Loading...
HomeMy WebLinkAboutSW4110401_Application_20131105U First Submittal ❑ Re -submittal Development/Project Name: , Receiving stream name Application Completeness Review Date Received;, I 1 1 Date Reviewed: By Bill Diuguid class For post -construction rdquirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HOW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404'within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): _Al Latitude and Longitude: 36 07 /�tz 4 AJ $o Z1 675, y-5 t„/ Jurisdiction Project Address: S15/ 1Zo61NGseo01 RhIV 5AP�kC Engineer name and firm: D Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets ii h :De:n;sity ❑ Other u �^ 401/404 impacts to surface waters, wetlands, and buffers {add language to cover letter and/orinfo letter) BLIA a� eck for $505.00 included S' ,Qriginal signature (not photocopy) on application a✓ Legal signature (Corporation-VP/higher, Partriership�General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: hap:/AAtwxv.sccretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement ,Sealed, signed & dated calculations `7�ei9'T -:J: GC2 ct 1---b ❑/Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) 2' Bioretention D Dry Detention Basin D Filter Strip ❑ Grass Swale ❑ Infiltration Basin D Infiltration Trench D Level Spreader D Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road :Gam o sets of sealed, signed & dated layout & finish grading plans with appropriate details Narrative Description of stormwater management provided Ck­" Soils report provided D ,klVetlands delineated or a note on the plans that none exist on site and/or adjacent property N etatls for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; o imensions & slopes provided n �rainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density �spection and mainte ance agreements provided Application complete�Soi'a�❑ Application Incomplete Returned: {Date} ,P\ r./ Comments February 9, 2009 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density protects ❑ No more than two dwelling units per acre or 24% built -upon area; o Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perenriial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other` restrictive'language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended solids.. ❑ For BMPs that require a separation from the seasonal high-water table (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive'languagelmeasures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements ❑ Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain. Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 ❑ Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. ❑ 85% average annual removal of total suspended solids. ❑ Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ;i ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TN ❑ 30% TP February 9, 2009 Revision