HomeMy WebLinkAboutSW4091201_Compliance Inspection_20110519BIORETENTION CELL: O & M Inspection Checklist
1.
Inlet and Perimeter are free of erosive gullies and bare soil areas:
�K
❑
❑
❑
2.
Inlet device (swa€e, pipe, stone verge) is free of erosion, damage or clogs:
P,
❑
❑
❑
3.
Weir heights appear to match approved plans:
❑
❑
❑
4.
Flow is entering pretreatment area (not being bypassed):
'E�
❑
❑
❑
5.
Pretreatment area is free of erosion:
1�
❑
❑
❑
6.
Pretreatment area is free of excessive sediment or clogs:
N
❑
❑
❑
7. Side slopes are 3:1 or less:
❑
❑
❑
8. The under drain system is free flowing and free of clogs (if applicable):
[
❑
❑
❑
9. Cleanout(s) and cap is provided for the under drain as per the approved plans: SU
❑
❑
10. Heavy equipment has not been driven into the cell:
❑
❑
❑
11. Surface is free of piles of heavy materials (piles of mulch, etc):
1�1
❑
❑
❑
12. Ponding depth is 9-12 inches after rain:
.J
❑
❑
❑
13. All dimensions are >=10ft.:
❑
❑
❑
r
-SOIL MULCM"and VEGETATION`+ '"�i -' �� ''"� Y �f ,_ 7F'
b /.. z l 4r,iYtii+.kiS�i':':i =��rty..p %:.:'
«s ,;»., elr i'•a:
r1fWAR
14. Plants are healthy and being maintained:
❑
❑
❑
15. The proper amount and type of vegetation is present in the cell:
❑
❑
❑
16. Mulch is in good condition (has not broken down or floated/migrated towards the outlet):
'S
❑
❑
❑
17. Surface if free of excessive sediment and clogs:
U
❑
❑
❑
18. Trees are free of stakes/wires > 6 months after planting:
❑
❑
❑
19. The annual soil test shows the proper pH and absence of heavy metal accumulation:
❑
❑
1li°L}`k4'{ti:`.thh'77`�,;; .CSy?yss'"�,�` E..i�}}�y;i'ly ���``pi.�,- �`1�r, "a 34i'7r� i,r',t a. �lb'.1 'F`i"%r:S;,C,,i43 u r�,,li,y�.�k�'.t�=3-.,'rwarif *''y`4 f...t4 r.{Z__�5 i <,rr.}';'[='✓,r.4
tLE%u.��k:�.i'xa,�r
20. Outlet is free of evidence of improper drainage (no standing water, cattails, etc.):
❑
❑
❑
21. Outlet device (drop inlet, weir, etc.) is free of damage or clogs:
❑
❑
❑
22. Orifice size matches approved plans:
"S
❑
❑
❑
23. Outlet is free of damage, clogs, or erosion:
`
❑
❑
❑
24. Relative elevations match approved plans:
❑
❑
❑
V3.3_49
I�
i
Compliance Inspection Report
Permit: SW4091201 Effective: 01/11/10 Expiration: 12/30/21 Owner: Goodwill Industries of Northwest NC
Project: Goodwill Mocksville
County: Davie Hwy 601 Yadkinville Rd
Region: Winston-Salem
Contact Person: Bill Haymore Title:
Directions to Project:
Type of Project: State Stormwater - HD - Other
Drain Areas: 001 - (Bear Creek) (03-07-06) ( C)
002 - (Bear Creek) (03-07-06) ( C)
On -Site Representative(s):
Related Permits:
Inspection Date: 06/03/2013 Entry Time: 11:45 AM
Primary Inspector: Sue L Homewood
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Mocksville NC 27028
Phone: 336-714-3012
Exit Time: 12:00 PM
Phone: 336-771-4964
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW4091201
Inspection Date: 06/03/2013
Inspection Summary:
Other wQ Issues
-
Owner - Project: Goodwill Industries of Northwest NC
Inspection Type: Compliance Evaluation
Is the site compliant with other water quality issues as noted during the inspection?
Comment:
Other Permit Conditions
Reason for Visit: Routine
Yes No NA NE
■ n n n
Yes No NA NE
Is the site compliant with other conditions of the permit? ■ Q
Comment:
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ■ 0 n n
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ n ❑ ❑
upon request?
