Loading...
HomeMy WebLinkAbout310849_fb poa_20230922PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-849 County: Duplin Facility Name: Sidney Cavenaugh Farm Certified Operator Name: Sidney Jordan Cavenaugh Operator Number: 998827 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/2/23 weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Sidney Jordan Cavenaugh Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ISidney Cavanaugh Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 21.E inches c. line b - line a (inches in red zone) = 6.6 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 72020 ftZ e. line c/12 x line d x 7.48 gallons/ft3 296290 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 94947.E ft3 h. current herd # F--2-88-01 certified herd # 2880 actual waste produced = current herd # x line g = 94948 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 42011.7 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 170743 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/17/2023 2.63 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1228 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 1228.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line in = lb PAN 5. Structure ID: line in = lb PAN 6. Structure ID: line in = lb PAN n.lines 1+2+3+4+5+6= 1228.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOR no NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 72435 Pivot Bermuda -Grazed 8.83 101.72 898.2 MAR-SEP 72435 8 Bermuda -Grazed 2.97 113.56 337.3 MAR-SEP 72435 9 Bermuda -Grazed 1.99 51.62 102.7 MAR-SEP v. Total PAN available Tor all tlelOS (sum Or column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) = -looa.t m. r'ary 1228.3 lb. PAN 1338.2 lb. PAN 109.9 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR.