Loading...
HomeMy WebLinkAboutNCC203269_NOT Signed Certification_20230925 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)� [40 CFR 122.22] 1V General Permit Certificate of Coverage (COC) No.: C C, 2 D 3 2 (4 -I Name of Project: L reShck_rr-A Pcu' KJI- Per NC General Statute 143-215.6B(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true, complete, and accurate. Legally Responsible Organizational Entity(must match eNOT): *Legally Responsible Person (must match eNOT): Doti!'I d Ir10{ *Title of Legally Responsible Person: `J Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: acnn e_ Don ey col+ - P.Q + (-°orci i n *Signature: I . 1 Date: t' 2J * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.