Comment:
Page: 2
BIORETENTION CELL: O & M Inspection Checklist
YES NO N
_ t' .ti-. 5' 4Yi''.}PtE l:�i.-i'.�5.1 ? + e. •i}.r �•z Y. +e7G Y'i X�� •.lr.. }L '+ti V Vb 5 r f�Mr }k ' 4'{. f J:`
1. Inlet and Perimeter are free of erosive gullies and bare soil areas: V V-\k C C
❑
❑
❑
2. Inlet device (swale, pipe, stone verge) is free of erosion, damage or clogs:
FXr
❑
❑
❑
3. Weir heights appear to match approved plans:
TO
❑
❑
❑
�.. .. - ..1'x'h+ �W'Ywlr Y f ��'�' 4?.° ur �. �'� 5i;'�n iYk.�' �N' ��� `�, 5 ti^ .F �Y L T'i �" y Y Pa Irey i'f 2�•`_Ah a �[} �
1PFtETREATP+IENT.,,`,�y a�.� <�►:E _x:�rxi'.; ;t:Pw? �tL:: rt'.;,��t� �;"'<<ti€
4. Flow is entering pretreatment area (not being bypassed):
❑
❑
❑
5. Pretreatment area is free of erosion: C"-'Vv-XDC CND
❑
�RL
❑
❑
6. Pretreatment area is free of excessive sediment or clogs: n�+r'CY' - - - - +
❑
❑
❑
w r.
. NDc
't'.�J.;.�'5�2�:
7. Side slopes are 3:1 or less:
❑
❑
❑
8. The under drain system is free flowing and free of clogs (if applicable):
❑
❑
❑
9. Cleanout(s) and cap is provided for the under drain as per the approved plans: CCUL)�v
❑
❑
❑
10. Heavy equipment has not been driven into the cell:
91
❑
❑
❑
11. Surface is free of piles of heavy materials (piles of mulch, etc):
❑
❑
❑
12. Ponding depth is 9-12 inches after rain:
❑
R
❑
❑
13, All dimensions are >=10ft.:
�,
❑
❑
❑
hiS r
14. Plants are healthy and being maintained:
1�r,
❑
❑
❑
15. The proper amount and type of vegetation is present in the cell:
❑
❑
❑
16. Mulch is in good condition (has not broken down or floated/migrated towards the outlet):
❑
❑
❑
17. Surface if free of excessive sediment and clogs:
❑
❑
18. Trees are free of stakes/wires > 6 months after planting:
❑
❑
❑
19. The annual soil test shows the proper pH and absence of heavy metal accumulation:
❑
❑
,F]
K
20. Outlet is free of evidence of improper drainage (no standing water, cattails, etc.):
❑
❑
❑
21. Outlet device (drop inlet, weir, etc.) is free of damage or clogs:
❑
❑
❑
22. Orifice size matches approved plans:
�,
❑
❑
❑
23. Outlet is free of damage, clogs, or erosion:
�9
❑
❑
❑
24. Relative elevations match approved plans:—t0L---- (-(7�
❑
0
❑
❑
V3.3_o9
Compliance Inspection Report
Permit: SW4091201 Effective: 01/11/10 Expiration: 01/11/20 Owner: Goodwill Industries of Northwest NC
Project: Goodwill Mocksville
County: Davie Hwy 601 Yadkinville Rd
Region: Winston-Salem
Contact Person: Bill claymore Title:
Directions to Project:
Type of Project: State Stormwater - HD - Other
Drain Areas: 001 - (Bear Creek) (03-07-06) ( C)
002 - (Bear Creek) (03-07-06) ( C)
On -Site Representative(s):
Related Permits:
Inspection Date: 05119/2011 Entry Time: 01:00 PM
Primary Inspector: Sue E_ Homewood
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ® Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Mocksville NC 27028
Phone: 336-714-3012
Exit Time: 01;30 PM
Phone: 336-771-4964
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW4091201 Owner - Project: Goodwill Industries of Northwest NC
Inspection Date: 05/19/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
File Review
Yes No
NA
NE
Is the permit active?
® n
n
n
Signed copy of the Engineer's certification is in the file?
n ■
Signed copy of the Operation & Maintenance Agreement is in the file?
■ ❑
❑
n
Copy of the recorded deed restrictions is in the file?
n n
n
■
Comment: no eng. cert.submitted
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
■
n
n
n
Is the drainage area as per the permit and approved plans?
■
n
n
n
Is the BUA (as permitted) graded such that the runoff drains to the system?
■
n
n
n
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
®
n
n
n
Are the inlets located per the approved plans?
■
❑
n
n
Are the outlet structures tocated per the approved plans?
n
■
n
n
Comment: outlet structure too low, cell not reaching approved ponding depth
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
■
n
n
n
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ
n
n
n
upon request?
Comment:
Other Permit Conditions
Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
■
n
n
n
Comment:
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? ® n n n
Comment:
Page: 2