Loading...
HomeMy WebLinkAboutSW4130801_O&M Agreement_20130905i Permit Number: S W 4 `-L 08 O I (to be provided by DWQ) Drainage Area Number: 1 Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a Iog in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. 13MP element: Potential problems. How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if a licable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW40 I -Bioretention O&M-Rev.3 Page 1 of 4 AV BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area FIow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after gradin . Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf. matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: sods, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months afterplanting._can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away, void areas. Replace whole mulch Iayer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tlet. 733-1786. Form SW40 I -Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by. DWQ} I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Dollar General - Snow Camp BMP drainage area number: I Print name:George T. Barnes, Jr. T _� Title:member- Address:3900 Merton Drive, Suite 210 Raleigh, NC 27609 Phon Signz Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 111 IV 6rM/ - , a Notary Public for the State of >/e[JI Luwlj , County of 6hj-7 , do hereby certify that C'-I-nitru C T znl1 I/L personally appeared before me this day of , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, O My commission expires Form SW40 I -Bioretention I&M-Rev. 2 1 Page 4 of 4