HomeMy WebLinkAboutSW4131203_401 Certification Application_20140109Permit Number: (to be provided by DWO) Myy� 020E W AI Fq�G �' �� NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with all of the required information. I` PROJECT INFORMATION+ Project name Dollar General # 15122 Contact name Phone number Date Drainage area number Matt Lowder, PE 919-333-5729 December 12, 2013 Bio-Retention Pond Site Characteristics Drainage area 45,740 ff'�// Impervious area 32,148, ftz Percent impervious 70.3% % / Design rainfall depth 1.0 inch ✓ Peak Flow Calculations 1w Is pre/post control of the 1-yr, 24-hr peak flow required? Y - (Y or N) / f al 1-yr, 24-hr runoff depth 2.87 in l 1-yr, 24-hr intensity 4.72 in/hr Pre -development 1-yr, 24-hr peak flow 1.350 ft'/sec Post -development 1-yr, 24-hr peak flow 3,670 ff'/sec Pre/Post 1-yr, 24-hr peak control 2.320 ff'/sec Storage Volume: Non -SA Waters rtrrr(rr2js' Minimum volume required 2,608.0.ft' ,ems °`" pt kS CAJ79 4 Volume provided 2,885.0ff' OK $ Storage Volume: SA Waters � _ 9�C� - c 1.5" runoff volume It' = SEAL Pre -development 1-yr, 24-hr runoff it 71 2443 A .13 Post -development 1-yr, 24-hr runoff Minimum volume required ft' 0 Volume provided ft' ft' Cell Dimensions %if ; i It Pending depth of water 12' inches K ny . / Pending depth of water 1,00 it (!� IqV/l Surface area of the top of the bioretention cell 2,885.0 ff2 OK Length: 52 It OK / Width: 55 If OK -or- Radius It Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 12! hr OK / Drawdown time, total: 18 hr In -situ soil. ✓// Soil permeability 0.10'. in/hr Insufficient. Increase infiltration rate or include eFdrains, Planting media soil: Soil permeability 2.00 in/hr OK yQs Soil composition % Sand (by volume) 87% OK % Fines (by volume) 8% OK . % Organic (by volume) 5% OK Total: 100% Phosphorus Index (P-Index) of media 10(unitless) OK Form SW401-Bioretention-Rev.8 June 25, 2010 Parts I and II. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Basin Elevations / Temporary pool elevation 483.40 fmsl Type of bioretention cell (answer "Y' to only one of the two following questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 482.4 first Depth of mulch inches Bottom of the planting media soil 480.4 fmsl / Planting media depth 2 ft ✓ Depth of washed sand below planting media soil 0.3 fit Are underdrains being installed? y (Y or N) �r How many clean out pipes are being installed? 4 OK What factor of safety is used for sizing the underdrains? (See 2 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 479.1 fmsl SHWT elevation 472 first Distance from bottom to SHWT 7.1 ft OK Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow imsl Separation of IWS and Surface 482.4 ft Planting Plan Number of tree species 0 Number of shrub species 0 Number of herbaceous groundcover species 0 Recommend more species. Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed Y (Y or N) OK through a vegetated filter? What is the length of the vegetated filter? It Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access Y (Y or N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) 2''. fYsec Insufficient inlet velocity unless energy dissipating devices are being used. Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X' in the shaded cell) Gravel and grass x (8inches gravel followed by 3-5 ft of grass) Grassed swale OK Forebay Other Form SW401-bioretention-Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 2 of 2 (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. /liG C C /D 1. Plans (1 - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Cell dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. 2 Plan details IV = 30' or larger) for the bioretention cell showing: - Cell dimensions - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P-Index between 10 and 30 3. Section view of the bioretention cell (V = 20' or larger) showing: - Side slopes, 3:1 or lower - Underdrain system (if applicable), and - Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] /1 'C L.N[5 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: - Soil permeability, - Soil composition (% sand, % fines, % organic), and GY/t L C-/0, C•// P-index. 5. A detailed planting plan IV = 20' or larger) prepared by a qualified individual showing: - A variety of suitable species, - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation, 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. `OR 61/4 S 7. The supporting calculations (including underdrain calculations, if applicable). // e /hfl L 544411IV744 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 1"Ze— � 9. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Part III, Page 1 of 1