HomeMy WebLinkAbout[External] Notice of As-Built Credit Release / RES Catawba UMB - Dogtown / SAW-2017-00608 / Catawba CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home
tab.
Good afternoon Ben,
The 15-Day As-Built/MY0 review for the Dogtown Mitigation Site (SAW- 2017-00608) ended September 1, 2023. This credit release followed the review process outlined in Section 332.8(o)(9)
of the 2008 Mitigation Rule. We have reviewed the baseline monitoring report and as-built plans you submitted on June 29, 2023, and a site meeting was conducted on August 17, 2023.
Based on the review and site meeting, we determined that the requested credit can be release in full. Please note that the action items identified during the site meeting should be
addressed and included in the MY1 annual report. No additional comments were received from the NCIRT other than those noted in the meeting minutes included with the attached credit
release letter.
Please let us know if you have any questions.
Thanks,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
From: Davis, Erin B CIV USARMY CESAW (USA)
Sent: Thursday, July 27, 2023 9:15 AM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY
CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron <byron_hamstead@fws.go
v>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer,
Olivia <olivia.munzer@ncwildlife.org>; Dave McHenry <david.mchenry@ncwildlife.org>
Cc: Benton Carroll <bcarroll@res.us>; Jamey McEachran <jmceachran@res.us>; Daniel Dixon <ddixon@res.us>
Subject: Notice of As-Built Review / RES Catawba UMB - Dogtown / SAW-2017-00608 / Catawba County
Good morning IRT,
The below referenced FINAL As-Built Report review and associated MY0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted
to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below
if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period
with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline
(shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's
approval or disapproval of the credit release.
15-Day Comment Start Date: July 31, 2023
15-Day Comment Deadline: September 1, 2023 (15 days following field review)
45-Day Credit Release Approval Deadline: October 1, 2023 (45 days following field review)
Field Review Date: Thursday, August 17, 2023 at 9:00am
Meeting Location: 35.765828, -81.185426 (North side of the project off Swinging Bridge Road)
Second meeting location: - 35.753685, -81.197803 (South side of project off C and B Farm Road)
Attached are georeferenced site CCPV maps.
Project Information:
Project: RES Catawba UMB – Dogtown Mitigation Project
Sponsor: Environmental Banc & Exchange, LLC
Sponsor POC: Ben Carroll, bcarroll@res.us <mailto:bcarroll@res.us> , (919) 209-1077
Action ID: SAW-2017-00608
County: Catawba
Location: 35.753050, -81.190668
HUC: 03050101
USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> , (828)-933-8032
USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887
Mitigation Plan Projected Credits
As-Built Credits
Mitigation Plan Projected Lengths
As-Built Lengths
8,655.818 SMUs (warm)
8,655.818 SMUs (warm)
11,602 ft
11,602 ft
Note: No credit changes noted from Final Mitigation Plan to As-Built
Requested Credit Release: As-built/MY0
15% of the total stream restoration credits: 1,286.954 Warm Water Stream Credits
RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:1290579993295:::RP,278:P278_BANK_ID:4581 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:1290579993295:::RP,278:P2
78_BANK_ID:4581>
Please note that you must be logged in to access documents in the cyber repository.
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
⁴敃瑲晩捩瑡牔獵⁴楌瑳倠䅃Ḱഗ㜱㐲ㄲ〲㜲ㄍ〸ㄴ㈲㈱㈰娷脰㆘》؉唃ȓ单ጱᄰ̆ѕገ圊獡楨杮潴ㅮ【؎唃܄ܓ敒浤湯ㅤ〞唃ᔓ楍牣獯景⁴潃灲牯瑡潩ㅮ」؋唃Г位剐㌱̆ѕጃ䴪捩潲潳瑦䌠牥楴楦慣整吠畲瑳䰠獩⁴畐汢獩敨ひƂ〢؍⨉䢆čā舃༁ ƂȊƂ鯲戫个䯱䪶襊ఐꜫ괢亟쑟췾猼羛襫墑眦넙뛢岰䗂鄀馰戴輭슐从᧿꧂籲㝹�밽煏䱒睤竽벆ﰦꭞꐘ鷁㎥厩ꢛ싡ꢖ䰋轱蜎秚�踈얉ἓ趇⚏톰伖ꇏ控뽼锞팰
䆨ᢅ蟏쎤꒼釿社컶즛猥䴊슎莩ꡘ跮측粈缼龞◞乙娞苆㉋猤樚쭔䮿帎鳶뷫쿟決삐죑渝蕖䵽ꔶ엁䣈齨삲曃뻼뀄扨쟌䦋̂ꌁƂスƂサؕ唃┝คరਆثЁ舁ःᴰ̆ᵕЎЖ픛핁厛鮋ᤤ䱩ぶْ唃ᄝ䬄䤰䞤䔰റର̆ѕጋ䴄偏ㅒ〴ز唃Ԅ⬓㈲㤹㌴挫㡢改〸ⴴ昵收㐭晤ⵥ㤹搵愭慤昰㈶ㄵ㝦〷؟唃⌝᠄ᘰᒀ鋡ꢗ呟᥍⯍⇪�ﰞㆡ쏟脰ڨ唃Ἕ脄゠鶁脰ꂚ鞁膠蚔案瑴㩰⼯睷業牣獯景潣⽭歰⽩牣⽬牰摯捵獴䴯捩敃呲畲楌偳䅃㉟〰ⴹ㐰〭⸲牣虬案瑴㩰⼯牣
業牣獯景潣⽭歰⽩牣⽬牰摯捵獴䴯捩敃呲畲楌偳䅃㉟〰ⴹ㐰〭⸲牣ぬٝ⬈ĆԅćЁけくٍ⬈Ćԅ〇蘂桁瑴㩰⼯睷業牣獯景潣⽭歰⽩散瑲⽳楍䍣牥牔䱵獩䍐彁〲㤰〭ⴴ㈰挮瑲രआ蘪虈āԅ̀Ƃ䴜曨㑥붵㎁ꓕཙ䳠ⴳ၌ゥ行욁�♫¢直ꥧ컇ࡼ굠ㄗᴢ뚣Ꞻ멣껔鄇댺⢟ꑠ钋蚥ꁧ䣱I耍퇨ௌ趰렲ꃲ饗ꃋ퉣C꠴驀້�禙딼㌾襲⬑♼嵶Ἲ㳃ΉꍚᜄԪ꼍අ伹㧚勖绨踗韜꧲蔾谠瞰冐녯⺺잴㦿◭덃ો︂�㐕Ǩ哾塜㢵儃ꏥ᧔叶둻틦
꽸锽鸾⮠᧶Ջ꿍扅寐춌�ꪛハ農]»舰舰툃ΠĂȂ愊鴑Ä