HomeMy WebLinkAboutSW4131203_Details_20140109PAVEMENT GENERAL NOTES:
1. DETAILS ARE DOLLAR GENERAL MINIMUM REQUIREMENTS AND MAY INCREASE WITH VARIOUS SOIL CONDITIONS. A
GEOTECHNICAL INVESTIGATION WITH PAVEMENT DESIGN RECOMMENDATIONS SHALL BE COMPLETED FOR EACH
DEVELOPMENT THE FOLLOWING DETAILS ARE MINIMUM DOLLAR GENERAL PAVEMENT REQUIREMENTS.
INCREASED RECOMMENDATIONS ARE TO BE USED.
2. THE SUBGRADE MATERIALS SHALL BE PROOF ROLLED AND/OR SCARIFIED AND COMPACTED PRIOR TO PLACEMENT
OF BASE MATERIAL, WHERE EXISTING SUBGRADE MATERIALS ARE UNSUITABLE, THEY SHALL BE REMOVED AND
REPLACED WITH COMPACTED SELECT MATERIAL IN ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS.
3. HEAVY DUTY CONCRETE PAVEMENT AND STANDARD DUTY CONCRETE PAVEMENT (AS RECOMMENDED BY THE
GEOTECHNICAL REPORT OR DOLLAR GENERAL MINIMUMS) SHALL BE STEEL REINFORCED. REINFORCEMENT TYPE
SHALL BE PRIOR APPROVED BY DOLLAR GENERAL.
4. CONCRETE PAVEMENT PLAN SHALL BE PROVIDED TO DOLLAR GENERAL FOR PRIOR APPROVAL. ALL JOINTS MUST BE
SEALED WITH AN APPROVED SEALANT. STEEL REINFORCING SHALL BE USED AT JOINTS. REFER TO ACI 330R (GUIDE
FOR DESIGN AND CONSTRUCTION OF CONCRETE PARKING LOTS) FOR JOINT DESIGN AND LAYOUT.
3" ASPHALT WEARING COURSE
(2) 1.5" LIFTS
NCDOT SF-9.5A
6" COMPACTED AGGREGATE BASE
Z
W
COMPACTED SUB GRADE
W
¢
STANDARD DUTY ASPHALT DETAIL
a.
U
SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA
E,
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION
a
--
x
a.
1.5" ASPHALT WEARING COURSE
NCDOT SF-9.5A
2.5• ASPHALT BINDER COURSE
NCDOT 1-19.08
8" COMPACTED AGGREGATE BASE
COMPACTED SUB GRADE
HEAVY DUTY ASPHALT DETAIL
SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION
REINFORCING AS RECOMMENDED
BY GEOTECHNICAL CONSULTANT
(RE: NOTE 3 ABOVE)
5" 4,000 PSI CONCRETE
--- 4" COMPACTED AGGREGATE BASE
COMPACTED SUB GRADE
STANDARD DUTY CONCRETE DETAIL
E-F
z
W
SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION
W
-
¢C2.
REINFORCING AS RECOMMENDED
BY GEOTECHNICAL CONSULTANT
F
(RE: NOTE 3 ABOVE)
r�
Ix
U
Z
CD
6" 4,000 PSI REINFORCED CONCRETE
AT DUMPSTER/LOADING AREA
6" COMPACTED AGGREGATE BASE
COMPACTED SUB GRADE
HEAVY DUTY CONCRETE DETAIL
SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION
I PAVEMENT DETAILS
C— 7 NOT TO SCALE
ACCESSIBLE PARKING SIGNAGE NOTES
1. ALL LETTERS ARE TO BE PER THE LATEST EDITION OF THE MUTCD.
2. TOP PORTION OF SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) BLUE BACKGROUND WITH WHITE
REFLECTORIZED LEGEND AND BORDER.
3. BOTTOM PORTION OF SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BUCK OPAQUE
LEGEND AND BORDER.
4. FINE NOTIFICATION SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BUCK OPAQUE
LEGEND AND BORDER. CONTRACTOR SHALL VERIFY FINE AMOUNT AND ORDINANCE NUMBER.
5. ONE (1) SIGN REQUIRED FOR EACH ACCESSIBLE PARKING SPACE.
6. INSTALLED HEIGHT OF SIGN SHALL BE IN ACCORDANCE WITH SECTION 24-23 OF THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES. (MUTCD)
7. SIGN MAY BE MOUNTED ON BUILDING/WALL, AT PROPER HEIGHT, IF AUGNED WITHIN 12" OF CENTER OF PARKING SPACE.
MUTCD
VAN
R7-BP
ACCESSIBLE
12"x6"
[RESERVED]
PARKING
MUTCD
R7-8
12%18"
MAXIMUM
PENALTY
12"x9"
OS30-S).e
PA
HANDICAP SIGN
MUTCD
VAN
R7-8P
ACCESSIBLE
12%6"
RESERVED
PARKING
MUTCD
R7-BE
12"z2fi°
MAXIMUM
PENALTY
$250
cezo-n.e
HANDICAP PARKING, ACCESS
RAMP AND ACCESS AISLE DETAILS
NOT TO SCALE
SITE ACCESSIBILITY DETAIL NOTES:
1, REFER TO SITE PLAN FOR EXACT LOCATION OF HANDICAP PARKING, WALKWAYS AND RAMPS.
2. ALL WALKWAYS, RAMPS, AND HANDICAP PARKING SIGNAGE, ETC. SHALL MEET APPROVED AMERICANS WITH DISABILITIES
ACT (ADA) STANDARDS AND LOCAL ACCESSIBILITY CODE.
3, ONE OUT OF EVERY EIGHT (8) ACCESSIBLE PARKING SPACES, BUT NOT LESS THAN ONE, IS REQUIRED TO BE VAN
ACCESSIBLE.
4, ALL CONCRETE ACCESSIBLE RAMPS (3000 PSI) SURFACES SHALL HAVE COLORED TOOLED/SERRATED SLIP RESISTAND
SURFACING AND/OR TACTILE WARNING DEVICE PER ADA STANDARDS AND LOCAL ACCESSABILITY CODE,
5. ALL CONCRETE ACCESSIBLE RAMPS SHALL BE COLOR IMPREGNATED TO PROVIDE VISUAL CONTRAST (DARK TO LIGHT)
WITH ADJOINING CONCRETE SURFACES (MINIMUM 70% COLOR CONTRAST),
6. THE MATERIAL USED TO PROVIDE COLOR CONTRAST IN CONCRETE ACCESSIBILE RAMPS SHALL BE AN INTEGRAL
(PERMANENT) PART OF THE CONCRETE AND SHALL NOT BE PAINTED ON OR CAPABLE OF FADING OR WEARING OFF.
7, FINISHED GRADES OF PAVEMENT IN HC PARKING AND ACESSIBIUTY AISLE SHALL NOT EXCEED 1:50 SLOPE IN ANY
DIRECTION.
1:10 MAX
BOLLA
R
PARKING S
RE
PANTED
SEE ARCH PLANS
H.C. / SHOPPING CART RAMP TO BE
CENTERED ABOUT THE FRONT DOOR.
g HANDICAP PARKING DETAIL
C—% NOT TO SCALE
STANDARD STATE APPROVED
HANDICAPPED SIGNAGE INSTALLED
ON A METAL COLUMN AT THE
PROPER HEIGHT REQUIRED.
PROVIDE ADDITIONAL SIGNAGE
AS REQUIRED PER REGULATIONS
BOLT SIGNS TO GALVANIZED METAL PIPE COLUMN
I I
N
REENSTREAK PAVING CAP SEAL
ROFILE #610 - SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
TYPICAL EXPANSION JOINT
5 CONCRETE JOINTS
C-7 NOT TO SCALE
o CONCRETE FILLED
STEEL P PERBOLLARD, PAINTED YELLOW 6 0"
a
1 III
-6"
MIN.
HANDICAP PARKING SIGN DETAIL
NOT TO SCALE
COLORED TOOLED/SERRATED
SLIP RESISTANT SURFACING
AND/OR TACTILE WARNING
DEVICE AS REQUIRED BY
AMERICAN WITH DISABILITIES
ACT ACCESSIBILITY GUIDEUNES
AND CODE REQUIREMENTS
1:10 MAX. SLOPE PAINTED YELLOW
BOLLARD WITH HANDICAP PARKING
SIGN, AS REQUIRED.
4" PAINTED STRIPES - HC BLUE
COLOR 0 24" O.C. AT 45 DEGREES.
4" PARKING SPACE STRIPE.
BLUE COLOR.
NM
ALL HANDICAPPED RAMP AND ACCESS ISLES
SHALL MEET ALL CODES AND ADA
REGULATIONS.
SURROUND AROUND PIPE COLUMN
PUN
CONTRACTOR TO COORDINATE
EXACT REBAR HOLE SIZES
AND LOCATIONS WITH WHEEL
STOP MANUFACTURER.
3/4" - 1" DIA. HOLE
I8" #3 REBAR. FILL HOLE WITH SLURRY
—
MIX OF NON -SHRINK GROUT AFTER
REBAR INSTALLATION.
g WHEEL STOP
C -7 NOT TO SCALE
SEALANT
1/2•
6X6 - 10/10 WWF
4" GONG. SIDEWALK . '
71�—
COMPACTED
SUBGRADE
CCR
(REFER TO
GEOTECHNICAL—--�_=-'
" •_
REPORT)
#4
CONTINUOUS STEEL
REBAR
(TOP AND BOTTOM);
—
CURB EDGE CONCRETE SIDEWALK
NOT TO SCALE
INSTALL A GROOVE 6" FROM FACE OF
CONCRETE SIDEWALK
9'-0- (MIN) WIDE TURN -DOWN STYLE
CONCRETE SIDEWALK IN FRONT OF
BUILDING - SLOPE AWAY FROM
BUILDING.
g SIDEWALK DETAIL
C—% NOT TO SCALE
2"-4" 4x4
SPACING
FRONT 17 TOP VIEW 1X6 2X4
g HVAC SCREEN FENCE
C — 7 NOT TO SCALE
SAWCUT JOINT - FILL
WITH SELF LEVELING
ELASTOMERIC SEALANT
NOTE: SEE SPECIFICATIONS FOR
SPACING REQUIREMENTS
TYPICAL CONTROL JOINT
:2 TO FACE OF BUILDING
8"
ASPHALT PAVEMENT
1- RAO.
ASPHALT PAVEMENT
1SPHALT PAVEMENT
COMPACTED STONE
BASE
COMPACTED SUB BASE
TREATED PINE (USE GALVANIZED NAILS FOR FASTENING)
IF ANY PARCEL OF LAND ADJACENT TO THE DEMISED PREMISES IS EITHER
ZONED FOR RESIDENTIAL USE OR IS ACTUALLY BEING USED FOR RESIDENTIAL
PURPOSES ('RESIDENTIAL PROPERTY"), LESSOR SHALL CONSTRUCT A PRIVACY
FENCE IN ACCORDANCE WITH TENANTS PROTOTYPE PLANS AND ANY
APPLICABLE ORNAMENTAL
REQUIREMENTS ALONG ANY PORTION OF THE DEMISED PREMISES BORDERING
UPON SUCH RESIDENTIAL PROPERTY.
NOTE: NUMBER OF BOARDS WILL VARY
DEPENDING ON SPACE BETWEEN
BOARDS AND ACTUAL WIDTH
OF BOARDS.
REAR AEW
TRIANGLE SITE DESIGN
CONSULTANT.
Triangle Site Design, PLLC
4006 Barrett Drive
Suite 203
Raleigh, NC 27609
(919)553-6570
mlowder@trianglesitedesign.com
NC LICENSE yP-0619
SEAL:
;�4QOFEssio!i=
SEAL
24434 01 1
•• 0 •I .''
'•. �'W E. �'�, , l
OWNER/DEVELOPER:
GLANDON FOREST EQUITY, LLC
3900 Merton Drive
Suite 210
Raleigh, NC 27609
919-459-2602
919-459-2604 fx
gventers(@vanguardpg co m
REVISIONS:
LAYOUT COORD:
1\1EL
PLANNING MGR.
P,IEL
DRAWING BY:
1fEL
DATE: 12 12/13
JOB NUMBER:
004063
TITLE:
CONSTRUCTION
DETAILS
SHEET NUMBER:
11
COMMENTS:
B
2 1/4" (TYP)
e
r m
6" DIA.
STL. CONC.
FlLLED
GATE POST
FRAME AND CROSS
BRACE
METAL CATE FENCING
GATE HINGE
GATE POST DETAIL
6" DIA. STL CONIC. CONCRETE PAD (HEAVY
FILLED GATE POST DUTY CONCRETE)
DOUBLE DUMPSTER LAYOUT DETAIL
4' PRE -CAST
CAP
NOTE: TTT—
FOO7ING TO I JLJI
MATCH BUILDING
SEE STRUCTURAL DWGS. (TYP. FTG.)
3" J HANDLE
I DOUBLE DUMPSTER DETAILS
C —S NOT TO SCALE
BLOCK DUMPSTER
SCREEN WALL
((5'S AT 32•
ON CENTER
VERTICALLY.
i 8" BLOCK TO
MATCH BUILDING
TION A -A - WALL SECTION
`1/2" STEEL
DROP BARS
1" DIA P/C
SLEEVES 6" LONG
ELEVATION REFER
TO GRADING PLAN
STEEL HINGE
- METAL GATE
6" DIA. STL CONC.
FILLED GATE POST
GATE HINGES
ANCHORED TO POST
AND FASTENED TO
DOOR BRACE,
6" DIA STL.
CONIC. FILLED
GATE POST
8" BLOCK
BACKFILL TO TOP OF CURB
CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 PSI IN 26. CONFlRM WITH
GEOGRAPHICAL LOCATION OF THIS PARTICULAR PROJECT.
2 CURB/GUTTER DETAIL
C - B NOT TO SCALE
NOTE:
SET BOLLARD INTO CONCRETE TOOTER AS SHOWN. POUR
CONCRETE SIDEWALK TO BOLLARD.
CONCRETE WASH DOME - PROVIDE SMOOTH, - - - - - -�
ROUND SURFACE '
METAL DUMPSTER LATE -
4" PIPE - CONCRETE FILLED. REFER TO
PLANS FOR SIZE AND LOCATION. PAINT
OSHA SAFETY YELLOW.
0
SLOPE SURFACE AWAY FROM PIPE TO 1/2"
PRE -MOLDED EXPANSION JOINT (TYP.)
ASHPHALT (OR) CONIC. PAVING
g STOP SIGN DETAIL
C-13 NOT TO SCALE
STEEL PIPE EMBEDDED IN CONCRETE
FOOTING.
1' 4"
3 TYPICAL BOLLARD DETAIL
C—B NOT TO SCALE
NOTE:
1. WORDS AND ARROWS FOR DRIVEWAYS SHALL
BE APPLIED ACCORDING TO REQUIREMENTS
AS OUTLINED IN SECTION 3B OF THE
MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES FOR STREETS AND HIGHWAYS
2. THESE WORDS AND ARROWS ARE TO BE
PAINTED REFLECTIVE WHITE.
4 PAVEMENT MARKINGS
C -8 NOT TO SCALE
2"x4" STRINGERS
TOP, CENTER, & BOTTOM 4"W POSTS 6'-0" TO 8'-0" O.C.
HINGE
1"x4" x 6'-0" FENCING
7 WOOD SCREEN FENCE
C—S NOT TO SCALE
NOTE -
NO COTE IS REQUIRED FOR THIS
DEVELOPMENT DUE TO THE SHORT LENGT
OF
PROPOSED FENCING.
WOOD FENCE NOTES
I)
ALL POST AND STRINGERS
SHALL BE OSMOSIS TREATED OR
PENTA TREATED PINE, TO BE
APPROVED BY ENGINEER.
2)
ALL FENCE SIDING SHALL BE
OSMOSIS TREATED OR PENTA TREATED
LOCK
PINE, TO BE APPROVED BY ENGINEER
HASP
3)
ALL METAL FASTENERS SUCH AS
VN R)
BOLTS, NAILS, HINGES, HASPS,
AND ETC. SHALL BE HOT DIPPED
GALVANIZED.
4)
FENCE DIRECTION AS NOTED ON
PLANS OR AS DIRECTED BY OWNER,
5)
SPLICE STRINGERS AT POSTS ONLY.
i
TRIANU-1 -
SITE DESIGN
CONSULTANT:
i
Triangle Site Design, 1111C
4006 Barrett Drive
Suite 203 j
Raleigh, NC 27609
(919)553-6570
mlowder@trianglesi Led esign.co c.
NC LICENSE #P-0619
J
SEAL:
CAR
:��`�•• .....0//'
••SEAL • •"�'{ ,, -
24434{`rJ
(75
i
i
W
Z
W
O I
U
2
zz0 b0 C
Z Ca G
OWNER/DEVELOPER:
GLANDON FOREST EQUITY, LLC
3900 Merton Drive
Suite 210
Raleigh, NC 27609
919-459-2602
919-459-2604 fx
gventers@vanguardpg.com
i
REVISIONS:
LAYOUT COORD: MEi
PLANNING MGR. -MEL
DRAWING BY: "'IEL
DATE: 19/12/13
JOB NUMBER: 00406
TITLE:
CONSTRUCTION
DETAILS
SHEET NUMBER:
C-8
COMMENTS
03 CLASS I RIP RAP (SEE SECTION THIRD BASIN BELOW)
MAINTENANCE
INSPECT INLET PROTECTION ONCE A WEEK
AND AFTER EVERY RAINFALL %LOW
IMMEDATECY REMOVE SEDIMENT FROM
i
THE FLOW AREA AND REPAIR THE--
\\ ,Y.r% -, t3..E^=- INVE ''._ RIP RAP HEADWALL
DIVERSION REPAIR THE CHANNEL UN/NC \ �"�'' - �. ...-,E-.;
AS NECESSARY PER THE
MANUFACTURERS INSTALLATIONk5 WASHED STONE. 1'-0" THICK
REQUIREMENTS CHECK OUTLETS AND �sE �Y77///lllllllLll1111� x 3'-0" HIGH MINIMUM
MAKE T/MECY REPAIRS AS NEEDED TO - / °iMEM STD,RACE AREA
AVOID GOLLY THE IMETNLET WHEN THE
AREA ABODE THE PR07ECTlON IS �
PERMANENTLY STABILIZED, REMOVE THE
PROTECTION AND FILL AND STABILIZE 7HE /
CHANNEL 70 BLEND WITH THE NATURAL
SURFACE / / ' PERSPECTIVE VIEW
NO SCALE
AREAS TO BE DISTURBED SEDIMENT STORAGE
r FLOOD STORAGE ZONE RIP RAP
(CUT, FILL, ETC.) / 1' 2' HEADWALL
MAINTENANCE
PER/00/C41LY
SLOPES FOR
THESE AREAS
ORIGINAL ORAL
MULCH AS SO
`LOW
z I? T INVERT �-NATURAL GROUND
3.
