Loading...
HomeMy WebLinkAboutSW6101104_O&M Agreement_20121221Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — The drainage area will be managed to reduce the sediment load to the dry extended detention basin. — Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. — I will maintain the vegetation in and around the basin at a height of approximately six inches. — Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired irmediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Form SW40I-Dry Detention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable), Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced, protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying, The main treatment area Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an appropriate rofessional, Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). Form SW401-Dry Detention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. Crass cover is unhealthy or Restore the health of the grass cover eroding. - consult a professional if necessary. Signs of seepage on the Consult a professional, downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 0_5 feet in the main pond, the sediment shall be removed. When the basin depth reads n a feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Temporary Pool Elevation 233 Sediment Removal E n/a �25% porar Pool -----------------olume Sediment Removal Elevation 229 Bottom Elevatio n/a -------------------`----`--- ---- Sediment Bottom Elevation 228.5 25% Storage FOREBAY MAIN POND Form SW401-Dry Detention O&M-Rev.3 Page 3 Of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nanie:TUAS Support Facility at Fort Bragg BMP drainage area number: Print name: Title:Director, CFMO Address:4105 Reedy Creek Road, Raleigh, NC 27609 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a rosident of the subdivision has been named the president. I, �i t1( �� S, A)IC -n1N a Notary Public for the State of NCeTk� CAOiNaj , County of WAiC do hereby certify that w t li�l A/-1 -'Z-Otv f-Ser-J personally appeared before me this �t74_ day of (k'ia6%,- ZO t d , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness. my ,and and offizial seal, SEAL My commission expires 31 " I y zo !/ Form SW401-Dry Detention O&M-Rev.3 Page of Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rcv.3 Page I of 4 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading, Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible, Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion 2roblems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. "Free stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretcntion O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop iidet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:TUAS Support Facility at Fort Bragg BMP drainage area number: Print name:William E. Johnson, NC National Guard Title:Director, CFMO Address:4105 Reedy Creek Road, Raleigh, NC 27607 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. [, M i ChNw I S. M �('A'V'J , a Notary Public for the State of NrjeW Ca�tul,acg , County of WI A0= , do hereby certify that \N M i Aj-�, F TJ 6 n1So fQ personally appeared before me this 07 day of a—ktA JL 201 u , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, SEAL My commission expires .3 -ru ly 20 11 Form SW401-Bioretention 1&M-Rev. 2 Page 4 of 4