356 13.37 2.201 195.08 1.318 1.128 1.318 13.40 2.163 195.08 1.280 1.128 1.280 13.43 2.125 195.08 1.243 1.128 1.242 13.47 2.086 195.07 1.204 1.127 1.205 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.50 2.048 195.07 1.167 1.127 1.167 13.53 2.010 195.07 1.129 1.127 1.129 13.57 1.976 195.07 1.091 1.126 1.091 13.60 1.946 195.06 1.054 1.126 1.054 13.63 1.918 195.06 1.018 1.126 1.019 13.67 1.890 195.06 0.984 1.126 0.984 13.70 1.863 195.06 0.951 1.125 0.951 13.73 1.835 195.06 0.918 1.125 0.918 13.77 1.808 195.05 0.886 1.125 0.886 13.80 1.780 195.05 0.855 1.125 0.855 13.83 1.753 195.05 0.825 1.124 0.824 13.87 1.725 195.05 0.794 1.124 0.794 13.90 1.697 195.05 0.765 1.124 0.765 13.93 1.670 195.04 0.735 1.124 0.735 13.97 1.642 195.04 0.706 1.123 0.706 14.00 1.614 195.04 0.677 1.123 0.677 14.03 1.588 195.04 0.649 1.123 0.649 14.07 1.568 195.04 0.621 1.123 0.621 14.10 1.554 195.04 0.595 1.123 0.595 14.13 1.543 195.03 0.570 1.122 0.570 14.17 1.533 195.03 0.548 1.122 0.548 14.20 1.524 195.03 0.528 1.122 0.528 14.23 1.514 195.03 0.509 1.122 0.509 14.27 1.505 195.03 0.492 1.122 0.492 14.30 1.495 195.03 0.475 1.122 0.475 14.33 1.486 195.03 0.460 1.122 0.460 14.37 1.476 195.03 0.446 1.121 0.446 14.40 1.467 195.03 0.432 1.121 0.432 Continues on next page... 13 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.43 1.457 195.03 0.419 1.121 0.419 14.47 1.448 195.02 0.406 1.121 0.406 ...End Peak Flow Period 14.47hr-11 .90hr = 2.57 hr -Use 3.0 hr 7/5/23, 1:12 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway#3 Name Grass Spillway#3 Discharge 40.21 Peak Flow Period 3 Channel Slope 0.3333 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 40.21 cfs 10.77 ft/s 0.19 ft 0.026 8.5 Ibs/ft2 3.85 Ibs/ft2 2.21 STABLE F P300 Unvegetated Underlying Straight 40.21 cfs 10.77 ft/s 0.19 ft 0.026 5.68 Ibs/ft2 3.79 Ibs/ft2 1.5 STABLE F Substrate Shoremax w/ Straight 40.21 cfs 10.38 ft/s 0.19 ft 0.027 14 Ibs/ft2 3.98 Ibs/ft2 3.51 STABLE F P300 Reinforced Vegetation Underlying Straight 40.21 cfs 10.38 ft/s 0.19 ft 0.027 8.5 Ibs/ft2 3.92 Ibs/ft2 2.17 STABLE F Substrate https://ecmds.com/project/151829/spillway-analysis/247810/show 1/1 Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=192.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 192.00 8,345 0 0 1.00 193.00 9,530 8,938 8,938 2.00 194.00 10,775 10,153 19,090 3.00 195.00 12,075 11,425 30,515 4.00 196.00 13,430 12,753 43,268 4.50 196.50 14,130 6,890 50,158 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) Inactive Inactive Inactive Inactive Crest Len(ft) = 20.00 0.00 0.00 0.00 Span(in) = 0.00 0.00 0.00 0.00 Crest El.(ft) = 195.00 0.00 0.00 0.00 No.Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 4.000(by Contour) Multi-Stage = n/a No Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 197.00 4.00 196.00 3.00 195.00 2.00 194.00 1.00 193.00 0.00 192.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 Total Q Discharge(cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.646 2 734 7,855 SCM Pre-Developed 2 SCS Runoff 11.59 2 718 23,175 SCM Post-Developed 3 Reservoir 0.000 2 1018 0 2 193.12 10,109 Post Through SCM 5 SCS Runoff 0.094 2 254 1,080 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 328 0 5 192.07 633 1.0inPost Through SCM Infiltration 3.gpw Return Period: 1 Year Wednesday, 07/5/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.646 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 7,855 cuft Drainage area = 2.420 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.80 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 2.00 2.00 1.00 - 1.00 0.00 - MIN 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 11.59 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 23,175 cuft Drainage area = 6.000 ac Curve number = 77.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 — — 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 1018 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 193.12 ft Reservoir name = BMP Pond Max. Storage = 10,109 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - - 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 10,109 cuft 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.094 cfs Storm frequency = 1 yrs Time to peak = 254 min Time interval = 2 min Hyd. volume = 1,080 cuft Drainage area = 6.000 ac Curve number = 77.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5-- 1 Year Q(cfs) 0.10 1 0.10 0.09 ' 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 t 0.02 0.01 0.01 0.00 ,- 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 328 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIAMIax. Elevation = 192.07 ft Reservoir name = BMP Pond Max. Storage = 633 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q(cfs) 0.10 0.10 0.09 i!11 11111i 0.09 0.08 0.08 0.07 0.07 0.06 ` 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 - � 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 633 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.563 2 734 11,649 SCM Pre-Developed 2 SCS Runoff 16.43 2 718 32,990 SCM Post-Developed 3 Reservoir 0.000 2 1200 0 2 193.69 15,942 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 192.00 0.000 1.0inPost Through SCM Infiltration 3.gpw Return Period: 2 Year Wednesday, 07/5/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 2.563 cfs Storm frequency = 2 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 11,649 cuft Drainage area = 2.420 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.80 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 - 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 16.43 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 32,990 cuft Drainage area = 6.000 ac Curve number = 77.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 18.00 18.00 • 15.00 15.00 • 12.00 • 12.00 • 9.00 • 9.00 • 6.00 • 6.00 3.00 3.00 0.00 s — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1200 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 193.69 ft Reservoir name = BMP Pond Max. Storage = 15,942 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 - 9.00 6.00 - 6.00 3.00 - 3.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 15,942 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.379 2 734 23,460 SCM Pre-Developed 2 SCS Runoff 30.78 2 716 62,464 SCM Post-Developed 3 Reservoir 1.569 2 748 4,462 2 195.10 31,732 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 192.00 0.000 1.0inPost Through SCM Infiltration 3.gpw Return Period: 10 Year Wednesday, 07/5/2023 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 5.379 cfs Storm frequency = 10 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 23,460 cuft Drainage area = 2.420 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.80 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q(cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 30.78 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 62,464 cuft Drainage area = 6.000 ac Curve number = 77.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 I 5.00 • 5.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 1.569 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 4,462 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 195.10 ft Reservoir name = BMP Pond Max. Storage = 31,732 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 35.00 1 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.001111 II r ' 1 ,�I1llul 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 31,732 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.41 2 732 44,970 SCM Pre-Developed 2 SCS Runoff 55.12 2 716 114,352 SCM Post-Developed 3 Reservoir 40.21 2 720 42,847 2 195.84 41,248 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 192.00 0.000 1.0inPost Through SCM Infiltration 3.gpw Return Period: 100 Year Wednesday, 07/5/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 10.41 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 44,970 cuft Drainage area = 2.420 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 30.80 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 ` - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 55.12 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 114,352 cuft Drainage area = 6.000 ac Curve number = 77.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 I 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 40.21 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 42,847 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 195.84 ft Reservoir name = BMP Pond Max. Storage = 41,248 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 1 20.00 10.00 I 10.00 „ I : 0.00 m 11111 l ����� ������ 1 1 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 41,248 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60N V=1.49R'r'S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's )1, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V Tn Troru Tc(minimUm) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s min (min) (10 min) 0.6'Tc(hrs) 3 100 215.3 215.0 0.003 3.70 0.24 28.34 503 215.0 192 0.04573 Unpaved 3.39 2.47 30.82 30.82 0.31 3 1/3 012 02 3 11:00 PM G:vlvonopralscls\TIMECONC_Ducks Lantling.XLS WATER QUALITY/QUANTITY -WET POND SCM 4 �Limpit ' ;tom ----- ' 1F1�: ,L- i Imara1,M , ,tom aim -,..) A . r_____,___,..__=_ -=__.- .4: , ,i L-, ..„ (;) `:-'-,Itosi-IP_WIENOCI :-. 7 il tigiiiitiiiiiimilii---- 7 c,,,,„„.k.A4., 1 ,1• , r-m-Air. . iivek c- all It 111111- 111 . r:‘ cCi\b-s,c TFIc.c..) J _ __ JIIIICEPW n I , ' . ' '141 '! : '� ,),,5)1 k''' ' Oamili3L10=11 ,,.,.4rs'i i'l. ;, t!a'1 lUI1 -----,,,-,e) ff„ --t ._!11L.== \timpil .-- -----.,, '( 1 -...1 �1 , _ ii, � �� :., t . ... ' iiiiiigiollwrnil \ 1 \ \ iiiimoillitwiii \I ' .,,,,,.... - . ii e 1 je,4- ‘---,.v.e _,(,..it-t 0 61 `-',.- -'1101fin Ili', i;1111010111___A' t—_ - Ag\ iiiimioltioto,-.--L0- t� i _ � b,ra',\nc,,c /46,,,c, ,.._ ,, .0c. c.c_ rail] .,i1V —1 , ,, , ,[� _ t � , l f , ,,, ,,-.,--„,„.., ,, \:),,,,,,E,_ .�.. 1 c- _ / .h SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Ducks Landing 2 Project Area(ac) _ 109.668 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 2.494 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No 1i NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bioretention Cell _ 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: _ 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �� �EESSIp�;9'yq l '-. -.-- C9- 6.1"--:7;7-," SEAL _ Signature of Designer 051571 73 ii C 0 E P \\\• ` >� �7iii111iiiuQkh° Date DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 • 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft) 4777138 sf 564434 599880 6 Onsite drainage area (sq ft) 4777138 sf 564434 599880 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 125494 sf 128952 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 76000 sf 104000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 49494 sf 24952 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 49494 sf 24952 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 22.2% 21.5% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 66388 cf 77080 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 4 • 4 Type of SCM - Infiltration Basin Wet Pond 5 Total drainage area (sq ft) 4777138 sf 261143 917130 6 Onsite drainage area (sq ft) 4777138 sf 261143 917130 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 28000 sf 180000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 10138 sf 52735 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 10138 sf 52735 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 14.6% 25.4% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 • 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 4777138 sf 701836 6 Onsite drainage area (sq ft) 4777138 sf 701836 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 140468 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 108000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 32468 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 32468 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 20.0% 19 Design storm (inches) _ 1.0 in 20 Design volume of SCM (cu ft) _ 15571 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. WET POND 1 Drainage area number 4 5 I 2 Minimum required treatment volume(Cu ft) 21277 cf 13459 cf 'GENERAL MDC FROM 02H.1050 31 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4'Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other No No engineered side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? _ 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes _ Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes _ Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 179.00 204.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 180.00 205.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 184.50 209.50 23 Elevation of the permanent pool(fmsl) 185.00 210.00 24 Elevation of the top of the vegetated shelf(fmsl) 185.50 210.50 25 Elevation of the temporary pool(fmsl) 185.70 210.50 26 Surface area of the main permanent pool(square feet) 24370 22680 27 Volume of the main permanent pool(cubic feet) 101055 cf 93535 cf 28 Average depth of the main pool(feet) 4.47 ft 4.45 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 630.0 ft 602.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft 32 Volume of the forebay(cubic feet) 18360 cf 17178 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 12 in 12 in 35 Design volume of SCM(cu ft) 23500 cf 15571 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 2.00 in 2.00 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.81 2.66 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth of forebay at entrance(inches) 48 in 48 in 44 Depth of forebay at exit(inches) 42 in 42 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 47 Slope of vegetated shelf(H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the Yes Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda_ 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 2:38 PM 7/5/2023 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Wet Pond #4) Drainage Area(acres): 15.79 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 15.79 100% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 10.72 74 50.3 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 5.06 70 22.4 Impervious Area 0.00 98 0.0 Cumulative Curve#= 72.7 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond #4) Drainage Area(acres): 21.05 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.00 0% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 21.05 100% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 0.00 55 0.0 Open Space-Good Condition C 15.71 74 55.2 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.00 70 0.0 Impervious Area 5.34 98 24.9 Cumulative Curve#= 80.1 Proposed Wet Pond Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond #4 Drainage Area (DA) = 21.05 Acres 917,130 sf Impervious Area (IA) = 5.34 Acres 232,735 sf Percent Impervious (I) = 25.38 % 25.38 % Required Surface Area Permament Pool Depth: 4.47 ft SA/DA= 0.782 Min Req'd Surface Area = 7,170 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.278 in/in Storage Volume Required = 21,277 cf(above Permanent Pool) Elevations Top of Pond Elevation = 191.00 ft Temporary Pool Elevation = 185.70 ft Permanent Pool Elevation = 185.00 ft Shelf Begining Elevation = 185.50 ft Forebay Weir= 184.00 ft Shelf Ending Elevation = 184.50 ft Bottom Elevation = 180.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 24,370 sf Volume of Temporary Storage = 23,500 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 24370 > 7170 ) sf Volume of Storage for Design Storm = 23,500 Yes ( 23500 > 21277 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Checked by: Date: Water Quality Orifice *Incremental Determination of Water Quality Volume Drawdown Time Zone 3 Q3=0.0437 CD"D2(Z-D/24-Ei)^(1/2) Zone 2 0 Q2=0.372 CD*D"(Z-Ei)^(312) t Zone 1 Q1 =0 1 Orifice Diameter(D)= 2 in Cd= 0.6 Ei= 185 Orifice Inv. Zone 1 Range= 0.00 to 185 Zone 2 Range= 185 to 185.1 Zone 3 Range= 185.1 to Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 185.00 31,875 0 0.00 2.00 0.000 185.50 34,375 16,563 0.50 3.00 0.068 4,078 185.70 34,990 6,937 0.20 3.00 0.082 1,404 Total -- 23,500 -- -- -- 5,481 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 23,500 cf Total Time= 5,481 min Total Time= 3.81 days 1/25/2023 Prop Wet Pond#4-new design(Ducks Landing).xls 1 of 1 Project: Pond #4 Date: 1/25/2023 - Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 185 24,370 11,720 101,055 A2 (Perm_Pool) 184.5 22,510 11,103 89,335 Al (Bottom_Shelf) 184 21,900 21,305 78,233 183 20,710 20,125 56,928 182 19,540 18,968 36,803 181 18,395 17,835 17,835 A3 (Bottom_Pond) 180 17,275 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes _ Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 185 7,255 7,255 3,531 18,360 184.5 6,870 6,870 3,339 14,829 184 6,485 6,485 6,113 11,490 183 5,740 5,740 5,378 5,378 182 5,015 5,015 0 0 Forebay Volume 18.2% *Between 15% &20% Average Depth (Option 1) 3.97 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 101,055 permeter of shelf 630 width of shelf 3 Al (Bottom_Shelf): 22,510 Average Depth = 4.47 Proposed Wet Pond Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 21.05 Acres Impervious Area (IA) = 5.34 Acres Percent Impervious (I) = 25.38 % (Drainage Area) Orifice Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 3.81 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 176.