FLOW
- I III III= =I II iTuli'=i:
= CUSS I RIP RAP
MAXIMUM SEDIMENT DEPTH Ifs WASHED STONE
(CLEAN OUT POINT)
SECTION THRU CATCH WIN FILTER AND CULVERT PIPE
NO SCALE
6 HORSESHOE INLET PROTECTION
C-9 NOT TO SCALE
7 \ SLOPE TRACKING DETAIL
C-9 / NOT TO SCALE
�-DEWATERING CONCRETE BLOCK
RAD
a
y;
, a
,�.l�i-* }�o OGo moo- cWDoama�
2:1 SLOPE, GRAVEL FILTER
TEMPORARY SEDIMENT POOL WIRE SCREEN
DEWATERING
16"MIN. 16"
2'MAX. I,
SEDIMENT
CONSTRUCTION SPECIFICATIONS
L LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO ALLOW POOL
DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCH BELOW THE CREST OF THE STORM
DRAIN. PUCE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL
SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO
SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS.
2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENING OVER ALL BLOCK
OPENING TO HOLD GRAVEL IN PLACE.
3. USE CLEAN GRAVEL,3/4-TO 1/2-INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK
ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS
RECOMMENDED.
MAINTENANCE SPECIFKA710N5
INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH S/6461FIC40
(112 INCH OR 65E47ER) RAINFALL EVENT. CLEAR THE MESH WIRE
OF ANY DEBRIS OR OTHER OBJECTS TO PROWOE AOEOUATE FLOW
FOR SUBSEQUENT R41NS TAKE CARE NOT TO DAMAGE OR
UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE
STONE AS NEEDED
TEMPORARY INLET PROTECTION
C-9 NOT TO SCALE
-HUB END ON OUTLET B
NOTE
USE DOZER TRACKS TO CREATE GROOVES
PERPENDICULAR TO THE SLOPE, GROOVES WILL CATCH
SEED, FERTILIZER, MULCH, RAINFALL AND DECREASE
SEDIMENT IN RUNOFF.
GENERAL NOTES:
I. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC
WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A
PUBLIC STREET,
2. STONE TO BE 2"-3" WASHED STONE
3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT
ONTO PUBLIC STREETS OR
EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL
STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY.
WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN
WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN
APPROVED SEDIMENT BASIN.
5. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL.
6. ENTRANCE SHALL BE A MINIMUM OF 20' IN WIDTH OR THE WIDTH OF THE EXIT, WHICHEVER IS GREATER.
EXISTING GROUND
MINIMUM 10
GAUGE LINE WIRES
I�
i
NOTE
SOIL STABILIZATION FABRIC
UNDER WASHED STONE
4 CONSTRUCTION ENTRANCE
C-9 NOT TO SCALE
6'-0' MAXIMUM
_
I
(If ,
Ohl
SILT FENCE FABRIC
Mm
INSTALLED TO SECOND
fd�
r
Y
WIRE FROM TOP
Ix
,-1
•_Il rl 1 Cll�u�!1-JLI uC!L;=1iLH�H111�T T.Ui-T
,Ili.
E
FRONT VIEW
MAINT RANI NOTES
E CE.
(Wil
- 1. FILTER OUTLE75 SHALL SE INSPECTED BY THE RAONCALLY
RESPONSIBLE PARTY OR HIS AGENT IMMEDATECY AFTER EACH
1. USE SILT FENCE ONLY WHEN
RAINFALL AND AT LEAST DAILY DURING PROLONGED RNNFALC.
DRAINAGE AREA DOES NOT
ANY REPAIRS NEEDED SHAG BE MALE /MMEOAIRY
EXCEED 1/4 ACRE AND NEVER IN
AREAS OF CONCENTRATED FLOW.
Z
THE STONE SHALL BE REPIACEO PROAYPTZY AFTER ANY EY£NT
THAT HAS CLOGGED OR REMOVED IT.
2. REMOVE SEDIMENT DEPOSITED AS
NEEDED TO PROVIDE STORAGE
J
S£OIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS
VOLUME FOR THE NEXT RAIN AND
REACH 6 INCHES ANY 5E0/MENT OEPo5/7S REMAINING /N
REMOVE PRESSURE ON THE
PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE
SI LT FENCE.
S
DRESSED TO CONFORM TO THE EXIST/NC CRADE, PREPARED
AND SEEDED.
5
SILT FENCE
C-9
NOT TO SCALE
DESIGN CRITERIA
ME DRAINAGE AREA IS UNITED TO DIVE HALF ACRE.
KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ME DAM.
KEEP ME CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER MAN ME OUTER
EDGES AT NATURAL GROUND ELEVATION.
KEEP THE SIDE SLOPES OF ME DAM AT 2:1 M RATTER
ENSURE MAT ME NAIfIMUM SPACING BETWEEN DAMS PULES ME TOE OF ME
UPSTREAM DAM AT ME SAME ELEVATION AS ME TOP OF ME DOWNSTREAM DAM.
STABIUZE OUTROW AREAS ALONG ME CHANNEL TO RESIST EROSION.
USE MOODY CUSS B STONE AND LINE ME UPSTREAM SIDE OF ME DAM MM
MCDOT K5 OR 457 STONE
KEY ME STONE INTO ME LATCH BANKS AND EXTEND IT BEYOND ME ABUTMENTS A
MINIMUM OF 1.5 FEET TO AVOID WASHOUT FROM OMERROW AROUND ME DAM.
NOTES
1. RACE STONE TO THE LINE AND DIMENSION SHOWN IN ME PLAN ON A FILTER FABRIC
FOUNDATION.
2. KEEP ME CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL
WHERE ME DAM ABUTS ME CHANNEL BANKS
3. EXTEND STONE AT LEAST 1.5 FEET BEYOND ME DITCH BANK TO KEEP WATER PROM CUTTING
AROUND ME ENDS OF ME NECK DAM.
4. SET SPACING BETWEEN DAMS TO ASSURE MAT ME EIE-TW AT ME TOR OF ME LOWER
DAM IS ME SAME AS ME TOE ELEVATON OE ME UPPER DAM,
5. REDIRECT ME CHANNEL AFTER ME LOWEST CHECK DAM FROM HEAW ROW MAT CWID
CAUSE E MON
6. MAKE SURE MM ME CHANNEL REACH ABOVE ME MOST UPSTREAM IS STABLE,
7. ENSURE MAT OTHER AREAS OF ME CHANNEL. SUCH AS CULVERT ENTRANCES BELOW ME
NECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES
12- OF NCDOT ,95
OR W57 WASHED STONE
1.5'
CLASS B RIP-11 00 1
O
FILTER CLOTH „
END SECTIONS. SPIGOT
III NATURAL GRADE
END ON INLET END
SECTIONS.
E _
MI X r-o b I= 2 RIP -RAP 2
- n - -
='
STEEL BACK ROD
4" #5 WASHED STONE
B
PLAN I' MIN. II LAYER OF FILTER FABRIC
NOTES
RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM
SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT.
THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE
AREA TO BE PAVED OR Rip-' RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE
SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR
TOE WALL AT THE DOWNSTREAM END.
MAXIMUM TAPER TO RECEIVING CHANNEL 5:1.
THE WIDTH OF THE END OFTHE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL.
ALL SUBGRADE STRUCTURE TO BE COMPACTED TO 95% OR GREATER.
THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED.
NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED.
MANIFNANCE
g RIP -RAP APRON INSPECT RIP-R4P APRON AT REGULAR NTERYALS AS AFTER AATOR R41NS, AND MAKE RERS PROMPR Wc�EU � C-9 NOT TO SCALE SPECAL AIIENTIOV TO THE POINT WHERE CONCENTRATED STORM
WATER FROM ORALN46E PIPE SYSTEMS ENTER THE APRON
CAREFULLY CHECK STABN7Y OF R/P-RAP AND LOOK FOR
INDICATIONS Of PIPING, SCOUR HOLES, OR BANK FAILURES
MAKE REPAIRS IMMEDATECY.
4' TO 6'
10 CHECK DAM
C-9 NOT TO SCALE
2' MAX AT
Rip -Rap Apron#1
DIMENSIONS
ENTRY WIDTH
3.0
FT
LENGTH
6.0
FF
EXIT WIDTH
7.0
FT
MIN. THICKNESS
22
IN
MIN. SNE DIAMETER
METER
6
IN
STONE CLTO
ASS
B
Rip -Rap Apron#2
DIMENSIONS
ENTRY WIDTH
3.8
FT
LENGTH
7.5
Ff
EXIT WIDTH
8.8
FF
MIN. THICKNESS
22
IN
MIN. STONE DIAMETER
6
IN
SiL
TONE CLASS
B
MIN. 10 G0.
