Loading...
HomeMy WebLinkAbout20140090 Ver 2_Aug 13 Inspection_20150817Wetland Inspection Report Project Num: 20140090 Version: 2 Status: Issued Project Name: NCDOT- US 158 (U-2579B) Project Type: Road County: Forsyth Region: �lanston Salem pair/improvemen Location: NCDOT- US 158 (U-2579B) Latitude: +36° 07' Longitude: -80° 07' 55" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 8/13/2015 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Title: Phone: Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: Standards/Sediment Question Areas: � Unpermittable Activities Inspection Summary: Moving forward, DOT said that grading crews will be instructed as to where and when temporary diversion are to be employed. At the end of the day the foreman will walk along and instruct operaters where to build them. page: 1 Site Number: 20140090 Owner: Thorpe, Gregory Inspection Date: 8/13/2015 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Unpermittabie Activities # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? Is wetland(s) free of unpermittable impacts? Is open water(s) free of unpermittable impacts? Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? Are surFace waters on the site free of illegal discharges? Yes No NA NE � ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ � ❑ ❑ ❑ Comment: This was a post cleanup inspection downstream from a stormwater pipe where sediment was discharged to a jurisdictional stream near station 590 left. A sediment basin was overwhelmed. Sediment was cleaned from the stream over a 150 feet length. Top of bank areas were seeded with riparian mix. Diversion berms were not installed in an efficacious manner which contributed to the sediment loss. Miscommunication between pipe crew and EC crew was partly to blame. page: 2