Loading...
HomeMy WebLinkAboutSW4090301_NCG01 Approval_20090421AM;AV NCDE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary 21 April 2009 McDonald's Corporation One McDonald's Plaza Oak Brook, IL 60523 Subject: NPDES General Stormwater Permit NCGO10000 (Construction Activities) Project Name. McDonald's - King Project ID: Stoke-2009-013 Stokes County Dear Mr. Sir or Madam: The NC Division of Land Resources (DLR) has informed our office that they have approved the Erosion and Sedimentation Control Plan (E&SCP) for the abovementioned land disturbing activity. Please be aware that, upon approval of your E&SCP by DLR, you, as the project's financially responsible party, were also issued a general stormwater permit (NCG010000) to discharge stormwater associated with construction activities. Our office, of the NC Division of Water Quality (DWQ) enforces these permits, and therefore the site is subject to inspections by DWQ in order to assess compliance with the NCGO10000 general permit. Please read the NCG010000 general permit in detail to become thoroughly familiar with all permit requirements. Also bear in mind that the NCG010000 general permit remains in full force at the site until DLR deems the, site to, be complete and thoroughly stabilized and closes their permit for the project. Some of the major permit requirements are outlined below: 1. You, or your authorized designated representative, must maintain a copy of the approved E&SCP on site at all times. 2. You, or your authorized designated representative, must maintain a rain gauge on site at all times and keep a record of all rainfall amounts and dates. 3. You, or your authorized designated representative, must inspect all erosion and sedimentation control (E&SC) measures specified on the approved E&SCP and all stormwater discharge outfalls (SDO) at least once every seven calendar days and within 24 hours of any storm event measuring greater than % inch of rain per 24-hour period. Inspection frequency requirements vary at some sites based on the, classification of the receiving stream; again please review the entire general permit in detail to ensure you thoroughly understand all requirements and what constitutes an SDO. 4. You, or your authorized designated representative, must provide the operation and maintenance. necessary to maintain all E&SC measures and stormwater controls at optimum efficiency at all times and take immediate corrective action when measures or controls are not functioning properly. 5. You, or your authorized designated representative, must notify our office within 24 hours if you observe significant amounts of sediment being discharged from the site into any receiving water body, and provide a written notice of all such events to our office within 5 days working days. Please also bear in mind that a dry creek bed, stormwater ditch, or anv other manmade or natural feature that conveys water at any time of year, may also be considered a receiving water body. Please refer to the permit for the definitions of SDOs and receiving waters. It is your ultimate responsibility, as the project's financially responsible party, to ensure complete compliance at the site with all permit requirements at all times. You should ensure that all individuals performing construction activities at North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 One Phone: 336-771.5000 l FAX: 336-771-4630 L Customer Service: 1.877.623-6748 North Carol i 1i a Intemet: www.ncwaterquality.org �/ y '� " atura lff An Equal Opportunity 1 Affirmative Action Employer David T. McGee NCG010000 Project10: Stoke-2009-009 Page 2 of 2 the site are also thoroughly familiar with the permit and E&SCP requirements. A copy of the general permit as well as the monitoring form you must use can be obtained from the following web site: http_//h2o.enr.state.nc.us/su/Forms Documents.htm. A copy of the permit technical bulletin as well as a sample copy of the monitoring form you must use is'attached. It is imperative that you understand that Director of the Division of Water Quality may assess civil penalties not to exceed $25,000 per day, per violation, upon you, the project's financially responsible party, for any and all violations of the NCG010000 general stormwater permit at the project site. If you have any questions regarding this letter or the NCG010000 general permit, please contact me at (336) 771-5000. Sincerely, Ron one Environmental Specialist NC Division of Water Quality Winston-Salem Regional Office Attachments: 1. NCG010000 Technical Bulletin 2. Sample Monitoring Form cc: LQ — WSRO FSWP — WSROJ