LINE WIRES
4' MIN. �51L7 FENCE STEEL FENCE PO
WIRE FENCE
HARDWARE CLOTH
NOTES:
" 1 REMOVE SEDIMENT
/NSPECT CONSTRUCTION ENTRANCE PERIODICALLY
�
�
T
r
PT �- �
x
� ',
4 ! rl
WHEN HALF OF STONE
E
FILTER 5 OF 7 5
WASHED STONE
� FILTER 0 57
WASH F
� WASHED STONE
FOR CONOIRON OF SURFACE TOP -DRESS WITH
TOP OF SILT FENCE
Jlt [{
41
�...
iVl
_!
.I _
"T'.,
Y:
OUTLET IS COVERED.
\ e �
„a a,
NEW GRAVEL AS NEEDED
MUST BE AT LEGST I'
'('" .
T If
k',:':
.!.,r ""
:.
2. REPLACE STONE ASC"'c�;t4
. o �
b
4� e`;T / 3' FILTER FABRIC
6
ABOVE THE TOP OF
'r,
a ..r...1....
's' I:
4�;,.
_. .,
s ''�
t
NEEDED TO ENSURE
c�
>e�°o
o_
o�°
o°cdF. ON GROUND
THE WASHED STONE
F :'
I]
�
DEWATERING.
-
-�G284Po°�o 38
godi3y i.B°$"�
B MAX
IIII■
■■I
1111111196
mill
IIIII
..
■■■■■■
N1111
��
ii
�'�■��
III
FROM VIEW
BURY WIRE FENCE AND HARDWARE CLOTH BOTTOM OF WIRE FENCE AND
STEEL FENCE POST BURY WIRE FENCE, FILTER FABRIC BURIED 8•
SET MAX 2' APART FILTER FABRIC, VERTICALLY AND 4" HORIZONTALLY
MIN. 18' INTO AND HARDWARE SECTION VIEW IN EXCAVATED TRENCH
MIN. 12-12 GA. SOLID CLOTH IN TRENCH
INTERMEDIATE GROUND MOWEMl NOTES:
WIRES I ao' 3 SILT FENCE OUTLET I. AFTER 40HRssRVL B9IAT LOST By rDIRWA7 PRLLr ResPR40WEE PAVYoRNa AGENT?IWAS24Tfir
BE
1-� -�-1 AFTER ZID? EACH75 SyAFL ANO AT IECIE By 7BURHE N4' PRUY RED R4WbEF ANY 6W R S NEEDED SHALL 9E M40E
cRADE C-9 NOT TO SCALE IMMELKITLZY
1- 2 ME SRM'E SWI BE REPZACED PROMPTLY AFTER ANY EYAVT 7MT HAS CLCGCLD OR AFII KD I/
II' TREE PROTECTION AREA t8 J SEDIMENT 05PoS/I5 SHOULD BE REMOKEO WHEN OEPo5175 REACH NALF INE HACHT OF NE 34WIZR ANY
DO NOT ENTER SEDMENT OfPoSIIS REIWMNC. IN PFACE AFTER THE SILT ff&^C OUTLET IS R£A/OVED SMU BE DRESSED TO
CONFORM 70 THE B'67ING GRADE, PREPARED AND SFEDEO.
WARNING SIGN DETAIL
NOTES
FRONT 'A
NOTES:
1.
TEMPORARY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND/OR DIVERT TO A
WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL.
94/NRN4NCE
SEDIMENT CONTROL MEASURE OR BMP.
LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED,
2.
SILT SHALL BE REMOVED WHEN DITCH IS ONE-HALF FULL.
- STEEL POST
SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS.
/ASPECT RMPORARY ONERCON DITCH 3.
DITCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY
WOVEN WIRE FABRIC
WARNING SIGN
PUCE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER.
ONCE A WEEK AND AFTER EYEAY
R41NFAF. FI/A/EA'47EZrfiL'Y F 4.
FILL.
ORANGE, W RESISTANT
FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA
ATTACH SIGNS SECURELY TO FENCE POSTS FABRIC.
SEDIMENT FROM THE FLOW AREA AND
STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING, MULCH WITH TAC,
HIGH - TENSILE STRENGTH
AND
REPAIR NNE DIYFR5M2N REPAb47HE
AND/OR EROSION CONTROL NETTING.
POLY BARRICADE FABRIC (TYPICAL)
MNNTAIN TREE PROTECTION FENCE THROUGHOUT DURATION Of PROJECT.
CHANNEL FINING AS NECfSWY PER
ADDITIOA14L SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS.
ME .WWUFACRERS INSTILMWAV
WASTE MATERIAL -COMPACT,
PUCE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER.
REQUREMENTS CRECK OU7CE/S AND
SEED & MULCH AFTER - 2 MIN
= 10
TREE PROTECTION FENCE
AX4Kf TNZZY REPAIRS AS NEELxO 70
AREA Al TE h5y
--_ I s�Npf
CONSTRUCTION OF DITCH
VAR. -7
C-9
NOT TO SCALE
VITCH5PENAANOIDLrSTABR/ZED,
I_
2 -
AXW F IHE DMRSXW AND ALL AND
?T
_
STABQ2E ME CIMNNEL 70 BEYOD 477N
T" "URASORfACE
I
`TT [� ICI �„
ICI 'WAk O VAR.2
r' 1
,L\ 'r T
III -
TEMPORARY SEEDING SPECIFICATIONS/SCHEDULE
1
ICI_%I�IH
Date Type Planting Rate
12'
March - Oct. Browntop Millet 40 as/acre
SIDE VIEW
Nov. - Feb. Winter Rye 120 Ibs/acre
CROSS SECTIONAL VIEW
INIMUM 12 1/2 GAUGE
SEEDING SPECIFICATIONS/SCHEDULE
2 TEMPORARY DIVERSION DITCH
ES
FOR SHOULDERS, SIDE DITCHES, SLOPES (MAX 3:1)
C-9 NOT TO SCALE
GRADE
Date Type Planting Rate
STEEL POST
Aug 15 - Nov 1 Toll Fescue300 Ihs/acre
WIRE FABRIC
/
Nov 1 - Mar I Toll Fescue & Abruzzi R e 300 Ibs acreWOVEN
SEEDBED PREPARATION:
Mar 1 - Apr 15 Tall Fescue 300 Ibs/acre
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE.
SILT FENCE FABRICJul
I - Aug 15 Tall Fescue & Browntop Millet 240 Ibs/acre-Tall Fescue;
2. RIP THE ENTIRE AREA TO SIX INCHES DEEP.
or Sorghum -Sudan Hybrids 35 Ibs/acre Browntop Millet
30 Ibs/acre Sorghum -Sudan Hybrids
3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORMFILL
SLOPEN
FOR SHOULDERS, SIDE DITCHES, SLOPES (3:1 - 2:1)4.
APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE).
Date Type Planting Rate
DE ':�
M -
ar 1 Jun 1 Sericea Lespedeza (scarfied) & 50 Ibs/acre (Serica Lespedeza)
5. CONTINUE TILLAGE UNITL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP.
°
use the following combinations:"'GRADEMar
1 - Apr 15 Add Tall Fescue 240 Ibs/acre
6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING.
Mar 1 - Jun 30 Of add Julled Common 25 Ibs/acre
12" MIN. ANCHOR
Bermuda Grass
7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
SKIRT
Jun 1 - Sep 1 Tall Fescue & Browntop Millet 240 Ihs/acre Tall Fescue
or Sorghum -Sudan Hybrids 35 Ibs/acre Browntop Millet
8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND
BOTTOM OF WIRE FENCE AND
30 Ibs/acre Sorghum -Sudan Hybrids
SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES.
FILTER FABRIC BURIED 8"
Sep 1 - Mar 1 Sell Lespedeza (Unhulled- 70 Ibs acre Sericea Les deza9.
VERTICALLY AND 4" HORIZONTALLY
&Tali Fescue 240 ibs/acre Tall Fescue
0 EC E 0 ENTAIL ENGI EERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED.
C NSULT S& NVIR NM NUnscamfied
EXCAVATED TRENCH
Nov 1 - Mar I Add Abruzzi a 25 Ibs/acreIN
SEEDING MIXTURE:
CONSULT 5&EC ENGINEER FDR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDEDSIDE
AREAS. THE ABOVE VEGETATION RATES ARE THOSE THAT DO WELL UNDER LCAL CONDITIONS; OTHER SEEDING RATE
AGRICULTURE LIMESTONE: 2 TDNS/ACRE (3 TONS/ACRE IN CLAY SOILS)
VIEW
COMBINATIONS ARE POSSIBLE.