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 10982 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 13,179 lbs Volume of Concrete Req'd: 87.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 133.5 cf (4'x4' riser x 6' = 96sf, 5'x5'footing x 1.5' =37.5cf) / I \ k I I I I 1 / RIP RAP DISSIPATER �I �\ / ( r 1 1 I I PAD #15 f r---- -N / ' -- / ) I 1 ( I 1 WIDTH=14' - - \ / 1 /� i I I �I LENGTH=12' / ' -FES I. , / ( SOD AREAS ABOVE I THICKNESS=22" N ( ELEV=184.8 ;r \ / NORMAL POOL l R P RAP CLASS=B / / EELVATION / / _''► .r �Y.1/ / II I 1 // Iii! r_--- 24" OUTLET P PE \\ j -/ -- �.•,,� REFER TO GRAD NG \ \� / "�'i __ 1\ '" PLAN \ ti i Y I (,o‘=. 'r"IIMI"lI2MllIllll..lII.''-' '' "' s:________.___,a �® im 845 \ ` \ \ 1MAIN POND AREA / / �_� � �\ \ \ \ / I \ \ OUTLET CONTROL \ \ / i/ if II \\ / �� \ \ STRUCTURE REFER _ 'TO DETAILS ON \-\ / // / / D5MAT \ ® \ \A THIS SHEET \/ / i / / It / UNDERLAYMENT AT \ / � � \\ \\ 6-\ \`i/ / / ( i FOREBAY BERM \�\ \ ; \ 1 ( DS75 MAT / �\ \ \ TOP OF \\N 0 \ II ' I CLASS B UNDERLAYMENT AT \� r \ EMBANKMENT \‘ U I i RIP-RAP AT FOREBAY BERM I \ ELEV=191.0 \ ,\ \ j/U � / � i FOREBAY WEIR \ - � I k 1II ' ��,�� / 1 �tal ;• . � GI3� 1/.f' / / ___=„2,,.... _ _ ___/ 77i,,,, _ ___,,-.‘ \ 1 STORMWATER1 82LITORAL SHELF MANAGEMENT AREA-3,785 SFEASEMENT REFER TO DETAIL (D)- / / / i \ FOR PLANTINGS / , �.,.1 / / _ FOREBAY AREA �� ��'i+ ♦•• L --- ID RIP RAP DISSIPATER ' �' _,- in-1_-- \ ���oa.° \ - STORMWATER /\ \ j v __I___ PAD #14 : \ INLET PIPE WITH _ MANAGEMENT - f WIDTH=16' \ I RIP-RAP APRON _ I EASEMENT LENGTH=19' \ \ (DESIGNED BY OTHERS) . Willi _THICKNESS=24" ,RIP RAP CLASS=1 - �� - \� r GRAPHIC SCALE 50 0 25 50 100 20 PLAN VIEW ( IN FEET ) 1 inch = 50 ft. / STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA � INCREvENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 185.0 31875 0 0 0.5 185.5 34375 16563 16563 OJ 185.7 34990 6937 23499 (WQV) 1 .0 186.0 35925 10637 34136 2.0 187.0 39060 37493 71629 3.0 188.0 42190 40625 112254 4.0 189.0 44530 43360 155614 5.0 190.0 46925 45728 201341 6.0 191 .0 49380 48153 249494 STORM WATER MANAGEMENT DESIGN WET DETENTION POND #4 ': IVR EiASI \: CAPE FEAR ECEIVI \G STHAN : UPPED LITTLE IVR STHAN I\SEX: 18-20-(8) STHAN CLASS: C HUC: 0303000402 PROJECT C00RD1\AYES: 35. 316452°\, - 78.919260°W PO\D >ESIG\ SUv1NAY DAI \AGE AREA TO PO\D: 21 .05 ACES SITE INPHVIOUS AREA TO PO\D: 5.34 ACES OFF-SITE DESIG\ INPHVIOUS AREA TO PO\D: 0.0 ACES TOTAL DESIG\ INPHVIOUS AREA TO PO\D: 5.34 ACES PEE-DEVELOPED POST- DEVELOPED POST DEVELOPED TO PO\D TO PO\D THOUGH PO\D DAI \AGE AREA: 15. 79 AC 21 .05 AC CURVE \UvEH: 72.7 80.1 TIvE OF CO\CE\ RATIO\: 23.5 NI\ 5.0 vl\ 1 .0" STON EVE\T: 0.667 CFS 0.032 CFS 1 -YEA STON EVE\T: 12.26 CFS 46.22 CFS 2.155 CFS 2-YEA STOv EVE\T: 19.04 CFS 64.00 CFS 4.175 CFS 10-YEAS STON EVE\T: 39.94 CFS 115.98 CFS 11 .03 CFS 100-YEAS STO�N EVE\T: 77.37 CFS 201 .85 CFS 30.89 CFS 4' MIN EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET 24" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED TOP OF EMBANKMENT ELEVATION=191.0 PER DIRECTION OF GEOTECHNICAL // / / \\ NOTE: EL0" STORMTIOELEVATION85.7. T ISE IS AD AND IL STORAIATE GE 6" TOPSOIL ABOVE WEIR IS ELEVATION 185.7. THERE IS ADDITIONAL STORAGE ENGINEER 2 6" CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=190.21 DESIGNED FROM THE 1.0" STORM ELEVATION TO THE 6" CLAY SOIL ON LITTORAL SHELF WE R INCREMENTAL INTERMEDIATE WEIR ELEVATION. 1 LINER ON INSIDE FACE OF EMBANKMENT 1 0 YEAR STORM ELEVATION=188.24 6 `` 4'x4' PRECAST o 6FT LITTORAL AN. 7 1 CONCRETE RISER 2 YEAR STORM ELEVATION=186.88 �� SHELF _ (INSTALL STEPS ,4 AS NECESSARY) 1 YEAR STORM ELEVATION=186.43 INV=185.0 r 1.0-INCH STORM ELEVATION=185.18 EXISTING GRADE=189.0± 0 NORMAL POND ELEVATION=185.00 ► PVC ELBOW 3' MIN ' ° SEE DETAIL 2 1 ELEV=183.0 Th JI 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 THE 1 N • 11 THIS SHEET POND WHEN FOR DEWATERING REQUIREMENTS.DETAIL 0 0 0 4' IN. ASTM C-923 SEAL -M KEY BETWEEN BARREL & RISER. RISER BASE TONE FILLED CUTOFF TRENCH W1TH CONC. TO INVERTT OFF (TOPSTORAGE)=180.0 OF POND OF SEDIMENT STORAGE=180.0 APPROXIMATE SIZE BARREL CONCRETE SHALL BE EXCAVATE AND BACKFILL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO PLACED IN RISER AFTER (BOTTOM OF SEDIMENT STORAGE-179.0 BASE. P"J" HOOKS 3/4"ROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND ANGLES ARE SECURED )- ALWITH AS 2-A307 ANGLE TO BE FIEDIA. X 12"LD COATED LONG ZROM NC RICH PAINT TO A TER TO BASE AND RISER. SE. WITH DIRECTED BY GEOTECHNICAL CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING ENGINEER STEEL. 6" CLAY SOIL 5'x5'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE MAIN POOL 19'-24" HDPE 1.05� BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM FOREBAY TOP ELEV= 187.0 WIDTH AT TOP = 2.0 FT 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 NOTE: PUMPS SHALL BE USED TO DRAIN ON LITTORAL SHELF THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE THIS SHEET FOR DEWATERING REQUIREMENTS. TOP FOREBAY BOTTOM ELEV=182.0 6FT LITTORAL 6:1 SHELF NORMAL POND ELEVATION 2 __ .116 BOTTOM LITTORAL SHELF ELEV. ' 1 CLASS B RIP-RAP OVER FILTER FABRIC MIN. 4' GRASS FOREBAY WEIR AT ELEV=184.0 DS75 MAT UNDERLAYMENT AT FOREBAY BERM 41414141# 6" TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE AREAS ABOVE THE DEEPER THAN FOREBAY EXIT NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT ELEV=181.5 STORAGE/ENTRANCEELEV=181.0 FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. TOP OF STRUCTURE NOT SHOWN FOR CLARITY TOp OF WFl (REMOVABLE TRASH RACK) R , 788. I/vTFRMF0Iq wFlB \ 785.7 1 7,0FT OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. RISER STRUCTURE 4 PVC SCREW CAP FOR CLEANING ACCESS A 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE - PERM. POND ELEV.=185.0 A 12" MIN. 2" DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 11.03 cfs Storm frequency = 10 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 226,496 cuft Inflow hyd. No. = 2 - BMP Post-Develodservoir name = BMP Pond Max. Elevation = 188.24 ft Max. Storage = 122,763 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.63 16.84 185.75 0.122 0.082 0.037 0.120 11.67 22.00 185.81 0.214 0.084 0.129 0.213 11.70 27.55 185.90 0.382 0.085 0.292 0.377 11.73 33.53 186.00 0.636 0.087 0.543 0.630 11.77 40.13 186.11 0.991 0.089 0.889 0.978 11.80 49.26 186.25 1.467 0.092 1.374 1.466 11.83 62.81 186.43 2.207 0.095 2.066 2.160 11.87 80.19 186.65 3.162 0.097 3.036 3.134 11.90 100.35 186.92 4.404 0.101 4.282 4.382 11.93 115.98<< 187.23 5.841 0.103 5.736 5.839 11.97 113.83 187.55 7.346 0.104 7.242 7.346 12.00 90.29 187.83 8.490 0.101 8.385 8.486 12.03 57.20 188.02 9.517 0.104 9.412 9.515 12.07 31.66 188.12 10.17 0.107 10.07 10.17 12.10 19.73 188.16 10.47 0.108 10.36 10.47 12.13 16.25 188.18 10.61 0.109 10.50 10.61 12.17 15.59 188.20 10.71 0.109 10.60 10.71 12.20 14.96 188.21 10.80 0.110 10.69 10.80 12.23 14.32 188.22 10.87 0.110 10.76 10.87 12.27 13.68 188.23 10.93 0.110 10.82 10.93 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.30 13.03 188.23 10.98 0.110 10.86 10.97 12.33 12.38 188.24 11.01 0.110 10.90 11.01 12.37 11.72 188.24 11.03 0.111 10.92 11.03 12.40 11.07 188.24 << 11.04 0.111 10.92 11.03 12.43 10.40 188.24 11.03 0.111 10.92 11.03 12.47 9.734 188.24 11.01 0.111 10.90 11.01 12.50 9.065 188.23 10.98 0.110 10.87 10.98 12.53 8.447 188.23 10.94 0.110 10.83 10.94 12.57 7.984 188.22 10.89 0.110 10.78 10.89 12.60 7.695 188.21 10.83 0.110 10.72 10.83 12.63 7.511 188.20 10.77 0.109 10.66 10.77 12.67 7.362 188.19 10.70 0.109 10.59 10.70 12.70 7.213 188.19 10.64 0.109 10.53 10.64 12.73 7.062 188.18 10.57 0.109 10.46 10.57 12.77 6.912 188.17 10.51 0.108 10.40 10.50 12.80 6.761 188.16 10.44 0.108 10.33 10.43 12.83 6.610 188.15 10.36 0.108 10.26 10.36 12.87 6.458 188.14 10.29 0.107 10.18 10.29 12.90 6.306 188.12 10.22 0.107 10.11 10.22 12.93 6.153 188.11 10.14 0.107 10.04 10.14 12.97 6.000 188.10 10.07 0.106 9.959 10.06 13.00 5.846 188.09 9.989 0.106 9.881 9.987 13.03 5.700 188.08 9.910 0.106 9.802 9.908 13.07 5.575 188.07 9.829 0.105 9.722 9.828 13.10 5.474 188.06 9.749 0.105 9.642 9.747 13.13 5.388 188.04 9.667 0.104 9.561 9.666 13.17 5.306 188.03 9.586 0.104 9.481 9.585 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.20 5.224 188.02 9.505 0.104 9.400 9.504 13.23 5.141 188.01 9.424 0.103 9.319 9.422 13.27 5.059 188.00 9.342 0.103 9.237 9.340 13.30 4.976 187.98 9.256 0.102 9.152 9.254 13.33 4.894 187.97 9.170 0.102 9.067 9.169 13.37 4.811 187.96 9.084 0.101 8.981 9.083 13.40 4.728 187.95 8.998 0.101 8.896 8.997 13.43 4.645 187.93 8.912 0.100 8.811 8.912 13.47 4.562 187.92 8.827 0.100 8.726 8.826 13.50 4.478 187.91 8.741 0.100 8.641 8.741 13.53 4.397 187.90 8.673 0.099 8.573 8.673 13.57 4.323 187.88 8.636 0.100 8.535 8.635 13.60 4.257 187.87 8.599 0.100 8.497 8.598 13.63 4.196 187.86 8.562 0.101 8.459 8.560 13.67 4.137 187.84 8.525 0.101 8.421 8.521 13.70 4.077 187.83 8.487 0.101 8.382 8.483 13.73 4.017 187.82 8.449 0.102 8.343 8.445 13.77 3.958 187.81 8.411 0.102 8.304 8.406 13.80 3.898 187.79 8.366 0.102 8.256 8.359 13.83 3.838 187.78 8.316 0.102 8.204 8.306 13.87 3.778 187.77 8.266 0.103 8.151 8.253 13.90 3.718 187.75 8.216 0.103 8.098 8.201 13.93 3.658 187.74 8.165 0.103 8.045 8.148 13.97 3.597 187.73 8.115 0.103 7.991 8.095 14.00 3.537 187.71 8.065 0.103 7.938 8.042 14.03 3.481 187.70 8.013 0.104 7.885 7.988 14.07 3.436 187.69 7.953 0.104 7.827 7.931 14.10 3.405 187.67 7.892 0.104 7.770 7.874 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.13 3.382 187.66 7.832 0.104 7.713 7.817 14.17 3.362 187.65 7.773 0.104 7.657 7.761 14.20 3.341 187.63 7.714 0.104 7.601 7.705 14.23 3.321 187.62 7.655 0.104 7.545 7.650 14.27 3.300 187.61 7.597 0.104 7.490 7.595 14.30 3.280 187.60 7.539 0.104 7.434 7.538 14.33 3.259 187.58 7.480 0.104 7.376 7.480 14.37 3.238 187.57 7.422 0.104 7.318 7.422 14.40 3.218 187.56 7.364 0.104 7.260 7.364 14.43 3.197 187.55 7.307 0.104 7.203 7.307 14.47 3.176 187.53 7.251 0.104 7.146 7.251 14.50 3.156 187.52 7.195 0.104 7.090 7.194 14.53 3.135 187.51 7.139 0.104 7.035 7.139 14.57 3.114 187.50 7.084 0.104 6.979 7.084 14.60 3.094 187.49 7.028 0.104 6.924 7.028 14.63 3.073 187.47 6.973 0.104 6.868 6.973 14.67 3.052 187.46 6.918 0.104 6.814 6.918 14.70 3.031 187.45 6.864 0.104 6.759 6.863 14.73 3.010 187.44 6.810 0.104 6.706 6.810 14.77 2.989 187.43 6.756 0.104 6.652 6.756 14.80 2.968 187.42 6.703 0.104 6.599 6.703 14.83 2.948 187.41 6.651 0.104 6.547 6.651 14.87 2.927 187.40 6.600 0.104 6.496 6.599 14.90 2.906 187.39 6.551 0.104 6.446 6.550 14.93 2.885 187.38 6.502 0.104 6.397 6.501 14.97 2.864 187.36 6.454 0.104 6.348 6.452 15.00 2.843 187.35 6.406 0.104 6.300 6.404 15.03 2.822 187.34 6.358 0.104 6.252 6.356 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.07 2.801 187.33 6.311 0.104 6.204 6.308 15.10 2.780 187.32 6.264 0.104 6.157 6.261 15.13 2.758 187.31 6.218 0.104 6.110 6.214 15.17 2.737 187.30 6.172 0.104 6.063 6.167 15.20 2.716 187.29 6.123 0.104 6.015 6.119 15.23 2.695 187.28 6.074 0.104 5.967 6.071 15.27 2.674 187.27 6.026 0.104 5.919 6.023 15.30 2.653 187.26 5.978 0.103 5.872 5.975 15.33 2.631 187.25 5.930 0.103 5.825 5.928 15.37 2.610 187.24 5.883 0.103 5.778 5.881 15.40 2.589 187.23 5.836 0.103 5.731 5.835 15.43 2.568 187.22 5.790 0.103 5.685 5.789 15.47 2.547 187.21 5.744 0.103 5.640 5.743 15.50 2.525 187.20 5.698 0.103 5.594 5.697 15.53 2.504 187.20 5.655 0.103 5.550 5.653 15.57 2.483 187.19 5.615 0.103 5.506 5.608 15.60 2.461 187.18 5.576 0.103 5.462 5.565 15.63 2.440 187.17 5.537 0.103 5.419 5.521 15.67 2.419 187.16 5.499 0.103 5.375 5.478 15.70 2.397 187.15 5.460 0.102 5.333 5.435 15.73 2.376 187.14 5.422 0.102 5.290 5.392 15.77 2.354 187.13 5.385 0.102 5.248 5.350 15.80 2.333 187.12 5.347 0.102 5.206 5.308 15.83 2.311 187.11 5.310 0.102 5.164 5.266 15.87 2.290 187.11 5.273 0.102 5.123 5.225 15.90 2.269 187.10 5.236 0.102 5.082 5.184 15.93 2.247 187.09 5.198 0.102 5.041 5.143 15.97 2.225 187.08 5.161 0.102 5.001 5.103 Continues on next page... Peak Flow Period 15 Post Through Pond 16.3Ohr-11 .9Ohr = 4.4 hr -Use 5.0 hrs Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.00 2.204 187.07 5.123 0.102 4.961 5.062 16.03 2.184 187.06 5.087 0.102 4.921 5.022 16.07 2.168 187.05 5.050 0.101 4.881 4.983 16.10 2.157 187.05 5.014 0.101 4.842 4.943 16.13 2.148 187.04 4.978 0.101 4.803 4.904 16.17 2.141 187.03 4.942 0.101 4.765 4.866 16.20 2.134 187.02 4.907 0.101 4.727 4.828 16.23 2.126 187.01 4.873 0.101 4.689 4.790 16.27 2.119 187.01 4.838 0.101 4.652 4.753 16.30 2.111 187.00 4.803 0.101 4.615 4.716 16.33 2.104 186.99 4.758 0.101 4.578 4.679 16.37 2.096 186.98 4.715 0.101 4.542 4.643 16.40 2.089 186.97 4.671 0.101 4.506 4.606 16.43 2.081 186.97 4.628 0.101 4.470 4.571 16.47 2.074 186.96 4.586 0.101 4.435 4.535 16.50 2.066 186.95 4.544 0.101 4.400 4.500 16.53 2.059 186.94 4.503 0.101 4.365 4.466 16.57 2.051 186.93 4.462 0.101 4.331 4.431 16.60 2.044 186.93 4.421 0.101 4.297 4.397 16.63 2.036 186.92 4.381 0.101 4.264 4.364 16.67 2.029 186.91 4.342 0.101 4.230 4.331 16.70 2.021 186.91 4.303 0.100 4.198 4.298 16.73 2.014 186.90 4.266 0.100 4.165 4.266 16.77 2.006 186.89 4.234 0.100 4.132 4.233 16.80 1.999 186.88 4.202 0.100 4.100 4.200 16.83 1.991 186.88 4.171 0.100 4.068 4.168 16.87 1.984 186.87 4.140 0.100 4.037 4.137 16.90 1.976 186.86 4.110 0.100 4.005 4.105 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.93 1.968 186.86 4.079 0.100 3.974 4.074 16.97 1.961 186.85 4.050 0.100 3.944 4.044 17.00 1.953 186.84 4.020 0.100 3.913 4.013 17.03 1.946 186.84 3.991 0.100 3.884 3.983 17.07 1.938 186.83 3.962 0.100 3.854 3.954 17.10 1.931 186.82 3.933 0.100 3.825 3.924 17.13 1.923 186.82 3.905 0.100 3.796 3.895 17.17 1.915 186.81 3.877 0.099 3.767 3.867 17.20 1.908 186.80 3.849 0.099 3.739 3.838 17.23 1.900 186.80 3.822 0.099 3.711 3.810 17.27 1.893 186.79 3.795 0.099 3.684 3.783 17.30 1.885 186.79 3.769 0.099 3.657 3.756 17.33 1.877 186.78 3.742 0.099 3.630 3.729 17.37 1.870 186.77 3.717 0.099 3.603 3.702 17.40 1.862 186.77 3.691 0.099 3.577 3.676 17.43 1.855 186.76 3.665 0.099 3.551 3.650 17.47 1.847 186.76 3.640 0.099 3.526 3.625 17.50 1.839 186.75 3.615 0.099 3.500 3.599 17.53 1.832 186.75 3.591 0.099 3.475 3.574 17.57 1.824 186.74 3.566 0.099 3.450 3.549 17.60 1.816 186.73 3.542 0.099 3.426 3.524 17.63 1.809 186.73 3.518 0.098 3.401 3.500 17.67 1.801 186.72 3.494 0.098 3.377 3.476 17.70 1.794 186.72 3.471 0.098 3.353 3.452 17.73 1.786 186.71 3.448 0.098 3.330 3.428 17.77 1.778 186.71 3.425 0.098 3.306 3.404 17.80 1.771 186.70 3.402 0.098 3.283 3.381 17.83 1.763 186.70 3.380 0.098 3.260 3.358 Continues on next page... 17 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.87 1.755 186.69 3.358 0.098 3.238 3.336 17.90 1.747 186.69 3.336 0.098 3.215 3.313 17.93 1.740 186.68 3.315 0.098 3.193 3.291 17.97 1.732 186.68 3.294 0.098 3.171 3.269 18.00 1.725 186.67 3.273 0.098 3.150 3.247 18.03 1.717 186.67 3.252 0.098 3.128 3.226 18.07 1.709 186.66 3.231 0.098 3.107 3.205 18.10 1.701 186.66 3.211 0.098 3.086 3.183 18.13 1.694 186.65 3.190 0.097 3.065 3.163 18.17 1.686 186.65 3.170 0.097 3.044 3.142 18.20 1.678 186.64 3.151 0.097 3.024 3.121 18.23 1.671 186.64 3.131 0.097 3.004 3.101 18.27 1.663 186.64 3.111 0.097 2.983 3.081 18.30 1.655 186.63 3.092 0.097 2.963 3.061 18.33 1.648 186.63 3.073 0.097 2.944 3.041 18.37 1.640 186.62 3.054 0.097 2.924 3.021 18.40 1.632 186.62 3.035 0.097 2.905 3.002 18.43 1.624 186.61 3.016 0.097 2.885 2.982 18.47 1.617 186.61 2.997 0.097 2.866 2.963 18.50 1.609 186.60 2.979 0.097 2.847 2.944 18.53 1.601 186.60 2.961 0.097 2.828 2.925 18.57 1.593 186.60 2.943 0.097 2.810 2.906 18.60 1.586 186.59 2.926 0.097 2.791 2.888 18.63 1.578 186.59 2.909 0.097 2.772 2.869 18.67 1.570 186.58 2.892 0.097 2.754 2.851 18.70 1.562 186.58 2.875 0.096 2.736 2.832 18.73 1.555 186.58 2.859 0.096 2.718 2.814 18.77 1.547 186.57 2.842 0.096 2.700 2.796 Continues on next page... 18 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.80 1.539 186.57 2.826 0.096 2.682 2.779 18.83 1.531 186.56 2.809 0.096 2.665 2.761 18.87 1.524 186.56 2.793 0.096 2.647 2.743 18.90 1.516 186.56 2.777 0.096 2.630 2.726 18.93 1.508 186.55 2.761 0.096 2.613 2.709 18.97 1.500 186.55 2.745 0.096 2.596 2.692 19.00 1.493 186.54 2.730 0.096 2.579 2.675 19.03 1.485 186.54 2.714 0.096 2.562 2.658 19.07 1.477 186.54 2.699 0.096 2.545 2.641 19.10 1.469 186.53 2.683 0.096 2.529 2.625 19.13 1.461 186.53 2.668 0.096 2.512 2.608 19.17 1.454 186.53 2.653 0.096 2.496 2.592 19.20 1.446 186.52 2.638 0.096 2.480 2.575 19.23 1.438 186.52 2.623 0.096 2.464 2.559 19.27 1.430 186.51 2.609 0.096 2.448 2.543 19.30 1.422 186.51 2.594 0.095 2.432 2.528 19.33 1.415 186.51 2.579 0.095 