Loading...
HomeMy WebLinkAboutSW6110803_401 Certification Application_20110829NC ENR Permit Number: (to be provided by OM) O2�p W Arf y T r O 51 UKMWA 1 tK MANAGtMtN I YtKMI1 AYYLIGA I IUN tUKM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. L PROJECT INFORMATION Project name Tumberry, Section 1 Contact name Gregory Floyd Phone number (910) 423-6700 .Data May 26, 2011 Drainage area number 2 She Characteristics Drainage area 178,596.00 ft' Impervious area 30,990.25 it' Percent impervious 17.4% % Design rainfall depth 3.00 inch Peak Flow Calculations 10-yr storm runoff depth 3.00 in . 10-yr storm intensity 3.10 in/hr Post -development 10-yr storm peak flow 8.75 ff'/sec Velocity Maximum non -erosive velocity (peak 10-year stone) 5.50 ftlsec Soil characteristics (enter Y below) . Sand/silt (easily erodible) Clay mix (erosion resistant) X Grass Type (enter Y below) Bermuda Tall fescue x Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below. Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity 1.00 Side slopes 5.00 :1 Swale length 450.00 it Option 2: Conveyance Swale, Seeking Pollutant Credit: Y (Y or N) Maximum velocity for 10-yr storm 0.98 it/sec OK Side slopes 5.00 :1 OK Swale length 450.00 It OK Pernit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an in the appropriate cell below: Trapezoidal X Parabolic V-shaped. Width of the bottom of the swale 3.00 ft Width of the top of the swale 23.00 It Additional Information Is the swale sized for all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a proposed drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 2.00 ft OK What is the ground level elevation? 224.00 fmsl What is the elevation of the bottom of the swale? 222.00 fmsl What is the SHWT elevation? 220.00 fmsl What is the longitudinal slope of the swale? 4.67 % OK What is the depth of freeboard? 0.93 ft OK Permit No: (to be assigned by D WQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial Wow. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Grass species, and - Boundaries of drainage easement. 2. Plan details (1" = 59 or larger) for the grassed swale showing: - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Grass species, - Off -site drainage (if applicable),and - Boundaries of drainage easement. 3. Section view of the grassed swale (1" = 20' or larger) showing: - Side slopes, - Longitudinal slope, - Freeboard - Swale dimensions, and - SHWT level(s) 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (O&M) agreement. �� 6. A copy of the deed restrictions (if required). r LTMWA ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION Project name Tumberry Section 1 Contact name Gregory Floyd Phone number (910) 423-6700 Dale .May.26, 2011 Drainage area number 2 The purpose of the LS-VFS SWmwrdler enters LS-VFS from Type of VFS Explanation of any responses above N Slormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak How from the 1 inmr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system gang to be used? Explanation of any'OBer responses above ff Stormwrater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peals discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any 'Other responses above LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit pant Feet of level lip needed per cfs Computed minimum length of the level lip needed Pollutant removal: 40%TSS, 30%TN, 35%TP -BMP Engineered filter strip (graded & sodded, slope < 8%) 178,596 fe Do not complete this section of the form. 30,9W- ff Do not complete this section at the forth. 17.35 % Do not complete this section of the form. Do not complete this section of the form. cis Do not complete this section of the form. min Do not complete this section of the forth. iNhr Do not complete this section of the forth. CIS Do not complete this section of the forth. CIS Do not complete this section of the forth. (Y or N) Do not complete this section of the form. Other. Explained below 8.75 cis 8.75 CIS 10 CIS 8.751 CIS N (Y or N) Grassed Swale 62 sq It No forebay is required. 18 in Depth is appropriate. 12 in Depth is appropdate. 10 Iticfs 88 It Forn SW401 - LS-VFS - 2gNov2010 - Rev.e page 1 of 3 Length of level lip provided 88 It Wk th of VFS 30 it Elevation at downslope base of level lip 223.00 fmsl Elevation at the end of the VFS that is farthest from the LS 222.50 fmsl Slope (from level lip to the end of the VFS) 1.67 % Are any draws present in the VFS? ,- n (Y or N) Is there a collector swale at the end of the VFS? n (Y or N) Bypass System Design (if applicable) Is a bypass system provided? n _ (Y or N) Is there an engineered flow splitting device? n (Y or N) Dimensions of the channel (see diagram below): M It W If y (flaw depth for 10-year storm) ft freeboard (during the 10-year storm) ft Peak velocity in the channel during the 10-yr storm ttsec Channel lining material Pick one: Does the bypass discharge through a wetland? (Y or N) Does the channel enter the stream at an angle? (Y or N) Explanation of any 'Other' responses above i B i 111. REQUIRED ITEMS CHECKLIST K3 EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. it a requirement has not been met, attach justification. Requried Item: 1. Plans (1' - 59 or larger) of the entire site showing: - Design at ultimate build -out, - Of -site drainage (f applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (it applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 2 of 3 �/ 2. Plan details (l' = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate buil"ut 3. Section view of the level spreader (V = 20' or larger) showing:. - Underdram system (if applicable), -Level lip, - Upslope channel, and - Dowrtsbpe fitter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). w 5. A construction sequence that shows how the level spreader willbe protected from sediment until the entire drainage area is stabilized. 