FERTILIZER: 1.000 LBS/ACRE - 10-10-10
SUPERPHOSPHATE: 5DO LBS/ACRE - 20% ANALYSIS
TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOWMULCH:
2 TDNS/ACRE -SMALL GRAIN STRAW
TEMPORARY COVER TO GROW MORE THAN 12• IN HEIGHT BEFORE MOWING; OTHERWISE, FESCUE MAY BE SHADED OUT.ANCHOR:
ASPHALT EMULSION AT 30D GALS/ACRE
A) OUTLET STRUCTURES SHALL BE UTILIZED THAT WITHDRAW WATER FROM THE SURFACE.
B) FOR BASINS OR TRAPS THAT HAVE A DRAINAGE AREA OF LESS THAN 1.0 ACRE, DRAW -DOWN DESIGNS SPECIFIED IN THE DIVISION
OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM REQUIREMENTS ARE ACCEPTABLE,
C) CHEMICAL TREATMENT:
1) ALL TREATMENT CHEMICALS MUST BE STORED IN LEAK -PROOF CONTAINERS THAT ARE KEPT UNDER
STORM -RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES DESIGNED TO PROTECT ADJACENT
SURFACE WATERS.
2) ALL TREATMENT CHEMICALS MUST BE USED IN ACCORDANCE WITH DOSING SPECIFICATIONS AND APPLICATION RATES
PROVIDED BY THE MANUFACTURER, SUPPUER AND AS SPECIFIED BY THE DMSIDN OF WATER QUALITY.
3) THE PERMITTEE MUST ONLY USE CHEMICALS THAT HAVE BEEN APPROVED BY THE INC DIVISION OF WATER QUALITY AND
POSTED ON THEIR "NORTH CAROLINA DIVISION OF WATER QUALITY APPROVED PAMS/FLOCCUTANTS LIST" FOUND ON THEIR
WEB SITE AT: http://portalncdenr,org/web/wq/ws/su.
4) THE PERMRTEE MUST ROUTE STORMWATER TREATED WITH POLYMERS, FLOCCULANTS, OR OTHER TREATMENT CHEMICALS
THROUGH SEDIMENT TRAPPING FILTERING AND/OR SETTLING DEVICES(S) TO ENSURE ADEQUATE REMOVAL OF SEDIMENT
FLOCCULENT PRIOR TO DISCHARGE TO SURFACE WATERS.
D) DISCHARGE REQUIREMENT - DISCHARGES MUST MEET THE STATUTORY REQUIREMENTS OF THE SEDIMENT POLLUTION CONTROL ACT
AND UTILIZE THE PROVISIONS OF SECTION 6.74 OF THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL TO
ASSURE THAT BUFFERS AND VEGETATED AREAS WILL BE USED TO REDUCE THE POTENTIAL FOR VISIBLE SILTATION OUTSIDE OF THE
25% BUFFER ZONE NEAREST THE LAND -DISTURBING ACTIVITY,
ARM ASSEMBLY
PERSPECTIVE VIEW
PVC ELBOW PV VENT
PVC END CAP PIPE
WATER SURFACE
PVC END CAP
PVC PIPE SCHEDULE 40
1 /2" HOLES IN PVC PIPE
PVC TEE UNDERSIDE
FL XIHOSE
END VI
FRONT VIEW
SKIMMER CONTACT
INFORMATION
J.W. FAIRCLOTH & SONS, INC.
P.O. BOX 757
HILLSBOROUGH, NO 27278
919-732-1244
919-732-1266 FX
- "C• ENCLOSURE
WATER ENTRY UNIT
PVC TEE
SCHEDULE 40
PVC PIPE
ORIFICE
PLATE
SKIMMERS SHALL BE
FAIRCLOTH SKIMMERS
Skimmer Basin
SURFACE AREA REQUIRED
1,872
SF
SURFACE AREA PROVIDED
1,950
SF
VOLUME REQUIRED
2,880
CIF
VOLUME PROVIDED
3,204
CIF
STORAGE DEPTH
2.0
FT
STORAGE ELEVATION
65 x 30
FT
485.00
TOP OF DAM
73 x 38
FT
487.00
EMGY. SPILLWAY LENGTH
10
IFT
485.50
BOTTOM OF BASIN
57 x 22
FT
483.00
SKIMMER SIZE
SKIMMER
SKIMMER
ORIFICE
ORIFICE
RADIUS
DIAMETER
1.5 IN
0.6 IN
1.2 IN
DATA BLOCK
INFLOW
STRUCTURE
DEWATERING
ZONE -
FILTER FABRIC
AREA
SURFACE
SPILLWAY
CROSS-SECTION VIEW
SEDIMENT
STORAGE ZONE
I' FREEBOARD W=5' MIN.
6• MAX. DEPTH OF FLOW EMBANKMENT
OVER EMERGENCY SPILLWAY -
"IN V -� 1 T=1.5' MIN.
BASIN
DRAINAGE
AREA
ACRES
DENUDED
AREA
ACRES)
DIG
BASIN VOLUME
A IN U A
CLEANOU
DEPTH (FT.;
H 2
H
(FEET)
Z
(FEET)
L
(FEET)
i
(FEET)
W
(FEET)
(CUBIC FT.
CUBIC FIT)
FT.
SQ Ff.
BASIN
!.6
1.6
5.8
2,880
J,204
1,872
1,950
1.0 2.0
4.0
10
1.5
5.0
EMERGENCY
SPILLWAY
ANTI -SEEP
COLLAR
IENT I
SENCY
WAY
J
REFER TO DETAILS NOTES:
SCHEDULE 40
FOR SKIMMER SIZE 1.
BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES
COUPLING CONNECTION REQUIREMENTS
USING OR BY RWILLHING AS FOR FENCE.
2.
MOST or THE SEEDIMENTA CUMULATE IN THE S BAY
SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE.
1. CLEAR, GRUB, AIFNIDASTTRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL
STANDARD SKIMMER DETAILWHICH
3.
PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE
CONTAINING HIGH AMOUNTS OF ORGANIC MATTER, AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL
TO THE DESIGNATED DISPOSAL AREA,
SUPPORT ROPE SUPPORT POST 4.
5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES.
BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET.
2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER
84FRE MAINTENANCE
TO WIRE TO 24" INTRO BOTTOM STAKE TO 5.
OR SIDE
TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS
OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE
INSPECT BAFFZES AT LEAST ONE A WEEK ANO AFTER
PREVENT
SAGGING SUPPORT WIRE
\ FENCE AND FABRIC
6.
INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL
EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT.
3. CONSTRUCT THE OUTLET SECTION IN
EACH RAINFALL. All -ANY REO/1RE0 REPAIRS
I BURIED IN TRENCH
THE EMBANKMENT, PROTECT THE CONNECTION BETWEEN THE RIP -RAP AND THE SOIL FROM
/MMEO/A7ELY.
PIPING BY USING FILTER FABRIC OR A KEYWAY CUTOFF TRENCH BETWEEN THE RIP -RAP STRUCTURE AND SOIL
_-STEEL POST
- PLACE THE FILTER FABRIC BETWEEN THE RIP -RAP AND THE SOIL. EXTEND THE FABRIC ACROSS THE SPILLWAY FOUNDATION AND
BE SURE TO AAIN7AN ACCESS TO THE DUFFLES
SIDES TO THE TOP OF THE DAM: OR
SHOULD THE FABq/C OF A BAFFLE COLLAPSE, YEAR,
P4Pr6"X6"
TRENCH
1
- EXCAVATE A KEYWAY TRENCH ALONG THE CENTER LINE OF THE SPILLWAY FOUNDATION EXTENDING UP THE SIDES TO THE HEIGHT OF
DECOMPOSE, OR BECOME INEFFEC7LVE, REPLACE O
COMPACTED b
�
_ _ _ -
THE DAM. THE TRENCH SHOULD BE AT LEAST 2 FEET DEEP AND 2 FEET WIDE WITH 1:1 SIDE SLOPES,
4. CLEAR THE POND AREA BELOW THE ELEVATION
PROMPTLY
_
OF THE CREST OF THE SPILLWAY TO FACIUTATE SEDIMENT CLEANOUT,
COIR MESH OR SIMILAR,
STAPLED OR
__
5. ALL CUT AND FILL SLOPES SHOULD BE 2:1 OR FLATTER,
REMOVE SEDIMENT DEPOSITS WHEN IT REACHES 841F
TRENCHED INTO BOTTOM OR SIDE SECTION MEW AT OPENING
= _ _ _ _ - - -_ - - - _
- -
6. ENSURE THAT THE STONE (DRAINAGE) SECTION OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FEET AND A MAXIMUM SIDE
FULL TO PROVIDE ADEQUATE STORAGE WLUME FOR
CROSS SECTION
_ _ _ - _
-_ -
--
SLOPE OF 1:1 THAT EXTENDS TO THE BOTTOM OF THE SPILLWAY SECTION.
THE NEXT RAN Al TO REDUCE PRESSURE ON 7HE
_ _ _ � _
_ _
- - - -
_ _
7. CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 2:1 SIDE SLOPES EXTENDING TO
TAKE G44E TO AVID/D LIWNTTUG THE
SK/MMER 84S/N MAINTENANCE
_-
- - - ,=
THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A
8MTZES
SHOLD DURING GEED A SEDIMENT DEPTH
SHOULD NEVER EXCEED EWCF THE DESIGNED
INSPECT SKIMMER SEDIMENT B4SlN AT LEST WEEKLY AND AFTER EACH 5/CNIFlC4NT (ONE-HALF INCH OR CREAIER) RNNFALC EYENI AND REPAIR IMMEDAA7ECY
_
= _ _ _ - _ _
_ _ _ _ _
�' -=-
_- - - :�.