2.416 2.512 19.37 1.407 186.50 2.565 0.095 2.401 2.496 19.40 1.399 186.50 2.551 0.095 2.385 2.481 19.43 1.391 186.50 2.535 0.095 2.370 2.466 19.47 1.383 186.49 2.519 0.095 2.355 2.451 19.50 1.376 186.49 2.503 0.095 2.341 2.436 19.53 1.368 186.49 2.487 0.095 2.326 2.421 19.57 1.360 186.48 2.472 0.095 2.312 2.407 19.60 1.352 186.48 2.456 0.095 2.297 2.392 19.63 1.344 186.48 2.441 0.095 2.283 2.378 19.67 1.336 186.47 2.425 0.095 2.268 2.364 19.70 1.328 186.47 2.410 0.095 2.254 2.349 Continues on next page... 19 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.73 1.321 186.47 2.395 0.095 2.240 2.335 19.77 1.313 186.46 2.380 0.095 2.226 2.321 19.80 1.305 186.46 2.365 0.095 2.212 2.307 19.83 1.297 186.46 2.350 0.095 2.198 2.293 19.87 1.289 186.45 2.335 0.095 2.185 2.280 19.90 1.282 186.45 2.320 0.095 2.171 2.266 19.93 1.274 186.45 2.306 0.095 2.157 2.252 19.97 1.266 186.44 2.291 0.095 2.144 2.239 20.00 1.258 186.44 2.277 0.095 2.131 2.225 20.03 1.251 186.44 2.262 0.095 2.117 2.212 20.07 1.245 186.44 2.248 0.095 2.104 2.199 20.10 1.242 186.43 2.234 0.095 2.091 2.186 20.13 1.240 186.43 2.220 0.095 2.078 2.173 20.17 1.239 186.43 2.206 0.095 2.065 2.160 20.20 1.237 186.42 2.192 0.095 2.052 2.147 20.23 1.236 186.42 2.179 0.095 2.040 2.135 20.27 1.234 186.42 2.166 0.095 2.027 2.122 20.30 1.233 186.42 2.152 0.095 2.015 2.110 20.33 1.231 186.41 2.139 0.095 2.003 2.098 20.37 1.230 186.41 2.127 0.095 1.991 2.086 20.40 1.229 186.41 2.114 0.095 1.979 2.074 20.43 1.227 186.40 2.101 0.095 1.968 2.062 20.47 1.226 186.40 2.089 0.095 1.956 2.051 20.50 1.224 186.40 2.077 0.095 1.945 2.040 20.53 1.222 186.40 2.066 0.095 1.935 2.029 20.57 1.221 186.39 2.054 0.095 1.925 2.019 20.60 1.220 186.39 2.043 0.094 1.914 2.009 20.63 1.218 186.39 2.032 0.094 1.904 1.999 Continues on next page... 20 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.67 1.217 186.39 2.021 0.094 1.894 1.989 20.70 1.215 186.38 2.010 0.094 1.884 1.979 20.73 1.214 186.38 2.000 0.094 1.874 1.969 20.77 1.212 186.38 1.989 0.094 1.865 1.959 20.80 1.211 186.38 1.979 0.094 1.855 1.949 20.83 1.209 186.37 1.968 0.094 1.846 1.940 20.87 1.208 186.37 1.958 0.094 1.836 1.931 20.90 1.206 186.37 1.948 0.094 1.827 1.921 20.93 1.205 186.37 1.938 0.094 1.818 1.912 20.97 1.203 186.36 1.928 0.094 1.809 1.903 21.00 1.202 186.36 1.918 0.094 1.800 1.894 21.03 1.200 186.36 1.909 0.094 1.791 1.885 21.07 1.199 186.36 1.899 0.094 1.782 1.876 21.10 1.197 186.36 1.890 0.094 1.774 1.867 21.13 1.196 186.35 1.880 0.094 1.765 1.859 21.17 1.194 186.35 1.871 0.094 1.757 1.850 21.20 1.193 186.35 1.862 0.094 1.748 1.842 21.23 1.191 186.35 1.853 0.094 1.740 1.833 21.27 1.190 186.35 1.844 0.094 1.732 1.825 21.30 1.188 186.34 1.835 0.094 1.723 1.817 21.33 1.187 186.34 1.826 0.094 1.715 1.809 21.37 1.185 186.34 1.817 0.094 1.707 1.801 21.40 1.184 186.34 1.809 0.094 1.699 1.793 21.43 1.182 186.34 1.800 0.093 1.692 1.785 21.47 1.181 186.33 1.792 0.093 1.684 1.777 21.50 1.179 186.33 1.783 0.093 1.676 1.770 21.53 1.178 186.33 1.775 0.093 1.669 1.762 21.57 1.176 186.33 1.767 0.093 1.661 1.755 Continues on next page... 21 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.60 1.174 186.33 1.759 0.093 1.654 1.747 21.63 1.173 186.32 1.751 0.093 1.646 1.740 21.67 1.172 186.32 1.743 0.093 1.639 1.732 21.70 1.170 186.32 1.735 0.093 1.632 1.725 21.73 1.169 186.32 1.727 0.093 1.625 1.718 21.77 1.167 186.32 1.720 0.093 1.618 1.711 21.80 1.165 186.32 1.712 0.093 1.611 1.704 21.83 1.164 186.31 1.704 0.093 1.604 1.697 21.87 1.162 186.31 1.697 0.093 1.597 1.690 21.90 1.161 186.31 1.690 0.093 1.590 1.683 21.93 1.160 186.31 1.682 0.093 1.584 1.677 21.97 1.158 186.31 1.675 0.093 1.577 1.670 22.00 1.156 186.31 1.668 0.093 1.570 1.663 22.03 1.155 186.30 1.661 0.093 1.564 1.657 22.07 1.153 186.30 1.654 0.093 1.558 1.650 22.10 1.152 186.30 1.647 0.093 1.551 1.644 22.13 1.150 186.30 1.640 0.093 1.545 1.638 22.17 1.149 186.30 1.635 0.093 1.539 1.632 22.20 1.147 186.30 1.629 0.093 1.534 1.626 22.23 1.146 186.29 1.623 0.093 1.528 1.621 22.27 1.144 186.29 1.617 0.093 1.522 1.615 22.30 1.143 186.29 1.612 0.093 1.517 1.609 22.33 1.141 186.29 1.606 0.093 1.511 1.604 22.37 1.140 186.29 1.601 0.093 1.506 1.598 22.40 1.138 186.29 1.595 0.093 1.500 1.593 22.43 1.137 186.29 1.590 0.093 1.495 1.588 22.47 1.135 186.28 1.584 0.093 1.490 1.582 22.50 1.134 186.28 1.579 0.093 1.484 1.577 Continues on next page... 22 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.53 1.132 186.28 1.574 0.092 1.479 1.572 22.57 1.131 186.28 1.568 0.092 1.474 1.566 22.60 1.129 186.28 1.563 0.092 1.469 1.561 22.63 1.128 186.28 1.558 0.092 1.464 1.556 22.67 1.126 186.28 1.553 0.092 1.459 1.551 22.70 1.124 186.27 1.548 0.092 1.454 1.546 22.73 1.123 186.27 1.543 0.092 1.449 1.541 22.77 1.122 186.27 1.538 0.092 1.444 1.536 22.80 1.120 186.27 1.533 0.092 1.439 1.531 22.83 1.119 186.27 1.528 0.092 1.434 1.526 22.87 1.117 186.27 1.523 0.092 1.429 1.521 22.90 1.115 186.27 1.518 0.092 1.424 1.517 22.93 1.114 186.27 1.514 0.092 1.420 1.512 22.97 1.112 186.26 1.509 0.092 1.415 1.507 23.00 1.111 186.26 1.504 0.092 1.410 1.502 23.03 1.109 186.26 1.499 0.092 1.406 1.498 23.07 1.108 186.26 1.495 0.092 1.401 1.493 23.10 1.106 186.26 1.490 0.092 1.397 1.489 23.13 1.105 186.26 1.486 0.092 1.392 1.484 23.17 1.103 186.26 1.481 0.092 1.388 1.480 23.20 1.102 186.26 1.477 0.092 1.383 1.475 23.23 1.100 186.25 1.472 0.092 1.379 1.471 23.27 1.099 186.25 1.468 0.092 1.374 1.466 23.30 1.097 186.25 1.463 0.092 1.370 1.462 23.33 1.096 186.25 1.459 0.092 1.366 1.458 23.37 1.094 186.25 1.455 0.092 1.361 1.453 23.40 1.093 186.25 1.450 0.092 1.357 1.449 23.43 1.091 186.25 1.446 0.092 1.353 1.445 Continues on next page... 23 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.47 1.089 186.25 1.442 0.092 1.349 1.441 23.50 1.088 186.25 1.438 0.092 1.345 1.436 23.53 1.086 186.24 1.433 0.092 1.341 1.432 23.57 1.085 186.24 1.429 0.092 1.337 1.428 23.60 1.083 186.24 1.425 0.092 1.332 1.424 23.63 1.082 186.24 1.421 0.092 1.328 1.420 23.67 1.080 186.24 1.417 0.092 1.324 1.416 23.70 1.079 186.24 1.413 0.092 1.320 1.412 23.73 1.077 186.24 1.409 0.092 1.317 1.408 23.77 1.076 186.24 1.405 0.092 1.313 1.404 23.80 1.074 186.24 1.401 0.091 1.309 1.400 23.83 1.073 186.23 1.397 0.091 1.305 1.396 23.87 1.071 186.23 1.393 0.091 1.301 1.393 23.90 1.069 186.23 1.390 0.091 1.297 1.389 23.93 1.068 186.23 1.386 0.091 1.294 1.385 23.97 1.066 186.23 1.382 0.091 1.290 1.381 24.00 1.065 186.23 1.378 0.091 1.286 1.377 24.03 0.851 186.23 1.373 0.091 1.281 1.372 24.07 0.425 186.23 1.364 0.091 1.272 1.364 24.10 0.142 186.22 1.352 0.091 1.260 1.351 24.13 0.000 186.22 1.336 0.091 1.245 1.336 24.17 0.000 186.21 1.320 0.091 1.229 1.320 24.20 0.000 186.21 1.305 0.091 1.213 1.304 24.23 0.000 186.21 1.289 0.091 1.198 1.289 24.27 0.000 186.20 1.274 0.091 1.183 1.274 24.30 0.000 186.20 1.260 0.091 1.169 1.259 24.33 0.000 186.19 1.247 0.091 1.155 1.246 24.37 0.000 186.19 1.234 0.091 1.142 1.233 Continues on next page... 24 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.40 0.000 186.19 1.222 0.090 1.129 1.219 24.43 0.000 186.18 1.209 0.090 1.116 1.206 24.47 0.000 186.18 1.197 0.090 1.103 1.193 24.50 0.000 186.17 1.185 0.090 1.090 1.180 24.53 0.000 186.17 1.172 0.090 1.078 1.168 24.57 0.000 186.17 1.160 0.090 1.065 1.155 24.60 0.000 186.16 1.149 0.090 1.053 1.143 24.63 0.000 186.16 1.137 0.090 1.041 1.131 24.67 0.000 186.16 1.125 0.090 1.029 1.119 24.70 0.000 186.15 1.114 0.090 1.017 1.107 24.73 0.000 186.15 1.102 0.090 1.005 1.095 24.77 0.000 186.15 1.091 0.090 0.993 1.083 24.80 0.000 186.14 1.080 0.090 0.982 1.071 24.83 0.000 186.14 1.069 0.089 0.970 1.060 24.87 0.000 186.13 1.058 0.089 0.959 1.048 24.90 0.000 186.13 1.048 0.089 0.948 1.037 24.93 0.000 186.13 1.037 0.089 0.937 1.026 24.97 0.000 186.12 1.026 0.089 0.926 1.015 25.00 0.000 186.12 1.016 0.089 0.915 1.004 25.03 0.000 186.12 1.006 0.089 0.904 0.993 25.07 0.000 186.12 0.996 0.089 0.894 0.983 25.10 0.000 186.11 0.985 0.089 0.883 0.972 25.13 0.000 186.11 0.975 0.089 0.873 0.962 25.17 0.000 186.11 0.966 0.089 0.863 0.951 25.20 0.000 186.10 0.956 0.089 0.853 0.941 25.23 0.000 186.10 0.946 0.089 0.842 0.931 25.27 0.000 186.10 0.937 0.089 0.834 0.922 25.30 0.000 186.09 0.928 0.089 0.825 0.914 Continues on next page... 25 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.33 0.000 186.09 0.919 0.089 0.816 0.905 25.37 0.000 186.09 0.910 0.088 0.808 0.896 25.40 0.000 186.09 0.902 0.088 0.800 0.888 25.43 0.000 186.08 0.893 0.088 0.791 0.880 25.47 0.000 186.08 0.884 0.088 0.783 0.871 25.50 0.000 186.08 0.876 0.088 0.775 0.863 25.53 0.000 186.07 0.868 0.088 0.767 0.855 25.57 0.000 186.07 0.859 0.088 0.759 0.847 25.60 0.000 186.07 0.851 0.088 0.751 0.839 25.63 0.000 186.07 0.843 0.088 0.743 0.831 25.67 0.000 186.06 0.835 0.088 0.735 0.823 25.70 0.000 186.06 0.827 0.088 0.727 0.815 25.73 0.000 186.06 0.819 0.088 0.719 0.807 25.77 0.000 186.06 0.811 0.088 0.712 0.800 25.80 0.000 186.05 0.803 0.088 0.704 0.792 25.83 0.000 186.05 0.795 0.088 0.697 0.785 25.87 0.000 186.05 0.788 0.088 0.690 0.777 25.90 0.000 186.05 0.780 0.088 0.682 0.770 25.93 0.000 186.04 0.773 0.088 0.675 0.763 25.97 0.000 186.04 0.765 0.088 0.668 0.755 26.00 0.000 186.04 0.758 0.088 0.661 0.748 26.03 0.000 186.04 0.750 0.088 0.654 0.741 26.07 0.000 186.03 0.743 0.088 0.647 0.734 26.10 0.000 186.03 0.736 0.087 0.640 0.727 26.13 0.000 186.03 0.729 0.087 0.633 0.720 26.17 0.000 186.03 0.722 0.087 0.626 0.714 26.20 0.000 186.02 0.715 0.087 0.619 0.707 26.23 0.000 186.02 0.708 0.087 0.613 0.700 Continues on next page... 26 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 26.27 0.000 186.02 0.701 0.087 0.606 0.693 26.30 0.000 186.02 0.695 0.087 0.600 0.687 26.33 0.000 186.02 0.688 0.087 0.593 0.680 26.37 0.000 186.01 0.681 0.087 0.587 0.674 26.40 0.000 186.01 0.675 0.087 0.580 0.668 26.43 0.000 186.01 0.668 0.087 0.574 0.661 26.47 0.000 186.01 0.662 0.087 0.568 0.655 26.50 0.000 186.00 0.655 0.087 0.562 0.649 26.53 0.000 186.00 0.649 0.087 0.556 0.643 26.57 0.000 186.00 0.643 0.087 0.550 0.637 26.60 0.000 186.00 0.637 0.087 0.544 0.631 26.63 0.000 186.00 0.631 0.087 0.538 0.625 26.67 0.000 185.99 0.625 0.087 0.533 0.619 26.70 0.000 185.99 0.619 0.087 0.527 0.614 26.73 0.000 185.99 0.613 0.087 0.521 0.608 26.77 0.000 185.99 0.607 0.087 0.516 0.603 26.80 0.000 185.99 0.601 0.087 0.511 0.597 26.83 0.000 185.98 0.596 0.087 0.505 0.592 26.87 0.000 185.98 0.590 0.087 0.500 0.587 26.90 0.000 185.98 0.584 0.087 0.495 0.581 26.93 0.000 185.98 0.579 0.087 0.489 0.576 26.97 0.000 185.98 0.573 0.087 0.484 0.571 27.00 0.000 185.97 0.568 0.086 0.479 0.566 27.03 0.000 185.97 0.563 0.086 0.474 0.561 27.07 0.000 185.97 0.557 0.086 0.469 0.555 27.10 0.000 185.97 0.552 0.086 0.464 0.551 27.13 0.000 185.97 0.548 0.086 0.460 0.546 27.17 0.000 185.97 0.543 0.086 0.455 0.541 Continues on next page... 27 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 27.20 0.000 185.96 0.538 0.086 0.450 0.537 27.23 0.000 185.96 0.534 0.086 0.446 0.532 27.27 0.000 185.96 0.529 0.086 0.441 0.527 27.30 0.000 185.96 0.524 0.086 0.437 0.523 27.33 0.000 185.96 0.520 0.086 0.432 0.518 27.37 0.000 185.95 0.515 0.086 0.428 0.514 27.40 0.000 185.95 0.511 0.086 0.423 0.510 27.43 0.000 185.95 0.507 0.086 0.419 0.505 27.47 0.000 185.95 0.502 0.086 0.415 0.501 27.50 0.000 185.95 0.498 0.086 0.411 0.497 27.53 0.000 185.95 0.494 0.086 0.406 0.492 27.57 0.000 185.94 0.489 0.086 0.402 0.488 27.60 0.000 185.94 0.485 0.086 0.398 0.484 27.63 0.000 185.94 0.481 0.086 0.394 0.480 27.67 0.000 185.94 0.477 0.086 0.390 0.476 27.70 0.000 185.94 0.473 0.086 0.386 0.472 27.73 0.000 185.94 0.470 0.086 0.382 0.468 27.77 0.000 185.93 0.466 0.086 0.379 0.464 27.80 0.000 185.93 0.462 0.086 0.375 0.461 27.83 0.000 185.93 0.459 0.086 0.371 0.457 27.87 0.000 185.93 0.455 0.086 0.368 0.453 27.90 0.000 185.93 0.452 0.086 0.364 0.450 27.93 0.000 185.93 0.448 0.086 0.360 0.446 27.97 0.000 185.93 0.445 0.086 0.357 0.442 28.00 0.000 185.92 0.441 0.086 0.353 0.439 28.03 0.000 185.92 0.438 0.086 0.350 0.435 28.07 0.000 185.92 0.435 0.086 0.346 0.432 28.10 0.000 185.92 0.431 0.086 0.343 0.428 Continues on next page... 28 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 28.13 0.000 185.92 0.428 0.085 0.339 0.425 28.17 0.000 185.92 0.425 0.085 0.336 0.422 28.20 0.000 185.92 0.421 0.085 0.333 0.418 28.23 0.000 185.91 0.418 0.085 0.329 0.415 28.27 0.000 185.91 0.415 0.085 0.326 0.411 28.30 0.000 185.91 0.412 0.085 0.323 0.408 28.33 0.000 185.91 0.409 0.085 0.320 0.405 28.37 0.000 185.91 0.406 0.085 0.317 0.402 28.40 0.000 185.91 0.403 0.085 0.314 0.399 28.43 0.000 185.91 0.400 0.085 0.311 0.396 28.47 0.000 185.90 0.397 0.085 0.308 0.393 28.50 0.000 185.90 0.395 0.085 0.305 0.390 28.53 0.000 185.90 0.392 0.085 0.302 0.387 28.57 0.000 185.90 0.389 0.085 0.299 0.384 28.60 0.000 185.90 0.387 0.085 0.296 0.381 28.63 0.000 185.90 0.384 0.085 0.293 0.378 28.67 0.000 185.90 0.381 0.085 0.290 0.376 28.70 0.000 185.90 0.379 0.085 0.288 0.373 28.73 0.000 185.89 0.376 0.085 0.285 0.370 28.77 0.000 185.89 0.373 0.085 0.282 0.367 28.80 0.000 185.89 0.371 0.085 0.279 0.364 28.83 0.000 185.89 0.368 0.085 0.277 0.362 28.87 0.000 185.89 0.366 0.085 0.274 0.359 28.90 0.000 185.89 0.363 0.085 0.271 0.356 28.93 0.000 185.89 0.361 0.085 0.269 0.354 28.97 0.000 185.89 0.358 0.085 0.266 0.351 29.00 0.000 185.88 0.356 0.085 0.263 0.348 29.03 0.000 185.88 0.354 0.085 0.261 0.346 Continues on next page... 29 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 29.07 0.000 185.88 0.351 0.085 0.258 0.343 29.10 0.000 185.88 0.349 0.085 0.256 0.340 29.13 0.000 185.88 0.347 0.085 0.253 0.338 29.17 0.000 185.88 0.344 0.085 0.251 0.336 29.20 0.000 185.88 0.342 0.085 0.249 0.333 29.23 0.000 185.88 0.340 0.085 0.246 0.331 29.27 0.000 185.88 0.338 0.085 0.244 0.329 29.30 0.000 185.87 0.336 0.085 0.242 0.326 29.33 0.000 185.87 0.334 0.085 0.240 0.324 29.37 0.000 185.87 0.332 0.085 0.237 0.322 29.40 0.000 185.87 0.330 0.084 0.235 0.320 29.43 0.000 185.87 0.328 0.084 0.233 0.318 29.47 0.000 185.87 0.326 0.084 0.231 0.315 29.50 0.000 185.87 0.324 0.084 0.229 0.313 29.53 0.000 185.87 0.322 0.084 0.227 0.311 29.57 0.000 185.87 0.320 0.084 0.224 0.309 29.60 0.000 185.86 0.319 0.084 0.222 0.307 29.63 0.000 185.86 0.317 0.084 0.220 0.305 29.67 0.000 185.86 0.315 0.084 0.218 0.302 29.70 0.000 185.86 0.313 0.084 0.216 0.300 29.73 0.000 185.86 0.311 0.084 0.214 0.298 29.77 0.000 185.86 0.309 0.084 0.212 0.296 29.80 0.000 185.86 0.307 0.084 0.210 0.294 29.83 0.000 185.86 0.306 0.084 0.208 0.292 29.87 0.000 185.86 0.304 0.084 0.206 0.290 29.90 0.000 185.86 0.302 0.084 0.204 0.288 29.93 0.000 185.85 0.300 0.084 0.202 0.286 29.97 0.000 185.85 0.298 0.084 0.200 0.284 Continues on next page... 30 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 30.00 0.000 185.85 0.297 0.084 0.198 0.282 30.03 0.000 185.85 0.295 0.084 0.196 0.280 30.07 0.000 185.85 0.293 0.084 0.194 0.278 30.10 0.000 185.85 0.291 0.084 0.192 0.277 30.13 0.000 185.85 0.289 0.084 0.191 0.275 30.17 0.000 185.85 0.287 0.084 0.189 0.273 30.20 0.000 185.85 0.285 0.084 0.187 0.271 30.23 0.000 185.85 0.283 0.084 0.186 0.270 30.27 0.000 185.84 0.280 0.084 0.184 0.268 30.30 0.000 185.84 0.278 0.084 0.182 0.266 30.33 0.000 185.84 0.276 0.084 0.181 0.265 30.37 0.000 185.84 0.274 0.084 0.179 0.263 30.40 0.000 185.84 0.272 0.084 0.177 0.261 30.43 0.000 185.84 0.270 0.084 0.176 0.260 30.47 0.000 185.84 0.268 0.084 0.174 0.258 30.50 0.000 185.84 0.266 0.084 0.173 0.257 30.53 0.000 185.84 0.264 0.084 0.171 0.255 30.57 0.000 185.84 0.262 0.084 0.169 0.253 30.60 0.000 185.84 0.260 0.084 0.168 0.252 30.63 0.000 185.84 0.258 0.084 0.166 0.250 30.67 0.000 185.83 0.256 0.084 0.165 0.249 30.70 0.000 185.83 0.254 0.084 0.163 0.247 30.73 0.000 185.83 0.252 0.084 0.162 0.246 30.77 0.000 185.83 0.250 0.084 0.160 0.244 30.80 0.000 185.83 0.248 0.084 0.159 0.243 30.83 0.000 185.83 0.246 0.084 0.157 0.241 30.87 0.000 185.83 0.244 0.084 0.156 0.240 30.90 0.000 185.83 0.242 0.084 0.154 0.238 Continues on next page... 31 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 30.93 0.000 185.83 0.241 0.084 0.153 0.237 30.97 0.000 185.83 0.239 0.084 0.151 0.235 31.00 0.000 185.83 0.237 0.084 0.150 0.234 31.03 0.000 185.83 0.235 0.084 0.148 0.232 31.07 0.000 185.82 0.233 0.084 0.147 0.231 31.10 0.000 185.82 0.231 0.084 0.145 0.229 31.13 0.000 185.82 0.230 0.084 0.144 0.228 31.17 0.000 185.82 0.228 0.084 0.143 0.227 31.20 0.000 185.82 0.226 0.084 0.141 0.225 31.23 0.000 185.82 0.224 0.084 0.140 0.224 31.27 0.000 185.82 0.222 0.084 0.138 0.222 31.30 0.000 185.82 0.221 0.084 0.137 0.221 31.33 0.000 185.82 0.220 0.084 0.136 0.220 31.37 0.000 185.82 0.219 0.084 0.135 0.219 31.40 0.000 185.82 0.218 0.084 0.134 0.217 31.43 0.000 185.82 0.217 0.084 0.132 0.216 31.47 0.000 185.82 0.216 0.084 0.131 0.215 31.50 0.000 185.81 0.215 0.084 0.130 0.214 31.53 0.000 185.81 0.214 0.084 0.129 0.213 31.57 0.000 185.81 0.214 0.084 0.128 0.211 31.60 0.000 185.81 0.213 0.084 0.127 0.210 31.63 0.000 185.81 0.212 0.084 0.126 0.209 31.67 0.000 185.81 0.211 0.084 0.124 0.208 31.70 0.000 185.81 0.210 0.084 0.123 0.207 31.73 0.000 185.81 0.209 0.084 0.122 0.206 31.77 0.000 