HomeMy WebLinkAboutNCG150071_Cover Letter (Signed)_20231002 ROY COOPER
Governor
ELIZABETH S.BISER
Secretary 0
WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
October 11,2023
North Carolina Air Guard Charlotte
Attn:Sam Ingram
4930 Minuteman Way
Charlotte, NC 28208
Subject: General Permit No.NCG150000
North Carolina Air National Guard
CDC No. NCG150071
Mecklenburg County
Dear Sam Ingram:
In accordance with your application for a discharge permit received on August 21, 2023,we are forwarding
herewith the subject certificate of coverage (COC)to discharge under the subject state-NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1
and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency
dated October 15,2007 (or as subsequently amended).
In order to comply with the conditions of NCG150000 to which you are now subject,you are required to do
the following:
➢ Develop and Implement a SWPPP within 12 months of permit issuance.
➢ Download and print a copy of the NCG150000 Permit from the General Permits page on the NPDES
Industrial Stormwater Program web site,which can be reached by typing"deq.nc.gov/SW-
industrial"into your browser and hitting enter.
➢ When you receive an invoice for your annual permit fee each year,pay it promptly. Electronic
payment is convenient and quick,you can access the ePayment web site by typing"deq.nc.gov/SW-
ePayments into your browser and hitting enter.
➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR),view the six step
process and complete the registration by typing"deq.ric.gov/SW-el)MR� your browser and
hitting enter.
➢ Per the requirements of the Catawba Riparian (streamside) Buffer Rule (15A NCAC 02B.0243),all
stormwater runoff into the riparian buffer shall meet dispersed flow requirements of 15A NCAC
021-1.1002 for portions of the project built after June 30, 2001. Also,drainage conveyances
(drainage ditches,roadside ditches, and stormwater conveyances)through riparian buffer must
meet requirements of the Catawba Riparian buffer rules,per 15A NCAC 02B .0243.
➢ Keep information about your facility name, ownership,legally responsible person,address, and
stormwater outfalls up to date. See the Industrial Stormwater Program web site for instructions.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
919.707,9200
r;sa:pns:n
xa"° AT o
ROY COOPER =
Governor
a
ELIZABETH S.BISER
Secretary
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
With the issuance of this permit,previous coverage under COC NCGO80607 is hereby rescinded.
Please take notice that this certificate of coverage is not transferable except upon approval from the
Division of Energy, Mineral,and Land Resources (Division). The Division may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Water Resources,the Coastal Area Management Act, or any other federal or local government
permit that may be required.
If you have any questions concerning this permit,please contact Brittany Cook at(919) 707-3648 or by
email at brittany.cook(@ncdenr.gov.
Sincerely,
Brittany Cook
NPDES Stormwater Permit Coordinator
Division of Energy,Mineral,and Land Resources
cc: Mooresville Regional Office/Z.Khan
.. �p North Carolina Department of Environmental Quality I Division of Energy..Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612