HomeMy WebLinkAboutWQ0002428_Monitoring - 08-2023_20230929Monitoring Report Submittal
Permit Number#* WQ0002428
Name of Facility:* Mountaire Farms- Mt Vernon Hatchery
Month: * August Year: * 2023
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR NDMR-NDAR WQ0002428 August 2023.pdf 1.52MB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address: * dgoodwin@mountaire.com
Name of Submitter: * Douglas W. Goodwin
Signature:
.0m,/n1%i% �7rYY/.rriv
Date of submittal: 9/29/2023
This will be filled in automatically
Initial Review
Reviewer: Wanda.Gerald
Is the project number correct?* W00002428
Is the monitoring report accepted?* Yes NO
Regional Office* Raleigh
Reviewer: _anonymous
Review Date: 10/3/2023
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ! of 2-
Permit No.: WQ0002428
Facility Name: Mount Vernon Hatchery
County: Chatham
Month: August
Year: 2023
PPI: 001
Flow Measuring Point: U Influent U Effluent J No now generated
Parameter Monitoring Point: I Influent L Effluent Groundvrater l oti:eung surface "Dater
Parameter Code -►
50050
00310
00916
00940
50060
31616
00927
00610
00625
00620
00600
00400
00665
00931
70300
00530
a)
¢ E
O
c
E
o
FL
Ln
p
E
'2
u
o
'
,v
, ao
E
_
U
LL O
a,
CM-
m
f0
c
O
E
Q
c
Y
Z
~
c
o
,'
Z
O
ooN
N
E 0
O
(n
Q
> -o_
O
ow
FN�
60
-0
_ocu vc° _
a O
7n
U
24-hr
hrs
GPD
mg/L
mg/L
mg/L
mg/L
#/100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
su
mg/L
Ratio
mg/L
mg/L
1
04:00
13
22,184
2
05:15
9.3
22,184
3
05:30
11.7
22,184
4
03:45
12.8
22,184
5
06:15
2.8
1 22,184
6
22,184
7
05:45
11.3
22,184
8
04:00
13.3
22,184
9
04:45
12.4
22,184
10
05:15
11.9
22,184
11
05:30
11.3
22,184
12
22,184
13
22,184
14
05:40
11.1
22,184
15
05:00
12
22,184
16
05:00
11.8
22,184
17
06:45
10.3
22,184
18
06:15
10.9
22,184
19
08:30
2
22,184
20
22,184
21
04:50
12.3
22,184
22
05:00
12.5
22,184
23
07:00
10
22,184
24
04:45
11.3
22,184
251
06:30
10.8
22,184
26
08:00
4
22,184
27
06:15
2.3
22,184
28
05:00
12.5
22,184
29
05:00
12
22,184
30
05:00
12
22,184
311
05:00
1 12
22,184
Average:
22,184
Daily Maximum:
22,184
Daily Minimum:
22,184
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Calculated
Grab
Grab
Grab
Monthly Avg. Limit:
24,840
Daily Limit:
Sample Frequency:
Continuous
3 x Year
3 x Year
3 x Year
Weekly
3 x Year
3 x Year
3 x Year
3 x Year
3 x Year
Weekly
3 x Year
3 x Year
3 x Year
3 x Year
3 x Year
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page Z of 2-
Sampling Person(s) Certified Laboratories
Name: Name:
Name: Name:
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? [A Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Did not sample effluent from lagoon #3 as we are in the middle of project to dewater, remove sludge and remove/install liner
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Douglas W. Goodwin
Permittee: Mountaire Farms Inc
Certification No.: 18557
Signing Official: Douglas W. Goodwin
Grade: SISO Phone Number: 919-548-5024
Signing Official's Title: Regional Hatchery Manager
Has the ORC changed since the previous NDMR? ❑ Yes F] No
Phone Number: 919-548-5024 Permit Expiration: 12/31/2026
Signature Date
Signature Date
By this signature, I certify that this report is accurrale and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _L of 3
Permit No.: WQ0002428
Facility Name: Mount Vernon Hatchery
County: Chatham
Month: August
Year: 2023
Did irrigation
Field Name:
A
Field Name:
B
Field Name:
C
Field Name:
D
occur
Area (acres):
1.17
Area (acres):
2.60
Area (acres):
1.90
Area (acres):
2.13
at this facility?
Cover Crop:Fescue
Cover Crop:
P�
Fescue
Cover Crop:
P:
Fescue
Cover Crop:
p:
Fescue
❑.r YES ❑ NO
Hourly Rate (in):
0.30
Hourly Rate (in):
0.30
Hourly Rate (in):
0.30
Hourly Rate (in):
0.30
Annual Rate (in):
26.66
Annual Rate (in):
25.71
Annual Rate (in):
25.76
Annual Rate (in):
25.74
Weather
Freeboard
Field Irrigated?
n YES ❑ No
Field Irrigated?
j [ YES ❑ NO
Field Irrigated?
