Loading...
HomeMy WebLinkAboutSW6100601_401 Certification Application_20100625Permit No. SW 6100&0 (to be pmvidetl by CUD) ®'\VY WA 9 i e O� �G NCDENR QU1Q STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name Lot 2 Airport Commerce Park Contact person Phone number - Chris Millis, PE - 910.791-6707 Date 611012010 Drainage area number 1 II IOESIGN'INF0RMAT10Na';. ;'Y„ a:.«1,Ja+"!n'. Site Characteristics Drainage area 101.1710 e 1,r� Impervious area, post -development - . 48,350 ft2 Su• M %impervious 4779 % tp $ Design rainfall depth 1.0 in - } Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5'runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the Pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PfelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) SedimenCcleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 1 y��, 4,051 ft3 /OK ' 7,873 ff3 It ff3 fl3 ff3 ft3 N (Y or N) rda in nla limitless) rda (uni0ess) Na irdhr nla ft3/sec nla ff3/sec #VALUE! ft3/sec 181.41 first 180.50 first first 181..00 fmsl 180.00 fmsl 176.50 fmsl 175.50 fmsl 1.00 it OK, volume provided is equal to or in excess of volume required. y (Y or N) -182.0 trust 4Bsnffi ' YaWered-- IV 0 =� 215e2 f�u�v�ri�rJ Form SW401-Wet Detention Baaln-Rev.e-9117/09 Parts 1. 8 II. Design Summary. Page 1 or 2 Permit No.Slg) % 1 00 G 01 n0 beprovided by WO) Surface Areast5'o-rr„4� t"r, rkd= Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ap,,,. Area, bottom of 10ft vegetated shelf, Ate, ,,s,, Area, sediment cleanout, top elevation (bottom of pond), A,_. Volumes Volume, temporary pool Volume, permanent pool, Vn _,, Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vim,,, via Area provided, permanent pool, A._p, Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0,5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A._,, Area, bottom of 1Oft vegetated shelf, Ax(_wrn Area, sediment cleanout, top elevation (bottom of pond), A,,. "Depth" (distance bAv bottom of 100 shelf and top of sediment) Average depth calculated Average depth used in SAIDA, it., (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development 1-yr. 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of Oowpath to width ratio Length to width ratio Trash rack for overflow 8 orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 5,544 ft2 2,924 ft2 ✓ 2.89 (unilless) ✓ 3,770 ft` ✓ OK 2,309 ft` 357 k2 7,873 ft3 OK 5,847 ft3 1,202 ft3 20.6% % OK 90 % N (Y or N) Y (Y or N) 2.89 (unilless) n (Y or N) 5,847 ft' 3,770 kr ft --_46W44� it y (Y or N) 3,770 ft` 2,309 k2 357 ft2 3.50 It k 3.0ft ✓ y (Y or N) 1.00 in in 0.60 (unitless) 0.50 it N (Y or N) limitless) limitless) R it 0.02 ft3/sec 1.36 ft3/sec 0.02 ft3/sec / OK, draws down in 2-5 days. 2.50 days 3 :1- •-' OK 10 :1 OK 10.0 ft OK 3:1 OK 3.0 :1 OK y (Y or N) OK . 2.5ft OK n (Y or N) OK y. (Y or N) OK y (Y or N) OK Pump Out Form S W401-Wet Detention Basin -Rev B-9117/09 Pans I. S 11. Design Summary. Page 2 of 2 Permit No. �AA(o100(001 (to be provided by DWQ) III'.REQUIRED:ITEMS;CHECKLISTi�',Atttk Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 66A— G_3,0 1. Plans (1" - 50' or larger) of the entire site showing: 6-3• IDA- ✓ Design at ultimate build -out, ✓- Off -site drainage (if applicable), ✓- Delineated drainage basins (include&atienetGeaeffreientper basin), USLD _ J)(tLS ( � AA ✓- Basin dimensions, ( AI W SGF#nI�) ✓- Pretreatment system, High flow bypass system, - ✓Maintenance access, ✓- Proposed drainage easement and public right of way (ROW), ✓- Overflow device, and Boundaries of drainage easement. C-3 D 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: C_ 3. 0/1 ✓- Outlet structure with trash rack or similar, C_ S. 0 _ ✓- Maintenance access, J � ✓- Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, ✓- Basin cross-section, ✓- Vegetation specification for planting shelf, and Filter strip. C� h C—S• 1 3. Section view of the wet detention basin (1" = 20' or larger) showing: ✓Side slopes, 3:1 or lower, Pretreatment and treatment areas, and ✓Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. CW G/a 1 C S 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. C NH C' j 0 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. C y CR1G 7. The supporting calculations. CH ✓ 1 8. A copy of the signed and notarized operation and maintenance (08M) agreement. C ✓YV 9. A copy of the deed restrictions (if required). 01A 0�4 10. A soils report that is based upon an actual field investigation, soil borings, and inf Itradon tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Paget of 1