Loading...
HomeMy WebLinkAboutWQ0002428_Monitoring - 08-2023_20230929Monitoring Report Submittal Permit Number#* WQ0002428 Name of Facility:* Mountaire Farms- Mt Vernon Hatchery Month: * August Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR NDMR-NDAR WQ0002428 August 2023.pdf 1.52MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * dgoodwin@mountaire.com Name of Submitter: * Douglas W. Goodwin Signature: .0m,/n1%i% �7rYY/.rriv Date of submittal: 9/29/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00002428 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 10/3/2023 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ! of 2- Permit No.: WQ0002428 Facility Name: Mount Vernon Hatchery County: Chatham Month: August Year: 2023 PPI: 001 Flow Measuring Point: U Influent U Effluent J No now generated Parameter Monitoring Point: I Influent L Effluent Groundvrater l oti:eung surface "Dater Parameter Code -► 50050 00310 00916 00940 50060 31616 00927 00610 00625 00620 00600 00400 00665 00931 70300 00530 a) ¢ E O c E o FL Ln p E '2 u o ' ,v , ao E _ U LL O a, CM- m f0 c O E Q c Y Z ~ c o ,' Z O ooN N E 0 O (n Q > -o_ O ow FN� 60 -0 _ocu vc° _ a O 7n U 24-hr hrs GPD mg/L mg/L mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L su mg/L Ratio mg/L mg/L 1 04:00 13 22,184 2 05:15 9.3 22,184 3 05:30 11.7 22,184 4 03:45 12.8 22,184 5 06:15 2.8 1 22,184 6 22,184 7 05:45 11.3 22,184 8 04:00 13.3 22,184 9 04:45 12.4 22,184 10 05:15 11.9 22,184 11 05:30 11.3 22,184 12 22,184 13 22,184 14 05:40 11.1 22,184 15 05:00 12 22,184 16 05:00 11.8 22,184 17 06:45 10.3 22,184 18 06:15 10.9 22,184 19 08:30 2 22,184 20 22,184 21 04:50 12.3 22,184 22 05:00 12.5 22,184 23 07:00 10 22,184 24 04:45 11.3 22,184 251 06:30 10.8 22,184 26 08:00 4 22,184 27 06:15 2.3 22,184 28 05:00 12.5 22,184 29 05:00 12 22,184 30 05:00 12 22,184 311 05:00 1 12 22,184 Average: 22,184 Daily Maximum: 22,184 Daily Minimum: 22,184 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Calculated Grab Grab Grab Monthly Avg. Limit: 24,840 Daily Limit: Sample Frequency: Continuous 3 x Year 3 x Year 3 x Year Weekly 3 x Year 3 x Year 3 x Year 3 x Year 3 x Year Weekly 3 x Year 3 x Year 3 x Year 3 x Year 3 x Year FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page Z of 2- Sampling Person(s) Certified Laboratories Name: Name: Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? [A Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Did not sample effluent from lagoon #3 as we are in the middle of project to dewater, remove sludge and remove/install liner Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Douglas W. Goodwin Permittee: Mountaire Farms Inc Certification No.: 18557 Signing Official: Douglas W. Goodwin Grade: SISO Phone Number: 919-548-5024 Signing Official's Title: Regional Hatchery Manager Has the ORC changed since the previous NDMR? ❑ Yes F] No Phone Number: 919-548-5024 Permit Expiration: 12/31/2026 Signature Date Signature Date By this signature, I certify that this report is accurrale and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _L of 3 Permit No.: WQ0002428 Facility Name: Mount Vernon Hatchery County: Chatham Month: August Year: 2023 Did irrigation Field Name: A Field Name: B Field Name: C Field Name: D occur Area (acres): 1.17 Area (acres): 2.60 Area (acres): 1.90 Area (acres): 2.13 at this facility? Cover Crop:Fescue Cover Crop: P� Fescue Cover Crop: P: Fescue Cover Crop: p: Fescue ❑.r YES ❑ NO Hourly Rate (in): 0.30 Hourly Rate (in): 0.30 Hourly Rate (in): 0.30 Hourly Rate (in): 0.30 Annual Rate (in): 26.66 Annual Rate (in): 25.71 Annual Rate (in): 25.76 Annual Rate (in): 25.74 Weather Freeboard Field Irrigated? n YES ❑ No Field Irrigated? j [ YES ❑ NO Field Irrigated? [[ YES ❑ No Field Irrigated? YES [ No � m ~ c D WO m T> to Ln o a Q - _ -FuE 0 o) Ez)u oo = E a > a E m L- _ -6 0 J E E -6 o ;x J a, E .