[[ YES ❑ No
Field Irrigated?
YES [ No
�
m
~
c
D
WO
m
T>
to
Ln
o a
Q
-
_
-FuE
0
o)
Ez)u
oo
=
E a
> a
E m
L-
_
-6
0
J
E
E -6
o
;x
J
a,
E .°
a
>
-_a
M
J
E oi
D
E�-6
o0
J
EQa
o aFE
> Q
-_m
L-
arn
J
EE >3 rnU
=C:E
o
JE
>
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
PC
88
31,742
320
1.00
0.19
70,653
320
1.00
0.19
2
C
84
3
PC
79
4
PC
81
4.8
5
C
91
6
7
CL
88
28,109
211
0.54
0.15
41,025
167
0.71
0.25
8
CL
90
9
PC
90
10
PC
84
11
PC
88
5
12
13
14
PC
97
26,525
267
0.83
0.19
59,041
267
0.84
0.19
15
PC
100
16
C
91
17
PC
91
18
C
91
5
19
C
90
20
21
PC
97
22
PC
93
23
C
88
24
C
95
14,068
107
0.27
0.15
39,226
160
0.68
0.25
25
PC
97
5.3
26
C
97
27
PC
93
28
PC
88
27,566
278
0.87
0.19
61,355
278
0.87
0.19
29
PC
91
30
CL
88
31
R
82
0.25
Monthly Loading:
85,833
2.70
191,049
2.71
42,177
0.82
;,..:
80,251
1.39
12 Month Floating Total (in):
19.21
1
19.24
17.05
18.681'
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page I of 3
Permit No.: WQ0002428
Facility Name: Mount Vernon Hatchery
County: Chatham
Month: August
Year: 2023
Did irrigation
Field Name:
E
Field Name:
F
Field Name:
Field Name:
occur
Area (acres):
1.69
Area (acres):
3.75
Area (acres):
Area (acres):
at this facility?
Cover Crop:Fescue
Cover Crop:
P�
Fescue
Cover Crop:
P�
Cover Crop:
P:
P1 YES ❑ No
Hourly Rate (in):
0.30
Hourly Rate (in):
0.30
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
25.78
Annual Rate (in):
25.67
Annual Rate (in):
Annual Rate (in):
Weather
Freeboard
Field Irrigated?
'I YES [_ I No
Field Irrigated?
[] YES ❑ No
Field Irrigated?
9
I YES NO
�
Field Irri
Irrigated?
g
[ [ YES ❑ NO
o°
(D
-0
°
w
w
3
(a
m
E
0
H
°
Y
a
v
d
a,
Ln
m
°
a,
N 9
a m
�°
fl
°_
� (D
ui
a) •o
E a)
0 Q
° a
Q
a
al Y
E m
i- -
_
rn
C
m y
o o
J
E rn
7` C
E 0 0
= o
J
ai -°
E O
0 Q
o a
Q
o
N ��,,
E�
i= °�
rn
>, C
,� a
o o
J
E rn
7 �` C
E 0
x° o
J
ai v
E .O
0 a
°°
Q
v
CD 2
E
i- °�
_
01
>. C
o
o o
J
E m
7 �` C
E ti
�= o
J
a, •0
E al
0 Q
o a
Q
'o
a7 ��,,
E m
rn
T C
o
J
E rn
7 —` a
E 3 a
@ x o
J
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
PC
88
2
C
84
92,109
284
0.90
0.19
3
PC
79
4
PC
81
4.8
5
C
91
6
7
CL
88
8
CL
90
9
PC
90
10
PC
84
33,411
230
0.73
0.19
11
PC
88
5
12
13
14
PC
97
15
PC
100
16
C
91
93.202
287
0.92
0.19
17
PC
91
18
C
91
5
19
C
90
20
21
PC
97
37,214
257
0.81
0.19
22
PC
93
23
C
88
24
C
95
25
PC
97
5.3
26
C
97
27
PC
93
28
PC
88
29
PC
91
30
CL
88
32,459
224
0.71
0A9
82
0.25Monthly
Loading:
r�t
103,084
2.25
185311
1.82
0
0.00
0
0 00
Month Floating Total (in):
. `
18.51
,,,,. , ,,
18.82-,
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of 3
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑� Compliant
❑ Non -Compliant
(] Compliant
❑ Non -Compliant
❑s Compliant
❑ Non -Compliant
i] compliant
❑ Non -Compliant
❑� Compliant
❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Douglas W. Goodwin
Permittee:
Mountaire Farms Inc
Certification No.: 18557
Signing Official: Douglas W. Goodwin
Grade: SISO Phone Number:
Signing Officials Title: Regional Hatchery Manager
Has the ORC changed since the previous NDAR-1? ❑ Yes 0 No
Phone Number: 919-548-5024 Permit Exp.: 12/31/26
1'
!z29 z3
C 24 2-
Signature Date
Signature Date
By this signature, I certify that this report is accurate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617