HomeMy WebLinkAboutSW6140505_Cover Letter & Permit_20140728i
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Tracy E. Davis, PE, CPM
Director
July 28, 2014
Mr. David Heins - Environmental Management Chief
Directorate of Public Works
2175 Reilly Rd. - Stop A
Fort Bragg, North Carolina 28310-5000
Subject: Stormwater Permit No. SW6140505
RTI Motor Pool Expansion at Fort Bragg
Cumberland County
Dear Mr. Heins:
Pat McCrory, Governor
John E. Skvada, III, Secretary
FEB 1 0 201E
The Stormwater Program under the Division of Energy, Mineral, and Land Resources (DELMR),
received a complete Stormwater Management Permit Application for the subject project. Staff
review of the plans and specifications has determined that the project, as proposed, will comply
with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246.
We are forwarding Permit No. SW6140505, dated July 28, 2014, for the construction, operation and
maintenance of the subject project and the stormwater BMPs. This permit shall be effective from
the date of issuance until July 28, 2022, and shall be subject to the conditions and limitations as
specified therein, and does not supersede any other agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing by filing a written petition with the Office of Administrative
Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General
Statutes. Per NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of
receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh,
NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com.
Unless such demands are made this permit shall be final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or
need additional information concerning this matter, please contact Larry Wade PE at (919) 807-6375; or
lany.wade@ncdenr.gov.
Sincerely,
.&&7
for Tracy E. Davis, PE, CPM, Director
cc: SW6150505 File
Fayetteville Regional Office
Geological Survey Section • Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 / FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.ncdenr.org/web/ir/
An Equal Opportunity 1 Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper
State Stormwater Permit
Permit No. SW6140505
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
North Carolina National Guard
RTI Motor Pool Expansion at Fort Bragg
Pratt Street, Cumberland County
FOR THE
construction, operation and maintenance of two Grass Swales, and one Dry Detention
Basin in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H
.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater
management plans and specifications and other supporting data as attached and on file
with and approved by the State and considered a part of this permit.
This permit shall be effective from the date of issuance until July 28, 2022, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. The two Grass Swales, and one Dry Detention Basin are approved for the
management of stormwater runoff as described in the application documents
and as shown on the approved plans.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
5. The built -upon areas associated with this project shall be located at least 30 feet
landward of all perennial and intermittent surface waters.
Page 1 of 4
State Stormwater Permit
Permit No. SW6140505
11. SCHEDULE OF COMPLIANCE
1. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
2. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted two Grass Swales, and one Dry Detention Basin
functions at optimum efficiency. The approved Operation and Maintenance Plan
must, be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans.
f. Debris removal and unclogging of all drainage structures, level spreader,
filter media, planting media, underdrains, catch basins and piping.
g. Access to the cell and outlet structure must be available at all times.
3. Records of maintenance activities must be kept for each permitted BMP. The
reports will indicate the date, activity, name of person performing the work and
what actions were taken.
4. The permittee shall submit an annual summary report of the maintenance and
inspection records for each two Grass Swales, and one Dry Detention Basin.
The report shall summarize the inspection dates, results of the inspections, and
the maintenance work performed at each inspection.
5. The two Grass Swales, and one Dry Detention Basin shall be constructed in
accordance with the approved plans and specifications, the conditions of this
permit, and with other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the two Grass Swales, and one Dry Detention
Basin certifying that the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must
be noted on the Certification. A modification may be required for those
deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval was sought.
Page 2 of 4
State Stormwater Permit
Permit No. SW6140505
Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of eight years from the date of the completion of
construction.
10. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form signed by both parties, to the
State, accompanied by the supporting documentation. The approval of this
request will be considered on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves a request to transfer the permit.
Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the State, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
Page 3 of 4
State Stormwater Permit
Permit No. SW6140505
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2006-
246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
12. The permittee shall submit a renewal request with all required forms and
documentation at least 180 days prior to the expiration date of this permit.
Permit issued this the 28`h day of July, 2014.
Director Division of Energy, Mineral, and Land Resources
Page 4 of 4
State Stormwater Permit
Permit No. SW6140505
RTI Motor Pool Expansion at Fort Bragg
Cumberland County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project Name)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL