LETTER OF APPROVAL WITH MODIFICATIONS
The Villas at Rocky River, LLC
Attention: Thomas Holderby, Manager
1034 Finnwood Drive
Whitsett,North Carolina 27377
RE: Project Name: The Villas at Rocky River
Acres Approved: 21.5
Project ID: CABAR-2021-029
County: Cabarrus, City: Concord
Address: Rocky River Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By:Nicholas Parker, PE, Amicus Partners,PLLC
Date Received by LQS: December 29, 2020
Plan Type: Revised
Dear Mr.Holderby:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOi form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially,DEMLR will
not charge a fee for coverage under the NCG01 permit.However,on or after May 1,2019, a$100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a)and the NCGO 1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
:�V North Carolina Department of Environmental Quality I Division of Energy,Mineral and land Resources
��/j� Mooresville Regional Office 1610 East Center Avenue,Suite 301 1 Mooresville,North Carolina 2BI15
G'i 'k _.\ �, ., .,i ..
The Villas at Rocky River
Letter of Approval with Modification
January 13, 2021
Page 2 of 3
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection
of existing natural resources and adjoining properties. If,following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
SL/cys
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
Amicus Partners,PLLC
Attention:Nicholas Parker,PE
30 Union Street, South
Concord,North Carolina 28025
The Villas at Rocky River
Letter of Approval with Modification
January 13, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: The Villas at Rocky River
Project ID: CABAR-2021-029
County: Cabanas
1. Adequate inlet protection shall be provided for the bottom drain in SB-1 prior to draining
water from basin.Refer to Detail 10 on Sheet C-5.4. If a pump is needed to remove water,
the pump outlet shall be passed through a silt bag.
2: On Sheet C-4.0, adequate fill placement across low area of TD-1 in the SE corner of site
will be required to obtain positive drainage to SB-3.
3. On Sheet C-4.2,the outlet of Slope Drain SD 11 shall outlet into Diversion Ditch D-6.
4. On Sheet C-5.0A, the reduction of SB-3 and fill placement for Building Pad#9 cannot be
conducted until upstream areas have been adequately stabilized so that Basin SB-3 can be
reduced as shown. Approval from DEMLR will be required prior to reducing the size of
SB-3.
5. If temporary seeding is needed,the attached seeding specifications shall be used.
Table 6.1Oa
Temporary Seeding Seeding mixture
Recommendations for Late Species Rata(lobos)
Winter and Early Spring Rya(grain) 120
Annual lespedeza(Kobe In
Piedmont and Coastal Plain,
Kaman In Mountains) 50
Omit annual Impedeza whin duration of temporary cover h not to extend
beyond Jun..
Seeding dates
Mountains--Above 2500 ft:Feb.15•May 15
Below 2500 ft:Feb.1-May 1
Piedmont—Jan.1-May t
Coastal Plain—Dec.1-Apr.15
Soil amendments
Follow recommendations of soil tests or apply 2,000 lb/acre ground agricul-
tural limestone and 750 lb/acre 10-10-10 fertilizer.
Mulch
Apply 4,000 lb/acre straw.Anchor straw by tacking with asphalt,netting,
• or a mulch anchoring tool.A disk with blades set nearly straight can be
used as a mulch anchoring tool.
Maintenance -
Refertillze if growth is not fully adequate.Reseed.relertiyze and mulch im-
mediately following erosion or other damage.
Table 6.10b
Temporary Seeding Seeding mixture
Recommendations for Species Rate(lb/acre)
Summer German millet 40
In the Piedmont and Mountains,a small-stemmed Sudangrass may be
substituted at a rate of 50 It/acre.
-Seeding dates
Mountains—May 15-Aug.15
Piedmont-May 1-Aug,15-
Coastal Plain'=Apr.15-Aug.15
Soli amendments
Follow recommendations of soli tests or apply 2,000lb/acre ground agricul-
tural limestone and 750lblacre 10-10-to fertilizer.
Mulch
Apply 4,0001b/acre straw.Anchor straw by tacking with asphalt,netting.
or a mulch anchoring tool.A disk with blades set nearly straight can be
used as a mulch anchoring tool.
Maintenance
Retorting it growth is nolfully adequate.Reseed,refertilize and mulch im-
mediately following erosion or other damage
Table 6.10c
Temporary Seeding Seeding mixture
Recommendations for Fall Species Rate(Ib/acre)
Rye(grain) 120
Seeding dates
Mountains—Aug.15-Dec 15
Coastal Plain and Piedmont—Aug.15•Dec.30
Sail amendments
Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and
1,000lb/acre 10-10.10 fertilizer.
Mulch
Apply 4,000 lb/acre straw.Anchor straw by tacking with asphalt,netting,
or a mulch anchoring tool.A disk with blades sat nearly straight can be
used as a mulch anchoring tool.
Maintenance
Repair and refertilize damaged areas immediately.Topdress with 50
lb/acre of nitrogen in March,II it is necessary to extend temporary cover
beyond June 15,overseed with 50 to/acre Kobe(Piedmont and Coastal
Plain)or Korean(Mountains)lespedeza in late February or early March.