185.81 0.208 0.084 0.121 0.205 31.80 0.000 185.81 0.207 0.084 0.120 0.203 31.83 0.000 185.81 0.206 0.084 0.119 0.202 Continues on next page... 32 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 31.87 0.000 185.81 0.205 0.084 0.118 0.201 31.90 0.000 185.81 0.204 0.084 0.117 0.200 31.93 0.000 185.81 0.203 0.083 0.115 0.199 31.97 0.000 185.81 0.202 0.083 0.114 0.198 32.00 0.000 185.80 0.201 0.083 0.113 0.197 32.03 0.000 185.80 0.201 0.083 0.112 0.196 32.07 0.000 185.80 0.200 0.083 0.111 0.195 32.10 0.000 185.80 0.199 0.083 0.110 0.193 32.13 0.000 185.80 0.198 0.083 0.109 0.192 32.17 0.000 185.80 0.197 0.083 0.108 0.191 32.20 0.000 185.80 0.196 0.083 0.107 0.190 32.23 0.000 185.80 0.195 0.083 0.106 0.189 32.27 0.000 185.80 0.195 0.083 0.105 0.188 32.30 0.000 185.80 0.194 0.083 0.104 0.187 32.33 0.000 185.80 0.193 0.083 0.103 0.186 32.37 0.000 185.80 0.192 0.083 0.102 0.185 32.40 0.000 185.80 0.191 0.083 0.101 0.184 32.43 0.000 185.80 0.190 0.083 0.100 0.183 32.47 0.000 185.80 0.189 0.083 0.099 0.182 32.50 0.000 185.79 0.189 0.083 0.098 0.181 32.53 0.000 185.79 0.188 0.083 0.097 0.180 32.57 0.000 185.79 0.187 0.083 0.096 0.179 32.60 0.000 185.79 0.186 0.083 0.095 0.178 32.63 0.000 185.79 0.185 0.083 0.094 0.177 32.67 0.000 185.79 0.185 0.083 0.093 0.176 32.70 0.000 185.79 0.184 0.083 0.092 0.175 32.73 0.000 185.79 0.183 0.083 0.091 0.174 32.77 0.000 185.79 0.182 0.083 0.090 0.173 Continues on next page... 33 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 32.80 0.000 185.79 0.181 0.083 0.089 0.172 32.83 0.000 185.79 0.180 0.083 0.088 0.171 32.87 0.000 185.79 0.179 0.083 0.088 0.171 32.90 0.000 185.79 0.178 0.083 0.087 0.170 32.93 0.000 185.79 0.177 0.083 0.086 0.169 32.97 0.000 185.79 0.177 0.083 0.085 0.168 33.00 0.000 185.79 0.176 0.083 0.084 0.168 33.03 0.000 185.79 0.175 0.083 0.084 0.167 33.07 0.000 185.78 0.174 0.083 0.083 0.166 33.10 0.000 185.78 0.173 0.083 0.082 0.165 33.13 0.000 185.78 0.172 0.083 0.081 0.164 33.17 0.000 185.78 0.171 0.083 0.081 0.164 33.20 0.000 185.78 0.170 0.083 0.080 0.163 33.23 0.000 185.78 0.169 0.083 0.079 0.162 33.27 0.000 185.78 0.168 0.083 0.078 0.161 33.30 0.000 185.78 0.167 0.083 0.078 0.161 33.33 0.000 185.78 0.166 0.083 0.077 0.160 33.37 0.000 185.78 0.166 0.083 0.076 0.159 33.40 0.000 185.78 0.165 0.083 0.075 0.158 33.43 0.000 185.78 0.164 0.083 0.075 0.158 33.47 0.000 185.78 0.163 0.083 0.074 0.157 33.50 0.000 185.78 0.162 0.083 0.073 0.156 33.53 0.000 185.78 0.161 0.083 0.073 0.156 33.57 0.000 185.78 0.160 0.083 0.072 0.155 33.60 0.000 185.78 0.159 0.083 0.071 0.154 33.63 0.000 185.78 0.159 0.083 0.070 0.153 33.67 0.000 185.78 0.158 0.083 0.070 0.153 33.70 0.000 185.77 0.157 0.083 0.069 0.152 Continues on next page... 34 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 33.73 0.000 185.77 0.156 0.083 0.068 0.151 33.77 0.000 185.77 0.155 0.083 0.068 0.151 33.80 0.000 185.77 0.154 0.083 0.067 0.150 33.83 0.000 185.77 0.153 0.083 0.066 0.149 33.87 0.000 185.77 0.153 0.083 0.066 0.148 33.90 0.000 185.77 0.152 0.083 0.065 0.148 33.93 0.000 185.77 0.151 0.083 0.064 0.147 33.97 0.000 185.77 0.150 0.083 0.063 0.146 34.00 0.000 185.77 0.149 0.083 0.063 0.146 34.03 0.000 185.77 0.149 0.083 0.062 0.145 34.07 0.000 185.77 0.148 0.083 0.061 0.144 34.10 0.000 185.77 0.147 0.083 0.061 0.144 34.13 0.000 185.77 0.146 0.083 0.060 0.143 34.17 0.000 185.77 0.145 0.083 0.059 0.142 34.20 0.000 185.77 0.145 0.083 0.059 0.142 34.23 0.000 185.77 0.144 0.083 0.058 0.141 34.27 0.000 185.77 0.143 0.083 0.058 0.140 34.30 0.000 185.77 0.142 0.083 0.057 0.140 34.33 0.000 185.77 0.141 0.083 0.056 0.139 34.37 0.000 185.76 0.141 0.083 0.056 0.138 34.40 0.000 185.76 0.140 0.083 0.055 0.138 34.43 0.000 185.76 0.139 0.083 0.054 0.137 34.47 0.000 185.76 0.138 0.083 0.054 0.136 34.50 0.000 185.76 0.138 0.083 0.053 0.136 34.53 0.000 185.76 0.137 0.083 0.052 0.135 34.57 0.000 185.76 0.136 0.083 0.052 0.135 34.60 0.000 185.76 0.135 0.083 0.051 0.134 34.63 0.000 185.76 0.135 0.083 0.051 0.133 Continues on next page... 35 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 34.67 0.000 185.76 0.134 0.083 0.050 0.133 34.70 0.000 185.76 0.133 0.083 0.049 0.132 34.73 0.000 185.76 0.132 0.083 0.049 0.132 34.77 0.000 185.76 0.132 0.083 0.048 0.131 34.80 0.000 185.76 0.132 0.083 0.048 0.131 34.83 0.000 185.76 0.131 0.083 0.047 0.130 34.87 0.000 185.76 0.131 0.083 0.047 0.130 34.90 0.000 185.76 0.130 0.083 0.046 0.129 34.93 0.000 185.76 0.130 0.083 0.046 0.129 34.97 0.000 185.76 0.130 0.083 0.046 0.128 35.00 0.000 185.76 0.129 0.083 0.045 0.128 35.03 0.000 185.76 0.129 0.083 0.045 0.127 35.07 0.000 185.76 0.128 0.083 0.044 0.127 35.10 0.000 185.76 0.128 0.083 0.044 0.126 35.13 0.000 185.75 0.128 0.083 0.043 0.126 35.17 0.000 185.75 0.127 0.083 0.043 0.125 35.20 0.000 185.75 0.127 0.083 0.042 0.125 35.23 0.000 185.75 0.127 0.083 0.042 0.124 35.27 0.000 185.75 0.126 0.083 0.041 0.124 35.30 0.000 185.75 0.126 0.083 0.041 0.124 35.33 0.000 185.75 0.125 0.082 0.041 0.123 35.37 0.000 185.75 0.125 0.082 0.040 0.123 35.40 0.000 185.75 0.125 0.082 0.040 0.122 35.43 0.000 185.75 0.124 0.082 0.039 0.122 35.47 0.000 185.75 0.124 0.082 0.039 0.121 35.50 0.000 185.75 0.124 0.082 0.038 0.121 35.53 0.000 185.75 0.123 0.082 0.038 0.120 35.57 0.000 185.75 0.123 0.082 0.038 0.120 Continues on next page... 36 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 35.60 0.000 185.75 0.122 0.082 0.037 0.120 35.63 0.000 185.75 0.122 0.082 0.037 0.119 35.67 0.000 185.75 0.122 0.082 0.036 0.119 35.70 0.000 185.75 0.121 0.082 0.036 0.118 35.73 0.000 185.75 0.121 0.082 0.035 0.118 35.77 0.000 185.75 0.121 0.082 0.035 0.117 35.80 0.000 185.75 0.120 0.082 0.035 0.117 35.83 0.000 185.75 0.120 0.082 0.034 0.116 35.87 0.000 185.75 0.120 0.082 0.034 0.116 35.90 0.000 185.75 0.119 0.082 0.033 0.116 35.93 0.000 185.74 0.119 0.082 0.033 0.115 35.97 0.000 185.74 0.118 0.082 0.033 0.115 36.00 0.000 185.74 0.118 0.082 0.032 0.114 36.03 0.000 185.74 0.118 0.082 0.032 0.114 36.07 0.000 185.74 0.117 0.082 0.031 0.114 36.10 0.000 185.74 0.117 0.082 0.031 0.113 36.13 0.000 185.74 0.117 0.082 0.031 0.113 36.17 0.000 185.74 0.116 0.082 0.030 0.112 36.20 0.000 185.74 0.116 0.082 0.030 0.112 36.23 0.000 185.74 0.116 0.082 0.029 0.111 36.27 0.000 185.74 0.115 0.082 0.029 0.111 36.30 0.000 185.74 0.115 0.082 0.029 0.111 ...End 7/5/23, 1:53 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Forebay Berm Lining SCM 4 Name Forebay Berm Lining SCM 4 Discharge 24.1 Peak Flow Period 5 Channel Slope 0.3333 Channel Bottom Width 114 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Unreinforced Vegetation - Class C - Mix (Sod & Bunch) - Very Good 80- 95 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 24.1 cfs 3.29 ft/s 0.06 ft 0.042 4 lbs/ft2 1.34 lbs/ft2 2.99 STABLE -- Vegetation Underlying Straight 24.1 cfs 3.29 ft/s 0.06 ft 0.042 3.27 lbs/ft2 1.33 lbs/ft2 2.45 STABLE -- Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern DS75 Straight 24.1 cfs 4.04 ft/s 0.05 ft 0.03 1.6 lbs/ft2 1.09 lbs/ft2 1.47 STABLE D Unvegetated Underlying Straight 24.1 cfs 4.04 ft/s 0.05 ft 0.03 1.51 lbs/ft2 1.09 lbs/ft2 1.39 STABLE D Substrate https://ecmds.com/project/151829/spillway-analysis/247824/show 1/1 EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Ducks Landing Project#: Designed by: CP Date: 7/5/2023 Revised by: Date: Checked by: Date: Rip-Rap Apron#15-SCM4 Pipe Diameter d= 24 Pipe Slope s= 1.05 % Manning's number n= 0.013 Flow Q= 11.03 cfs Velocity V= 7.29 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(3 X Do)= 6.0 ft Length(6 X Do)= 12.Oft Width(La+Do)= 14.0 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches 12.0 1 *All units are in feet Dissipator pad designed for full flow of pipe 6.0 14.0 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 7/5/2023 Page 1 of 1 Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=185.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 185.00 31,875 0 0 0.50 185.50 34,375 16,563 16,563 0.70 185.70 34,990 6,937 23,499 1.00 186.00 35,925 10,637 34,136 2.00 187.00 39,060 37,493 71,629 3.00 188.00 42,190 40,625 112,254 4.00 189.00 44,530 43,360 155,614 5.00 190.00 46,925 45,728 201,341 6.00 191.00 49,380 48,153 249,494 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 2.00 0.00 0.00 Crest Len(ft) = 1.00 15.00 Inactive 0.00 Span(in) = 24.00 2.00 0.00 0.00 Crest El.(ft) = 185.70 188.30 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 185.00 185.00 0.00 0.00 Weir Type = Rect Broad Broad --- Length(ft) = 19.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 1.05 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 6.00 191.00 5.00 190.00 4.00 189.00 3.00 188.00 2.00 187.00 1.00 186.00 0.00 185.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 36.00 Total Q Discharge(cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.26 2 730 49,256 BMP Pre-Developed 2 SCS Runoff 46.22 2 718 92,695 BMP Post-Developed 3 Reservoir 2.155 2 802 82,665 2 186.43 50,088 Post Through Pond 5 SCS Runoff 0.667 2 152 6,068 BMP Post-Developed 6 Reservoir 0.032 2 366 4,475 5 185.18 5,868 1.0-in Storm Thru Pond Wet Pond #4-(Ducks Landing).gpw Return Period: 1 Year Wednesday, 01 /25/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 12.26 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 49,256 cuft Drainage area = 15.790 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 23.50 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 14.00 - 14.00 12.00 I - 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 I 0.00 - J \- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 46.22 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 92,695 cuft Drainage area = 21.050 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 — 30.00 20.00 — 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 2.155 cfs Storm frequency = 1 yrs Time to peak = 802 min Time interval = 2 min Hyd. volume = 82,665 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 186.43 ft Reservoir name = BMP Pond Max. Storage = 50,088 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 50.00 1 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 50,088 cuft 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.667 cfs Storm frequency = 1 yrs Time to peak = 152 min Time interval = 2 min Hyd. volume = 6,068 cuft Drainage area = 21.050 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5-- 1 Year Q(cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 — 1 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - • 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.032 cfs Storm frequency = 1 yrs Time to peak = 366 min Time interval = 2 min Hyd. volume = 4,475 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 185.18 ft Reservoir name = BMP Pond Max. Storage = 5,868 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 5,868 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 19.04 2 730 73,189 BMP Pre-Developed 2 SCS Runoff 64.00 2 716 129,227 BMP Post-Developed 3 Reservoir 4.175 2 764 119,042 2 186.88 67,053 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 185.00 0.000 1.0-in Storm Thru Pond Wet Pond #4-(Ducks Landing).gpw Return Period: 2 Year Wednesday, 01 /25/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 19.04 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 73,189 cuft Drainage area = 15.790 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 23.50 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 21.00 21.00 18.00 1 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 64.00 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 129,227 cuft Drainage area = 21.050 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 70.00 I 70.00 60.00 I i 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 I' 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 4.175 cfs Storm frequency = 2 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 119,042 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 186.88 ft Reservoir name = BMP Pond Max. Storage = 67,053 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 67,053 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 39.94 2 728 147,815 BMP Pre-Developed 2 SCS Runoff 115.98 2 716 236,935 BMP Post-Developed 3 Reservoir 11.03 2 744 226,496 2 188.24 122,763 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 185.00 0.000 1.0-in Storm Thru Pond Wet Pond #4-(Ducks Landing).gpw Return Period: 10 Year Wednesday, 01 /25/2023 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 39.94 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 147,815 cuft Drainage area = 15.790 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 23.50 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 40.00 -I, 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 115.98 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 236,935 cuft Drainage area = 21.050 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 • 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 11.03 cfs Storm frequency = 10 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 226,496 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 188.24 ft Reservoir name = BMP Pond Max. Storage = 122,763 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 120.00 1 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 122,763 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 77.37 2 728 283,936 BMP Pre-Developed 2 SCS Runoff 201.85 2 716 423,316 BMP Post-Developed 3 Reservoir 30.89 2 726 412,669 2 190.21 211,519 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 185.00 0.000 1.0-in Storm Thru Pond Wet Pond #4-(Ducks Landing).gpw Return Period: 100 Year Wednesday, 01 /25/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 77.37 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 283,936 cuft Drainage area = 15.790 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 23.50 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 • 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 201.85 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 423,316 cuft Drainage area = 21.050 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 II 30.00 30.00 IW 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 30.89 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 412,669 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 190.21 ft Reservoir name = BMP Pond Max. Storage = 211,519 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 211,519 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60N V=1.49R°S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's T: Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 Tc TO Tc(minimum) Tlag Basin (ft) (ftttt) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec rnin Flow Area ft^2 ft ft ft ft/ft s rpn (min) (10 min) 0.6'Tc(hrs) 4 100 238.0 235.2 0.028 3.70 0.24 11.60 1887 235.2 185 0.02660 Unpaved 2.64 11.91 23.51 23.51 0.24 4 1/20/02311:23 PM G:WYDRO4pralscls\TIMECONC_Ducks Lantling.XLS WATER QUALITY/QUANTITY -WET POND SCM 5 ((AIM- S,(.:/-1 -a D Cry-1x, - 1‘. l k<_ FI ,,, 4\\.-•• ,/,,, ,\ /\ ‘'Z.,..--I -fit-i Nom , , p_f-i , \ _,,'S;10,------_..41111 \ 1 ____......... ,.--1. iv., A . ,,,2 V\ (-46k* 4‘ . "'''- `' itt ItaRIMISI .-. 'f--'1%;11 - ../ r; / trit::::: : , C"... ill A ••••''''' -----11 -I._ r-t-----"(1/ 1 INPW.;;?.' ' I,: ' . too° .1/ . At --- It 1 Iii___-.. ...--=--::11\ -------vi (5.....,_,,,:, .,:t Ii' �/ / ��-7 w� ` `-..-./ , f t 11_91..__,__—_-_ ,—,—it , Ne„..,..; ) 2 i V......1.1A 1 ILIPW.. . -1111 -...77:-\ r-(///7---- ;fol.,V N , ,,,,,v.-. ......--.7,il raj Jo" •...,.....__________„:„//r,:. if,i4sg*,‘, . : . iv-----woll. 1 ilk _._____,,\ .:._-_„_:--_,:-..___:::/;:y.i ilsokii - i 1 • • rL ;jr q { - s *MN ii-ost fr---.--/(.r..--- : �L r � t �z. - I 7 , iw -/ z-------. j, i -.___ ', .,_-- ----s--,_%-, . '' ' 1,, 1 Illt_____=,-c.-_-_-.01 -/..--3i;-_:-'- . 1 kievegli fir,- .--_ ------2--,_-_,---_ ,_:- 11 _ _ 1 a \1 1------1 . ). ' I v- m___ -r �1.,. (r7j,- I I, I , 1 I 111 11?11/;,'""7:2L... .._.:_ . ri Trerim•-itiiiiIMINAIII 1 0 )10 Ifils/147-79# \ ‘-, I .--: ] i\ :\ 114 1 J--d4*-ii-4 :A-4-f,,,::-: :.': . ''',.,,', „,.,,,,-& ---.4....-.....--r....=- 7.......- - _,Ali: iv,. ---:------.7.1--- ,...:1 ---L--------:',7-_-----=---7.------ orbi , ,, , ', ••••,' '3---V- (N ' N N 1 \ 1\ ( -. << - :/ , ..., wo....INI r '''' * 4 3 70.* / '. k \4 j< 1 1 il(l' (,L(T—.: ;li f-/(0,....,.. .,,,,, ,H,, Y'I/f i 'ii :, ) .\:771'.Nr._./,7. -1/ /r , : . . . , , ,. .,.„:„..__„,, ,,, ,,,,,, „,._„_,, ,, , ,,,„ .4 ,." ,) ,,,...„ ri , , ,, ,(„,,,„,,,,, t,,„ , ,,__, ,, „,, ,, , .. ,. ) , . , , . . , ,, , , ,%7 , ,,, ,,„ ,, ,.:, ././,, ,, „ , ,.L,„„t„,i„,.,,,r, ,,_., ,,y,/ /, 1,,,,,, ,_.,„: „ ). , / , , ,\\. \ \\\ \ , ,„ „ , ,,„, , 4 k, ( \\\-, ,z.1_,-,- .7,of r ( \ .( . \I \\.,,` t( 1(:( , s-v --------',/ j /i. / 1‘, . L:-=,..--,-- --/ r./- ,.--) k \li (/- )V\-1-1' -7 -'' lic ‘i 0' (C/►-►CP.►1T O.--\ Pia- i`.I 'YL SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ Ducks Landing 2 Project Area(ac) _ 109.668 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 2.494 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No 1i NUMBER AND TYPE OF SCMs: 11 Infiltration System 3 12 Bioretention Cell _ 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: _ 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �� �EESSIp�;9'yq l '-. -.