HomeMy WebLinkAbout20230824 Ver 1_Design/Maps/Site Plans_20230905HEET INDEX:
No. TITLE
C-000 COVER SHEET
C-001 GENERAL NOTES
C-101 EXISTING CONDITIONS
C-301 PROPOSED SITE GRADING PLAN
C-401 PROPOSED PLAN
C-501 PROFILE
C-601 CROSS SECTION
C-701 ACCESS/WORK AREA PLAN
C-801 TYPICAL DETAILS
C-802 TYPICAL DETAILS
C-803 TYPICAL DETAILS
cruswc
COLONIAL PIPELINE COMPANY
LICK CREEK
LINE 24 SHALLOW COVER
ALAMANCE COUNTY
SNOW CAMP, NC
utp;111n
M
8°17°
VICINITYMAP
SCALE: I "=1Q000'
M
;O
U
r w
1711 Dunn Street
O
Houma, LA 70360
Ph.985-868-0001
Fax 985-851-0108
QEmail:
submar@submar.com
Website: www.submar.com
m
cn
Vandals
CP
COLONIAL PIPELINE COMPANY
SURVEY NOTES:
1. THIS SURVEY IS FOR INFORMATIONAL PURPOSES
ONLY AND WAS CONDUCTED ON THE GROUND
ON 3/30/2023, BUT DOES NOT CONFORM TO
THE MINIMUM STANDARDS SET FORTH BY THE
STATE BOARD FOR PROFESSIONAL ENGINEERS
AND SURVEYORS.
2. COORDINATE SYSTEM IS SITE SPECIFIC AND
BASED OFF OF CP1.
3. ALL LOCATIONS OF UNDERGROUND UTILITIES
SHOWN ARE APPROXIMATE. ACTUAL PIPELINE
LOCATION SHOWN IS ESTIMATED SHALL BE
VERIFIED PRIOR TO CONSTRUCTION.
4. LOCATION OF RIGHT OF WAY SHOWN IS
APPROXIMATE, INFORMATION WAS PROVIDED BY
OWNER AND IS FOR INFORMATIONAL PURPOSES
ONLY.
LEGEND:
BURIED PIPELINE
- - - - APPARENT RIGHT OF WAY
EXISTING CENTERLINE
ALIGNMENT
PROPOSED CENTERLINE
ALIGNMENT
III=III PROPOSED FILL
PROPOSED CUT
O BURIED PIPELINE
CP1
CONTROL POINT
500(A)� PROPOSED ELEVATION
1
C601 SECTION INDICATORS
1 SECTION INDICATORS
C401
m 1 1
WETLAND
® WETLAND IMPACT
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVE
BY SUBMAR, INC. COPYRIGHT SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED.
ONTROL POINTS:
No.1
NORTHING (N)
EASTING (E)
ELEVATION (Z)
1
762,733.7'
1 ,905,490.7'
536.0'
2
762,631.9
1,905,798.3'
524.3'
3
7Rq s7a_a'
1 ans a7R_9'
522.5'
GRADING NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ANY
SPECIAL REQUIREMENTS OF THE PERMIT.
2. NO EXCAVATION SHALL BE STARTED WITHOUT FIRST
NOTIFYING ONE CALL 48 HOURS PRIOR TO
COMMENCEMENT OF WORK. A PRE -GRADING MEETING
SHALL BE SCHEDULED AT THE SITE BEFORE START
OF GRADING WITH THE FOLLOWING PEOPLE PRESENT:
OWNER, CONTRACTOR & INSPECTOR.
3. PRIOR TO ANY CLEARING, BRUSHING OR DEMOLITION,
OTHER THAN WHAT IS AUTHORIZED, APPROVAL MUST
BE OBTAINED FROM THE PROJECT MANAGER AND
INSPECTOR.
4. CUT SLOPES SHALL NOT BE STEEPER THAN 1.5:1
SLOPE.
5. ALL TRENCH BACKFILLS SHALL BE EXAMINED AND
CERTIFIED BY THE SITE INSPECTOR PER THE GRADING
PLAN.
6. DUST ABATEMENT SHALL BE CONTROLLED BY
WATERING.
7. SANITARY FACILITIES SHALL BE MAINTAINED ON THE
SITE PLUS CONTAINMENT.
8. ALL PUBLIC ROADWAYS MUST BE MAINTAINED DAILY
OF ALL DEBRIS DEPOSITED ON THEM AS A RESULT
OF THE CONSTRUCTION OPERATION. CLEANING IS TO
BE DONE TO THE SATISFACTION OF THE OWNER.
ENVIRONMENTAL NOTES:
1. THE OWNER SHALL NOTIFY ALL CONTRACTORS,
SUBCONTRACTORS & MATERIAL SUPPLIERS THAT
DUMPING OF CHEMICALS INTO THE STORM DRAIN
SYSTEM IS PROHIBITED.
2. PERMITTEE SHALL MAINTAIN CONSTRUCTION SITE IN
SUCH A CONDITION THAT AN ANTICIPATED STORM
DOES NOT CARRY WASTES OR POLLUTANTS OFF THE
SITE. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT
LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS;
WASTES FROM PAINTS, STAINS, SEALANTS, GLUES,
LIMES, PESTICIDES, HERBICIDES, WOOD
PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS,
PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS,
LUBRICANTS AND HYDRAULIC, RADIATOR OR BATTERY
FLUIDS; FERTILIZERS,VEHICLE/EQUIPMENT WASH
WATER AND CONCRETE WASH WATER; CONCRETE,
DETERGENT OR FLOATABLE WASTES; WASTES FROM
ANY ENGINE/EQUIPMENT STEAM CLEANING OR
CHEMICAL DEGREASING; AND SUPER CHLORINATED
POTABLE WATER LINE FLUSHING. DURING
CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH
MATERIALS IN A SPECIFIED AND CONTROLLED
TEMPORARY AREA ON -SITE, PHYSICALLY SEPARATED
FROM POTENTIAL STORM WATER RUNOFF, WITH
ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL,
STATE AND FEDERAL REQUIREMENTS.
3. CONTRACTOR SHALL CONSTRUCT PROJECT AS
AUTHORIZED IN PERMITTED DRAWINGS. ANY CHANGES
MUST FIRST BE APPROVED BY PROJECT MANAGER,
OWNER AND INSPECTOR AND DOCUMENTED IN THE
CONSTRUCTION CREW BOOK.
CONSTRUCTION NOTES:
1. ALL WORK IS TO BE PERFORMED IN LOW FLOW
CONDITIONS WHEN POSSIBLE. IT IS PREFERRED THAT
WORK OCCURS DURING THE DRY SEASON (OR
OTHERWISE UPSTREAM CONTROLS MANAGED TO
MINIMIZE FLOW), CONTRACTOR SHALL MONITOR
WEATHER CONDITIONS AND PLAN CONSTRUCTION
ACTIVITIES ACCORDINGLY TO AVOID IN -STREAM WORK
DURING RAIN EVENTS AND MINIMIZE EXPOSURE OF
DISTURBED SOILS TO RAINFALL.
2. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
IN GOOD WORKING CONDITION AND FREE OF
HYDRAULIC, FUEL OR OIL LEAKS. THERE SHOULD BE
A PORT-O-POT ONSITE . FUEL, HEAVY EQUIPMENT
AND ALL CHEMICAL PRODUCTS SHOULD HAVE
ADEQUATE CONTAINMENT.
3. PERIMETER EROSION AND SEDIMENT CONTROLS SHALL
BE ESTABLISHED ALLOWING FOR SUBSEQUENT
CLEARING AND GRUBBING WITHIN THE PROJECT AREA.
4. SALVAGE, FURNISH AND WASTE MATERIALS SHALL BE
TEMPORARILY STOCKPILED IN A DESIGNATED
APPROVED AREA UNTIL FINAL HANDLING FOR ULTIMATE
PLACEMENT. IT IS THE RESPONSIBILITY OF THE
SELECTED CONTRACTOR TO ESTABLISH APPROVED
STOCKPILE, STAGING AND ACCESS AREAS. IF A RAIN
EVENT IS EMINENT, THEN A SILT FENCE SHALL BE
INSTALLED BETWEEN THE STOCKPILE SOIL AND THE
EXISTING STREAM.
5. UPON COMPLETION OF WORK, ALL EXCESS OR
TEMPORARILY STOCKPILED SOILS, STUMPS OR OTHER
MATERIAL SHALL BE PERMANENTLY REMOVED AND
PLACED IN UPLAND STORAGE AREAS, PER LOCAL,
STATE AND FEDERAL REQUIREMENTS.
6. IT MAY BE NECESSARY TO DIVERT STREAM FLOW
AROUND THE WORKING AREA TO FACILITATE
CONSTRUCTION USING A BYPASS PUMP OR JERSEY
BARRIER. IN NO INSTANCE SHALL SILT LADEN WATER
BE DISCHARGED INTO THE STREAM, DIRECTLY OR
INDIRECTLY.
7. ALL TEMPORARY ACCESS, STAGING, STOCKPILE OR
OTHER TEMPORARILY DISTURBED AREAS SHALL BE
STABILIZED AND REESTABLISHED TO THEIR
PRE -CONSTRUCTION CONDITIONS, INCLUDING GRADE
AND VEGETATION.
8. ALTHOUGH THIS PLAN MAKES EVERY ATTEMPT TO
ACCOUNT FOR EROSION AND SEDIMENT CONTROL,
BANK STABILIZATION AND CONSTRUCTION LOGISTICS,
UNFORESEEN CIRCUMSTANCES MAY ARISE THAT
REQUIRE ADDITIONAL OR MODIFIED MEASURES TO
CONTROL SEDIMENT, STABILIZE RIPARIAN STREAM
BANKS AND FACILITATE STRUCTURE INSTALLATION.
CONTRACTOR SHALL WORK WITH CLIENT AND
ENGINEER, AS NECESSARY, TO ENSURE THAT THE
PROJECT IS CONSTRUCTED IN ACCORDANCE WITH THE
INTENT OF THESE PLANS.
