HomeMy WebLinkAboutWQ0011655_Staff Report_20231002State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Application No.: WQ0011655 Attn: Nathaniel Thornburg Facility name: East Carolina Council, Boy Scouts of America, Inc From: Robbie Bullock Washington Regional Office Note: This form has been adapted from the non -discharge facili . staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: September 28, 2023 b. Site visit conducted by: Robbie Bullock/Victoria Herdt c. Inspection report attached? ❑ Yes or ® No In Laserfiche d. Person contacted: Beniamin Davis and their contact information: (2� 917-2396 ext. e. Driving directions: 419 Boy Scout Road, Blounts Creek NC 27814 2. Discharge Point(s): N/A Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Classification: River Basin and Subbasin No. Describe receiving stream features and pertinent downstream uses: II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Beniamin Davis Certificate #;SI/18551 Backup ORC: Louis Delozier Certificate #:SI/29106 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: The description of the permit states four septic tank effluent pump (STEP) units. This should state Six septic tank effluent pump (STEP) units. Eco Lodge and Sea Base are two buildings that have been constructed. A septic tank has been added to each building. WaRO has requested an Engineers Certification for these recently added septic tanks. Other than this change the description of the facility is correct. Proposed flow: Current permitted flow: 18,000 Gallons per day FORM: WQROSSR 04-14 Page 1 of 4 Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ® Yes or ❑ No If yes, please explain: Two additional STEP systems have been added which will cause additional flow to the Lagoon. Facility is still operating within permitted limits. 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ®N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ❑ Yes or ® No If no, please explain: The description of the permit states four septic tank effluent pump (STEP) units. This should state Six septic tank effluent pump (STEP) units. 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A If no, please complete the following ex and table if necessary): Monitoring Well Latitude Longitude O / // O I Il O / // O I Il O / // O I Il O / // O I Il O / // O I if 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: Violations in BIMS were failure to report data and late NDMR and NDAR submittals. There were no limit violations over this permit cycle. During the site visit it was discussed that all data needs to be reported and on time. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ❑ No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A If no, please explain: FORM: WQROSSR 04-14 Page 2 of 4 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A If yes, please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (Please state reasons: ) 6. Signature of report preparer: /Pd66� U?a&Clli� Signature of regional supervisor: Ro" T"" Date: 10/2/2023 FORM: WQROSSR 04-14 Page 3 of 4 IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS FORM: WQROSSR 04-14 Page 4 of 4