Loading...
HomeMy WebLinkAboutNC0083275_Staff Comments_2000120844 NPDES Permit Rating Work Sheet O Regular Addition 0 . Discretlahary Addition 7 a' Scare but no NPOES No.: I C�1 �I �I -? ! I _!! status change. 13 Deletion Facility Name: I�I� _I_I�I � hi F�-I�i k-I •�I � � ��I�I � I�f �I�i �i � I_I_I �—I �—I �—I_I r I_I_! City: Receiving Water: I_I RI_LILN-, I_I ���I v 16 RL I Reach Number. Is this facility a steam electric power plant (SIC=4911) Is this permit for a municipal separaMe storm sewer with one or more of the following characteristics? serving a populadon greater than 1 t0,000? 1. Power output 500 MW or greater (not using a coding pond/lake) 2. A nuclear power plant ❑ YES; score is 700 (stop here) 3. Cooling water discharge greater than 2S% of the receiving stream's 7Q10 flow rate ❑ NO (continue) ❑ YES; score is 600 (stop here) ❑ NO (continue) _ FACTOR 1: Toxic Pollutant -Potential PCS SIC Code: I 1 1_I 1 Primary SIC Code: I�1 �111 Other SIC Codes: I_I_I I —I 1 1—I—I I I I ICI 1' I I,I I —I Industrial Subcategory Code: I vl �I 1 (Code 000 if no subcategory) Determine the Toxicity potential from Appendix A. Be sure to use the TOTAL toxicity potential column and check one$ Toxicity Group Code Points Toxidty Group Code Points Toxtdty Group Code Points ❑ No process ❑ 3. 3 is ❑ 7. 7 3S waste streams 0 0 ❑ 4• 4 20 ❑ 8. 8 40 ❑ 1. 1 S ❑ S. s 2S ❑ 9. 9 4S ❑ 2• 2 10 ❑ 6. 6 30 .910. 10 SO Cliti®ck" 'I I vr,.'-'�':f •-'ter?,{: • tot_a!' Poilt�s'Fac�or'..t I. FACTOR 2: Flow/Stream Flow Volume (CorVefe after Soeffon A orSecllon *check only ono) Section A Wastewater Flow Only Considered Section 6 Mintewater and Stream Flow Cordidered Wastewater Type Code Points Wastewat,erType Percent of Instream Code Points (See Instructions) (See instructions) wastewater Concen- Type 1: Flow c S MGD ❑ 11 0 tration at ReoeMng Now 5 to 10 MGD ❑ 12 10 Stream Low Flow Flow >10 to 50 MGD ❑ 13 20 Now > 50 MGD O 14 30 TYPE 1/111: < 1096 ❑ 41 0 Type II: Flow <1 MGD i21. 10 210% to <5096 Q 42 10 Now 1 to 5 MGD ❑ 20 Raw >5 to 10 MGD ❑ 23 30 2! 5096 ❑ 43 20 Flow >10 MGD ❑ 24 SO _ Type if: < 1096 O Sl 0 Type III: Flow <1 MGD ❑ 31 0 Flow 1 to S MGD ❑ 32 10 2!1096 to <SOgb 0 S2 20 Flow >5 to 10 MGD ❑ . 33 20 Flow >10 MGD ❑ 34 30 z �� ❑ 53 30 . Code Checked trom•Section � or B• t—�} Zi .. • ;Total Points Factorl� I NPDES Permit Rating Work Sheet FACTOR 3: Conventional Pollutants NPDES No.: 11LI� I 1 P I� 157 1 1 (only when l/mltQd by the permit) A. Oxygen Demanding Pollutant: (check one) ❑ BOD Permit limits: (check one) O O l' B. Total Suspended Solids (TSS) COD ❑ Other: Code Points <100 lbs/day 1 0 100 to 1000 Ibs/day 2 >1000 to 3000 lbs/day 3 >3000 lbs/day 20 :Code Checked: I_,f : Points Scored: IZj_ l Permit Umits: (check one) <100 lbs/day Code Po" is 0` 100 to 1000 lbs/day 2 O >1000 to 5000 lbs/day 3 15 O >SOOOlbs/day 4 20 -- ---=.