0
U
wooa
:2
Nnl=
g-�
I
m
o:2w3
0 Li
a to
m
w
3
d
m
0 U
N
M M
N ca
0 00
N
'-, o
M Z
� U
w
i..i
1- 0
o CL
:1
!i!
w
z
J
w
VIL
J
a
z
0
J
0
U
rig
TF
0
0
Jz
U
YQOz
LU = U
LLI (n Lw Q
UNZ'
Y LU:�
UZQ0
JJQ(n
SHEET TITLE:
GENERAL
NOTES
SHEET No:
C-001
............... ........... .... . \
\ . . . . . . . . . . . . . . . . . . . . . . v
.� - - - - - - - - - - - - - - -
\ - - - - - - - - - -
DELINEATED WETLAND \ \� - - - - - - - - - -``;\ Csp -�
\ \ \ 11
COLONIAL PIPELINE J \ \
16" 22 PIPELINE \ \
CP3 \ \ 4
\ C60
COLONIAL PIPELINE \
8" 23 PIPELINE \
\ EXISTING LOW
WATER CROSSING
\
\ \ IXISTING CENTERLINE ;
COLONIAL PIPELINE \ \ ALIGNMENT
8" 24 PIPELINE
\ \ zz C601
TOF
DEBRIS
(TO BE REMOVED)
— o0
`'
DELINEATED UNNAMED . . .
INTERMITTENT STREAM _ _ _ . .
DELINEATED
` PERENNIAL STREAM
. . . . . . .
. . . 1
. . . . . . . . . . .
. . . . . . :%
-I
I
.
`
8.0(D)
- -
- - -
TOE
TREE LINE
. . . . . . .
.
HIGH BANK
I -
.. \.
_
' 45 ; ; �'�' -PROPOSED CENTERLINE - - - -
�'� - ALIGNMENT
-
\
�. . . . .
. . . . .
\ \
`,V
DEER STAND
(TO BE MOVED)
/ 518.0(C)
SHALLOW COVER \ \ \
DELINEATED WETLAND , . . . . . . \ .. _
\
F I INF — _ . . . . . . .
NOTE:
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR 1. CONTROL POINT 1 AND 2 NOT SHOWN FOR CLARITY.
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED 0, 10, 2O 30'
BY SUBMAR, INC. COPYRIGHT C LLC. 2023 ALL RIGHTS
RESERVED.SCALE' 1 "=10'
o
O
U
a
O Q
w � _
doom
VI 00 O
ZgfDln
I
0�00
LO
P�
CO
�o w
av)
m
w
3
INN
N
�
ISM
Z
Y
0
U
N
N
o °0
N
� o
tM Z
F_
U
w
o CL
z
Q
d
m
0
U
u
n
0,
U
0 Z
JDU
YQOZ
LLI = U
LU (n Lw Q
U N Z U
Y LLI
0
J J Q (n
SHEET TITLE:
EXISTING
CONDITIONS
SHEET No:
C-101
/ O
. . . . . . . . . . . . . . . . . - - - - DELINEATED UNNAMED F`' �o
INTERMITTENT STREAM DELINEATED w ►fDo o Q
. . . . . . . . . . . . . . . . . . . TREE LINE. . . . . . . . . . . . . . . - �� PERENNIAL STREAM o o m
Nn00 lD
\ ,'�,, Z-100
Ailt,3
`t �LO
. . . . . . . . - - - - . . . . . . . . 0�CO
== o
\ m
- - - - - - - - C 517.8(E) . . . - - - - 3
\ N d
DELINEATED WETLAND \ - - - - - - - - 601 " -
\\ ` \�S \� CNN
.�
\fir i-i r i i� i imi i-� i i� i i�i�i � i i� i i= i i� i i� i i
COLONIAL PIPELINE \ \ r . . . - p - - - - - - - - - - o
16" 22 PIPELINE \ \ 4
\ C60 ♦ / �- - - - - - o 0 0
\azz
\ N
518.0(D) - TOE (n w w C*4 ao
COLONIAL PIPELINE �\ \ o - - - - o N N o °O
\ 04
8" 23 PIPELINE \ \ �`'V ,�� J�
\ EXISTING CENTERLINE \ h , �'�;� - HIGH BANK N W o M z
\ \ ALIGNMENT Iryo - - w a a w
\ \ cN 4:1 / 2:1 SIDE SLOPES zl
\\ COLONIAL PIPELINE \ 518.0(C) v� / / �� �` (TYP.)
\\ 8" 24 PIPELINE i
\
a ,
In 11
3
l \
cV
. PROPOSED CENTERLINE \.
�
._
_
a
ue
h�/. . . .ALIGNMENT _ _ _ _ . . . .
.
\
\a.
"'Z. C6 1
. . . . . . . . . . . . . . . . . .
. .
. .
LOW WATER
CROSSING
CO
\
\
HIGH BANK TOE
h �cv N�
,yam' r
Ole
Ole
0
k
0
518
518.0(B)
- 523----- \ - - - - - - - -
\
\-i
z
518.2(A)
TOE
---�
- ` -� \ - - -
\
\
Y Q O z
- - - - -� -
� - - - - - - - - -
LL1 = U
Lu (n Lij IZ
DELINEATED WETLAND
N ZQU
Y Lu
\
\
\
gZgo
v
J J Q Un
SHEET TITLE:
r TREE LINE _ . . . . . . . .
_ . . . . . .
PROPOSED
- . . .
SITE GRADING
PLAN
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
01 10, 2O
30'
SHEET No:
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED
BY SUBMAR, INC. COPYRIGHRESERVED.AR, LLC. 2023 ALL RIGHTS SCALE' 1 "=109
30
/f
3' DEEPx30' LONG RIPRAP =♦,
. . . . SUBGRADE DELINEATED
TREE LINE DELINEATED UNNAMED (12" DIA.)