-- C9- 6.1"--:7;7-," SEAL _ Signature of Designer 051571 73 ii C 0 E P \\\• ` >� �7iii111iiiuQkh° Date DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 • 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft) 4777138 sf 564434 599880 6 Onsite drainage area (sq ft) 4777138 sf 564434 599880 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 125494 sf 128952 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 76000 sf 104000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 49494 sf 24952 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 49494 sf 24952 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 22.2% 21.5% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 66388 cf 77080 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 4 • 4 Type of SCM - Infiltration Basin Wet Pond 5 Total drainage area (sq ft) 4777138 sf 261143 917130 6 Onsite drainage area (sq ft) 4777138 sf 261143 917130 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 38138 sf 232735 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 28000 sf 180000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 10138 sf 52735 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 10138 sf 52735 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 14.6% 25.4% 19 Design storm (inches) _ 1.0 in 1.0 in 20 Design volume of SCM (cu ft) _ 30515 cf 23500 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. DRAINAGE AREAS 1 I Is this a high density project? Yes _ 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 5 • 4 Type of SCM - Wet Pond 5 Total drainage area (sq ft) 4777138 sf 701836 6 Onsite drainage area (sq ft) 4777138 sf 701836 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 665787 sf 140468 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 496000 sf i 108000 sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 169787 sf 32468 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 169787 sf 32468 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 13.94% 20.0% 19 Design storm (inches) _ 1.0 in 20 Design volume of SCM (cu ft) _ 15571 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ There is 108,653 sf (2.494 ac) of surface water area. WET POND 1 Drainage area number 4 5 I 2 Minimum required treatment volume(Cu ft) 21277 cf 13459 cf 'GENERAL MDC FROM 02H.1050 31 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4'Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other No No engineered side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? _ 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes _ Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes _ Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 179.00 204.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 180.00 205.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 184.50 209.50 23 Elevation of the permanent pool(fmsl) 185.00 210.00 24 Elevation of the top of the vegetated shelf(fmsl) 185.50 210.50 25 Elevation of the temporary pool(fmsl) 185.70 210.50 26 Surface area of the main permanent pool(square feet) 24370 22680 27 Volume of the main permanent pool(cubic feet) 101055 cf 93535 cf 28 Average depth of the main pool(feet) 4.47 ft 4.45 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 630.0 ft 602.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft 32 Volume of the forebay(cubic feet) 18360 cf 17178 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 12 in 12 in 35 Design volume of SCM(cu ft) 23500 cf 15571 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 2.00 in 2.00 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.81 2.66 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth of forebay at entrance(inches) 48 in 48 in 44 Depth of forebay at exit(inches) 42 in 42 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 47 Slope of vegetated shelf(H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the Yes Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda_ 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 2:38 PM 7/5/2023 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Wet Pond #5) Drainage Area(acres): 14.27 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 3.02 21% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 11.25 79% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 1.95 55 7.5 Open Space-Good Condition C 9.50 74 49.3 Wooded -Good Stand A/D 1.07 50 3.8 Wooded -Good Stand C 1.75 70 8.6 Impervious Area 0.00 98 0.0 Cumulative Curve#= 69.1 Bowman North Carolina, Ltd. Ducks Landing, Harnett County, NC Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond #5) Drainage Area(acres): 16.11 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 3.16 20% C/D Ro Roanoke loam 0.00 0% C BnB/BnD Blaney loamy sand 12.95 80% C GaB/GaD Gilead loamy Sand 0.00 0% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A/D 2.27 55 7.8 Open Space-Good Condition C 10.61 74 48.7 Wooded -Good Stand A/D 0.00 50 0.0 Wooded -Good Stand C 0.00 70 0.0 Impervious Area 3.22 98 19.6 Cumulative Curve#= 76.1 Proposed Wet Pond Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 16.11 Acres 701,836 sf Impervious Area (IA) = 3.22 Acres 140,468 sf Percent Impervious (I) = 20.01 % 20.01 % Required Surface Area Permament Pool Depth: 4.45 ft SA/DA= 0.654 Min Req'd Surface Area = 4,592 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.230 in/in Storage Volume Required = 13,459 cf(above Permanent Pool) Elevations Top of Pond Elevation = 215.00 ft Temporary Pool Elevation = 210.50 ft Permanent Pool Elevation = 210.00 ft Shelf Begining Elevation = 209.50 ft Forebay Weir= 209.00 ft Shelf Ending Elevation = 210.50 ft Bottom Elevation = 205.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 22,680 sf Volume of Temporary Storage = 15,571 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 22680 > 4592 )sf Volume of Storage for Design Storm = 15,571 Yes ( 15571 > 13459 )cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Checked by: Date: Water Quality Orifice *Incremental Determination of Water Quality Volume Drawdown Time Zone 3 Q3=0.0437 CD"D2(Z-D/24-Ei)^(1/2) Zone 2 0 Q2=0.372 CD*D"(Z-Ei)^(312) t Zone 1 Q1 =0 1 Orifice Diameter(D)= 2 in Cd= 0.6 Ei= 210 Orifice Inv. Zone 1 Range= 0.00 to 210 Zone 2 Range= 210 to 210.1 Zone 3 Range= 210.1 to Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 210.00 29,905 0 0.00 2.00 0.000 210.50 32,380 15,571 0.50 3.00 0.068 3,833 Total -- 15,571 -- -- -- 3,833 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 15,571 cf Total Time= 3,833 min Total Time= 2.66 days 1/25/2023 Prop Wet Pond#5-new design(Ducks Landing).xls 1 of 1 Project: Pond #1 Date: 1/25/2023 - Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 210 22,680 10,895 93,535 A2 (Perm_Pool) 209.5 20,900 10,305 82,640 Al (Bottom_Shelf) 209 20,320 19,750 72,335 208 19,180 18,623 52,585 207 18,065 17,520 33,963 206 16,975 16,443 16,443 A3 (Bottom_Pond) 205 15,910 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes _ Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 210 6,980 6,980 3,384 17,178 209.5 6,555 6,555 3,171 13,794 209 6,130 6,130 5,718 10,623 208 5,305 5,305 4,905 4,905 207 4,505 4,505 0 0 Forebay Volume 18.4% *Between 15% &20% Average Depth (Option 1) 3.95 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 93,535 permeter of shelf 602 width of shelf 3 Al (Bottom_Shelf): 20,900 Average Depth = 4.45 Proposed Wet Pond Project Information Project Name: Ducks Landing Project#: Designed by: CB Date: 12/21/2022 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 16.11 Acres Impervious Area (IA) = 3.22 Acres Percent Impervious (I) = 20.01 % (Drainage Area) Orifice Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 2.66 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 lbs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 117.5 cf (4'x4' riser x 5' = 80sf, 5'x5'footing x 1.5' =37.5cf) C \ / _' / ) ( I , / " / / / / I l\ f I R R PAR DISSIPATER j I / ) / I ( // ( / / / // / / / / / i _ \ PAD #16 ( 1 / / / J ( ( ( / // / / WIDTH=14' - _ - - �M; '�� LITORAL SHELF LENGTH=12' / � t� �� �� �` AREA=3,625 SF T - A ���/ ate-� �� ��. I REFER TO DETAIL CKNESS 22 / �'�,.� �� �. � _ � _ � /' /%��-� � I FOR PLANTINGS R RAP CLASS B ���•_ r� )))` FES ���� i ELEV=209.5 ® / ���— � ' ' / �r �� 208 �` SOD AREAS ABOVE �\ / 24 OUTLET PIPE fit � � � � � \ 1 I � NORMAL POOL \ / REFER TO GRADING • I \ \ I I DS75 MAT 1 J / EELVATION PLAN \i J ` I \ UNDERLAYMENT AT ) / 1 r' I / `�( ''�� \ FOREBAY BERM I I I I / / \\ , OUTLET CONTROL DS75 MAT ) / @ 1 N fr- / 1 r ' STRUCTURE REFER I I f / UNDERLAYMENT AT J CLASS 5 1J / / TO DETAILS ON I * FOREBAY BERM RIP-RAP AT 1 I 2, / , THIS SHEET �1 1 '� / I / FOREBAY WEIR /( 1 ( i P 1 / \ I/f! / ' / I 3 ' MAN POND TOP OF � 1 I / I / (LID/ J � �EMBANKMENT \ 1 / / l I / / 1 l I I AREA / ELEV=215.0 \--,\ .� _ .� ri-7.k_.l'.',_.-..E—v—.a,_., .-...—.7.--..---"7-"."i.m— r,�_——:j a—s vs,,,i 1 1 v ji ,/ \ — 211.6 ®GTE — Q - . \\\I 7 \ 1 ) 1 I ) // CNN-‘ V \ \‘ ‘,1 / l I / ( j / i) 1 I / / / / / =OREBAY AREA ;\ \ ��`� \�` ,►..'o ( / l L.________- t INLET PIPE WITH \\ ,,,�,i!� / \( / CT ii � RIP-RAP APRON / ♦ \ Q �I ��. �•� `\I ) I (DESIGNED BY OTHERS) \ ) :�� . 1 / -� ► I . •` / / STORMWATER s — — -� RIP RAP DISSIPATER >--"Elialterk I �`� �`�(' MANAGEMENT ` \� / II 1 I PAD #12 ` \ ` \ EASE VENT \ \,( ' \I oto I / WIDTH=16 l I . l `� - m / � / oo0go LENGTH=19' away / ( i/?�`.� � r � � / \I I °�� THICKNESS=24" -� i \\ x\\ , i� �� / ,�• �� 7) RAP CLASS=1 /I - I_de► GRAPHIC SCALH 50 0 25 50 100 20 PLAN VIEW N ( IN FEET ) 1 inch = 50 ft. ,/ STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREVENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 210.0 29905 0 0 0.5 210.5 32380 15571 15571 (WQV) 1 .0 211 .0 33950 16583 32154 2.0 212.0 37120 35535 67689 3.0 213.0 40080 38600 106289 4.0 214.0 42380 41230 147519 5.0 215.0 44735 43558 191076 STORM WATER MANAGEMENT DESIGN WET DETENTION POND #5 : IVR - ASI\: CAPE FEAR ECEIVI\G STHAN : UPPED LITTLE IVR STHAv1 I \SEX: 18-20-(8) STEAM CLASS: C HUC: 0303000402 PROJECT C00M1\AYES: 35.316452°\, - 78.919260°W PO\D DESIG\ SUvNAY DAI\AGE AREA TO PO\D: 16.11 ACES SITE INPHVIOUS AREA TO PO\D: 3. 22 ACES OFF-SITE DESIG\ INPRVIOUS AREA TO PO\D: 0.0 ACES TOTAL DESIG\ IvPRVIOUS AREA TO PO\D: 3. 22 ACES PEE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO PO\D TO PO\ D THROUGH PO\D DAI\AGE AREA: 14.27 AC 16.11 AC CURVE \UvE;H: 69.1 76.1 TINE OF CO\CE\ RATIO\: 20.0 NI\ 5.0 NI\ 1 .0" STORN EVE\T: 0.212 CFS 0.008 CFS 1 -YEA STOv EVE\ T: 10.10 CFS 28.89 CFS 1 .149 CFS 2-YEA STON EVE\T: 16.68 CFS 41 .57 CFS 2.357 CFS 10-YEAS STORN EVE\T: 37.56 CFS 79.31 CFS 7.448 CFS �100- YEAS STORN EVE\T: 76.36 CFS 144.34 CFS 25.48 CFS 4' MIN EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET 24" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED TOP OF EMBANKMENT ELEVATION=215.00 PER DIRECTION OF GEOTECHNICAL / // / / \\ NOTE: 1.0" STORM ELEVATION IS 210.07 AND INTERMEDIATE l l l 6" TOPSOIL ABOVE WEIR IS ELEVATION 210.5. THERE IS ADDITIONAL STORAGE ENGINEER 2 6" CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=213.88 DESIGNED FROM THE 1.0" STORM ELEVATION TO THE ON LITTORAL SHELF — FOR INCREMENTAL INTERMEDIATE WEIR ELEVATION. 1 6" CLAY SOIL 3 WEIR LINER ON INSIDE FACE OF 10 YEAR STORM ELEVATION=212.32 EMBANKMENT 1 6 `` 4'x4' PRECAST 6FT LITTORAL 1 `/ CONCRETE RISER Lci SHELF (INSTALL STEPS 2 YEAR STORM ELEVATION=211.29 AS NECESSARY) 1 YEAR STORM ELEVATION=210.97 NV 210.0 1.0—INCH STORM ELEVATION=210.07 EXISTING GRADE=215.O± NORMAL POND ELEVATION=210.00 _I PVC ELBOW ::: 1 SEE DETAIL 2 ELEV=208.0 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 1 0 � u o I 1 THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. 4' NIN. ASTM C-923 SEAL " KEY BETWEEN BARREL& RISER. CUTOFF TRENCH RISER BASE TO BE FILLED BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=205.0 WITH CONC. TO INVERT OF ) APPROXIMATE SIZE BARREL CONCRETE SHALL BE EXCAVATE AND BACKFILL 8"X8"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO PLACED IN RISER AFTER (BOTTOM OF SEDIMENT STORAGE—204.0 BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND ANGLES ARE SECURED )— WITH COMPACTED TO BASE AND RISER. STRUCTURAL FILL AS 2—A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINCR RICH PAINTE AFTER L 6" CLAY SOIL DIRECTED BY GEOTECHNICAL CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING ENGINEER 5'x5'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE MAIN POOL 21' 24" HDPE 238% BETWEEN EDGE OF CONC. AND STEEL REINFORCING. 4.7 PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM FOREBAY TOP ELEV= 212.0 WIDTH AT TOP = 2.0 FT 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 NOTE: PUMPS SHALL BE USED TO DRAIN ON LITTORAL SHELF /////l THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE THIS SHEET FOR DEWATERING REQUIREMENTS. 1 ,3 TOP FOREBAY BOTTOM 6FT LITTORAL ELEV=207.0 A 6:1 SHELF NORMAL POND ELEVATION I' 2 ������ _Ai BOTTOM LITTORAL SHELF ELEV. 1 CLASS B RIP-RAP OVER FILTER FABRIC MIN. 4' GRASS FOREBAY �;` WEIR AT ELEV=209.0 1 DS75 MAT UNDERLAYMENT AT FOREBAY BERM 6" TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE 1 AREAS ABOVE THE DEEPER THAN FOREBAY EXIT NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT ELEV=206.5 STORAGE/ENTRANCE PROFILE OF WET POND DETENTION SYSTEM ELEV=206.0 SCALE: N.T.S. FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT TOP OF STRUCTURE NOT SHOWN FOR CLARITY TOP OF (REMOVABLE TRASH RACK) E/ R \ 2/24 I N7-FRME0IT� 4, ki/4711' , 111 270.5 1 l`0 FT OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T.S. RISER STRUCTURE 4" PVC SCREW CAP FOR CLEANING ACCESS A 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE PERM. POND ELEV.=210.0 A 12" MIN. 2" DIA. HOLE DRILLED /I INTO BOTTOM CAP PVC DRAIN OUTLET SCALE: N.T.S. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,07/5/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 7.449 cfs Storm frequency = 10 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 155,010 cuft Inflow hyd. No. = 2 - BMP Post-Develodservoir name = BMP Pond Max. Elevation = 212.32 ft Max. Storage = 79,952 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.70 17.34 210.53 0.092 0.068 0.021 0.089 11.73 21.33 210.60 0.180 0.069 0.103 0.172 11.77 25.81 210.68 0.339 0.071 0.262 0.333 11.80 32.07 210.79 0.605 0.073 0.510 0.583 11.83 41.41 210.92 0.989 0.076 0.894 0.970 11.87 53.53 211.08 1.558 0.080 1.462 1.541 11.90 67.85 211.28 2.303 0.085 2.218 2.303 11.93 79.31 << 211.51 3.345 0.091 3.228 3.319 11.97 78.56 211.77 4.551 0.098 4.410 4.508 12.00 62.74 211.99 5.697 0.103 5.532 5.635 12.03 39.95 212.13 6.424 0.107 6.296 6.403 12.07 22.20 212.21 6.883 0.108 6.712 6.820 12.10 13.87 212.24 7.056 0.109 6.907 7.016 12.13 11.44 212.26 7.143 0.109 7.006 7.115 12.17 10.99 212.27 7.206 0.110 7.077 7.187 12.20 10.55 212.28 7.261 0.110 7.140 7.250 12.23 10.11 212.29 7.309 0.110 7.193 7.303 12.27 9.661 212.30 7.349 0.110 7.238 0.000 7.349 12.30 9.209 212.31 7.389 0.111 7.276 0.000 7.386 12.33 8.755 212.31 7.419 0.111 7.304 0.000 7.415 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.37 8.297 212.32 7.440 0.111 7.324 0.000 7.435 12.40 7.835 212.32 7.452 0.111 7.336 0.000 7.446 12.43 7.370 212.32 << 7.455 0.111 7.338 0.000 7.449 12.47 6.899 212.32 7.449 0.111 7.333 0.000 7.444 12.50 6.428 212.31 7.434 0.111 7.319 0.000 7.430 12.53 5.993 212.31 7.411 0.111 7.297 0.000 7.408 12.57 5.666 212.31 7.381 0.111 7.269 0.000 7.379 12.60 5.463 212.30 7.347 0.110 7.236 0.000 7.346 12.63 5.334 212.29 7.317 0.110 7.202 7.312 12.67 5.231 212.29 7.285 0.110 7.167 7.277 12.70 5.126 212.28 7.253 0.110 7.130 7.240 12.73 5.021 212.27 7.220 0.110 7.092 7.202 12.77 4.916 212.27 7.185 0.110 7.053 7.163 12.80 4.810 212.26 7.150 0.109 7.013 7.123 12.83 4.704 212.25 7.113 0.109 6.972 7.081 12.87 4.597 212.25 7.076 0.109 6.930 7.039 12.90 4.490 212.24 7.037 0.109 6.886 6.995 12.93 4.382 212.23 6.998 0.109 6.842 6.950 12.97 4.274 212.22 6.957 0.109 6.796 6.904 13.00 4.166 212.21 6.916 0.108 6.749 6.857 13.03 4.062 212.21 6.874 0.108 6.701 6.809 13.07 3.975 212.20 6.827 0.108 6.653 6.761 13.10 3.904 212.19 6.774 0.108 6.606 6.714 13.13 3.843 212.18 6.720 0.108 6.558 6.666 13.17 3.785 212.17 6.666 0.107 6.510 6.618 13.20 3.728 212.16 6.612 0.107 6.462 6.569 13.23 3.670 212.15 6.557 0.107 6.414 6.521 Continues on next page... 12 Peak Flow Period Post Through Pond 13.83hr-12.0hr = 1 .83 hr Hydrograph Discharge Table -Use 2.0 hrs Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.27 3.611 212.14 6.503 0.107 6.366 6.473 13.30 3.553 212.14 6.448 0.107 6.317 6.424 13.33 3.495 212.13 6.393 0.106 6.268 6.375 13.37 3.436 212.12 6.338 0.106 6.220 6.326 13.40 3.378 212.11 6.283 0.106 6.171 6.277 13.43 3.319 212.10 6.228 0.106 6.122 6.227 13.47 3.260 212.09 6.185 0.106 6.073 6.178 13.50 3.201 212.08 6.142 0.105 6.023 6.129 13.53 3.144 212.07 6.099 0.105 5.974 6.079 13.57 3.091 