HomeMy WebLinkAboutNCG030466_DMR Upload Review_20231004 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 10/4/2023 9:35:41 AM (DMR Submittal)
Submit by Brittany.Cook 10/4/2023 2:41:39 PM (DMR Submittal Review)
• The task was assigned to DEMLR SW Admin for DMRs 10/4/2023 9:35:42 AM
• Brittany.Cook assigned the task to Brittany.Cook 10/4/2023 2:40:37 PM
DEQStormwater NPDES Permit Discharge
Monitoring Report (DMR) Upload
DMR Submittal from 10/4/2023
Permit and Facility Information:
.....................................................................................................................................................................................................................................................................................................................................................................................................
Permit Number* Enter COC or Individual Permit Number
NCG030466
Must begin with NCS or NCG
Facility Name:* Eaton Electrical
Owner/Operator Eaton Corp
Name:*
County:* Buncombe
Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the
Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS
information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments.
Reason for not yet If applicable:
reporting data Eaton provided the signed DMR on 8/28/2023; however,there was a
through eDMR for miscommunication by Anchor QEA regarding the DMR upload due to issues with the
this permit: eDMR system permissions,which the DEQ has now resolved.The eDMR process
will be used going forward.
Monitoring Period Information:
.....................................................................................................................................................................................................................................................................................................................................................................................................
Monitoring Period What is the YEAR of the sample date(s)?
Year:* 2023
DMR Upload* Click the upload button or drag and drop files here to attach document.
S I G N E D_N CG030466_DM R_Ju Iy_2023_Outfall 001
57.23KB
Monthly.pdf
Only PDFs are accepted.
Comments:
* By checking the box and signing box below, I certify that:
• I have given true,accurate,and complete information on this form;
• I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66,
Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same
way as a written signature;AND
• I intend to electronically sign and submit this DMR Upload form.
Full Name:* Jennifer Hill
Name of person submitting this form
Email Address:* jverde@anchorqea.com
Phone Number:* 828-281-3350
Signature:
Date:* 10/04/2023
Review
Review Date: 10/04/2023
Confirm Permit No.* Correct the permit ID number if needed.
NCG030466
Confirm DMR Year* 2023
Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above.
Can submittal be Yes
accepted?* No(Explain why below)
Do Central Office No
staff need to be Yes
alerted?*
Do Regional Office No
staff need to be Yes
alerted?
Type of Permit* General
Ensures DMR(s)filed correctly.