INTERMITTENT STREAM . . . - - 401 PERENNIAL STREAM
RIPRAP 3' DEEPx15' LONG
(12" DIA.) RIPRAP SUBGRADE ► ,
. . . . . . . $ - - - - - - - - (12" DIA.)
\ - - - - - - - - - - - C601 . . . - - - . . . .,
\ /
DELINEATED WETLAND \\\�
COLONIAL PIPELINE \\ 4
16" 22 PIPELINE \C601
\
EXISTING CENTERLINE
COLONIAL PIPELINE ALIGNMENT
8" 23 PIPELINE
\
\ \ \ 518.0(C) -
\ \ \ COLONIAL PIPELINE \ \ C 3
\ 8" 24 PIPELINE 601
HIGH BANK
E--
RIPRAP
(12" DIA.)
MAMA -
� i
I
518.2(A)
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED 0' 10, 20' 30'
BY SUBMAR, INC. COPYRIGHT C LLC. 2023 ALL RIGHTS
RESERVED.SCALE' 1 "=10'
518.0(B)
RIPRAP
(12" DIA.)
TREE LINE
- RIPRAP
o` (12" DIA.)
511
rmmw
�y��� •I�f�i�SUBMAR MAT SYSTEM
%r
r
I-
EMMA
,� ,�,.=���♦�♦i 13ACKFILL EXCAVATED
♦� TRENCH WITH
!-N iiV A ` .EXISTING MATERIAL
�'�;�♦♦,e♦ems
h�o.�♦♦
�s♦♦♦.,s
PROPOSED CENTERLINE
ALIGNMENT
►e♦e♦♦♦LOW WATER
CROSSING
SEED & PLACE EROSION
ALL DISTURBED AREAS \
(1,566 SF TOTAL) \
DELINEATED WETLAND \\
IMPACT TABLE
LINEAR IMPACT -
PERENNIAL STREAM
50
LF (MATS) (0.0046 ACRES)
35
LF (RIPRAP) (0.0037 ACRES)
LINEAR IMPACT -
UNNAMED
0 LF
(MATS) (0 ACRES)
INTERMITTENT STREAM
35
LF (RIPRAP) (0.0022 ACRES)
mWETLAND
IMPACT
180
SF (MATS) (0.0041 ACRES)
-
163
SF (RIPRAP) (0.0037 ACRES)
o
O
0
a
_
W (D O Q
woom
W 00 O
°O
zgtOv,
00
0�0`003
P�
�o w
r__~
0_ v)
m
W
3
N
�
0
U
N
N ao
0 °0
N
� O
M Z
F-
0
Li
m d
z
a
m
0
0
LU
0
U
0z
JDU
YQOZ
LLl = U
W (n Lw Q
U N Z U
Ye Lu
O
J J Q (n
SHEET TITLE:
PROPOSED
PLAN
SHEET No:
C-401
530
BACKFILL EXCAVATED
TRENCH WITH
EXISTING MATERIAL SUBMAR MAT SYSTEM
518.0(B) 8'x20' (12 TOTAL)
518.2(A) 518.0(C)
520
510
500
0 00
COLONIAL PIPELINE
8" 24 PIPELINE
PROPOSED
GRADE
COLONIAL PIPELINE
8" 23 PIPELINE
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED 0, 10, 20' 30'
BY SUBMAR, INC. COPYRIGHT SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED. SCALE: 1 is=1 0,
518.0(D)
COLONIAL PIPELINE
16" 22 PIPELINE
530
3'DEEPx15'LONG
RIPRAP SUBGRADE
(12" DIA.)
EXISTING
GRADE
520
1 00
510
500
0
0
_U
Q
Ld
= 0 0:2
N ^ I
0o
O
0-0g0In
I
o:2w3
0 LLJ
_F-
a to
m
w
3
N
d
W
1
M
Z
Y
o
U
N
O N
w o 00
0 N
z o
Q r z
U � �
0 U
z
w
N Q �
0 O_
r
z
a
D_
m
0
U
w
z
J
W
V(L
O_
J
Q
Z
0
J
0
U
r"
Lu
i
O
U
O�
J z
J U
Y Q O Z
LLI = U
Lu (n w Q
U Nz�
Y Lu :
UZQ0
JJQ(n
SHEET TITLE:
PROFILE
SHEET No:
C-501
530
1 520
RIPRAP
EXISTING (12" DIA.)
GRADE
518.2(A)
RIPRAP
(12" DIA.)
COLONIAL PIPELINE COLONIAL PIPELINE
8" 24 PIPELINE 8" 23 PIPELINE
I 510
30
1 530
1 520
-20 -10 0 10 20
1
C401
530 530
520 520
BACKFILL EXCAVATED SUBMAR MAT SYSTEM
TRENCH WITH 8'x2O' (12 TOTAL) EXISTING
EXISTING MATERIAL GRADE
518.0(B)
— — — — — — — / — —
PROPOSED
GRADE
7 — — — — — —
COLONIAL PIPELINE
8" 24 PIPELINE
510 510 510 p U
30 -30 -20 -10 0 10 20 30
0 z w
� U
OWN
2
C401
BACKFILL EXCAVATED
TRENCH WITH SUBMAR MAT SYSTEM EXISTING
EXISTING MATERIAL 8'x2O' (12 TOTAL) GRADE 1
518.0(D)
PROPOSED
— — — — — — — — — — — — — — — — — — — — — GRADE — — — — — —
— — —
— — — — — — — — — — — — — — —
COLONIAL PIPELINE
I 16" 22 PIPELINE
510 510 510
30
BACKFILL EXCAVATED SUBMAR MAT SYSTEM
TRENCH WITH 8'x2O' (12 TOTAL) EXISTING
EXISTING MATERIAL GRADE
518.0(C) — —
PROPOSED
—--------- ---- —GRADE__
COLONIAL PIPELINE
8" 23 PIPELINE
-20 -10 0 10
3
C401
530
520
510
530 530
520 520
20 30 -30 -20 -10
RIPRAP
EXISTING (12" DIA.) RIPRAP
GRADE (12" DIA.)