212.06 6.056 0.105 5.925 6.030 13.60 3.045 212.05 6.012 0.105 5.875 5.980 13.63 3.002 212.04 5.969 0.105 5.826 5.931 13.67 2.960 212.04 5.926 0.104 5.777 5.881 13.70 2.917 212.03 5.883 0.104 5.728 5.832 13.73 2.875 212.02 5.840 0.104 5.679 5.783 13.77 2.833 212.01 5.797 0.104 5.630 5.734 13.80 2.790 212.00 5.754 0.103 5.581 5.685 13.83 2.748 211.99 5.697 0.103 5.531 5.634 13.87 2.705 211.98 5.640 0.103 5.481 5.584 13.90 2.663 211.97 5.583 0.103 5.431 5.534 13.93 2.620 211.96 5.526 0.102 5.381 5.484 13.97 2.577 211.95 5.469 0.102 5.332 5.434 14.00 2.534 211.94 5.413 0.102 5.282 5.384 14.03 2.494 211.93 5.357 0.102 5.233 5.335 14.07 2.463 211.92 5.301 0.102 5.184 5.285 14.10 2.441 211.91 5.245 0.101 5.135 5.236 14.13 2.424 211.90 5.190 0.101 5.087 5.188 14.17 2.410 211.89 5.144 0.101 5.039 5.140 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.20 2.396 211.88 5.103 0.101 4.993 5.094 14.23 2.381 211.88 5.063 0.100 4.947 5.047 14.27 2.367 211.87 5.023 0.100 4.901 5.002 14.30 2.352 211.86 4.983 0.100 4.857 4.957 14.33 2.338 211.85 4.944 0.100 4.812 4.912 14.37 2.323 211.84 4.905 0.100 4.768 4.868 14.40 2.309 211.83 4.867 0.099 4.725 4.824 14.43 2.294 211.82 4.829 0.099 4.682 4.781 14.47 2.280 211.82 4.792 0.099 4.640 4.739 14.50 2.265 211.81 4.755 0.099 4.598 4.697 14.53 2.251 211.80 4.717 0.098 4.557 4.655 14.57 2.236 211.79 4.673 0.098 4.518 4.616 14.60 2.221 211.78 4.629 0.098 4.479 4.577 14.63 2.207 211.77 4.586 0.098 4.441 4.539 14.67 2.192 211.77 4.543 0.098 4.404 4.501 14.70 2.177 211.76 4.501 0.097 4.366 4.464 14.73 2.162 211.75 4.459 0.097 4.329 4.427 14.77 2.147 211.74 4.417 0.097 4.293 4.390 14.80 2.133 211.74 4.376 0.097 4.256 4.353 14.83 2.118 211.73 4.335 0.097 4.220 4.317 14.87 2.103 211.72 4.295 0.097 4.185 4.281 14.90 2.088 211.71 4.255 0.096 4.150 4.246 14.93 2.073 211.71 4.215 0.096 4.115 4.211 14.97 2.058 211.70 4.176 0.096 4.080 4.176 15.00 2.044 211.69 4.147 0.096 4.046 4.142 15.03 2.029 211.69 4.119 0.096 4.013 4.108 15.07 2.014 211.68 4.090 0.095 3.980 4.075 15.10 1.999 211.67 4.062 0.095 3.947 4.042 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.13 1.984 211.66 4.034 0.095 3.914 4.009 15.17 1.969 211.66 4.007 0.095 3.882 3.977 15.20 1.954 211.65 3.979 0.095 3.850 3.944 15.23 1.939 211.64 3.952 0.094 3.818 3.912 15.27 1.924 211.64 3.925 0.094 3.786 3.881 15.30 1.909 211.63 3.898 0.094 3.755 3.849 15.33 1.893 211.62 3.872 0.094 3.724 3.818 15.37 1.878 211.62 3.845 0.094 3.693 3.787 15.40 1.863 211.61 3.819 0.094 3.663 3.756 15.43 1.848 211.61 3.793 0.093 3.633 3.726 15.47 1.833 211.60 3.767 0.093 3.603 3.696 15.50 1.818 211.59 3.735 0.093 3.575 3.668 15.53 1.803 211.59 3.704 0.093 3.547 3.640 15.57 1.787 211.58 3.673 0.093 3.520 3.613 15.60 1.772 211.57 3.643 0.093 3.492 3.585 15.63 1.757 211.57 3.612 0.092 3.465 3.558 15.67 1.742 211.56 3.582 0.092 3.438 3.531 15.70 1.726 211.56 3.552 0.092 3.412 3.504 15.73 1.711 211.55 3.522 0.092 3.385 3.477 15.77 1.696 211.54 3.492 0.092 3.359 3.450 15.80 1.681 211.54 3.462 0.092 3.332 3.424 15.83 1.665 211.53 3.433 0.092 3.306 3.398 15.87 1.650 211.53 3.404 0.092 3.280 3.372 15.90 1.635 211.52 3.375 0.091 3.254 3.346 15.93 1.619 211.52 3.346 0.091 3.229 3.320 15.97 1.604 211.51 3.317 0.091 3.203 3.295 16.00 1.588 211.50 3.289 0.091 3.178 3.269 16.03 1.574 211.50 3.261 0.091 3.153 3.244 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.07 1.563 211.49 3.236 0.091 3.129 3.220 16.10 1.555 211.49 3.211 0.091 3.105 3.195 16.13 1.549 211.48 3.186 0.090 3.081 3.171 16.17 1.543 211.48 3.161 0.090 3.057 3.147 16.20 1.538 211.47 3.136 0.090 3.034 3.124 16.23 1.533 211.47 3.112 0.090 3.011 3.101 16.27 1.528 211.46 3.088 0.090 2.988 3.078 16.30 1.522 211.45 3.065 0.090 2.965 3.055 16.33 1.517 211.45 3.041 0.089 2.943 3.032 16.37 1.512 211.44 3.018 0.089 2.921 3.010 16.40 1.507 211.44 2.995 0.089 2.899 2.988 16.43 1.501 211.43 2.973 0.089 2.877 2.967 16.47 1.496 211.43 2.950 0.089 2.856 2.945 16.50 1.491 211.42 2.928 0.089 2.835 2.924 16.53 1.485 211.42 2.906 0.089 2.814 2.903 16.57 1.480 211.42 2.885 0.089 2.793 2.882 16.60 1.475 211.41 2.863 0.088 2.773 2.861 16.63 1.469 211.41 2.842 0.088 2.753 2.841 16.67 1.464 211.40 2.821 0.088 2.733 2.821 16.70 1.459 211.40 2.802 0.088 2.714 2.802 16.73 1.453 211.39 2.783 0.088 2.695 2.783 16.77 1.448 211.39 2.764 0.088 2.676 2.764 16.80 1.443 211.38 2.746 0.088 2.658 2.746 16.83 1.437 211.38 2.727 0.087 2.640 2.727 16.87 1.432 211.37 2.709 0.087 2.622 2.709 16.90 1.427 211.37 2.691 0.087 2.604 2.691 16.93 1.421 211.37 2.674 0.087 2.586 2.673 16.97 1.416 211.36 2.656 0.087 2.569 2.656 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.00 1.410 211.36 2.638 0.087 2.551 2.638 17.03 1.405 211.35 2.621 0.087 2.534 2.621 17.07 1.400 211.35 2.604 0.087 2.517 2.604 17.10 1.394 211.35 2.587 0.087 2.501 2.587 17.13 1.389 211.34 2.570 0.086 2.484 2.570 17.17 1.383 211.34 2.554 0.086 2.467 2.554 17.20 1.378 211.33 2.537 0.086 2.451 2.537 17.23 1.373 211.33 2.521 0.086 2.435 2.521 17.27 1.367 211.33 2.505 0.086 2.419 2.505 17.30 1.362 211.32 2.489 0.086 2.403 2.489 17.33 1.356 211.32 2.473 0.086 2.387 2.473 17.37 1.351 211.31 2.457 0.086 2.372 2.457 17.40 1.346 211.31 2.442 0.086 2.356 2.442 17.43 1.340 211.31 2.426 0.085 2.341 2.426 17.47 1.335 211.30 2.411 0.085 2.326 2.411 17.50 1.329 211.30 2.396 0.085 2.311 2.396 17.53 1.324 211.30 2.382 0.085 2.297 2.382 17.57 1.318 211.29 2.368 0.085 2.283 2.368 17.60 1.313 211.29 2.354 0.085 2.269 2.354 17.63 1.307 211.29 2.340 0.085 2.255 2.340 17.67 1.302 211.28 2.326 0.085 2.241 2.326 17.70 1.297 211.28 2.313 0.085 2.228 2.313 17.73 1.291 211.28 2.299 0.085 2.215 2.299 17.77 1.286 211.27 2.286 0.084 2.201 2.286 17.80 1.280 211.27 2.273 0.084 2.188 2.272 17.83 1.275 211.26 2.259 0.084 2.175 2.259 17.87 1.269 211.26 2.246 0.084 2.162 2.246 17.90 1.264 211.26 2.233 0.084 2.149 2.233 Continues on next page... 17 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.93 1.258 211.26 2.220 0.084 2.136 2.220 17.97 1.253 211.25 2.208 0.084 2.124 2.208 18.00 1.247 211.25 2.195 0.084 2.111 2.195 18.03 1.242 211.25 2.182 0.084 2.098 2.182 18.07 1.236 211.24 2.170 0.084 2.086 2.170 18.10 1.231 211.24 2.158 0.084 2.074 2.157 18.13 1.225 211.24 2.145 0.084 2.061 2.145 18.17 1.220 211.23 2.133 0.083 2.049 2.133 18.20 1.214 211.23 2.121 0.083 2.037 2.121 18.23 1.209 211.23 2.109 0.083 2.025 2.109 18.27 1.203 211.22 2.097 0.083 2.013 2.097 18.30 1.198 211.22 2.085 0.083 2.002 2.085 18.33 1.192 211.22 2.073 0.083 1.990 2.073 18.37 1.187 211.21 2.062 0.083 1.978 2.061 18.40 1.181 211.21 2.050 0.083 1.967 2.050 18.43 1.175 211.21 2.038 0.083 1.955 2.038 18.47 1.170 211.21 2.027 0.083 1.944 2.027 18.50 1.164 211.20 2.016 0.083 1.933 2.015 18.53 1.159 211.20 2.004 0.083 1.921 2.004 18.57 1.153 211.20 1.994 0.083 1.911 1.993 18.60 1.148 211.19 1.984 0.082 1.900 1.982 18.63 1.142 211.19 1.974 0.082 1.889 1.972 18.67 1.137 211.19 1.963 0.082 1.879 1.961 18.70 1.131 211.19 1.953 0.082 1.868 1.951 18.73 1.125 211.18 1.944 0.082 1.858 1.940 18.77 1.120 211.18 1.934 0.082 1.848 1.930 18.80 1.114 211.18 1.924 0.082 1.838 1.920 18.83 1.109 211.18 1.914 0.082 1.827 1.909 Continues on next page... 18 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.87 1.103 211.17 1.904 0.082 1.817 1.899 18.90 1.098 211.17 1.895 0.082 1.807 1.889 18.93 1.092 211.17 1.885 0.082 1.797 1.879 18.97 1.086 211.16 1.876 0.082 1.787 1.869 19.00 1.081 211.16 1.866 0.082 1.777 1.859 19.03 1.075 211.16 1.857 0.082 1.767 1.849 19.07 1.070 211.16 1.847 0.082 1.758 1.839 19.10 1.064 211.15 1.838 0.081 1.748 1.829 19.13 1.058 211.15 1.829 0.081 1.738 1.820 19.17 1.053 211.15 1.819 0.081 1.729 1.810 19.20 1.047 211.15 1.810 0.081 1.719 1.800 19.23 1.042 211.14 1.801 0.081 1.710 1.791 19.27 1.036 211.14 1.792 0.081 1.700 1.781 19.30 1.030 211.14 1.783 0.081 1.691 1.772 19.33 1.025 211.14 1.774 0.081 1.681 1.762 19.37 1.019 211.13 1.765 0.081 1.672 1.753 19.40 1.014 211.13 1.756 0.081 1.663 1.744 19.43 1.008 211.13 1.747 0.081 1.653 1.734 19.47 1.002 211.13 1.739 0.081 1.644 1.725 19.50 0.997 211.12 1.730 0.081 1.635 1.716 19.53 0.991 211.12 1.721 0.081 1.626 1.707 19.57 0.985 211.12 1.712 0.081 1.617 1.697 19.60 0.980 211.12 1.704 0.081 1.608 1.688 19.63 0.974 211.11 1.695 0.080 1.599 1.679 19.67 0.968 211.11 1.687 0.080 1.590 1.670 19.70 0.963 211.11 1.678 0.080 1.581 1.661 19.73 0.957 211.11 1.670 0.080 1.572 1.653 19.77 0.952 211.11 1.661 0.080 1.563 1.644 Continues on next page... 19 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.80 0.946 211.10 1.653 0.080 1.555 1.635 19.83 0.940 211.10 1.644 0.080 1.546 1.626 19.87 0.935 211.10 1.636 0.080 1.537 1.618 19.90 0.929 211.10 1.627 0.080 1.529 1.609 19.93 0.923 211.09 1.618 0.080 1.521 1.601 19.97 0.918 211.09 1.610 0.080 1.512 1.592 20.00 0.912 211.09 1.601 0.080 1.504 1.584 20.03 0.907 211.09 1.593 0.080 1.496 1.575 20.07 0.903 211.08 1.584 0.080 1.487 1.567 20.10 0.901 211.08 1.576 0.080 1.479 1.559 20.13 0.899 211.08 1.567 0.080 1.471 1.551 20.17 0.898 211.08 1.559 0.080 1.463 1.543 20.20 0.897 211.08 1.551 0.080 1.455 1.535 20.23 0.896 211.07 1.543 0.080 1.447 1.527 20.27 0.895 211.07 1.535 0.079 1.439 1.519 20.30 0.894 211.07 1.527 0.079 1.432 1.511 20.33 0.893 211.07 1.519 0.079 1.424 1.503 20.37 0.892 211.07 1.511 0.079 1.417 1.496 20.40 0.891 211.06 1.503 0.079 1.409 1.488 20.43 0.890 211.06 1.496 0.079 1.402 1.481 20.47 0.889 211.06 1.488 0.079 1.394 1.474 20.50 0.888 211.06 1.481 0.079 1.387 1.466 20.53 0.887 211.06 1.473 0.079 1.380 1.459 20.57 0.886 211.05 1.466 0.079 1.373 1.452 20.60 0.885 211.05 1.459 0.079 1.366 1.445 20.63 0.884 211.05 1.452 0.079 1.359 1.438 20.67 0.883 211.05 1.445 0.079 1.352 1.431 20.70 0.881 211.05 1.438 0.079 1.346 1.424 Continues on next page... 20 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.73 0.880 211.04 1.431 0.079 1.339 1.418 20.77 0.879 211.04 1.424 0.079 1.332 1.411 20.80 0.878 211.04 1.417 0.079 1.326 1.404 20.83 0.877 211.04 1.411 0.079 1.319 1.398 20.87 0.876 211.04 1.404 0.079 1.313 1.391 20.90 0.875 211.04 1.397 0.079 1.306 1.385 20.93 0.874 211.03 1.391 0.079 1.300 1.379 20.97 0.873 211.03 1.384 0.079 1.294 1.372 21.00 0.872 211.03 1.378 0.079 1.288 1.366 21.03 0.871 211.03 1.372 0.078 1.282 1.360 21.07 0.870 211.03 1.366 0.078 1.276 1.354 21.10 0.869 211.03 1.359 0.078 1.270 1.348 21.13 0.868 211.02 1.353 0.078 1.264 1.342 21.17 0.867 211.02 1.347 0.078 1.258 1.336 21.20 0.866 211.02 1.341 0.078 1.252 1.330 21.23 0.864 211.02 1.335 0.078 1.246 1.325 21.27 0.863 211.02 1.330 0.078 1.241 1.319 21.30 0.862 211.02 1.324 0.078 1.235 1.313 21.33 0.861 211.01 1.318 0.078 1.229 1.308 21.37 0.860 211.01 1.312 0.078 1.224 1.302 21.40 0.859 211.01 1.307 0.078 1.219 1.297 21.43 0.858 211.01 1.301 0.078 1.213 1.291 21.47 0.857 211.01 1.296 0.078 1.208 1.286 21.50 0.856 211.01 1.290 0.078 1.202 1.280 21.53 0.855 211.01 1.285 0.078 1.197 1.275 21.57 0.854 211.00 1.279 0.078 1.192 1.270 21.60 0.853 211.00 1.274 0.078 1.187 1.265 21.63 0.852 211.00 1.269 0.078 1.182 1.260 Continues on next page... 21 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.67 0.851 211.00 1.264 0.078 1.177 1.255 21.70 0.850 211.00 1.258 0.078 1.172 1.250 21.73 0.849 211.00 1.253 0.078 1.167 1.245 21.77 0.847 211.00 1.248 0.078 1.162 1.240 21.80 0.846 210.99 1.243 0.078 1.157 1.235 21.83 0.845 210.99 1.238 0.078 1.152 1.230 21.87 0.844 210.99 1.233 0.078 1.148 1.225 21.90 0.843 210.99 1.228 0.077 1.143 1.220 21.93 0.842 210.99 1.223 0.077 1.138 1.216 21.97 0.841 210.99 1.218 0.077 1.134 1.211 22.00 0.840 210.99 1.213 0.077 1.129 1.206 22.03 0.839 210.98 1.208 0.077 1.124 1.202 22.07 0.838 210.98 1.203 0.077 1.120 1.197 22.10 0.837 210.98 1.199 0.077 1.115 1.193 22.13 0.836 210.98 1.194 0.077 1.111 1.188 22.17 0.835 210.98 1.189 0.077 1.107 1.184 22.20 0.834 210.98 1.185 0.077 1.102 1.179 22.23 0.832 210.98 1.180 0.077 1.098 1.175 22.27 0.831 210.98 1.175 0.077 1.094 1.171 22.30 0.830 210.97 1.171 0.077 1.090 1.167 22.33 0.829 210.97 1.167 0.077 1.085 1.162 22.37 0.828 210.97 1.162 0.077 1.081 1.158 22.40 0.827 210.97 1.158 0.077 1.077 1.154 22.43 0.826 210.97 1.154 0.077 1.073 1.150 22.47 0.825 210.97 1.149 0.077 1.069 1.146 22.50 0.824 210.97 1.145 0.077 1.065 1.142 22.53 0.823 210.97 1.141 0.077 1.061 1.138 22.57 0.822 210.97 1.137 0.077 1.057 1.134 Continues on next page... 22 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.60 0.821 210.96 1.133 0.077 1.053 1.130 22.63 0.819 210.96 1.129 0.077 1.050 1.126 22.67 0.818 210.96 1.125 0.077 1.046 1.122 22.70 0.817 210.96 1.121 0.077 1.042 1.119 22.73 0.816 210.96 1.117 0.076 1.038 1.115 22.77 0.815 210.96 1.113 0.076 1.035 1.111 22.80 0.814 210.96 1.109 0.076 1.031 1.107 22.83 0.813 210.96 1.105 0.076 1.027 1.104 22.87 0.812 210.96 1.101 0.076 1.024 1.100 22.90 0.811 210.95 1.097 0.076 1.020 1.096 22.93 0.810 210.95 1.094 0.076 1.017 1.093 22.97 0.809 210.95 1.090 0.076 1.013 1.089 23.00 0.808 210.95 1.086 0.076 1.010 1.086 23.03 0.807 210.95 1.082 0.076 1.006 1.082 23.07 0.805 210.95 1.080 0.076 1.003 1.079 23.10 0.804 210.95 1.077 0.076 1.000 1.076 23.13 0.803 210.95 1.074 0.076 0.996 1.073 23.17 0.802 210.95 1.072 0.076 0.993 1.069 23.20 0.801 210.95 1.069 0.076 0.990 1.066 23.23 0.800 210.94 1.066 0.076 0.987 1.063 23.27 0.799 210.94 1.064 0.076 0.984 1.060 23.30 0.798 210.94 1.061 0.076 0.981 1.057 23.33 0.797 210.94 1.059 0.076 0.978 1.054 23.37 0.796 210.94 1.056 0.076 0.975 1.051 23.40 0.794 210.94 1.054 0.076 0.972 1.048 23.43 0.793 210.94 1.051 0.076 0.969 1.045 23.47 0.792 210.94 1.049 0.076 0.966 1.042 23.50 0.791 210.94 1.046 0.076 0.963 1.039 Continues on next page... 23 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.53 0.790 210.94 1.044 0.076 0.960 1.036 23.57 0.789 210.94 1.042 0.076 0.957 1.033 23.60 0.788 210.93 1.039 0.076 0.954 1.030 23.63 0.787 210.93 1.037 0.076 0.951 1.027 23.67 0.786 210.93 1.034 0.076 0.949 1.024 23.70 0.785 210.93 1.032 0.076 0.946 1.022 23.73 0.783 210.93 1.030 0.076 0.943 1.019 23.77 0.782 210.93 1.027 0.076 0.940 1.016 23.80 0.781 210.93 1.025 0.076 0.938 1.013 23.83 0.780 210.93 1.023 0.076 0.935 1.011 23.87 0.779 210.93 1.021 0.076 0.932 1.008 23.90 0.778 210.93 1.018 0.076 0.929 1.005 23.93 0.777 210.93 1.016 0.076 0.927 1.002 23.97 0.776 210.93 1.014 0.076 0.924 1.000 24.00 0.775 210.92 1.012 0.076 0.922 0.997 24.03 0.619 210.92 1.009 0.076 0.918 0.994 24.07 0.310 210.92 1.004 0.076 0.912 0.987 24.10 0.103 210.92 0.996 0.076 0.903 0.978 24.13 0.000 210.92 0.987 0.076 0.892 0.967 24.17 0.000 210.91 0.978 0.075 0.880 0.956 24.20 0.000 210.91 0.968 0.075 0.869 0.945 24.23 0.000 210.90 0.959 0.075 0.858 0.934 24.27 0.000 210.90 0.950 0.075 0.847 0.923 24.30 0.000 210.90 0.940 0.075 0.837 0.912 24.33 0.000 210.89 0.929 0.075 0.827 0.902 24.37 0.000 210.89 0.919 0.075 0.817 0.892 24.40 0.000 210.89 0.908 0.075 0.807 0.882 24.43 0.000 210.89 0.898 0.075 0.797 0.872 Continues on next page... 24 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.47 0.000 210.88 0.888 0.075 0.788 0.863 24.50 0.000 210.88 0.878 0.075 0.778 0.853 24.53 0.000 210.88 0.868 0.075 0.769 0.844 24.57 0.000 210.87 0.858 0.075 0.760 0.834 24.60 0.000 210.87 0.848 0.075 0.750 0.825 24.63 0.000 210.87 0.838 0.075 0.741 0.816 24.67 0.000 210.86 0.829 0.075 0.732 0.807 24.70 0.000 210.86 0.819 0.074 0.723 0.798 24.73 0.000 210.86 0.810 0.074 0.715 0.789 24.77 0.000 210.86 0.801 0.074 0.706 0.780 24.80 0.000 210.85 0.792 0.074 0.697 0.772 24.83 0.000 210.85 0.783 0.074 0.689 0.763 24.87 0.000 210.85 0.775 0.074 0.681 0.755 24.90 0.000 210.84 0.767 0.074 0.673 0.747 24.93 0.000 210.84 0.759 0.074 0.666 0.740 24.97 0.000 210.84 0.752 0.074 0.658 0.732 25.00 0.000 210.84 0.744 0.074 0.651 0.725 25.03 0.000 210.83 0.737 0.074 0.643 0.717 25.07 0.000 210.83 0.729 0.074 0.636 0.710 25.10 0.000 210.83 0.722 0.074 0.629 0.702 25.13 0.000 210.83 0.715 0.074 0.621 0.695 25.17 0.000 210.82 0.708 0.074 0.614 0.688 25.20 0.000 210.82 0.700 0.074 0.607 0.681 25.23 0.000 210.82 0.693 0.074 0.600 0.674 25.27 0.000 210.82 0.687 0.073 0.593 0.667 25.30 0.000 210.81 0.680 0.073 0.586 0.660 25.33 0.000 210.81 0.673 0.073 0.580 0.653 25.37 0.000 210.81 0.666 0.073 0.573 0.646 Continues on next page... 25 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.40 0.000 210.81 0.659 0.073 0.566 0.640 25.43 0.000 210.80 0.653 0.073 0.560 0.633 25.47 0.000 210.80 0.646 0.073 0.553 0.627 25.50 0.000 210.80 0.640 0.073 0.547 0.620 25.53 0.000 210.80 0.634 0.073 0.541 0.614 25.57 0.000 210.80 0.629 0.073 0.535 0.608 25.60 0.000 210.79 0.623 0.073 0.530 0.603 25.63 0.000 210.79 0.618 0.073 0.524 0.597 25.67 0.000 210.79 0.613 0.073 0.518 0.591 25.70 0.000 210.79 0.607 0.073 0.513 0.586 25.73 0.000 210.78 0.602 0.073 0.507 0.580 25.77 0.000 210.78 0.597 0.073 0.502 0.574 25.80 0.000 210.78 0.592 0.073 0.496 0.569 25.83 0.000 210.78 0.587 0.073 0.491 0.564 25.87 0.000 210.78 0.582 0.073 0.486 0.558 25.90 0.000 210.77 0.577 0.072 0.480 0.553 25.93 0.000 210.77 0.572 0.072 0.475 0.548 25.97 0.000 210.77 0.567 0.072 0.470 0.542 26.00 0.000 210.77 0.562 0.072 0.465 0.537 26.03 0.000 210.77 0.557 0.072 0.460 0.532 26.07 0.000 210.76 0.552 0.072 0.455 0.527 