° a > -_a M J E oi D E�-6 o0 J EQa o aFE > Q -_m L- arn J EE >3 rnU =C:E o JE > °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 PC 88 31,742 320 1.00 0.19 70,653 320 1.00 0.19 2 C 84 3 PC 79 4 PC 81 4.8 5 C 91 6 7 CL 88 28,109 211 0.54 0.15 41,025 167 0.71 0.25 8 CL 90 9 PC 90 10 PC 84 11 PC 88 5 12 13 14 PC 97 26,525 267 0.83 0.19 59,041 267 0.84 0.19 15 PC 100 16 C 91 17 PC 91 18 C 91 5 19 C 90 20 21 PC 97 22 PC 93 23 C 88 24 C 95 14,068 107 0.27 0.15 39,226 160 0.68 0.25 25 PC 97 5.3 26 C 97 27 PC 93 28 PC 88 27,566 278 0.87 0.19 61,355 278 0.87 0.19 29 PC 91 30 CL 88 31 R 82 0.25 Monthly Loading: 85,833 2.70 191,049 2.71 42,177 0.82 ;,..: 80,251 1.39 12 Month Floating Total (in): 19.21 1 19.24 17.05 18.681' FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page I of 3 Permit No.: WQ0002428 Facility Name: Mount Vernon Hatchery County: Chatham Month: August Year: 2023 Did irrigation Field Name: E Field Name: F Field Name: Field Name: occur Area (acres): 1.69 Area (acres): 3.75 Area (acres): Area (acres): at this facility? Cover Crop:Fescue Cover Crop: P� Fescue Cover Crop: P� Cover Crop: P: P1 YES ❑ No Hourly Rate (in): 0.30 Hourly Rate (in): 0.30 Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 25.78 Annual Rate (in): 25.67 Annual Rate (in): Annual Rate (in): Weather Freeboard Field Irrigated? 'I YES [_ I No Field Irrigated? [] YES ❑ No Field Irrigated? 9 I YES NO � Field Irri Irrigated? g [ [ YES ❑ NO o° (D -0 ° w w 3 (a m E 0 H ° Y a v d a, Ln m ° a, N 9 a m �° fl °_ � (D ui a) •o E a) 0 Q ° a Q a al Y E m i- - _ rn C m y o o J E rn 7` C E 0 0 = o J ai -° E O 0 Q o a Q o N ��,, E� i= °� rn >, C ,� a o o J E rn 7 �` C E 0 x° o J ai v E .O 0 a °° Q v CD 2 E i- °� _ 01 >. C o o o J E m 7 �` C E ti �= o J a, •0 E al 0 Q o a Q 'o a7 ��,, E m rn T C o J E rn 7 —` a E 3 a @ x o J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 PC 88 2 C 84 92,109 284 0.90 0.19 3 PC 79 4 PC 81 4.8 5 C 91 6 7 CL 88 8 CL 90 9 PC 90 10 PC 84 33,411 230 0.73 0.19 11 PC 88 5 12 13 14 PC 97 15 PC 100 16 C 91 93.202 287 0.92 0.19 17 PC 91 18 C 91 5 19 C 90 20 21 PC 97 37,214 257 0.81 0.19 22 PC 93 23 C 88 24 C 95 25 PC 97 5.3 26 C 97 27 PC 93 28 PC 88 29 PC 91 30 CL 88 32,459 224 0.71 0A9 82 0.25Monthly Loading: r�t 103,084 2.25 185311 1.82 0 0.00 0 0 00 Month Floating Total (in): . ` 18.51 ,,,,. , ,, 18.82-, FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of 3 Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑ Non -Compliant (] Compliant ❑ Non -Compliant ❑s Compliant ❑ Non -Compliant i] compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Douglas W. Goodwin Permittee: Mountaire Farms Inc Certification No.: 18557 Signing Official: Douglas W. Goodwin Grade: SISO Phone Number: Signing Officials Title: Regional Hatchery Manager Has the ORC changed since the previous NDAR-1? ❑ Yes 0 No Phone Number: 919-548-5024 Permit Exp.: 12/31/26 1' !z29 z3 C 24 2- Signature Date Signature Date By this signature, I certify that this report is accurate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617