— — — _ 517.8(E)
— RY79
-30 -20 -10 0 10 20
G
5
CC401
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED 0, 10, 2O 30'
BY SUBMAR, INC. COPYRIGHT C LLC. 2023 ALL RIGHTS
RESERVED.SCALE' 1 "=10'
0 10
4
C401
r 530
520
+ 510
30
20
o 0
U
530
a wILO o�
a
woom
(n 00 D
°O :5 -w
z
I
0�0`003
v� p rn
520
�__�
0_ v)
m
W
3
LLJ N
N
N
d
p ^
M
Z
Y
3
=
O
W N
p 0
w
N
0
ao
0:
0
N
530
U
Q
z
0
NWU
U
Q
0z
W
OWN
d
520
}
z
a
a
m
0
U
W
z
J
w
510 a
30 0 d
J
Q
z
0
J
0
U
LLI
0
U
0 Z
JDU
YQOZ
LLI = U
LLI (n Lj Q
U N Z U
Y LLI
Uzg0
J J Q (n
SHEET TITLE:
CROSS
SECTION
SHEET No:
C-601
........................:� „ 1
:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.: .::.'.:.
ACCESS PLAN
SCALE: 1 "=500'
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVED 0, 30' 60' 90,
BY SUBMAR, INC. COPYRIGHT SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED. SCALE: 1 "=30'
COLONIAL PIPELINE
16" 22 PIPELINE
.`•
COLONIAL PIPELINE
8" 23 PIPELINE
COLONIAL PIPELINE
8" 24 PIPELINE
WORK AREA PLAN
SCALE: 1 "=30'
IMPACT TABLE
PERMANENT IMPACTS
PERENNIAL STREAM
50 LF
MATS 0.0046 ACRES
35 LF
RIPRAP (0.0037 ACRES)
INTERMITTENT STREAM
MATS (0
35LLFR
PRAP (0.0022 ACRES)
WETLAND
180 SF
(MATS) (0.0041 ACRES)
163 SF
(RIPRAP) (0.0037 ACRES)
TOTAL PERMANENT IMPACTS
120 LF
STREAM
0.0078
ACRE WETLAND
TEMPORARY IMPACTS
STREAM
30 LF
UPSTREAM (0.0027 ACRES)
GRADING/WORKSPACE
30 LF
DOWNSTREAM (0.0027 ACRES)
GRADING/WORKSPACE
TOTAL TEMPORARY IMPACTS
60 LF
STREAM
TOTAL SITE IMPACTS
180 LF
STREAM
0.0078
ACRE WETLAND
o
O
U
a
_
ui(DD O�
Q
O O :2
0o
co
g to
ro
I
o:2w3
0 Li
a to
m
W
3
a
1
M
Z
Y
,.
0
U
N
M
M �
cV p0
O
CV
r O
Z
F-
U
W
W
0 d
Lw
0�
Jz
� U
Y Q O Z
LLl = U
W (n Lw Q
U N=')
Y W :2 3:
UZQo
JJQ(n
SHEET TITLE:
ACCESS/WORK
AREA PLAN
SHEET No:
C-701
SF
• MATTRESS TYPE: REVETMENT
• MATTRESS DIMENSIONS: 8' x 20' x 4.5"
• MATTRESS WEIGHT: AIR 6,200 POUNDS
• MATTRESS WEIGHT SUBMERGED: 3,600 POUNDS (APPROX.)
• CONCRETE DENSITY: 145 LBS PER CU. FT., 4,000 PSI
• 160 ELEMENTS: 5/8" ULTRA VIOLET STABILIZED
COPOLYMER EXTRUDED FIBER ROPE,
MINIMUM TENSILE STRENGTH 9,500 POUNDS
SUBMAR MAT SYSTEM
SCALE: N.T.S.
GEOTEXTILE PLAN LAYOUT
SCALE: N.T.S.
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVE
BY SUBMAR, INC. COPYRIGHT C SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED.
® 4.5" 8.25"
12"
INDIVIDUAL ELEMENT
�B
3.75"
2.25"
NOTE:
1. EXACT PLACEMENT OF MATS AND/OR
ANCHORS WILL BE DETERMINED IN
THE FIELD.
2. MATS ARE PLACED ON A GEOTEXTILE
FABRIC AS SHOWN IN DETAIL.
8' x 20' x
4.5" MATS
MAT 1
II III I�
.111
PLAN VIEW
PROPOSED
GRADE
GEOTEXTILE UNDERNEATH
SUBMAR MAT SYSTEM
EXISTING
GRADE III I I VS� f
BACKFILL EXCAV
3' DEEP TRENCH ..
COMPACTED MATERIAL
3' SUBMAR MAT SYSTEM
GEOTEXTILE UNDERNEATH
SUBMAR MAT SYSTEM TO BE
PLACED 1' BEYOND MAT SYSTEM
UPSTREAM ANCHOR TRENCH DETAIL
SCALE: N.T.S.
BACKFILL EXCAVATED EXISTING
2' DEEP TRENCH WITH GRADE
PROPOSED COMPACTED MATERIAL
GRADE
47
• III —III
lil 111 l l l l 2'
SUBMAR MAT
SYSTEM
3'
GEOTEXTILE UNDERNEATH
SUBMAR MAT SYSTEM TO BE
PLACED 1' BEYOND MAT
FLANK TRENCH DETAIL
SCALE: N.T.S.
RIPRAP TO BE PLACED AT
PROPOSED LEAST 3 ELEMENTS IN AND
GRADE A MINIMUM OF 10' OUT 7 EXISTING
/ f- GRADE
3'
SUBMAR
MAT
SYSTEM 10'
GEOTEXTILE UNDERNEATH
SUBMAR MAT SYSTEM
RIPRAP SUBGRADE RIPRAP GRADE CONTROL DETAIL
SCALE: N.T.S.
SS. WORM DRIVE CONNECTORS
MAT 2
/II1 11
NOTE:
316 STAINLESS STEEL 2,200 LB. BREAKING STRENGTH IN THE LINE
CONFIGURATION ABOVE. 5/16" NUT DRIVER NEEDED
SS. WORM DRIVE
CURRENT CONNECTORS
FLOW
MAT 1
PERIMETER MAT CONNECTION DETAIL
SCALE: N.T.S.
ROPE TUCKED J
UNDER
SIDE VIEW
8'x20'x
4.5" MATS
MAT 2 1
o
O
U
a
_
W (D O Q
La
w O OI m
W O0 =)
fD
Zg1n
m
I
0�0`003
��
v�!
� rn
O w
a 1n
m
W
3
N
�
�
I
M
Z
Y
3
=
_
0
U
N
O N
Ld O m
z O
Q z
AN Q U F-
O w
Z Lal
F O
Q�
m 0_
z
a
a
m
O
U
W
Z
J
w
VCL
d
J
Q
z
O
J
O
U
ry
w
0
U
0z
JDU
YQOz
LLJ = U
Lu (n LL! Q
U N Z U
Ye Lu
Uzg71
J J Q (n
SHEET TITLE:
TYPICAL
DETAILS
SHEET No:
C-801
HIGHBANK
CLEAN WATER SANDBAG
DAM (SEE CROSS SECTION)
SUMP -HOLE OR POOL
(12" TO 18" DEEP 2'
DIA.)
SUCTION PIPE
STREAM DIVERSION PUMPS
WITH CONTAINMENT
HIGHBANK
APPROVED DEWATERING PUMP WITH
CONTAINMENT
SUCTION _
TOE PIPE
SEDIMENT _
SANDBAG DAM
DISCHARGE PIPE
WORK AREA LENGTH
-NOT TO EXCEED THAT WHICH CAN BE -
COMPLETED IN ONE DAY
BASE FLOW + 1'
DISCHARGE PIPE
(2' MIN.)
r� SEDIMENT BAG
STRAW BALES
IMPERVIOUS
SHEETING
WORK AREA
SANDBAG DAM
CROSS SECTION
ENERGY DISSIPATOR
(PUMPS SHOULD DISCHARGE
ONTO A STABLE VELOCITY
DISSIPATOR MADE OF RIPRAP
OR SANDBAGS)
DEWATERING DETAIL
SCALE: N.T.S.
AAA' A n
ea
STRAP nA' naa"� ne
e <°�Ie
°
FLOW "
FILTER BAG 12" MIN.
° eaae°�^anEaa �� 4a
e<e`a�ea°B<g<�a a4�
neap°°<a °°o a>e^' ^e ' °n a e� ^> � a a °a'$ A
PUMP DISCHARGE A.ea < e $Qa°d ° e $a a e 12" MIN.
HOSE
PLAN VIEW MULCH, LEAF / WOOD COMPOST,
STRAP WOODCHIPS, SAND OR STRAW
BALES
FLOW ; SLOPE
5% MAX.
$ $n <a ad' nn°Ba: cca>?. .eo >e Qf., :,;.;.Qo .. •°� ..n>^enAgg&ZA' n °
8" MIN.
ELEVATION FILTER BAG
FILTER BAG CONSTRUCTION SPECIFICATIONS
1. TIGHTLY SEAL SLEEVE AROUND THE PUMP DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE.
2. PLACE FILTER BAG ON SUITABLE BASE (E.G., MULCH, LEAF/WOOD COMPOST, WOOD CHIPS, SAND OR
STRAW BALES) LOCATED ON A LEVEL OR 5% MAX. SLOPING SURFACE. DISCHARGE TO A STABILIZED AREA.
EXTEND BASE A MIN. OF 12" FROM EDGES OF BAG.
3. CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE FILTER BAG IN ACCORDANCE
WITH THE MANUFACTURING RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE PUMPING
RATE.
4. REMOVE & PROPERLY DISPOSE OF FILTER BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER
BAG HAS REACHED CAPACITY, WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE
BAG IN AN APPROVED UPLAND AREA AND STABILIZE WITH SEED AND MULCH BY THE END OF THE WORK
DAY. RESTORE THE SURFACE AREA BENEATH THE BAG TO ORIGINAL CONDITION UPON REMOVAL OF THE
DEVICE.