_ _ _ -
T,"':
MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY.
B. MATERIAL USED IN THE STONE SECTION SHOULD
OULD BE DWELL -GRADED MIXTURE OFSTONE WITH A D50 SIZE OF 9 INCHES B
S70R1GE DEPTH
REMOVE SEDIMENT AND RESTORE THE B4SlN TO ITS ORIGINAL DIMENSIONS WHEN SEOIM£NI ACCUMULATES TO ONE-HALF 7HE HE7GNT OF THE FIRST BAFFLE. PULL
= _ _ _ _ _
_ _ - _
(CLASS
CONTROL STONE IS RECOMMENDED AND A
) MAXIMUM STONE SIZE OF 14 INCHES. THE STONE MAY BE MACHINE PLACED AND THE
THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED EXCAVATE THE SEO/MENT FROM THE ENTIRE BASIN, NOT ✓UST AROUND
- -_ -_ - =_ - _-
-
- _
SMALLER STONES WORKED INTO THE VOIDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY
AFI£R THE CONTR1901VG DRAINAGE AREA HAS BEEN
THE SKIMMER OR THE FIRST CELL MAX£ SURE VEGETATION GROWING IN THE BOTTOM OF 7HE 945IN DOES NOT HOLD DOWN THE SK/MMER
_ -
_ =
WEATHER -RESISTANT.
PROPERLY STABILIZED,, REMOVE Al 349ZE
464TERIAIS AND UNSTABLE 5E0191 DEPOSITS
REPAIR THE BAFFLES /F TNEY ARE DAMAGED. RE -ANCHOR THE 84FFLLS IF WATER lS FLOWING UNDERNEATH OR AR&INO THEM
9. DISCHARGE INLET WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH
OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY,
BRING THE AREA TO GRADE, AND STABIUZE 1T
lF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE WN, USUALLY JERKING ON 7HE ROPE WILL MAKE THE 5K/MMER BOB UP AND DOWN AND
- --
1st Cell 2nd Cell
10. ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE
DISLODGE THE DEBRIS AND RESTORE FLOW. IF T1115 POfS NOT WORK, PULL THE SK/MMER OVER TO THE 510£ OF THE &tSN AND REMOVE lH£ DEBRIS ALSO
INLET ZONE OUTLET ZONE
25% of 25% of basin 25% of basin 25% of
CONDITIONS ARE REACHED AND OUTLET VELOCITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE
OUTLET SECTION FLUSH WITH THE SURROUNDING GROUND, AND SHAPE THE CENTER TO CONFINE THE OUTFLOW
CHECK 7HE ORIFICE INS/DE THE SKIMMER TO SEE lF lT IS CLOCGED,, IF SO REMOVE THE DEBRIS
surface ores surface area
basin surface area basin surface area
STREAM.
11, DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS SO THAT FLOW WILL NOT DAMAGE THE
IF THE SKIMMER ARM OR BARREL PIPE lS CLOGGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITF/ A PLUMBER'S SNAKE OR BY FLUSHING
EMBANKMENT.
12. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY
WITH WATER BE SURE ANO R50CACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER
FUN VIEW
AFTER CONSTRUCTION.
CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REOU/RED REPAIRS W/TH FABRIC THAT SP4A5 THE FULL W,9l OF 7HE SPILLWAY. CHECK THE
13. SHOW THE DISTANCE FROM THE TOP OF THE SPILLWAY TO THE SEDIMENT CLEANOUT LEVEL (� THE DESIGN DEPTH) ON THE PLN4S
I SKIMMER BASIN
EM&WKMENT, SPILLWAYS, ANO OURET FOR EROSION DAMAGE, AND /NSPECT THE EMLANKVENT FOR PIPING AND SETTLEMENT. AWE ALL NECESSARY REPAIRS
AND MARK IT IN THE FIELD.
4. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS
IMMEDATECY, REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS
BAFFLES.
C-9 NOT TO SCALE
FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN SOME SP£CAL PRECA0770NS SHOULD BE TAKEN IN THE Jill TO PREVENT THE SKIMMER FROM
PLUGGING WITH ICE
TRIANGLE
SITE DESIGN
z "
CONSULTANT:
Triangle Site Design, PLLC
4006 Barrett Drive
Suite 203
Raleigh, NC 27609
(919)553-6570
mlowder@trianglesitedesign.com
NC LICENSE #P-0619
SEAL:
7aL �y .
SEAL "'...".
l
2443g�•)
'°"N1I E'car
E.
OWNER/DEVELOPER:
GLANDON FOREST EQUITY, LLC
3900 Merton Drive
Suite 210
Raleigh, NC 27609
919-459-2602
919-459-2604 fx
gventers@vanguardpg.coin
REVISIONS:
LAYOUT COORD:
MEL
PLANNING MGR.
M E L
DRAWING BY:
MEL
DATE:
12/12/13
JOB NUMBER:
004063
TITLE:
EROSION CONTROL
DETAILS
SHEET NUMBER:
C
- 9
COMMENTS:
._-._r -'
I' 1 111 l 1, 511 9 r,l
t t t
BMP element:
Potentialproblem:
How I will remedlale the problem
The entire BMP
Trash/debris is present
Remove the trash/debris
The perimeter of the No -retention cell
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed
remove the gully, and then plant
a ground cover and water until it
is established. Provide lime and
a one-time fertilizer application
Maintain vegetation at a height
0 approximately f roximatel six Inches.
0
The inlet device: pipe, stone verge or
Swale
The pipe is clogged.
Unclog the pipe. Dispose of the
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged
Erasion is occurring in the
Regrade the Swale if necessary
swole.
to smooth it over and provide
erosion control devices such as
reinforced turf matting or riprop
to avoid future problems with
erosion.
Stone verge is clogged or covered
in sediment
Remove sediment and clogged stone
and replace with clean stone.
The pretreatment area
Flow is bypassing pretreatment
area and/or gullies have formed
Re -grade if necessary to route all
flow to the pretreament area.
Restabilize the area after grading.
Sediment has accumulated to a
Search for the source of the sediment
depth greater than three inches
and remedy the problem if possible.
Remove the sediment and restabilize the
.
pretreatment area.
Erosion has occured
Provide additional erosion protection
such as reinforced turf matting or
rip -rap if needed to prevent future
erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand.
The bio-retention cell:
Vegetation
Best professional practices
show that pruning is needed
to maintain optimal plant
Prune according to best
professional practices
health.
Plants are dead, diseased or
Determine the source of the
dying,
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a
one -lime fertilizer application to
establish the ground cover if a
soil lest indicates it is necesso
Tree slakes wires are present six
months after porting.
Remove tree stakes wires which can
kill the tree if not removed)
The bio-retention cell:
soils and mulch
Mulch is breaking down or has
floated away.
Spot mulch if there are only random void
areas. Replace whole mulch layer if
necessary. Remove the remaining
mulch and replace with triple
shredded hard wood mulch at
a maximum depth of three inches.
Soils and/or mulch are clogged
Determine the extend of the clogging.
with sediment
Remove and replace either just the
top layers or the entire media as needed.
Dispose of the spoil in an appropriate
off -site location. Use triple shredded
hard wood mulch at a maximum depth of
three inches. Search for the source
of the sediment and remedy the
problem if possible,
An annual soil test shows that pH has
Dolomitic time shall be applied as
dropped or heavy metals have accumulated
recommended per the soil test and
in the soil media
toxic soils shall be removed, disposed
of properly and replaced with new
planting material.
The underdrain system
Clogging has occurred.
Wash out the underdrain system
The drop Inlet
Clogging has occured
Clean out the drop inlet. Dispose of the
sediment off -site.
The drop inlet is damaged.
Repair or replace the drop inlet.
The receiving water
Erosion or other signs of
damage have occurred at the
outlet.
Contact the local NC Division of
Water Quality Regional Office, or
the 401 Oversight Unit at
919-733-1786.
RIO-RRTRNTION SOTL MIXTURE
ITEM
PERCENT BY VOLUME
MATERIAL
SAND
85%-88%
CONSTRUCTION SAND
FINES
8%-12%
SILT
ORGANIC MATTER
3%-5%
COMPOST/PEAT MOSS
PERMEABILITY
PERMEABILITY SHOULD FALL BETWEEN I AND 6 INCHES PER HOUR,
AND 1-2 INCHES PER HOUR IS PREFERRED.
AND
PHOSPHOROUS INDEX
RANGE BETWEEN 10 AND 30 (CONFIRM WITH SOIL ANALYSIS REPORT
FROM NCDA LAB)
LENGTH VARIES -SEE PLANS
OUTLET PIPE
SHAPE OF BIO-RETENTION
REFER TO GRADING PLAN
AREA MAY BE IRREGULAR
�CLEANOUT
- -
OVERFLOW OUTLET STRUCTURE.
