Loading...
HomeMy WebLinkAboutNCC230702_NOT Closeout Documents_20230927 _-'- STATE of , _ ',° rs+ 3 Off' !, 1. ROY COOPER 'u $ - o Governor 4 ELIZABETH S.BISER Secretary *85t OUAmwto WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality September 25, 2023 SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER INSPECTION REPORT Cedar Run Capital, LLC ATTN: Mr. Barnes Boykin, Member 2405-F Nash Street Wilson, North Carolina 27896 Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. If any deficiencies are noted, it is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Chris Pullinger Environmental Program Consultant (252) 948-3934 Enclosure: Sediment/Construction Stormwater Inspection Report D E North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources ;) Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 NORTH CAROLINA Department nt Environmental umr\ r 252.946.6481 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Martin Project: Farm Life Family Dollar River basin: Roanoke Person financially responsible:Cedar Run Capital,LLC-G.Barnes Boykin Project#: MARTI-2023-003 Address: 2405-F Nash St,Wilson,NC 27896 1. Project Location: Fire Dept.Rd,Farm Life Pictures: No 2. Weather and soil conditions: warm,dry,clear Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): nobody Title: Inspection report: Sent Report Date given/sent: September 26,2023 9. Corrective action needed: 10. Comments: Permanent ground over sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested via a Notice of Termination(NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be updated as part of completing the NOT process. Reported by: Robert Pullinger Others present: Date of inspection: September 15,2023 Time arriving on site: 2:45 PM Time leaving site: 3:00 PM CC: D E "). North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 NORTH CAROLINA Department nt Environmental umr\ r 252.946.6481