6. 9 a non -engineered VFS is being used, then provide a photograph of the VFS.showing . that no draws are present 7. The supporting calculations. S. A ropy of the signed and rutan¢ed operation and maintenance (O&M) agreement R 4 Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 3 of 3 Permit No. (to be mWded by DM) O2ot WAZS;g HMENR� r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required Information. Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION - Site Characteristics Drainage area Impervious area, post -development %Impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1-5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the tyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainta0 aratrrsty: l yr, 24-hr Shrum Predevelopment 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1011 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment deanout top elevation (bottom of pond) Seel mend dearrout, bottom elevation Sediment storage provided Is there additional volume stored above the state-rsquired temp, pool? Elevation of the top of the additional volume Farm SM4101-Wel Delenbon eaam-ilev.9-911710e 2,196,282 fe 878,513 fe 40.00 % 1.0 in 75,040 fe 79,013 hi to 8 fl3 Y (Y or N) 3.1 in Floyd OK OK, volume provided is equal to or in excess of volume required. 0.40 (uni less) 0,65 (tentless) 3.00 Whir OK 0.18 felsec 8.05,fe/sec 7.87 fe/sec 236.30 fmsl 234.50 frrxsl 234.50 fmsl 235.00 imsl 234.00 im91 227.00 hid 226.00 hest 1.00 8 n (Y or N) Tmsl Parts 1, a H. Deelen Summery, Page 1 or 2 Permit No. (to be prOVfOW by DWG) Ill. DESIGN INFORMATION Surface Areas Area, temporary pool 46,094 fe Area REQUIRED,permanent pool 35,141 fitz SAIDA ratio 1.60 limitless) Area PROVIDED, permanent pool, 4..nm 35,150 fe OK Area, bottom of 100 vegetated shelf, 4, , 29,751 fe Area, sediment deanout, top elevation (bottom of pond), @x�„4 19,455-le Volumes Volume, temporary pool 79,013 fe OK Volume, permanent pool, �,,,,,, 201,627 fe Volume, forebay (sum of forebays If more than one forebey) 40,714 f? Forebay %of permanent pool volume 20.2% % OK SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountairdPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pod, 1 ._pay Area provided, permanent pod, 7.., 90 % N (Y or N) Y (Y or N) 1.60 (uri tless) n (Y or N) 201,627 fe 35,150 to Average depth calculated. It Need 3 ft min. Average depth used in SAIDA, rL (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area paw", permanent pod, �._pw 35,150 fe Area, bottom of 10ft vegetated shelf, Ay ,„e 9,751.fe Area, sediment cleanout, top elevation (bottom of pond), 4g nea 19,455 h" 'Depth' (distance b/w bottom of 1011 shelf and top of sediment) 7.00 If Average depth calculated 6.25 It OK Average depth used in SAIDA, d„ (Round to nearest 0.511) 6.0 It OK Drawdown Calculations Drawdown thmmgh orifice? Diameter of orifice (If circular) Area of odiR: ('drron+9rcular) Coefficient of discharge (Ce). Driving head (lj Drawdown through weal Weir type Coefficient of discharge (Cy) Length of wet (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Postdevelopmed 1-yr, 24Ju peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown firm Additional Information Vegetated side slopes. Vegetated shelf slope Vegetated shed width Length of f owpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated fitter provided? Recorded drainage easement provided? Captures all runoff at ultimate build -out? Drain mechanism W mainlamance or emergerxies is: Y (Y or N) 3.00 in Inn 0.60. (unitless) 0.60 ft N (Y or N) (unidess) (unitless) ft it 0.18 fe/sec 8.05 eisec 0.18 fetsec 4.64 days 3 :1 10 :1 10.0 It 3 :1 3.0 :1 y (Y or N) 1.7 It OK, draws down in 2-5 days. OK OK OK OK OK OK OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Font SW401-VM Detention Baain-Rer.&w17/09 Perte I. a II. DesW Summery, Pegs 2 of 2 Permit No. (to be provided by 0") III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Paget Plan In'� Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin 0" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. s 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans pdor to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, tovedfy volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 'mot 7. The supporting calculations. Priti� 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 1%rtA"_ r-- 9. A copy of the deed restrictions (d required). %vb,z't 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9117t09 Part III. Required Items Checklist, Page 1 of 1