Loading...
HomeMy WebLinkAbout20161044 Ver 1_RE:IRT Request to Modify (Extend) Growing Season: Lone Hickory Mitigation SiteCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Paul, The IRT is okay with Wildlands’ request to change the project’s growing season to March 28-Novemeber 03. Since soil temperature and vegetation indicators were documented for all monitoring years, we are also okay with the growing season being applied to all previous monitoring years as requested. We appreciate the additional documentation/data provided in the report to support the request. Please ensure these dates are used for the project moving forward as discussed during the NCDMS Credit Release meeting for consistency. Thank you, Casey From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Sent: Wednesday, September 20, 2023 9:55 AM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.go v>; Youngman, Holland J <holland_youngman@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org> Subject: IRT Request to Modify (Extend) Growing Season: Lone Hickory Mitigation Site / SAW-2017-00100 / Yadkin County Good morning IRT, At the April 17, 2023, credit release meeting, the IRT requested that additional documentation be emailed to the IRT if a growing season change was proposed on the Lone Hickory Mitigation site. Please let me know your thoughts or concerns by Oct 02, 2023. Wildlands Engineering, Inc. is requesting a change of the project’s growing season as follows: * Original growing season dates: April 4 through October 27 * Revised growing season dates: March 28 through November 3 The attached letter documents data collected over the past five monitoring years which supports Wildlands request to extend the project’s growing season. If approved, the attached request document will be included in an Appendix and the MY5 (2023) report will be updated accordingly. Project information is as follows: Lone Hickory Mitigation Site DMS Project # 97135 Institution Date: 5/23/2016 RFP# 16-006706 (Issued: 10/21/2015) Yadkin River Basin Cataloging Unit 03040101 Yadkin County, North Carolina USACE Action ID: SAW‐2017-00100 DWR# 2016-1044v1 Proposed Mitigation Project Credits: 13,164.574 SMUs (warm) 9.5 WMUs (riparian) Full Delivery Provider: Wildlands Engineering, Inc. Contact: Emily Reinicker, PE, CFM, ereinicker@wildlandseng.com <mailto:ereinicker@wildlandseng.com> , O: 704.332.7754 x106 M: 704.965.7834 NCDEQ - DMS Project Manager: Paul Wiesner, paul.wiesner@deq.nc.gov <mailto:paul.wiesner@deq.nc.gov> , (828) 273-1673 USACE POCs: USACE Bank Manager: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> USACE Mitigation Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil> Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell The attached letter documents data collected over the past five monitoring years which supports Wildlands request to extend the project’s growing season. If approved, the attached request document will be included in an Appendix and the MY5 (2023) report will be updated accordingly. Project information is as follows: Lone Hickory Mitigation Site DMS Project # 97135 Institution Date: 5/23/2016 RFP# 16-006706 (Issued: 10/21/2015) Yadkin River Basin Cataloging Unit 03040101 Yadkin County, North Carolina USACE Action ID: SAW‐2017-00100 DWR# 2016-1044v1 Proposed Mitigation Project Credits: 13,164.574 SMUs (warm) 9.5 WMUs (riparian) Full Delivery Provider: Wildlands Engineering, Inc. Contact: Emily Reinicker, PE, CFM, ereinicker@wildlandseng.com , O: 704.332.7754 x106 M: 704.965.7834 NCDEQ - DMS Project Manager: Paul Wiesner, paul.wiesner@deq.nc.gov, (828) 273-1673 USACE POCs: USACE Bank Manager: Steve Kichefski Steven.L.Kichefski@usace.army.mil USACE Mitigation Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 750-7397 work cell 2