26.10 0.000 210.76 0.548 0.072 0.450 0.522 26.13 0.000 210.76 0.543 0.072 0.445 0.517 26.17 0.000 210.76 0.538 0.072 0.440 0.512 26.20 0.000 210.76 0.534 0.072 0.435 0.507 26.23 0.000 210.76 0.529 0.072 0.430 0.502 26.27 0.000 210.75 0.525 0.072 0.426 0.498 26.30 0.000 210.75 0.520 0.072 0.421 0.493 Continues on next page... 26 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 26.33 0.000 210.75 0.516 0.072 0.416 0.488 26.37 0.000 210.75 0.511 0.072 0.412 0.484 26.40 0.000 210.75 0.506 0.072 0.408 0.480 26.43 0.000 210.74 0.501 0.072 0.404 0.476 26.47 0.000 210.74 0.497 0.072 0.400 0.472 26.50 0.000 210.74 0.492 0.072 0.396 0.468 26.53 0.000 210.74 0.487 0.072 0.392 0.464 26.57 0.000 210.74 0.483 0.072 0.388 0.460 26.60 0.000 210.74 0.478 0.072 0.384 0.456 26.63 0.000 210.73 0.474 0.072 0.380 0.452 26.67 0.000 210.73 0.469 0.072 0.376 0.448 26.70 0.000 210.73 0.465 0.072 0.372 0.444 26.73 0.000 210.73 0.460 0.072 0.369 0.440 26.77 0.000 210.73 0.456 0.072 0.365 0.436 26.80 0.000 210.73 0.451 0.072 0.361 0.433 26.83 0.000 210.73 0.447 0.072 0.357 0.429 26.87 0.000 210.72 0.443 0.072 0.354 0.425 26.90 0.000 210.72 0.439 0.072 0.350 0.422 26.93 0.000 210.72 0.434 0.072 0.347 0.418 26.97 0.000 210.72 0.430 0.071 0.343 0.415 27.00 0.000 210.72 0.426 0.071 0.339 0.411 27.03 0.000 210.72 0.422 0.071 0.336 0.407 27.07 0.000 210.71 0.418 0.071 0.332 0.404 27.10 0.000 210.71 0.414 0.071 0.329 0.400 27.13 0.000 210.71 0.410 0.071 0.326 0.397 27.17 0.000 210.71 0.406 0.071 0.322 0.394 27.20 0.000 210.71 0.402 0.071 0.319 0.390 27.23 0.000 210.71 0.398 0.071 0.316 0.387 Continues on next page... 27 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 27.27 0.000 210.71 0.394 0.071 0.312 0.384 27.30 0.000 210.70 0.390 0.071 0.309 0.380 27.33 0.000 210.70 0.387 0.071 0.306 0.377 27.37 0.000 210.70 0.383 0.071 0.302 0.374 27.40 0.000 210.70 0.379 0.071 0.299 0.371 27.43 0.000 210.70 0.376 0.071 0.296 0.368 27.47 0.000 210.70 0.373 0.071 0.294 0.365 27.50 0.000 210.70 0.370 0.071 0.291 0.362 27.53 0.000 210.70 0.367 0.071 0.288 0.359 27.57 0.000 210.69 0.364 0.071 0.285 0.357 27.60 0.000 210.69 0.362 0.071 0.283 0.354 27.63 0.000 210.69 0.359 0.071 0.280 0.351 27.67 0.000 210.69 0.356 0.071 0.277 0.349 27.70 0.000 210.69 0.353 0.071 0.275 0.346 27.73 0.000 210.69 0.350 0.071 0.272 0.343 27.77 0.000 210.69 0.348 0.071 0.270 0.341 27.80 0.000 210.69 0.345 0.071 0.267 0.338 27.83 0.000 210.68 0.342 0.071 0.265 0.336 27.87 0.000 210.68 0.340 0.071 0.262 0.333 27.90 0.000 210.68 0.337 0.071 0.259 0.330 27.93 0.000 210.68 0.334 0.071 0.257 0.328 27.97 0.000 210.68 0.332 0.071 0.255 0.325 28.00 0.000 210.68 0.329 0.071 0.252 0.323 28.03 0.000 210.68 0.327 0.071 0.250 0.321 28.07 0.000 210.68 0.324 0.071 0.247 0.318 28.10 0.000 210.67 0.322 0.071 0.245 0.316 28.13 0.000 210.67 0.319 0.071 0.242 0.313 28.17 0.000 210.67 0.317 0.071 0.240 0.311 Continues on next page... 28 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 28.20 0.000 210.67 0.314 0.071 0.238 0.309 28.23 0.000 210.67 0.312 0.071 0.235 0.306 28.27 0.000 210.67 0.309 0.071 0.233 0.304 28.30 0.000 210.67 0.307 0.071 0.231 0.302 28.33 0.000 210.67 0.304 0.071 0.229 0.299 28.37 0.000 210.67 0.302 0.071 0.226 0.297 28.40 0.000 210.66 0.300 0.071 0.224 0.295 28.43 0.000 210.66 0.297 0.071 0.222 0.293 28.47 0.000 210.66 0.295 0.071 0.220 0.290 28.50 0.000 210.66 0.293 0.071 0.217 0.288 28.53 0.000 210.66 0.290 0.071 0.215 0.286 28.57 0.000 210.66 0.288 0.071 0.213 0.284 28.60 0.000 210.66 0.286 0.071 0.211 0.282 28.63 0.000 210.66 0.284 0.071 0.209 0.279 28.67 0.000 210.66 0.281 0.071 0.207 0.277 28.70 0.000 210.66 0.279 0.071 0.205 0.275 28.73 0.000 210.65 0.277 0.071 0.203 0.273 28.77 0.000 210.65 0.275 0.070 0.201 0.271 28.80 0.000 210.65 0.273 0.070 0.199 0.269 28.83 0.000 210.65 0.271 0.070 0.197 0.267 28.87 0.000 210.65 0.269 0.070 0.195 0.265 28.90 0.000 210.65 0.267 0.070 0.193 0.263 28.93 0.000 210.65 0.265 0.070 0.191 0.261 28.97 0.000 210.65 0.263 0.070 0.189 0.260 29.00 0.000 210.65 0.262 0.070 0.188 0.258 29.03 0.000 210.65 0.260 0.070 0.186 0.256 29.07 0.000 210.64 0.259 0.070 0.184 0.255 29.10 0.000 210.64 0.257 0.070 0.183 0.253 Continues on next page... 29 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 29.13 0.000 210.64 0.256 0.070 0.181 0.251 29.17 0.000 210.64 0.254 0.070 0.180 0.250 29.20 0.000 210.64 0.252 0.070 0.178 0.248 29.23 0.000 210.64 0.251 0.070 0.176 0.247 29.27 0.000 210.64 0.249 0.070 0.175 0.245 29.30 0.000 210.64 0.248 0.070 0.173 0.243 29.33 0.000 210.64 0.246 0.070 0.172 0.242 29.37 0.000 210.64 0.245 0.070 0.170 0.240 29.40 0.000 210.64 0.243 0.070 0.169 0.239 29.43 0.000 210.64 0.242 0.070 0.167 0.237 29.47 0.000 210.63 0.240 0.070 0.166 0.236 29.50 0.000 210.63 0.239 0.070 0.164 0.234 29.53 0.000 210.63 0.238 0.070 0.163 0.233 29.57 0.000 210.63 0.236 0.070 0.161 0.231 29.60 0.000 210.63 0.235 0.070 0.160 0.230 29.63 0.000 210.63 0.233 0.070 0.158 0.228 29.67 0.000 210.63 0.232 0.070 0.157 0.227 29.70 0.000 210.63 0.231 0.070 0.155 0.225 29.73 0.000 210.63 0.229 0.070 0.154 0.224 29.77 0.000 210.63 0.228 0.070 0.153 0.222 29.80 0.000 210.63 0.226 0.070 0.151 0.221 29.83 0.000 210.63 0.225 0.070 0.150 0.220 29.87 0.000 210.62 0.224 0.070 0.148 0.218 29.90 0.000 210.62 0.222 0.070 0.147 0.217 29.93 0.000 210.62 0.221 0.070 0.146 0.215 29.97 0.000 210.62 0.220 0.070 0.144 0.214 30.00 0.000 210.62 0.218 0.070 0.143 0.213 30.03 0.000 210.62 0.217 0.070 0.141 0.211 Continues on next page... 30 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 30.07 0.000 210.62 0.216 0.070 0.140 0.210 30.10 0.000 210.62 0.214 0.070 0.139 0.209 30.13 0.000 210.62 0.213 0.070 0.137 0.207 30.17 0.000 210.62 0.212 0.070 0.136 0.206 30.20 0.000 210.62 0.211 0.070 0.135 0.205 30.23 0.000 210.62 0.209 0.070 0.134 0.203 30.27 0.000 210.62 0.208 0.070 0.132 0.202 30.30 0.000 210.61 0.207 0.070 0.131 0.201 30.33 0.000 210.61 0.206 0.070 0.130 0.199 30.37 0.000 210.61 0.204 0.070 0.128 0.198 30.40 0.000 210.61 0.203 0.070 0.127 0.197 30.43 0.000 210.61 0.202 0.070 0.126 0.195 30.47 0.000 210.61 0.201 0.070 0.125 0.194 30.50 0.000 210.61 0.200 0.070 0.123 0.193 30.53 0.000 210.61 0.198 0.070 0.122 0.192 30.57 0.000 210.61 0.197 0.070 0.121 0.190 30.60 0.000 210.61 0.196 0.070 0.120 0.189 30.63 0.000 210.61 0.195 0.070 0.119 0.188 30.67 0.000 210.61 0.194 0.069 0.117 0.187 30.70 0.000 210.61 0.193 0.069 0.116 0.186 30.73 0.000 210.61 0.191 0.069 0.115 0.184 30.77 0.000 210.60 0.190 0.069 0.114 0.183 30.80 0.000 210.60 0.189 0.069 0.113 0.182 30.83 0.000 210.60 0.188 0.069 0.111 0.181 30.87 0.000 210.60 0.187 0.069 0.110 0.180 30.90 0.000 210.60 0.186 0.069 0.109 0.179 30.93 0.000 210.60 0.185 0.069 0.108 0.177 30.97 0.000 210.60 0.184 0.069 0.107 0.176 Continues on next page... 31 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 31.00 0.000 210.60 0.183 0.069 0.106 0.175 31.03 0.000 210.60 0.182 0.069 0.105 0.174 31.07 0.000 210.60 0.181 0.069 0.104 0.173 31.10 0.000 210.60 0.180 0.069 0.103 0.172 31.13 0.000 210.60 0.179 0.069 0.102 0.172 31.17 0.000 210.60 0.178 0.069 0.101 0.171 31.20 0.000 210.60 0.177 0.069 0.101 0.170 31.23 0.000 210.60 0.176 0.069 0.100 0.169 31.27 0.000 210.60 0.175 0.069 0.099 0.168 31.30 0.000 210.59 0.174 0.069 0.098 0.167 31.33 0.000 210.59 0.173 0.069 0.097 0.167 31.37 0.000 210.59 0.172 0.069 0.096 0.166 31.40 0.000 210.59 0.171 0.069 0.096 0.165 31.43 0.000 210.59 0.170 0.069 0.095 0.164 31.47 0.000 210.59 0.169 0.069 0.094 0.163 31.50 0.000 210.59 0.169 0.069 0.093 0.162 31.53 0.000 210.59 0.168 0.069 0.092 0.162 31.57 0.000 210.59 0.167 0.069 0.092 0.161 31.60 0.000 210.59 0.166 0.069 0.091 0.160 31.63 0.000 210.59 0.165 0.069 0.090 0.159 31.67 0.000 210.59 0.164 0.069 0.089 0.158 31.70 0.000 210.59 0.163 0.069 0.089 0.158 31.73 0.000 210.59 0.162 0.069 0.088 0.157 31.77 0.000 210.59 0.162 0.069 0.087 0.156 31.80 0.000 210.59 0.161 0.069 0.086 0.155 31.83 0.000 210.59 0.160 0.069 0.085 0.155 31.87 0.000 210.58 0.159 0.069 0.085 0.154 31.90 0.000 210.58 0.158 0.069 0.084 0.153 Continues on next page... 32 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 31.93 0.000 210.58 0.157 0.069 0.083 0.152 31.97 0.000 210.58 0.156 0.069 0.082 0.151 32.00 0.000 210.58 0.156 0.069 0.082 0.151 32.03 0.000 210.58 0.155 0.069 0.081 0.150 32.07 0.000 210.58 0.154 0.069 0.080 0.149 32.10 0.000 210.58 0.153 0.069 0.079 0.148 32.13 0.000 210.58 0.152 0.069 0.079 0.148 32.17 0.000 210.58 0.151 0.069 0.078 0.147 32.20 0.000 210.58 0.151 0.069 0.077 0.146 32.23 0.000 210.58 0.150 0.069 0.077 0.146 32.27 0.000 210.58 0.149 0.069 0.076 0.145 32.30 0.000 210.58 0.148 0.069 0.075 0.144 32.33 0.000 210.58 0.147 0.069 0.074 0.143 32.37 0.000 210.58 0.147 0.069 0.074 0.143 32.40 0.000 210.58 0.146 0.069 0.073 0.142 32.43 0.000 210.58 0.145 0.069 0.072 0.141 32.47 0.000 210.58 0.144 0.069 0.072 0.141 32.50 0.000 210.57 0.144 0.069 0.071 0.140 32.53 0.000 210.57 0.143 0.069 0.070 0.139 32.57 0.000 210.57 0.142 0.069 0.070 0.138 32.60 0.000 210.57 0.141 0.069 0.069 0.138 32.63 0.000 210.57 0.141 0.069 0.068 0.137 32.67 0.000 210.57 0.140 0.069 0.068 0.136 32.70 0.000 210.57 0.139 0.069 0.067 0.136 32.73 0.000 210.57 0.138 0.069 0.066 0.135 32.77 0.000 210.57 0.138 0.069 0.066 0.134 32.80 0.000 210.57 0.137 0.069 0.065 0.134 32.83 0.000 210.57 0.136 0.069 0.064 0.133 Continues on next page... 33 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 32.87 0.000 210.57 0.135 0.069 0.064 0.132 32.90 0.000 210.57 0.135 0.069 0.063 0.132 32.93 0.000 210.57 0.134 0.069 0.062 0.131 32.97 0.000 210.57 0.133 0.069 0.062 0.130 33.00 0.000 210.57 0.132 0.069 0.061 0.130 33.03 0.000 210.57 0.132 0.069 0.060 0.129 33.07 0.000 210.57 0.131 0.069 0.060 0.128 33.10 0.000 210.57 0.130 0.069 0.059 0.128 33.13 0.000 210.57 0.130 0.069 0.058 0.127 33.17 0.000 210.57 0.129 0.069 0.058 0.127 33.20 0.000 210.56 0.128 0.069 0.057 0.126 33.23 0.000 210.56 0.127 0.069 0.057 0.125 33.27 0.000 210.56 0.127 0.069 0.056 0.125 33.30 0.000 210.56 0.126 0.069 0.055 0.124 33.33 0.000 210.56 0.125 0.069 0.055 0.123 33.37 0.000 210.56 0.125 0.069 0.054 0.123 33.40 0.000 210.56 0.124 0.069 0.054 0.122 33.43 0.000 210.56 0.123 0.069 0.053 0.122 33.47 0.000 210.56 0.123 0.069 0.052 0.121 33.50 0.000 210.56 0.122 0.069 0.052 0.120 33.53 0.000 210.56 0.121 0.069 0.051 0.120 33.57 0.000 210.56 0.121 0.069 0.051 0.119 33.60 0.000 210.56 0.120 0.069 0.050 0.119 33.63 0.000 210.56 0.119 0.069 0.049 0.118 33.67 0.000 210.56 0.119 0.069 0.049 0.117 33.70 0.000 210.56 0.118 0.069 0.048 0.117 33.73 0.000 210.56 0.117 0.069 0.048 0.116 33.77 0.000 210.56 0.117 0.069 0.047 0.116 Continues on next page... 34 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 33.80 0.000 210.56 0.116 0.069 0.047 0.115 33.83 0.000 210.56 0.116 0.069 0.046 0.115 33.87 0.000 210.56 0.115 0.069 0.045 0.114 33.90 0.000 210.56 0.114 0.069 0.045 0.113 33.93 0.000 210.56 0.114 0.069 0.044 0.113 33.97 0.000 210.55 0.113 0.069 0.044 0.112 34.00 0.000 210.55 0.112 0.069 0.043 0.112 34.03 0.000 210.55 0.112 0.069 0.043 0.111 34.07 0.000 210.55 0.111 0.069 0.042 0.111 34.10 0.000 210.55 0.111 0.069 0.042 0.110 34.13 0.000 210.55 0.110 0.069 0.041 0.110 34.17 0.000 210.55 0.109 0.069 0.040 0.109 34.20 0.000 210.55 0.109 0.069 0.040 0.108 34.23 0.000 210.55 0.108 0.069 0.039 0.108 34.27 0.000 210.55 0.108 0.069 0.039 0.107 34.30 0.000 210.55 0.107 0.069 0.038 0.107 34.33 0.000 210.55 0.106 0.069 0.038 0.106 34.37 0.000 210.55 0.106 0.069 0.037 0.106 34.40 0.000 210.55 0.106 0.068 0.037 0.105 34.43 0.000 210.55 0.105 0.068 0.037 0.105 34.47 0.000 210.55 0.105 0.068 0.036 0.105 34.50 0.000 210.55 0.105 0.068 0.036 0.105 34.53 0.000 210.55 0.105 0.068 0.036 0.104 34.57 0.000 210.55 0.104 0.068 0.036 0.104 34.60 0.000 210.55 0.104 0.068 0.035 0.104 34.63 0.000 210.55 0.104 0.068 0.035 0.103 34.67 0.000 210.55 0.104 0.068 0.035 0.103 34.70 0.000 210.55 0.103 0.068 0.034 0.103 Continues on next page... 35 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 34.73 0.000 210.55 0.103 0.068 0.034 0.102 34.77 0.000 210.55 0.103 0.068 0.034 0.102 34.80 0.000 210.55 0.103 0.068 0.034 0.102 34.83 0.000 210.54 0.102 0.068 0.033 0.102 34.87 0.000 210.54 0.102 0.068 0.033 0.101 34.90 0.000 210.54 0.102 0.068 0.033 0.101 34.93 0.000 210.54 0.102 0.068 0.033 0.101 34.97 0.000 210.54 0.101 0.068 0.032 0.100 35.00 0.000 210.54 0.101 0.068 0.032 0.100 35.03 0.000 210.54 0.101 0.068 0.032 0.100 35.07 0.000 210.54 0.101 0.068 0.031 0.100 35.10 0.000 210.54 0.100 0.068 0.031 0.099 35.13 0.000 210.54 0.100 0.068 0.031 0.099 35.17 0.000 210.54 0.100 0.068 0.031 0.099 35.20 0.000 210.54 0.100 0.068 0.030 0.098 35.23 0.000 210.54 0.099 0.068 0.030 0.098 35.27 0.000 210.54 0.099 0.068 0.030 0.098 35.30 0.000 210.54 0.099 0.068 0.030 0.098 35.33 0.000 210.54 0.099 0.068 0.029 0.097 35.37 0.000 210.54 0.098 0.068 0.029 0.097 35.40 0.000 210.54 0.098 0.068 0.029 0.097 35.43 0.000 210.54 0.098 0.068 0.029 0.097 35.47 0.000 210.54 0.098 0.068 0.028 0.096 35.50 0.000 210.54 0.098 0.068 0.028 0.096 35.53 0.000 210.54 0.097 0.068 0.028 0.096 35.57 0.000 210.54 0.097 0.068 0.028 0.095 35.60 0.000 210.54 0.097 0.068 0.027 0.095 35.63 0.000 210.54 0.097 0.068 0.027 0.095 Continues on next page... 36 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 35.67 0.000 210.54 0.096 0.068 0.027 0.095 35.70 0.000 210.54 0.096 0.068 0.026 0.094 35.73 0.000 210.54 0.096 0.068 0.026 0.094 35.77 0.000 210.53 0.096 0.068 0.026 0.094 35.80 0.000 210.53 0.095 0.068 0.026 0.094 35.83 0.000 210.53 0.095 0.068 0.025 0.093 35.87 0.000 210.53 0.095 0.068 0.025 0.093 35.90 0.000 210.53 0.095 0.068 0.025 0.093 35.93 0.000 210.53 0.095 0.068 0.025 0.092 35.97 0.000 210.53 0.094 0.068 0.024 0.092 36.00 0.000 210.53 0.094 0.068 0.024 0.092 36.03 0.000 210.53 0.094 0.068 0.024 0.092 36.07 0.000 210.53 0.094 0.068 0.024 0.091 36.10 0.000 210.53 0.094 0.068 0.023 0.091 36.13 0.000 210.53 0.093 0.068 0.023 0.091 36.17 0.000 210.53 0.093 0.068 0.023 0.091 36.20 0.000 210.53 0.093 0.068 0.023 0.090 36.23 0.000 210.53 0.093 0.068 0.023 0.090 36.27 0.000 210.53 0.092 0.068 0.022 0.090 36.30 0.000 210.53 0.092 0.068 0.022 0.090 36.33 0.000 210.53 0.092 0.068 0.022 0.089 36.37 0.000 210.53 0.092 0.068 0.022 0.089 36.40 0.000 210.53 0.092 0.068 0.021 0.089 36.43 0.000 210.53 0.091 0.068 0.021 0.089 36.47 0.000 210.53 0.091 0.068 0.021 0.088 36.50 0.000 210.53 0.091 0.068 0.021 0.088 36.53 0.000 210.53 0.091 0.067 0.020 0.088 36.57 0.000 210.53 0.090 0.067 0.020 0.088 Continues on next page... 37 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 36.60 0.000 210.53 0.090 0.067 0.020 0.087 36.63 0.000 210.53 0.090 0.067 0.020 0.087 36.67 0.000 210.53 0.090 0.067 0.019 0.087 36.70 0.000 210.53 0.090 0.067 0.019 0.087 36.73 0.000 210.53 0.089 0.067 0.019 0.086 36.77 0.000 210.53 0.089 0.067 0.019 0.086 36.80 0.000 210.52 0.089 0.067 0.018 0.086 36.83 0.000 210.52 0.089 0.067 0.018 0.086 36.87 0.000 210.52 0.089 0.067 0.018 0.085 36.90 0.000 210.52 0.088 0.067 0.018 0.085 36.93 0.000 210.52 0.088 0.067 0.018 0.085 36.97 0.000 210.52 0.088 0.067 0.017 0.085 37.00 0.000 210.52 0.088 0.067 0.017 0.084 37.03 0.000 210.52 0.088 0.067 0.017 0.084 37.07 0.000 210.52 0.087 0.067 0.017 0.084 37.10 0.000 210.52 0.087 0.067 0.016 0.084 37.13 0.000 210.52 0.087 0.067 0.016 0.083 37.17 0.000 210.52 0.087 0.067 0.016 0.083 37.20 0.000 210.52 0.087 0.067 0.016 0.083 37.23 0.000 210.52 0.086 0.067 0.016 0.083 37.27 0.000 210.52 0.086 0.067 0.015 0.082 37.30 0.000 210.52 0.086 0.067 0.015 0.082 37.33 0.000 210.52 0.086 0.067 0.015 0.082 37.37 0.000 210.52 0.086 0.067 0.015 0.082 37.40 0.000 210.52 0.085 0.067 0.014 0.082 37.43 0.000 210.52 0.085 0.067 0.014 0.081 37.47 0.000 210.52 0.085 0.067 0.014 0.081 37.50 0.000 210.52 0.085 0.067 0.014 0.081 Continues on next page... 38 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 37.53 0.000 210.52 0.085 0.067 0.014 0.081 37.57 0.000 210.52 0.084 0.067 0.013 0.080 37.60 0.000 210.52 0.084 0.067 0.013 0.080 37.63 0.000 210.52 0.084 0.067 0.013 0.080 37.67 0.000 210.52 0.084 0.067 0.013 0.080 37.70 0.000 210.52 0.084 0.067 0.012 0.079 37.73 0.000 210.52 0.083 0.067 0.012 0.079 37.77 0.000 210.52 0.083 0.067 0.012 0.079 37.80 0.000 210.52 0.083 0.067 0.012 0.079 37.83 0.000 210.52 0.083 0.067 0.012 0.079 37.87 0.000 210.52 0.083 0.067 0.011 0.078 37.90 0.000 210.52 0.083 0.067 0.011 0.078 37.93 0.000 210.51 0.082 0.067 0.011 0.078 37.97 0.000 210.51 0.082 0.067 0.011 0.078 38.00 0.000 210.51 0.082 0.067 0.011 0.077 38.03 0.000 210.51 0.082 0.067 0.010 0.077 38.07 0.000 210.51 0.082 0.067 0.010 0.077 38.10 0.000 210.51 0.081 0.067 0.010 0.077 38.13 0.000 210.51 0.081 0.067 0.010 0.077 38.17 0.000 210.51 0.081 0.067 0.010 0.076 38.20 0.000 210.51 0.081 0.067 0.009 0.076 38.23 0.000 210.51 0.081 0.067 0.009 0.076 38.27 0.000 210.51 0.081 0.067 0.009 0.076 38.30 0.000 210.51 0.080 0.067 0.009 0.075 38.33 0.000 210.51 0.080 0.067 0.009 0.075 38.37 0.000 210.51 0.080 0.067 0.008 0.075 38.40 0.000 210.51 0.080 0.067 0.008 0.075 38.43 0.000 210.51 0.080 0.067 0.008 0.075 ...End 7/5/23,3:20 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Forebay Berm Lining SCM 5 Name Forebay Berm Lining SCM 5 Discharge 8.78 Peak Flow Period 2 Channel Slope 0.3333 Channel Bottom Width 136 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Unreinforced Vegetation - Class C - Mix (Sod & Bunch) - Very Good 80- 95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 8.78 cfs 1.78 ft/s 0.04 ft 0.053 4 lbs/ft2 0.75 lbs/ft2 5.32 STABLE -- Vegetation Underlying Straight 8.78 cfs 1.78 ft/s 0.04 ft 0.053 5.18 lbs/ft2 0.75 lbs/ft2 6.89 STABLE -- Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern DS75 Straight 8.78 cfs 2.39 ft/s 0.03 ft 0.032 1.6 lbs/ft2 0.56 lbs/ft2 2.85 STABLE D Unvegetated Underlying Straight 8.78 cfs 2.39 ft/s 0.03 ft 0.032 1.51 lbs/ft2 0.56 lbs/ft2 2.7 STABLE D Substrate https://ecmds.com/project/151829/spillway-analysis/247824/show# 1/1 EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Ducks Landing Project#: Designed by: CP Date: 7/5/2023 Revised by: Date: Checked by: Date: Rip-Rap Apron#16 Pipe Diameter d= 24 Pipe Slope s= 2.38 % Manning's number n= 0.013 Flow Q= 7.45 cfs Velocity V= 8.78 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(3 X Do)= 6.0 ft Length(6 X Do)= 12.Oft Width(La+Do)= 14.0 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches 12.0 1 *All units are in feet Dissipator pad designed for full flow of pipe 6.0 14.0 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 7/5/2023 Page 1 of 1 Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=210.