- -
CLEANOUT WITH THREADED LID
REFER TO HART & DETAIL FOR STRUCTURE
C ET
-
a �caa� '6'D-a3�ire���e�
o
03 AT 100 FEET MAX. HOR 2.
ELEVATIONS &DIMENSIONS
- �
' ' �
_
� SPACING)
, , _ o ,
p
6• SCHEDULE 40 PVC, SDR35, OR SMOOTH
WALL CORRUGATED PLASTIC PIPE WITH 3/8"
TOP OF EMBANKMENT
GRASS SOD
ENTIRE BIO-RETENTION AREA
CLEANOUT WITH THREADED LID
PERFERATIONS ® 6" ON CENTER (4 HOLES
REFER TO CHART FOR ELEVATION
(BERMUDA SOD)
(AT iW FEET MAX. HORIZ.
SPACING)
PER ROW)
GRASS SOD NOTE:
GRASS SOD SHALL BE EITHER HYBRID BERMUDA GRASS OR CENTIPEDE THAT HAS BEEN GROWN IN A SOIL
THAT IS FREE OF AN IMPERMEABLE LAYER (SUCH AS CLAY).
BID -RETENTION SOIL MIXTURE:
Blo-retention Soil Mixture (BSM): shall be placed and graded using low ground -contact pressure equipment or by excavators and/or backhoes
operating on the ground adjacent to the bio-retention facility. No heavy equipment shall be used within the perimeter of the bio-retention
facility before, during, or after the placement of the BSM. The BSM shall be placed in horizontal layers not to exceed 12 inches for the
entire area of the bio-retention facility. The BSM shall be compacted by saturating the entire area of the bio-retention facility after each
lift of BSM is placed until water flows from the under -drain. Water for saturation shall be applied by spraying or sprinkling. An appropriate
sediment control device shall be used to treat any sediment -laden water discharged from the under -drain. If the BSM becomes
contaminated during the construction of the facility, the contaminated material shall be removed and replaced with uncontaminated material at
no additional cost to the Administration. Final grading of the BSM shall be performed after a 24-hour settling period. Final elevations shall
be within 2 inches of elevations shown on the Contract Plans.
The Bio-retention Soil Mixture (BSM) shall be a uniform mix, free of stones, stumps, roots or other similar objects larger than two inches.
No other materials or substances shall be mixed or dumped within the bio-retention area that may be harmful to plant growth, or prove a
hindrance to the planting or maintenance operations.
Prior to placing the under -drain and the BSM, the bottom of the excavation shall be roto-tilled to a minimum depth of 6 inches to alleviate
any compaction of the facility bottom. Any substitute method for roto-tilling must be approved by the Engineer prior to use. Any ponded
water shall be removed from the bottom of the facility and the soil shop be friable before roto-tilling.
Once the BSM has been placed the entire bio-retention area shall be sodded with grass that has been grown in sandy soils or that has the
roots washed clean of any clay or other materials that could clog the function of the bio-retention system.
OPERATION AND MAINTENANCE
North Carolina storm water rules require annual inspections by the regulating agency of bio-retention areas as a minimum. More frequent
inspections by the land owner or system operator are strongly encouraged to ensure the proper operation of bio-retention areas.
A. Rainfall Event
1. Inspect the basin after every runoff -producing rainfoll event.
B. Monthly Inspection
1. Inspect the basin monthly -
2. Check the bio-retention area side slopes; remove trash and repair eroded areas before the next rainfall event.
3. Check the vegetative and rock filters for sediment accumulation, erosion and proper operation of the flow spreader
mechanism and repair as necessary.
C. Quarterly P
uarterl Inspection
r r functioning. Clear accumulated trash from
h sin pipes and Toss swales for proper
I h collection system i.e. colt basin,
1. Inspect the cokc ) P P
P Y . DP 9
f
basin grates and basin bottoms. Check piping or obstructions.
2. Check pond inlet pipes for undercutting, replace rip -rap and repair broken pipes.
3. Reseed grossed swoles, including the vegetated filter if applicable, twice a year as necessary. Repair eroded areas
immediately.
D. Six Month Inspection
1. Remove accumulated sediment from the bottom of the outlet structure or other areas where accumulated sediment is noted.
2. Inspect the embankment taking note of any wet areas where water may be seeping through the soil.
E. General Inspection
1. Maximum grass height is to be Bin.
2. No woody vegetation shall be allowed to grow in the bio-retention area.
3. Debris shall be removed from blocking the inlet and outlet structures and from areas of potential clogging.
4. Periodic removal of dead vegetation shall be accomplished.
5. All components of the bia-retention system must be kept in good working order.
1 BIO-RETENTION DETAILS
N.T.S.
PLAN VIEW
FFF--- SLAB TOP WITH MANHOLE RING
FOR ACCESS
BERMUDA SOD
POND DATA
TOP OF EMBANKMENT ELEVATION = 484.4 4wrr
25 YEAR STORM ELEVATION = 484.39
10 YEAR STORM ELEVATION = 484.20 ,
RECIST
2 YEAR STORM ELEVATION = 483.77 P;
OURET STRUCTURE
1 YEAR STORM ELEVATION = 483.55 w1TN STEPS
SPILLWAY ELEVATION = 483A
1" STORM ELEVATION = 482.64
FILTER BED ELEVATION = 482A
GEOTEXTILE LINING BID -RETENTION
BETWEEN SO -RETENTION SOIL - '`... SOIL MIXTURE
MIXTURE AND RESIDUAL SOILS
(NON -WOVEN GEOTEXTILE FABRIC n
WITH MIN. PERMITTVITY RATE OF
75 GAL/MIN/FT2)
_ 4" WASHED SAND
OUTLET
BOTTOM OF SOIL MIXTURE = 480.4 PIPE
DEPTH _ FILTER FABRIC AROUND
VARIES BOTTOM OF GRAVEL/UNDERDRAIN = 478.9 I _ '! - UNDERDRAIN GRAVEL BED (TOP,
_ __
BOTTOM AND SIDES, TYP.)
(NON-WOVEN GEOTEXTILE FABRIC
EXISTING SURFACE ELEVEVATION=484.0 REFER TO GRADING WITH MIN. PERMITTMTY RATE OF
SEASONAL HIGH WATER TABLE DEPTH=I2FT+ PLAN FOR INVERT 75 GAL/MIN/FT2)
SEASONAL HIGH WATER TABLE ELEVATION <472 ELEVATIONS
8•(MIN) UNDERDRAIN GRAVEL
Top
op'�OCTURL,, +B{4
�� EIEI'ATiph,
ift74
REFER TO GRADING BED (M57 WASHED STONE)
PLAN FOR OUTLET PIPE
BIO-RETENTION CONTROL STRUCTURE
11 - '^^ `TOT
CLARITY
OUTLET CONTROL STRUCTURE
SCALE: N.T.S.
OUTLET CONTROL
PIPE - REFER TO
GRADING PLAN
OUTLET CONTROL STRUCTURE
REFER TO DETAIL THIS SHEET
& GRADING PLAN
REFER TO GRASS SOD NOTE
THIS SHEET FOR
REQUIREMENTS
CLEANOUT
)�O // RIM=4B9.D3.1
Q INV=
BIO-RETENTION POND
ue //
° /
WASHED SAND I TO UNDERDRAIN PIPEIF
UNDISTURBED SUBSOIL /
UNDERDRAIN GRAVEL
CLEANOUT BED (#57 WASHED
STONE)
N
/I
BIO-RETENTION CONSTRUCTION SEQUENCE: / / / / RIII T
RIM
NOTE. Step I. Construction of the bioretention area may only begin after the contributing drainage area has been / =483.1 /
stabilized. It may be necessary to block certain curb or other inlets while the bioretention area is being / INV=479.3 /
A PERMEABILITY SOIL REPORT SHALL BE
h for existing utilities prior to on excavation.
constructed. The proposed site should be checked o e sl g Les p y /
PROVIDED AFTER BID -RETENTION SOIL ti
MIXTURE IS IN PUCE - REFER TO Q
STORMWATER MANAGEMENT NOTES FOR Step 2. Temporary E&S controls are needed during construction of the bioretention area to divert stow water U
REQUIREMENTS. away from the bioretention area until it is completed. Maintain erosion control measures in place until /
bioretention area has been completed. Special protection measures such as erosion control fabrics may be
needed to protect vulnerable mbe side slopes; from erosion during the construction process.
/
o Step 3. Excavators or backhoes should work from the sides to excavate the bioretention area to its appropriate VQ
NOTES: design depth and dimensions. Excavating equipment should have scoops with adequate reach so they do not /
I. ALL BID -RETENTION SHALL HAVE AN ACCESS EASEMENT have to sit inside the footprint of the bioretention area. Contractors should use a cell construction approach in /
REMOVABLE CAP
0
ro o°
J
N
a
&a
y
6' SCHEDULE 40PVC,
10-RETENTIO N
_ ) -
i ro oao°
SDR35, OR SMOOTH
�o
WALL CORRUGATED
SOIL MIXTURE
PLASTIC PIPE (SOLID)
o
� o o
J
CONNECTION
REFER TO CHART FOR
OVERFLOW OUTLET TOP OF BERM ELEVATION
REFER TO DETAIL FOR GRASS SOD
ELEVATIONS & DIMENSIONS (BERMUDA SOD)
REFER CHART BOTTOM ELEVATION
+aw rw 4 wL� +,w +o aae i n+a+Ar,L W
r
r J
xS J �
P
r12*V PONDING
SOIL MIXTURE
STORMWATER MANAGEMENT
DATA
RIVER BASIN:
CAPE FEAR
RECEMNG STREAM NAME:
BIG ALAMANCE CREEK (ALAMANCE CREEK)
STREAM CLASS:
WS-V, NSW
STREAM INDEX:
16-19-(4.5)
BIO-RETENTION:
DRAINAGE AREA=
1.05AC
(45,740SF)
IMPERVIOUS AREA=
0.74AC
(32,148SF)
WATER QUALITY VOLUME REQUIRED=
2,608CF
WATER QUALITY VOLUME PROVIDED=
2,885CF
�iTUNMWAI'Ett MANAUEMEN'1NUTE�:
1. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE ENGINEER WHEN THE BEST
MANAGEMENT PRACTICE($) ARE CONSTRUCTED AND ABOUT TO BECOME
OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE
COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED.
