HomeMy WebLinkAboutNCG500652_Compliance Inspection Report_20230907DocuSign Envelope ID: 871AB8FB-5306-456A-8D62-5F93EA459DE2
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Lorenz Falls
Butterball LLC
5604 Turkey Hwy
Turkey, NC 28393
NORTH CAROLINA
Environmental Quality
September 07, 2023
SUBJECT: Compliance Inspection Report
Butterball Feed Mill
NPDES WW Permit No. NCG500652
Sampson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Butterball Feed Mill on
8/29/2018. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NCG500652. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this.
inspection report is not required.
D �North Carolina Department of Environmental Quality I Division of Water Resources
:/ Fayetteville Regional Office 1 225 Green Street Suite 114 1 Fayetteville, North Carolina 28301
910.433.3300
DocuSign Envelope ID: 871AB8FB-5306-456A-8D62-5F93EA459DE2
If you should have any questions, please do not hesitate to contact Katie Fontenot with the Water
Quality Regional Operations Section in the Fayetteville Regional Office at 910-433-3300 or via email at
katie.fontenot@deq. nc.gov.
Sincerely,
DoouSigned by:
Ault, f. F011L . f 9/7/2023
F96478EC87AF402... ww
Katie Fontenot, Environmental Specialist I
Water Quality Regional Operations Section
Fayetteville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: WQS Fayetteville Regional Office - Enforcement File
NPDES Compliance/Enforcement Unit - Enforcement File
Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Fayetteville Regional Office 1 225 Green Street Suite 114 1 Fayetteville, North Carolina 28301
910.433.3300
DocuSign Envelope ID: A06AE4C8-A873-49DC-AF92-554AF4BF588B
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 2 u 3 I NCG500652 111 121 23/09/07 I17 18 I C I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 73 � I 74 79 I I I I I I I80
70 I I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:30AM 23/09/07
21/01/05
Butterball Feed Mill
5604 Turkey Hwy
Exit Time/Date
Permit Expiration Date
Turkey NC 28393
10:30AM 23/09/07
25/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Lorenz Falls,5604 Turkey Hwy Turkey NC 28393//919-778-3130/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Other
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Katie Fontenot Doausigned by: DWR/FRO WQ/910-433-3327/
Et, f,D L 1 9/25/2023
wwt
F96478EC87AF402_
Signature of Manage UA�miedyer Agency/Office/Phone and Fax Numbers Date
6MAA {," 9/25/2023
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
DocuSign Envelope ID: A06AE4C8-A873-49DC-AF92-554AF4BF588B
NPDES yr/mo/day Inspection Type (Cont.)
NCG500652 I11 12I 23/09/07 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
As part of the inspection conducted on September 7th, 2023, a tour of the plant was conducted along
with a review of the monitoring data. Butterball Turkey Feed Mill, located at 5604 Turkey Hwy, Turkey
NC contracts Environmental Chemist Inc. to perform all the monthly boiler water analysis of the
subsurface wastewater system including pH, Temperature, Ammonia series, metals, dissolved solids
and Oil and Grease. Zee Chemical company is the company that supplies and put chemicals into the
Boiler. Due to the chemicals the plant properly samples for Chemical Oxygen Demand (Cod). There
is no chlorine added to the Boiler. The effluent is discharged into a rocky ditch which the water is
absorbed by the soil therefore, no upstream or downstream temperature measurements are required.
During the record review one sample in August 2023 had the pH of a 11. Take required action to keep
your pH between 6-9 as stated in your permit section 3. However, the history of pH seemed to fall
between 6-9 historically. The boiler room was clean of debris and leaks. There were no
environmental concerns at the time of the inspections. Thank you for your time, no response is
needed from your office at this time.
Page#
DocuSign Envelope ID: A06AE4C8-A873-49DC-AF92-554AF4BF588B
Permit: NCG500652 Owner -Facility: Butterball Feed Mill
Inspection Date: 09/07/2023 Inspection Type: Compliance Evaluation
Other
Comment:
Yes No NA NE
Page#