Loading...
HomeMy WebLinkAbout20201095 Ver 1_Notice of As-Built Credit Release / Wildlands Catawba 01 UMB - Double RockCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Andrea, The 15-Day As-Built/MY0 review for the Double Rock Mitigation Site (SAW-2020-01532) ended August 31, 2023. This credit release followed the review process outlined in Section 332.8(o)(9) of the 2008 Mitigation Rule. We have reviewed the baseline monitoring report and as-built plans you submitted on July 28, 2023, and a site meeting was conducted on August 16, 2023. Based on the review and site meeting, we determined that the requested credit can be release in full. Attached to the credit release letter are the site meeting minutes and IRT comment memo. Please make sure that IRT comments and site meeting action items are addressed and included in the MY1 annual report. Please let us know if you have any questions. Thanks, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell From: Davis, Erin B CIV USARMY CESAW (USA) Sent: Wednesday, August 2, 2023 12:48 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron <byron_hamstead@fws.go v>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Dave McHenry <david.mchenry@ncwildlife.org> Cc: Kirsten Gimbert <kgimbert@wildlandseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com>; Andrea Eckardt <aeckardt@wildlandseng.com> Subject: Notice of As-Built Review / Wildlands Catawba 01 UMB - Double Rock / SAW-2020-01532 / Alexander County Good afternoon IRT, The below referenced FINAL As-Built Report review and associated MY0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of the credit release. 15-Day Comment Start Date: August 3, 2023 15-Day Comment Deadline: August 31, 2023 (15 days following field review) 45-Day Credit Release Approval Deadline: September 30, 2023 (45 days following field review) Field Review Date: Wednesday, August 16, 2023 at 9:30am Meeting Location: 35.864580, -81.095985 Park by old barn (egg house). From Stikeleather Rd you will drive down landowner’s driveway, once you pass house on right you will cross over cattle guard and then follow existing dirt road to right and park by old barn on left. Attached are georeferenced site overview CCPV map. Project Information: Project: Wildlands Catawba 01 – Double Rock Mitigation Project Sponsor: Wildlands Holdings VI, LLC Sponsor POC: Kirsten Gimbert, kgimbert@wildlandseng.com <mailto:kgimbert@wildlandseng.com> , (704) 941-9093 Action ID: SAW-2020-01532 County: Alexander Location: 35.863028, -81.101083 HUC: 03050101 USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> , (828)-933-8032 USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887 Mitigation Plan Projected Credits As-Built Credits Mitigation Plan Projected Lengths As-Built Lengths 4556.100 SMUs (warm) 4556.100 SMUs (warm) 5,922 ft 5,931 ft Note: No credit changes noted from Final Mitigation Plan to As-Built Requested Credit Release: As-built/MY0 15% of the total stream restoration credits: 666.690 Warm Water Stream Credits RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:33628202683028:::RP,278:P278_BANK_ID:5788 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:33628202683028:::RP,278: P278_BANK_ID:5788> Please note that you must be logged in to access documents in the cyber repository. Please reach out if you have questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell 獩敨ひƂ〢؍⨉䢆čā舃༁ ƂȊƂ鯲戫个䯱䪶襊ఐꜫ괢亟쑟췾猼羛襫墑眦넙뛢岰䗂鄀馰戴輭슐从໭᧿꧂籲㝹�밽煏䱒睤竽벆ﰦꭞꐘ鷁㎥厩ꢛ싡ꢖ䰋轱蜎秚�὇踈얉ἓ趇⚏톰伖ꇏ控뽼锞팰䆨ᢅ蟏쎤꒼釿社컶즛猥䴊슎꨽莩ꡘ跮측粈缼龞◞乙娞苆㉋猤樚쭔䮿帎鳶뷫쿟決삐죑渝蕖䵽ꔶ엁䣈齨삲曃뻼뀄扨쟌䦋̂ꌁƂスƂサؕ唃┝คరਆثЁ舁਷ःᴰ̆ᵕЎЖ픛핁厛鮋ᤤ䱩૲ぶْ唃ᄝ䬄䤰䞤䔰റର̆ѕጋ䴄偏ㅒ〴ز唃 Ԅ⬓㈲㤹㌴挫㡢改〸ⴴ昵收㐭晤ⵥ㤹搵愭慤昰㈶ㄵ㝦〷؟唃⌝᠄ᘰᒀ鋡ꢗ呟᥍⯍⇪�ﰞㆡ쏟脰ڨ唃Ἕ脄゠鶁脰ꂚ鞁膠蚔案瑴㩰⼯睷⹷業牣獯景⹴潣⽭歰⽩牣⽬牰摯捵獴䴯捩敃呲畲楌偳䅃㉟〰ⴹ㐰〭⸲牣虬案瑴㩰⼯牣⹬業牣獯景⹴潣⽭歰⽩牣⽬牰摯捵獴䴯捩敃呲畲楌偳䅃㉟〰ⴹ㐰〭⸲牣ぬٝ⬈ĆԅćЁけくٍ⬈Ćԅ〇蘂桁瑴㩰⼯睷⹷業牣獯景⹴潣⽭歰⽩散瑲⽳楍䍣牥牔䱵獩䍐彁〲㤰〭ⴴ㈰挮瑲രआ蘪虈෷āԅ̀Ƃ䴜曨㑥붵㎁ꓕཙ䳠᯶ⴳ၌౤ゥ行욁� ♫¢直ꥧ컇ࡼ굠ㄗᴢ뚣Ꞻ멣껔꣌鄇댺⢟ꑠ钋蚥ꁧ䣱I耍퇨ௌ趰렲ꃲ饗ꃋ퉣C꠴驀້�禙딼㌾襲⬑♼嵶Ἲ㳃ΉꍚᜄԪ꼍අ伹᪮㧚勖绨踗韜꧲蔾谠瞰冐녯⺺잴㦿◭덃ો︂�㐕Ǩ哾塜㢵儃ꏥ᧔叶둻틦꽸锽鸾⮠᧶Ջ꿍扅寐춌�ꪛ﩯ハ農]»舰舰툃ΠĂȂ愊鴑Ä