5. USE NONWOVEN GEOTEXTILE WITH DOUBLE STITCHED SEAMS USING HIGH STRENGTH THREAD. SIZE SLEEVE
TO ACCOMMODATE A MAX. 4" DIA. PUMP DISCHARGE HOSE. THE BAG MUST BE MANUFACTURED FROM A
NONWOVEN GEOTEXTILE THAT MEETS OR EXCEEDS MIN. AVERAGE ROLL VALUES (MARV) FOR THE
FOLLOWING: GRAB TENSILE 250 LB ASTM
D-4632
PUNCTURE 150 LB ASTM D-4833
FLOW RATE 70 GAL/MIN/FT' ASTM D-4491
PERMITTIVITY (SEC-) 1.2 SEC' ASTM D-4491
UV RESISTANCE 70% STRENGTH ® 500 HOURS ASTM D-4355
APPARENT OPENING SIZE (ADS) 0.15 - 0.18 MM ASTM D-4751
SEAM STRENGTH 90% ASTM D-4632
6. REPLACE FILTER BAG IF BAG CLOGS OR HAS RIPS, TEARS OR PUNCTURES. DURING OPERATION KEEP
CONNECTION BETWEEN PUMP HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING IF IT BECOMES
DISPLACED.
FILTER BAG DETAIL
SCALE: N.T.S.
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVE
BY SUBMAR, INC. COPYRIGHT C SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED.
MAX
' CENTER
TO CENTER �1
36" MIN. FENCE
POST LENGTH
WOVENSLIT FILM
_
EMBED GEOTEXTILE-OTEXTILE
MIN. OF 8" VERTICALLY
INTO THE GROUND. BACKFILL FLOW,
AND COMPACT THE SOIL ON a,
BOTH SIDES OF GEOTEXTILE
POSTS
STEP 1
STAPLE J��{{ II STAPLE
STEP 3�
e
36" MIN. FENCE POST
LENGTH DRIVEN MIN. 16"
INTO GROUND
16" MIN. HEIGHT OF
WOVEN SLIT FILM GEOTE)
8" MIN. DEPTH_
INTO GROUND
ELEVATION
FENCE POST 18"
MIN. ABOVE GROUND
UNDISTURBED
GROUND
FENCE POST DRIVEN
A MIN. OF 16" INTO -
THE GROUND
CROSS SECTION
STEP 2j
STAPLE STAPLE
TWIST POST TOGETHE
STAPLE - STAPLE
FINAL
CONFIGURATION
STAPLE STAPLE
JOINING TWO ADJACENT SILT
FENCE SECTIONS (TOP VIEW)
1. USE WOOD POSTS 1-3/4" x 1-3/4" t 1/16" (MINIMUM) SQUARE CUT OF SOUND
QUALITY HARDWOOD. AS AN ALTERNATIVE TO WOODEN POST USE STANDARD "T" OR "U"
SECTION STEEL POSTS WEIGHING NOT LESS THAN 1 POUND PER LINEAR FOOT.
2. USE 36" MINIMUM POSTS DRIVEN 16" MINIMUM INTO GROUND NO MORE THAN 6' APART.
3. USE WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS AND
FASTEN GEOTEXTILE SECURELY TO UPSLOPE SIDE OF FENCE POSTS WITH WIRE TIES OR
STAPLES AT TOP AND MID -SECTION.
4. PROVIDE MANUFACTURER CERTIFICATION TO THE AUTHORIZED REPRESENTATIVE OF THE
INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT THE GEOTEXTILE USED MEETS THE
REQUIREMENTS IN SECTION H-1 MATERIALS.
5. EMBED GEOTEXTILE A MINIMUM OF 8" VERTICALLY INTO THE GROUND. BACKFILL AND
COMPACT THE SOIL ON BOTH SIDES OF FABRIC.
6. WHERE 2 SECTIONS OF GEOTEXTILE ADJOIN: OVERLAP, TWIST AND STAPLE TO POST IN
ACCORDANCE WITH THIS DETAIL.
7. EXTEND BOTH ENDS OF THE SILT FENCE A MINIMUM OF 5' HORIZONTAL UPSLOPE AT 45
DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND
THE ENDS.
8. REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP IN SILT FENCE
OR WHEN SEDIMENT REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEXTILE IF TORN. IF
UNDERMINING OCCURS, REINSTALL FENCE.
SILT FENCE DETAIL
SCALE: N.T.S.
m
0
U
La
Q
w O OI m
W 00 D
ZgfD 00
LO
In
I
o�co3
�ch
a In
m
W
3
Z j[
3 =
0 U
Ig
Tr
i
0 11
U
0z
JDU
YQOz
LLJ = U
W (n w Q
U N Z U
Ye Lu
Uzgz
J J Q (n
SHEET TITLE:
TYPICAL
DETAILS
SHEET No:
C-802
EXISTING GRADE RIPRAP TYPICAL THICKNESS TO BE
1.5 TIME THE UPPER LIMIT OF D.
------------------ -----�
GEOTEXTILE FABRIC SHALL BE GRADE INTO SLOPE
PROPEX 801 OR APPROVED EQUAL UNIFORMLY THE
THICKNESS OF THE
1 L RIPRAP USED
2
MAX. SLOPE FOR 3' I
RIPRAP PLACEMENT i
2'
TOE TRENCH - MINIMUM TOE TRENCH DEPTH BELOW f
CHANNEL INVERT SHALL BE DESIGNED BASED ON SITE
CHARACTERISTICS AND TO PREVENT FAILURE DUE TO
SCOUR
RIPRAP DETAIL
SCALE: N.T.S.