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 210.00 29,905 0 0 0.50 210.50 32,380 15,571 15,571 1.00 211.00 33,950 16,583 32,154 2.00 212.00 37,120 35,535 67,689 3.00 213.00 40,080 38,600 106,289 4.00 214.00 42,380 41,230 147,519 5.00 215.00 44,735 43,558 191,076 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 2.00 0.00 0.00 Crest Len(ft) = 1.00 15.00 Inactive 0.00 Span(in) = 24.00 2.00 0.00 0.00 Crest El.(ft) = 210.50 212.40 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 210.00 210.00 0.00 0.00 Weir Type = Rect Broad Broad --- Length(ft) = 21.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 2.38 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/Discharge Elev(ft) 5.00 215.00 4.00 214.00 3.00 213.00 2.00 212.00 1.00 211.00 0.00 210.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 Total Q Discharge(cfs) 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.10 2 726 36,319 BMP Pre-Developed 2 SCS Runoff 28.89 2 718 57,811 BMP Post-Developed 3 Reservoir 1.149 2 832 52,553 2 210.97 31,143 Post Through Pond 5 SCS Runoff 0.212 2 360 2,158 BMP Post-Developed 6 Reservoir 0.008 2 368 1,319 5 210.07 2,123 1.0-in Storm Thru Pond Wet Pond #5-(Ducks Landing).gpw Return Period: 1 Year Wednesday, 01 /25/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 10.10 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 36,319 cuft Drainage area = 14.270 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 12.00 12.00 10.00 I - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 28.89 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 57,811 cuft Drainage area = 16.110 ac Curve number = 76.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 + — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 1.149 cfs Storm frequency = 1 yrs Time to peak = 832 min Time interval = 2 min Hyd. volume = 52,553 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 210.97 ft Reservoir name = BMP Pond Max. Storage = 31,143 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 31,143 cuft 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.212 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 2,158 cuft Drainage area = 16.110 ac Curve number = 76.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 0.50 1 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 ------ -\_ 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.008 cfs Storm frequency = 1 yrs Time to peak = 368 min Time interval = 2 min Hyd. volume = 1,319 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 210.07 ft Reservoir name = BMP Pond Max. Storage = 2,123 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 - 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 2,123 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 16.68 2 726 56,030 BMP Pre-Developed 2 SCS Runoff 41.57 2 718 83,275 BMP Post-Developed 3 Reservoir 2.342 2 782 77,907 2 211.29 42,312 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 210.00 0.000 1.0-in Storm Thru Pond Wet Pond #5-(Ducks Landing).gpw Return Period: 2 Year Wednesday, 01 /25/2023 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 16.68 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 56,030 cuft Drainage area = 14.270 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 18.00 18.00 15.00 1 15.00 12.00 12.00 9.00 9.00 I 6.00 6.00 3.00 3.00 -I 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 41 .57 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 83,275 cuft Drainage area = 16.110 ac Curve number = 76.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — : : : I t — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 2.342 cfs Storm frequency = 2 yrs Time to peak = 782 min Time interval = 2 min Hyd. volume = 77,907 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 211.29 ft Reservoir name = BMP Pond Max. Storage = 42,312 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 50.00 1 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 t' 0.00 — —p- 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 42,312 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.56 2 724 119,479 BMP Pre-Developed 2 SCS Runoff 79.31 2 716 160,551 BMP Post-Developed 3 Reservoir 7.449 2 746 155,010 2 212.32 79,952 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 210.00 0.000 1.0-in Storm Thru Pond Wet Pond #5-(Ducks Landing).gpw Return Period: 10 Year Wednesday, 01 /25/2023 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 37.56 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 119,479 cuft Drainage area = 14.270 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 � ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 79.31 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 160,551 cuft Drainage area = 16.110 ac Curve number = 76.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.46 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 7.449 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 155,010 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 212.32 ft Reservoir name = BMP Pond Max. Storage = 79,952 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 ' - — 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 79,952 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 76.36 2 724 238,741 BMP Pre-Developed 2 SCS Runoff 144.34 2 716 297,934 BMP Post-Developed 3 Reservoir 25.46 2 726 292,248 2 213.88 142,653 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 210.00 0.000 1.0-in Storm Thru Pond Wet Pond #5-(Ducks Landing).gpw Return Period: 100 Year Wednesday, 01 /25/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 76.36 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 238,741 cuft Drainage area = 14.270 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 80.00 i 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 — IL-- 30.00 20.00 I 20.00 10.00 10.00 J 0.00 - 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 144.34 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 297,934 cuft Drainage area = 16.110 ac Curve number = 76.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 I 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,01 /25/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 25.46 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 292,248 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 213.88 ft Reservoir name = BMP Pond Max. Storage = 142,653 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 y 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00GOMM 20.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 142,653 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60`V V=1.49R'r'S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's )1, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V Tc TcTOTu Tc(minimUm) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s Mg (min) (10 min) 0.6'Tc(hrs) 5 100 245.0 243.0 0.020 3.70 0.24 13.27 1190 243.0 203 0.03361 Unpaved 2.95 6.72 19.99 19.99 0.20 5 1/25g02312:00 AM G:v1YDROtpmlecls\TIMECONC_Ducks Lantling.XLS Project Name Riprap Dissipator#1 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 18 in. Pipe diameter in inches D-o= 1.50 ft. Pipe diameter in feet Q-25= 1.20 cfs Pipe outlet(from drainage calculations) d-50= 0.3 ft. from Figure 8.06 a L-a= 9 ft. from Figure 8.06 a Step 3. 3"D-o= 4.50 ft. 3 times the outlet pipe diameter W= 10.50 ft. Pipe diameter+Apron length Step 4. d-max 0.45 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 5 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.68 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 8 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 9 11 5 18in. B TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#2 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 24 in. Pipe diameter in inches D-o= 2.00 ft. Pipe diameter in feet 0-25= 11.00 cfs Pipe outlet(from drainage calculations) d-50= 0.4 ft. from Figure 8.06 a L a= 12 ft. from Figure 8.06 a Step 3. 3"D-o= 6.00 ft. 3 times the outlet pipe diameter W= 14.00 ft. Pipe diameter+Apron length Step 4. d-max 0.60 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 7 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.90 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 11 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 12 14 6 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#3 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 24 in. Pipe diameter in inches D-o= 2.00 ft. Pipe diameter in feet 0-25= 13.60 cfs Pipe outlet(from drainage calculations) d-50= 0.4 ft. from Figure 8.06 a L a= 12 ft. from Figure 8.06 a Step 3. 3"D-o= 6.00 ft. 3 times the outlet pipe diameter W= 14.00 ft. Pipe diameter+Apron length Step 4. d-max 0.60 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 7 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.90 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 11 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 12 14 6 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#4 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 30 in. Pipe diameter in inches D-o= 2.50 ft. Pipe diameter in feet 0-25= 21.60 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L a= 16 ft. from Figure 8.06 a Step 3. 3"D-o= 7.50 ft. 3 times the outlet pipe diameter W= 18.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 19 8 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#5 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 36 in. Pipe diameter in inches D-o= 3.00 ft. Pipe diameter in feet 0-25= 28.50 cfs Pipe outlet(from drainage calculations) d-50= 0.6 ft. from Figure 8.06 a L-a= 20 ft. from Figure 8.06 a Step 3. 3"D-o= 9.00 ft. 3 times the outlet pipe diameter W= 23.00 ft. Pipe diameter+Apron length Step 4. d-max 0.90 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 11 in. Maximum Stone Diameter(1.5"d-50) in feet Step 5. Thickness= 1.35 ft. Min.Apron Thickness With Filter Fabric(1.5"d-max) in feet Thickness= 16 in. Min.Apron Thickness With Filter Fabric(1.5"d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3"D-o Thick Class 20 23 9 36in. 2 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3"D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#6 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 36 in. Pipe diameter in inches D-o= 3.00 ft. Pipe diameter in feet 0-25= 28.50 cfs Pipe outlet(from drainage calculations) d-50= 0.6 ft. from Figure 8.06 a L-a= 20 ft. from Figure 8.06 a Step 3. 3"D-o= 9.00 ft. 3 times the outlet pipe diameter W= 23.00 ft. Pipe diameter+Apron length Step 4. d-max 0.90 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 11 in. Maximum Stone Diameter(1.5"d-50) in feet Step 5. Thickness= 1.35 ft. Min.Apron Thickness With Filter Fabric(1.5"d-max) in feet Thickness= 16 in. Min.Apron Thickness With Filter Fabric(1.5"d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3"D-o Thick Class 20 23 9 36in. 2 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3"D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#7 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 30 in. Pipe diameter in inches D-o= 2.50 ft. Pipe diameter in feet 0-25= 26.80 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L a= 16 ft. from Figure 8.06 a Step 3. 3"D-o= 7.50 ft. 3 times the outlet pipe diameter W= 18.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 19 8 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#8 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 24 in. Pipe diameter in inches D-o= 2.00 ft. Pipe diameter in feet 0-25= 25.30 cfs Pipe outlet(from drainage calculations) d-50= 0.4 ft. from Figure 8.06 a L a= 12 ft. from Figure 8.06 a Step 3. 3"D-o= 6.00 ft. 3 times the outlet pipe diameter W= 14.00 ft. Pipe diameter+Apron length Step 4. d-max 0.60 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 7 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.90 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 11 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 12 14 6 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#9 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 30 in. Pipe diameter in inches D-o= 2.50 ft. Pipe diameter in feet 0-25= 24.10 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L a= 16 ft. from Figure 8.06 a Step 3. 3"D-o= 7.50 ft. 3 times the outlet pipe diameter W= 18.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 19 8 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#10 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 18 in. Pipe diameter in inches D-o= 1.50 ft. Pipe diameter in feet Q-25= 4.10 cfs Pipe outlet(from drainage calculations) d-50= 0.3 ft. from Figure 8.06 a L-a= 9 ft. from Figure 8.06 a Step 3. 3"D-o= 4.50 ft. 3 times the outlet pipe diameter W= 10.50 ft. Pipe diameter+Apron length Step 4. d-max 0.45 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 5 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.68 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 8 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 9 11 5 18in. B TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#10 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 36 in. Pipe diameter in inches D-o= 3.00 ft. Pipe diameter in feet 0-25= 28.50 cfs Pipe outlet(from drainage calculations) d-50= 0.6 ft. from Figure 8.06 a L-a= 20 ft. from Figure 8.06 a Step 3. 3"D-o= 9.00 ft. 3 times the outlet pipe diameter W= 23.00 ft. Pipe diameter+Apron length Step 4. d-max 0.90 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 11 in. Maximum Stone Diameter(1.5"d-50) in feet Step 5. Thickness= 1.35 ft. Min.Apron Thickness With Filter Fabric(1.5"d-max) in feet Thickness= 16 in. Min.Apron Thickness With Filter Fabric(1.5"d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3"D-o Thick Class 20 23 9 36in. 2 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3"D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#10 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 30 in. Pipe diameter in inches D-o= 2.50 ft. Pipe diameter in feet 0-25= 26.80 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L a= 16 ft. from Figure 8.06 a Step 3. 3"D-o= 7.50 ft. 3 times the outlet pipe diameter W= 18.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 19 8 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#10 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 18 in. Pipe diameter in inches D-o= 1.50 ft. Pipe diameter in feet 0-25= 14.90 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L-a= 11 ft. from Figure 8.06 a Step 3. 3"D-o= 4.50 ft. 3 times the outlet pipe diameter W= 12.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 11 13 5 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#10 Date Ducks Landing Sept.7,2022 DD Project No. Location D&L Engineering, PLLC DL2201 Harnett County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By P-2587 JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 30 in. Pipe diameter in inches D-o= 2.50 ft. Pipe diameter in feet 0-25= 24.10 cfs Pipe outlet(from drainage calculations) d-50= 0.5 ft. from Figure 8.06 a L a= 16 ft. from Figure 8.06 a Step 3. 3"D-o= 7.50 ft. 3 times the outlet pipe diameter W= 18.50 ft. Pipe diameter+Apron length Step 4. d-max 0.75 ft. Maximum Stone Diameter(1.5"d-50) in inches d-max 9 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.13 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 14 in. Min.Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 19 8 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a= Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W= Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.)