Loading...
HomeMy WebLinkAbout20171291 Ver 1_Monitoring Year 3 Credit Release / RES Yadkin 01 UMB - Gideon Mitigation SiteCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Ryan, Attached is the Year 3 monitoring credit release letter for the: SAW-2017-01462 / EBX, LLC / RES Yadkin 01 UMBI / Gideon Year 3 Monitoring Report. IRT comments on the MY3 Report are incorporated in this email. **The Corps agrees to the M&M bond reduction for Bond No. SUR0069945 in conjunction with the Year 3 credit release, in the amount of $64,598, per the bond reduction schedule. Maria Polizzi (NCDWR) comments: 1. Overall the site is progressing well and DWR is in support of the proposed credit release. 2. Groundwater well #1 is a bit low, so it will be good to keep an eye on this in subsequent years. 3. In the first comment by Erin Davis from MY2, she mentions concern with haybale installation for a headcut repair in 2022 and a desire to see photographs of this location. In Appendix B I see photos of a bank stabilization repair and no haybales are shown. Is this the same repair? If haybales were utilized, have they been effective? Casey Haywood (USACE) comments: 1. Was supplemental planting needed near the repair area(s) on MC2-A as a result of the equipment use on the floodplain? In future reports, it would be helpful if the repair area(s) were shown on the monitoring map. 2. Please be sure to include the flow monitoring data for the remainder of this year in next year’s report (beginning at 7-Aug-23). While there are no concerns with the flow on JN6-C, the data needs to capture the prescribed monitoring period per the 2016 Guidance to avoid data gaps. The MY2 flow data goes from 18-Nov-21 to 18-SEP-22, and the MY3 data goes from 01-Nov-22 to 7-Aug-23, so data is missing from 18-Sep-22 to 01-Nov-22. This electronic copy is an official Department of the Army Notification. If you wish to receive a paper copy, one will be mailed upon request. Please let me know if you have any questions. Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell From: Haywood, Casey M CIV USARMY CESAW (USA) Sent: Thursday, August 17, 2023 12:01 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Youngman, Holland J <holland_youngman@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Ryan Medric <rmedric@res.us>; Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us>; Hannah Gadai <hgadai@res.us> Subject: Notice of Year 3 Monitoring Report Review/ RES Yadkin 01 UMBI - Gideon Mitigation Site/ SAW-2017-01462/ Surry County Hello IRT, The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository. This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Please indicate if you are requesting a site visit. 15-Day Comment Start Date: August 22, 2023 15-Day Comment Deadline: September 6, 2023 45-Day Credit Release Approval Deadline: October 6, 2023 NOTE: Deadlines will be extended if an on-site meeting is requested, and comments will be due 15-days following the site visit. Project Information: Sponsor: RES Bank Name: RES Yadkin 01 UMB – Gideon Site Site Name: Bucher USACE ID: SAW-2017-01462 River Basin: Upper Yadkin Watershed; Upper Pee Dee River Basin HUC: 03040101 County: Surry USACE PM: Steve Kichefski Requested MY3 Credit Release: 10-percent of the total stream restoration and enhancement credits: 291.127 stream mitigation units Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:11840594340329:::RP,278:P278_BANK_ID:4724 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:11840594340329:::RP,278:P278_BA NK_ID:4724> Please reach out if you have any questions. Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell 징⬺浒킲쫕ﺴ㢴䈋굷嗱犭垭┭偨憌꘸዆⹯ꉬ誱䗥鷒싉뿬ط흦邆힞┫흚凑뭰㶂ꭕํ楍⫈ᨐ㫋矏猄뱘ꩪ巡䟝쓣蹈�犮喭啕坕呵铎ᕧ톨풓唀` Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell From: Haywood, Casey M CIV USARMY CESAW (USA) Sent: Thursday, August 17, 2023 12:01 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Youngman, Holland J <holland_youngman@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Ryan Medric <rmedric@res.us>; Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us>; Hannah Gadai <hgadai@res.us> Subject: Notice of Year 3 Monitoring Report Review/ RES Yadkin 01 UMBI - Gideon Mitigation Site/ SAW-2017-01462/ Surry County Hello IRT, The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository. This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Please indicate if you are requesting a site visit. 15-Day Comment Start Date: August 22, 2023 15-Day Comment Deadline: September 6, 2023 45-Day Credit Release Approval Deadline: October 6, 2023 NOTE: Deadlines will be extended if an on-site meeting is requested, and comments will be due 15-days following the site visit. Project Information: Sponsor: RES Bank Name: RES Yadkin 01 UMB – Gideon Site Site Name: Bucher USACE ID: SAW-2017-01462 River Basin: Upper Yadkin Watershed; Upper Pee Dee River Basin HUC: 03040101 County: Surry USACE PM: Steve Kichefski 2 Requested MY3 Credit Release: 10-percent of the total stream restoration and enhancement credits: 291.127 stream mitigation units Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:11840594340329:::RP,278:P278_BANK_ID:4724 Please reach out if you have any questions. Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell 3