2. PRIOR TO CONSTRUCTION, A SOIL TEST OF THE BID -RETENTION FILTER MEDIA
SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A COPY
SENT TO THE ENGINEER. THE TEST SHALL CONSIST OF BOTH THE STANDARD SOIL
TEST FOR pH, PHOSPHORUS, MAGNESIUM, AND POTASSIUM AND ADDITIONAL TESTS
OF ORGANIC MATTER, AND SOLUBLE SALTS. ALL TESTING RESULTS SHALL COME
FROM THE SAME TESTING FACILITY. THE NC F DEPARTMENT
E 0 AGRICULTURE NCDA
LAB IS THE PREFERRED TESTING FACILITY. SHOUL
D THE pH FALL OUT OF THE
ACCEPTABLE RANGE, IT MAY BE MODIFIED (HIGHER) WITH LIME OR (LOWER) WITH
IRON SULFATE PLUS SULFUR OR AS DIRECTED BY THE NCDA OR ENGINEER
J. PRIOR TO CONSTRUCTION A COMPOSITION TEST OF THE BID -RETENTION FILTER
MEDIA SHALL BE REWEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A
COPY SENT TO THE ENGINEER FILTER MEDIA SHALL CONFORM TO THE
FOLLOWING: 85-889 SAND (USDA TEXTURAL CLASSIFICATION), 8-12% FINES (SILT
AND CLAY), AND 3-58 ORGANIC MATTER (PEATMOSS OR PINE BARK) BY VOLUME
4. PERFORM A DOUBLE RING INFILTRATION TEST (MINIMUM OF 3 TESTS OR I PER
500 SF OF FILTER MEDIA WHICHEVER IS GREATER) AT THE COMPLETION OF THE
BID -RETENTION BMP. INFILTRATION RATE OF THE CONSTRUCTED BID -RETENTION
MEDIA SHALL BE BETWEEN 1-6 IN/HR. PROWDE A COPY OF THE RESULTS TO
THE ENGINEER.
5. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A
PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A
MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER
ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE
RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL
STRUCTURES.
6. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY
SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE
COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER
MANAGEMENT PLANS AND DESIGNS,
Z A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS
TO BE SCHEDULED WITH AND COMPLETED BY THE ENGINEER & INSPECTOR.
8. THE ENGINEERS CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE
FINAL PUT OR CERTIFICATE OF OCCUPANCY THE STORMWATER CONTROL IS TO
BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL
DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY
BIO-RETENTION
STAGE
STORAGE
TABLE
STAGE
ELEVATION
CONTOUR
INCREMENTAL
TOTAL
(FT)
(FT)
AREA (SF)
STORAGE (CF)
STORAGE (CF)
0.0
482.4
2585
0
0
0.6
483.0
3250
1839
1839
1.6
484.0
3920
3579
5419
1.0
484.4
4210
1625
7044
If
24e4sepi SS
01 /
P /
39h INLET PIPF/VIITH /
RI -RAP' APRON
W � /
�/ r• ,Y p 6• UNDERDRAIN /
yr
_CI
d /
l D + r• j140D . -- / / STORMWATER
r• / "a'. Lw, / /MANAGEMENT
Y r• r• w• r• / ! EASEMENT
�' / / W . • • RIM 483
/ W W , \ t^1' W • Y W INV=479.3 /
RIP-RAPE WITH
APRONAPRON
/ W W\ W \ W • W W ♦ Q W W //
sl/ `V 41 14, \ i \ r/y
/
W/ Wy
y. Y /V V/ VI V/ V/ 41 W
LEANDUT /
w 14, %1,/ �J" h WV=4479.3
l l W r 1 I \V 41 1/
/ y /
/ V V• W I• `Y `L '4"/ -4,/
II v),Y' /j/' \yi -L�•Z6 k% W / � W � W W i i i W iV /\
I/ Y/• /"'444 /,Y' J N W �.Y W W W W W J W W W `Y `Y / W W W W W W W W W W ♦ ��
J W/ � •T � �� � r- -W � W- y' ✓/ / ✓ 'Y W W `Y !' `Y W W W W y W y V,
'Y W W J' W W ♦ w
v�Y
CONNECTING TO A DEDICATED PUBLIC RIGHT OF WAY, larger bioretention basins, whereby the basin is split into 500 to 1,000 sq. ft. temporary cells with a 10-15
e in between, so that cells can be excavated from the side.
9 \
foot earth bridge
2. DRAINAGE AREAS TO ABID-RETENTION FACILITY ARE TO
TO BE STABILIZED PRIOR TO INSTALLATION OF SOILS OR Step 4. It may be necessary to rip the bottom soils to a depth of 6 to 12 inches to promote greater
GRASS SOD. infiltration. , / •` / / /� / /
3. WRAP PERFORATED UNDERDRAIN WITH FILTER FABRIC Step 5. Place geolextile fabric on the sides of the bioretention area with a 6-inch overlap on the sides. Place ✓/ / \� / /-
PRIOR TO 8ACKRLUNG. the appropriate depth of stone on the bottom, install the perforated underdroin pipe, place stone above the
underdrain pipe, and add sand layer between the underdrain and the soil media layer.
4. UNDERDRAIN PIPE SHOULD HAVE 3/8• PERFORATIONS
SPACED AT 6' CENTERS, MIN. 4 HOLES PER ROW. MAX Step 6. Deliver the soil media from an approved vendor, and store it on an adjacent impervious area or plastic
SPACING OF UNDERDRAIN PIPE IS 10 FEET ON CENTER. sheeting. Apply the media in 12-inch lifts until the desired top elevation of the bioretention area is achieved.
Wait a few days to check for settlement, and add additional media, as needed, to achieve the design elevation.
5. UNDERDRAIN CLEANOUTS MUST EXTEND A MIN. OF 6
INCHES ABOVE TOP SURFACE OF GRASS LAYER, Step 7. Install the vegetation, and water accordingly.
PREFERABLY TO THE TOP OF DESIGN MAXIMUM PONDING
DEPTH IN THE 810-RETENTION BASIN, Step 8. Coordinate with inspector and engineer to conduct the final construction inspection. Upon completion of
bioretention facility remove temporary erosion control measures and complete final stabilization of the project.
W �W W W W W W W� W W W W/ WV ♦ ♦ W�1 W W W W W W W W W /W/ W W
W W ♦ W W W W W W -T .Y O W W W W T�
I�.� y..�W1.' J. W 1. •T. / /VWJJ/\�!�V J. .l. W rY/WW W 1 WVD
y.W W W W W . W W
... �-W V,. W J' WW + ..YY/vo Y W /W /// .Y y'W W�`'Y✓ W M.Y� •WY W 4 W W W W
W Y
'Y
will T �w� T wwwy� T �iw� ��� r ��� wY +r rY +✓GYi wY�
/ TOP OF EMBANKMENT
ELEV=484.4
BID -RETENTION BASIN - PLAN VIEW
1"=15'
i
TRIANCI -
SITE I�ESI�.N
CONSULTANT:
Triangle Site Des
ign, I7
ILC
I
4006 Barrett Drive
Suite 203
Raleigh, NC 27609
(919)553-6570
mlowder®trianglesitedesign.coir,
NC LICENSE #P-0619
SEAL:
��••��r�5uv .I
z443q.j '
11V
i
�J
I
OWNER/DEVELOPER:
GLANDON FOREST EQUITY, LLC
3900 Merton Drive
Suite 210
Raleigh, NC 27609
919-459-2602
919-459-2604 fx
gventers@vanguardpg.com
REVISIONS:
Ira: r F mrI wrntm
rnnstruc, r cordance wnI nose documenttss 1h
required by tn., s ormwaterpelUd! Ilorth
odes require that the St system designer
Inspect during construction hy -, certify GOnf0rmWith the
nits ecsi and certify camptiance with the
Stornlwater rules. p_
Permit:i,5 /3 03_Date�
billl N DWlsion of
I.neet - «wlsiAna-r -_
LAYOUT COORD:
MEL
PLANNING MGR.
MEL,
DRAWING BY:
MFL
DATE:
1_, 1. 1.
JOB NUMBER:
004063
TITLE: STORMWATER
MANAGEMENT
DETAILS
SHEET NUMBER:
C 10
COMMENTS