-Code Checked- t i• 1 Points Scored: f 01 C. Nitrogen Pollutant: (check one) ❑ Ammonia Other: 17 Permit Umits: (check one) Nkiogen fquiwlent <300 lbs/day 1 PIQWA 0 300 to 1000 lbs/day ❑ >1000 to 3000 lbs/day 3 is O >3000lbs/day 4 20 . :. .. ,.. - •PoInts scored: i_1_� or 3: L Tatsl Points Fact FACTOR 4: Public Health Impact Is there a public ddnking water supply located within SO miles downstream of the effluent discharge (this Includes any body of water to which the receiving water Is a tdbutary)? A public drinking water supply may include InRltradon galleries, or other methods of conveyance that ultimately get water from the above referenced supply. ❑ YES (if yes, check toxicity potential number below) ❑ NO (If no, go to Factor 5) Determine the human heakh toxicity potential from Appendix A. Use the same SIC code and subcategory reference as In Factor 1. (Be sure to use the human health toxicity group column — check one below) Toxicity Group Code Points Toxicity Group Code Points Toxicity Group Code Points ❑ No process ❑ 3. 3 0 ❑ 7. 7 is waste streams 0 0 ❑ 4. 4 0 ❑ a. 8 20 ❑ 1. 1 0 ❑ 5. S S � 9.`'� IS ❑ 2. 2 0 ❑ 6. 6 10 010. 10 30 Code Number Checked: I I t fiaf ad Points Factor 4: 2 �A NPDFS Permit Rating Work Sheet FACTOR 5: Walter Qua• Factors NPDFS No.: 1 �L L i-83 V 1 1 I 1 rh/ A. Is (or will) one or more of the effluent discharge limits based on water quality factors of the receiving stream (rather than technology -based federal effluent guidelines, or technology -based state effluent guldelines), or has a wastedoad allocation been assigned to the discharge? Code Polrds x Yes 10 0 % I- U No 2 0 B. is the receiving water In compliance with applicable water quality standards for that,woter quality limited in the permit??3A Cr P� IS[ Yes �, 0 ❑ No 2 S C. Does the effluent discharged from this fadlity exhlbit the reasonable potential to violate water quality standards due to whole effluent toxicity? C e P Yes 1 10 ❑ No 2 0 ked: A f Code Number. Chec . - - Potrits Factor S. - : .:�'E ��� A ! t�:. .iC1 Al,. + •:. S �� + C � T FACTOR b: Proximity to Near Coastal Waters A. Base Score: Enter How code here (from Factor 2). 1 1 1 Enter the muldplication factor that corresponds to the Row code: I 1 1 Check appropriate facility HPRI Code (from PCS): HPRI N Code HPRI Score Row Code Multiplication Factor ❑ 1 1 20 11, 31, or 41 0.00 ❑ 2 2 0 12, 32, or 42 0.05 13, 33, or 43 0.10 O 3 3 30 14 or 34 0.15 4 4 00 21 or 51 22 or 52 0.10 0.30 S S 20 23 or S3 0.60 HPRI code checked: I l 24 1.00 Base Score: (HPRI Score) - x (MuEtipEication Factor) (TOTAL POINTS) 8. Additional Points — NEP Program C. Additional Points — Great Lakes Area of Concern For a facility that has an HPRI code of 3, does the fadllty For a facility that has an HPRI code of S, does the facility discharge to one of the estuades enrolled In the National discharge any of the pollutants of concern Into one of the Estuary Protection (NEP) program (see Instructions) or Great Lakes' 31 areas of concern (see instructions) the Chesapeake Bay? Code Points Code Points ❑ Yes 1 10 ❑ Yes 1 10 D No 2 0 ❑ No 2 0 - Potrtts . [TOTAL ' 3 s NPDES Permit Rating Work Sheet SCORE SUMMARY NPDES No.: I I_i____I Factor Description Total Polnu - 1 Tonic Pollutant Potential 2 Flow/Streamflow Vdume 3 Conventional Pollutants 4 Public Health Impacts S Water Quality Factors 6 Proximity to Near Coastal Waters TOTAL (Factors 1 through 6 1 S1. Is ❑ the total score equal to or greater than 80? Yp (Facility is a major) No S2. If the answer to the above question is no, would you like this facility to be discretionary major? O No - ❑ Yes (Add S00 points to the above score and provide reason below: Reason: NEW SCORE: OLD SCORE: � f Permit s Name 4