Loading...
HomeMy WebLinkAboutNC0072575_Authorization to Construct_198812201,& STA7F w GL+v+ State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512*North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms S. Thomas Rhodes, Secretary December 20, 1988 Director Mr. D. D. Deemer Golden Poultry Company, Inc. P. 0. Box 2210 Atlanta, GA 30301 SUBJECT: Permit No. NCO072575 Authorization to Construct Golden Poultry Company, Inc. Lee County Dear Mr. Deemer: A letter of request for an Authorization to Construct was received October 3, 1988, by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of a 1.0 MGD wastewater treatment facility consisting of a septic tank, five (5) 40 sq.ft. shaker screens, a 30,000 gallon DAF unit with chemical addition, a 1.2 million gallon capacity aerated surge lagoon, a 3.9 million gallon storage lagoon, a 92-acre terraced overland flow system, dual 700 GPM irrigation pumps,a parshall flume and gas chlorination system. This Authorization to Construct is issued in accordance with Part III paragraph B of the NPDES Permit No. NCO072575 issued April 4, 1988 , and shall be subject to the following conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications, and other supporting data. 2. The Permittee must employ a certified wastewater operator in accordance with Part III paragraph C of the referenced permit. 3. The sludge generated from these treatment facilities must be disposed of in 'accordance with G.S. 143-215.1 and in a manner approvable by the North Carolina Division of Environmental Management. 4. The Raleigh Regional Office, telephone number 919/733-2314 shall be notified at least twenty-four (24) hours in advance of operation of these facilities. Such notification to the Regional Supervisor shall 'le made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Pollution: Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer 5. In event the facilities fail to perform satisfactorily in meeting its NPDES permit effluent limits, the permittee shall take such immediate corrective action as may be required by this Division, including -the construction of additional wastewater treatment and disposal facilities. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 27687, Raleigh, N.C. 27611-7687. 7. A set of approved plans and specifications for the subject project must be retained by the Permittee for the life of the project. 8. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permit -tee shall take such immediate corrective action as may be required by this Division, including the construction of additional or replacement wastewater treatment or disposal facilities. 9. A suitable year round vegetative cover shall be maintained. 10. Freeboard in the lagoons shall not be less than two (2) at any time. Prior to beginning waste disposal operations, five (5) monitor wells, two (2) -- upgradient and three (3) downgradient, must be installed to monitor groundwater quality. One (1) upgradient and one (1) downgradient monitor well shall be installed in the vicinity of the storage ponds. One (1) upgradient and two (2) downgradient monitor wells shall be installed in the vicinity of the overland flow system. The location and construction details for these wells must be by approval of the Raleigh Regional Office, from which a well construction permit must be obtained. 12. The monitor wells must be sampled initially after construction (and prior to waste disposal operations) and thereafter every March, July, and November for the following parameters: NO3 pH TOC Water Level TDS Chloride Total Coliforms SO4 Orthophosphate The measurement of water level must be made prior to sampling for the remaining parameters. The results of the sampling and analysis shall be sent to the N. C. Division of Environmental Management on Form GW-59 (Compliance Monitoring Report Form) every April, August, and December. 13. Prior to beginning waste disposal operations, the observation wells which were /'IA abandoned by backfilling with clean local fill material shall be properly abandoned according to procedures outlined in 15 NCAS 2C, "Well Construction Standards." 14. Any additional groundwater quality monitoring, as deemed necessary by the Department, shall be provided. 15. The surge lagoon and storage lagoon shall have liners of natural material, at least one (1) foot in thickness at all locations, and have a maximum hydrualic conductivity of 1 x 10-6 cm/sec when compacted. Following installation and inspection of the lagoon liners and prior to waste disposal operations, vertification of the liner's compliance with permeability and thickness specifications should be provided to the Division of Environmental Management Groundwater Section, by the project engineer. One (1) set of approved plans and specifications is being forwarded to ou.. If you have any questions or need additional information, please contact Mrs Ba Mckemie, telephone number 919/733-5083, ext. 546. Sincerely, R. Pa cc: Lee County Health Department Raleigh Regional Supervisor ERM Southeast ENGINEER'S CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) (Name or Location) for the hereby state that, to the best of my (Project Owner) abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Aw% Registration No.