THESE CONCEPTUAL DRAWINGS ARE PREPARED BY SUBMAR FOR
ESTIMATING PURPOSES ONLY AND ARE NOT CONSTRUCTION DRAWINGS.
THESE CONFIDENTIAL DRAWINGS MAY NOT BE COPIED UNLESS APPROVE
BY SUBMAR, INC. COPYRIGHT SUBMAR, LLC. 2023 ALL RIGHTS
RESERVED.
OVERLAP OR ABUT
ROLL EDGES (TYP.)
6" DEEP (MIN.)
KEY I NTRENCH
UM
PREPARED SLOPE (SEEDBED)
WITH SEED IN PLACE
6" MIN. OVERLAP
AT ROLL END (TYP.)
EROSION CONTROL BLANKET CONSTRUCTION SPECIFICATIONS
1. USE TEMP. SOIL STABILIZATION MATTING MADE OF DEGRADABLE (LASTS 6 MOS. MIN.) NATURAL OR
MAN-MADE FIBERS (MOSTLY ORGANIC). MAT MUST HAVE UNIFORM THICKNESS & DISTRIBUTION OF FIBERS
THROUGHOUT & BE SMOLDER RESISTANT. CHEMICALS USED IN THE MAT MUST BE NON -LEACHING &
NON -TOXIC TO VEGETATION & SEED GERMINATION & NON-INJUROUS TO THE SKIN. IF PRESENT, NETTING
MUST BE EXTRUDED PLASTIC WITH A MAX MESH OPENING OF 2"x2" & SUFFICIENTLY BONDED OR SEWN ON
2" CENTERS ALONG LONGITUDINAL AXIS OF THE MATERIAL TO PREVENT SEPARATION OF THE NET FROM THE
PARENT MATERIAL.
2. SECURE MATTING USING STEEL STAPLES, WOOD STAKE OR BIODEGRADABLE EQUIVALENT. STAPLES MUST BE
"U" OR "T" SHAPED STEEL WIRE HAVING A MIN. GAUGE OF NO. 11 AND NO. 8 RESPECTIVELY "U" SHAPED
STAPLES MUST AVERAGE 1" TO 1-1/2" WIDE & BE A MIN. 6" LONG. 'T" SHAPED STAPES MUST HAVE A
MIN. 8" MAIN LEG, A MIN. 1" SECONDARY LEG, & A MIN. 4" HEAD. WOOD STAKES MUST BE ROUGH -SAWN
HARDWOOD, 12" TO 24" IN LENGTH, 1" x 3" IN CROSS SECTION & WEDGE SHAPED AT THE BOTTOM.
3. PERFORM FINAL GRADING, TOPSOIL APPLICATION, SEEDBED PREP. & PERMANENT SEEDING IN ACCORDANCE
WITH SPECS. PLACE MATTING WITHIN 48 HRS OF COMPLETING SEEDING OPERATIONS UNLESS END OF
WORKDAY STABILIZATION IS SPECIFIED ON THE APPROVED EROSION & SEDIMENT CONTROL PLAN.
4. UNROLL MATTING DOWN SLOPE. LAY MAT SMOOTHLY & FIRMLY UPON THE SEEDED SURFACE. AVOID
STRETCHING THE MATTING.
5. OVERLAP OR ABUT ROLL EDGES PER MANUFACTURING RECOMMENDATIONS. OVERLAP ROLL ENDS BY 6"
(MIN.) WITH THE UPSLOPE MAT OVERLAPPING ON TOP OF THE DOWNSLOPE MAT.
6. KEY IN THE UPSLOPE END OF MAT 6" (MIN.) BY DIGGING A TRENCH, PLACING THE MATTING ROLL END IN
THE TRENCH, STAPLING THE MAT IN PLACE, REPLACING THE EXCAVATED MATERIAL, & TAMPING TO SECURE
THE MAT END IN THE KEY.
7. STAPLE/STAKE MAT IN A STAGGERED PATTERN ON 4' (MAX.) CENTERS THROUGHOUT & 2' (MAX.) CENTERS
ALONG SEAMS, JOINTS & ROLL ENDS.
8. ESTABLISH & MAINTAIN VEGETATION SO THAT REQUIREMENTS FOR ADEQUATE VEGETATIVE ESTABLISHMENT ARE
CONTINUOUSLY MET IN ACCORDANCE WITH SECTION B-4 VEGETATIVE STABILIZATION.
EROSION CONTROL BLANKET DETAIL
SCALE: N.T.S.
o
O
0
a
_
wcOD0
Q
Ld
= 0 0:2
n l
0o
t~n =
g0In
I
o:2w3
0 LLJ
_F-
a to
m
w
3
N
�
�
_
0
U
N
M M
00
N 00
O
N
� O
Z
F_
U
Ll
F O
Q Q�
0 d
i
1
Lu
O
U
O�
J z
J U
Y Q O Z
Lu = U
Lu (n w Q
U Nz�
Y Lu
UZQ0
JJQ(n
SHEET TITLE:
TYPICAL
DETAILS
SHEET No: