Loading...
HomeMy WebLinkAboutSW4090301_Add Info Request_20090513NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Ken Binkley Stimmel Associates, PA 601 N. Trade St., Suite 200 Winston-Salem, NC 27101 Dear Mr. Binkley: Division of Water Quality Coleen H. Sullins Director April 2, 2009 Subject: Request for Additional Information Stormwater Project No. SW4090301. Dee Freeman Secretary McDonald's, South Main St. — King, NC Stokes County The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on March 25, 2009; with follow up information on April 1, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: �/ 1. Please delineate all wetlands on site, or provide a note on the plans (or in a letter) stating there are no wetlands on site. ,/2. Information on the seasonal high water table (SHWT) needs to be provided. The soils report provided does not specifically estimate the SHWT at each of the bioretention cells. At least one soil boring is required within the foot print of each cell to estimate SHWT. The SFIWT must be at least 2 feet below the bottom of the cell. ✓ 3. An O&M Agreement was submitted, but not signed and notarized. Please submit a completed O&M Agreement for the bioretention cells (1 original & 1 copy). AThe drainage calculations must use the Rational Method, unless you are designing a LID project. Please revise the calculations accordingly. /5. For future submissions, please be sure to initial each item in the submittal requirements on page 4 of SWU-101. 6. Please revise the drainage area table in III.8. of SWU-101 to reflect the same numbers shown on the plans, calculations, and supplement forms. You may submit just the revised page(s) if you so choose. Wetlands and Slamwater Branch One 1617 Mad Service Center, Raleigh, North Carolina 27699-1617 Norte Carol_i n a Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 ` Phone: 919-807-63001 FAX: 91927-64941 Customer Service: 1-877-623-6748 Neutrally Intemet: www.nmaterquality,org An Equal Oppurtunily 1 Affamathe kkri Err Boyer Mr. Ken Hinkley SW4090301 — McDonald's, South Main St. — King, NC April 2, 2009 7. Some type of pretreatment device (forebay, plunge pool, etc.) is required at each flume into the bioretention cells. Also, please provide calculations to show that the inlet velocity for grassed cells is no more than 3 ft/sec (1 ft/sec for mulch/shrub cells). J 8. The bioretention materials specifications on C-5.2 includes shredded hardwood mulch. What is the mulch used for in these grassed cells? Please explain and revise as needed. j9. Sheet L=1 shows shrubs and trees within the bioretention cells, but the cells are designed to be grassed cells. If they are shrub/tree cells, the planting media depth will need to be increased to a minimum of 3 feet deep to ensure plant survival. Please explain and revise as needed. J 10. Please note for future reference: The State storn►water rules do not require peak attenuation of the 1-yr, 24-hr storm as stated in the narrative. The related requirement that is in the rules, is that the discharge rate of the storage volume (treatment volume) must be less than or equal to the pre -development l -yr, 24-hr storm rate. This project meets that requirement. Please be sure to revise any plans, calculations, and forms that are affected by any changes based on the above comments. If any plan sheets must be revised, be sure to submit two copies of the revised sheets. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 20, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, fax, or email your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW4090301 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to contact me at (919) 807-6375, or' robei-t.patterson@ncmai1.net. Sincerely, Robert D. Patterson, P.E. Environmental Engineer Stormwater Permitting Unit cc: Ms. C. Nadine Perry, McDonald's USA, LLC, 4601 Six Corks Rd. 9200, Ralchub, NC 27609 Winston-Salem Regional Office DWQ Central Files Stormwater Permitting Unit Files Page 2 of 2 RE: McDonald's - King Subject: RE: McDonald's - King From: "Jessie Lester" <,ILestercr stinurtelpa.com> Date: Mon, 30 Mar 2009 10:18:50 -0400 To: "Robert Patterson" <Robert.Patterson a ncmail.net> CC: "Ken I3inkley" <kbinkley a stinlrnelpa.com> March 30, 2009 oe Hey Robert - Thanks for the detailed e-mail. I will have my Civil Engineer who worked on putting that package together, en in e , call you within the hour to discuss comments 3-5. 1 will al 0&M form to the owner for signature - as well as pass along your comment #f 1 below - to them to have them try and resolve. We really appreciate you working with us on this - and we will do our best to expedite getting you the additional and / or revised information. Have a good one - Jessie Jessie Lester Project Manager Stimmel Associates PA Tel.tf: 336-723-1067 Eax#: 336-761-5069 j]-ester@sLi.inmelpa.com Stimmel Associates, P.A. E-mail Disclaimer This email and any files transmitted with it are confidential and intended'solely for the use of the individual or entity to which they are addressed. If you have received this email in error please notify Stimmel Associates, P.A. immediately. E-mail transmission cannot be guaranteed to be secure or error --free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Stimmel Associates, P.A. therefore does not accept liability for any errors or omissions in the content of this message, which arise as a result of e-mail transmission. Warning: Although the company has taken reasonable precautions to ensure no viruses are present in this email, the company cannot- accept responsibility for any loss or damage arising from the use of this email or attachments. -----Original Message ----- From: Robert Patterson[mailto:Robert.Patterson@ncmail..net] Sent: Monday, March 30, 2009 10:06 AM To: Jessie Lester Cc: Robert Patterson Subject: McDonald's - King Jessie, I left you a voice mail earlier today. Please tali me to discuss this when you have a chance. Based on a preliminary review, the application is incomplete. We cannot process your application until, these some of these are resolved. Otherwise, I'll have to return the application as incomplete. All these requirements are on page 4 of SWU-101 in the submittal requirements checklist which was not initialed as required; in the BMP Manual; in the rules; or in the required items checklist of the supplement form. ' 1. The application and forms must be signed by someone having legal authority to do so. C. Nadine perry is not in the Sec. of State's database for this LLC as having signing authority. Another option is to 1 of 2 3/30/2009 ] 0:22 AM RE: Mcl)onald's - King get a letter from someone who does have signing authority giving the same•to C. Nadine Perry. I.am technically suppose to return the whole package due to this, but will hang on to it if you can get this resolved quickly'. —The narnes,.in the SOS database are Gloria Santona, Matthew H. Paull, Ralph 'Alvarez,.- and Marcy. Miller. 2. The bioretention 0&M,form was included, but it must be signed by the owner. 3. The Rational Method must.be used for the calculations. The SCS method can only be used if it ia;shown to be more conservative than the rational method, or if it is an LID project. 4. Any wetlands must be shown on the plans or a note must be on the plans saying none exist on the site. , 5. The soils report was submitted, but it does not appear to contain the information required. A boring is required in the footprint of each bmp, with a field determination of the estimated SHWT. This is based on visual inspection of the soil, not whether water is seen in the boring. Please call me at your earliest convenience to discuss. Robert Robert D. Patterson, PE Environmental Engineer NCDENR 1 DWQ 1 Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 (919) 807-6375 Phone 1 (919) 807-6494 Fax Email: robert.patterson@ncmail.net Website: littp://h2o.enr.state.nc.us/su/stormwate.r.htnil *Please consider the environment before deciding to print this email* E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 of 2 3/30/2009 10:22 AM Is NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director f ------- April 2, 2009 Mr. Ken Binkley Stimmel Associates, PA 601 N. Trade St., Suite 200 Winston-Salem, NC 27101 RECENEt3 N•o. DOW. of ENR ,APR Q 9 2E,09 Wnstun-Saform Regional office Dee Freeman Secretary Subject: Request for Additional Information Stormwater.Project No. SW4090301 McDonald's, South Main St. — King, NC Stokes County Dear Mr, Binkley: The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on March 25, 2009- with follow up information on April 1, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please delineate all wetlands on site, or provide a note on the plans (or in a letter) stating there are no wetlands on site. 2. Information on the seasonal high water table (SHWT) needs to be provided. The soils report provided does not specifically estimate the SHWT at each of the bioretention cells. At least one soil boring is required within the foot print of each cell to estimate SHWT. The SHWT, must be at least 2 feet below the bottom of the cell. 3. An O&M Agreement was submitted, but not signed and notarized. Please submit a completed O&M Agreement for the bioretention cells (I original P�, I copy). 4. The drainage calculations must use the Rational Method, unless you are designing a LID project. Please revise the calculations accordingly. 5. • For future submissions, please be sure to initial each item in the submittal requirements on page 4 of SWU-101. 6. Please revise the drainage area table in III.8. of SWU-101 to reflect the same numbers shown oil the plans, calculations, and supplement forms. You may submit just the revised page(s) if you so choose. Wetlands and Slormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 � One Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 N orth Carol l n a Phone: 919.807.63001 FAX: 91H07-64941 Customer Service: 1-877-623-674$ % �� * ��j/ Internet: www.ncwaterquality.org C� ij • r. Equal Opportunity 1 AffrmaVveAction Employer Mr. Ken Binkley SW4090301 — McDonald's, South Main St. — King, NC April 2, 2009 7. Some type of pretreatment device (forebay, plunge pool, etc.) is required at each flume into the bioretention cells. Also, please provide calculations to show that the inlet velocity for grassed cells is no more than 3 ft/sec (1 ft/sec for mulch/shrub cells). The bioretention materials specifications on C-5.2 includes shredded hardwood mulch. What is the mulch used for in these grassed cells? Please explain and revise as needed. 9. Sheet L=1 shows shrubs and trees within the bioretention cells, but the cells are designed to be grassed cells. If they are.shrub/tree cells, the planting media depth will need to be increased to a minimum of 3 feet deep to ensure plant survival. Please explain and revise as needed. 10. Please note for future reference: The State storniwater rules do not require peak attenuation of the 1-yr, 24-hr storm as stated in the narrative. The related requirement that is in the rules, is that the discharge rate of the storage volume (treatment volume) must be less than or equal to the pre -development 1-yr, 24-hr storm rate. This project meets that requiremert. Please be sure to revise any plans, calculations, and forms that are affected by any changes based on the above comments. If any plan sheets must be revised, be sure to submit tivo copies of the revised sheets. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 20, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, fax, or email your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control PIan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW4090301 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to -contact me at (919) 807-6375, or' robert.patterson@..iicmail.net. Sincerely, Robert D. Patterson, P.E. Environmental Engineer Stormwater Permitting Unit cc: Ms. C. Nadine Perry, McDonald's USA, LLC, 4601 Six Forks Rd. 4200, Raleigh, NC 27609 Winston-Salem Regional Office -DWQ Central Files Stormwater Permitting Unit Files Page 2 of 2 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary RECEIVED N,C, Dept. of ENR April 2, 2009 APR 0 9 20u9 Mr. Ken Binkley Winston•Saiem Regional Qffiee Stimmel Associates, PA 601 N. Trade St., Suite 200 Winston-Salem, NC 27101 Subject: Request for Additional Information Stormwater Project No. Ski' :09030I • McDonald's, South Main St. — King, NC Stokes County Dear Mr. 13inkley: The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on March 25, 2009; with follow up information on April 1, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please delineate all wetlands on site, or provide a note on the plans (or in a letter) stating there are no wetlands on site. 2. Information on the seasonal high water table (SHWT) needs to be provided. The soils report provided does not specifically estimate the SHWT at each of the bioretention cells. At least one soil boring is required within the foot print of each cell to estimate SHWT. The SHWT must be at least 2 feet below the bottom of the cell. 3. An O&M Agreement was submitted, but not signed and notarized. Please submit a completed . O&M Agreement for the bioretention cells (1 original & I copy), 4. "fhe drainage calculations must use the Rational Method, unless you are designing a LID project. Please revise the calculations accordingly. 5. for future su_ bmissionS, please be sure to initial each item in the submittal requirements on page 4 of SWU-101. 6. Please revise the drainage area table in 1I1.8. of SWU-101 to reflect the same numbers shown on the plans, calculations, and supplement forms. You may submit just the revised pabe(s) if you so choose. Wetlands and Stormwater Branch t�[7C 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 ',.ocatiom 512 N. Salisbury St Ralegh, North Caroina 27604 North Carol.i na/ Phone: 919-807-63001 FAX:91M07-64941 Customer Service; 1-877-623-6748 yIVV�l.�'�7Cl� Internet: www.ncwaterquali�.org ;/ A.. equal Opporlun4y 1 Affirmative Aclion Employer Mr. Ken Binkley SW4090301 — McDonald's, South Main St. — King, NC April 2, 2009 7. Some type of pretreatment device (forebay, plunge pool, etc.) is required at each flume into the bioretention cells. Also, please provide calculations to show that the inlet velocity for grassed cells is no more than 3 ft/sec (1 ft/sec for mulch/shrub cells). 8. The bioretention materials specifications on C-5.2 includes shredded hardwood mulch. 'What is the mulch used for in these grassed cells? Please explain and revise as needed. 9. Sheet L=1 shows shrubs and trees within the bioretention cells, but the cells are designed to be grassed cells. If they are shrub/tree cells, the planting media depth will need to be increased to a minimum of 3 feet deep to ensure plant survival. Please explain and revise as needed. 10. Please note for future reference: The State stonnwater rules do not require peak attenuation of the 1-yr, 24-hr storm as stated in the narrative. The related requirement that is in the rules, is that the discharge rate of the storage volume (treatment volume) must be less than or equal to the pre-development-l-yr, 24-hr storm rate. This project mccts•that requirement. Please be sure to revise any plans, calculations, and forms that are affected by any changes based on the above comments. If any plan sheets must be revised, be sure to submit two copies of the revised sheets. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 20, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, fax, or email your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW4090301 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to -contact me at (919) 807-6375, or' robert.patterson@iie.-n-,ii].net. Sincerely, Robert D. Patterson, P.E. Environmental Engineer Stormwater Permitting Unit ec: Ms. C. Nadine Perry, McDonald's USA, LLC, 4601 Six Forks Rd. 4200, Raleigh, NC 27609 Winston-Salem Regional Office DWQ Central Files. Stormwater Permitting Unit Files Page 2 of 2