Loading...
HomeMy WebLinkAboutNCC232956_ESC Approval Submitted_20231004 TTown of• nterssille NORTH CAROLINA May 19, 2023 LETTER OF APPROVAL—EROSION CONTROL PLANS ONLY Mr. Robert Aylward 14521 NC HWY 73 Huntersville, NC 28078 RE: Project Name: HWY 73 Aylward Subdivision Disturbed Acres Approved: 1.352 Project ID: 444760 County: Mecklenburg City: Huntersville Address: 14521 NC HWY 73 River Basin: Catawba Stream Classification: WS-IV; CA Submitted By: Jay Henson Date Accepted for Review: December 21, 2022 Plan Type: Erosion Control Only Dear Mr.Aylward, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. A determination was made by the Stormwater Administrator the first lot will not be subject to the 12% MBUA LID requirement. However,the development will be subject to the 24% LN Watershed MBUA requirement. Lot 3 will be built upon first. Before subsequent lots receive building permits, they must submit EC Plans and receive a determination of LID Applicability. Letter of Approval Mr. Robert Aylward May 19, 2023 Page 2 of 3 As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. No work shall begin on site prior to the pre-construction meeting. Please contact the Town of Huntersville Erosion Control Coordinator,Anne Loftin at (704) 579-1090, or via Letter of Approval Mr. Robert Aylward May 19, 2023 Page 3 of 3 email at aloftin@huntersville.org to set up a pre-construction meeting after providing the Recorded PC019 Form and after obtaining your Certificate of Coverage (COC) from NCDEQ. Please refer to the attached Fact Sheet for additional information. The Financially Responsible Owner (FRO) is responsible for ensuring this project meets all federal, state, and local town codes, ordinances, and standards. Approved and stamped plans are accessible through the "Approved Package" section in EPM for print. Please always keep one set of stamped plans onsite. Your cooperation is appreciated. Sincerely, qJJA. Ja*9 Michael MacIntyre, PE Senior Land Development Plan Reviewer Enclosures: e-NOI Tips for Applicants NPDES NCG01 Fact Sheet Huntersville Sediment and Erosion Control Ordinance cc: Town of Huntersville Planning Department- Lauren Speight Town of Huntersville Engineering-Andrew Cheek Town of Huntersville Construction Engineer-Kevin Garton Town of Huntersville Erosion Control Coordinator-Anne Loftin Town of Huntersville Executive Assistant Engineering-Jane Pethel Town of Huntersville Land Development Inspector-Cecil Talbot Town of Huntersville Bond Administrator-Kim Behrenbrinker Mecklenburg County GIS-Angela Johnson HensonFoley-Jay Henson File Path: M:\PLANNING\Subdivisions\_Minor&Exempt Subdivisions\14521 NC 73 Hwy\EC Only (#444760)\Approved Package (#444760)