Loading...
HomeMy WebLinkAboutSW4130801_Inspection_20141103ti 1 0 ' a . Y r �IA30�� MCDE R North Carolina Department of Environment and Natural Resources Pat McCrory Governor November 3, 2014 George T. Barnes Glandon Forest Equity, LLC 3900 Merton Drive, Suite 210 Raleigh, NC 27609 Subject: NOTICE OF INSPECTION Dollar General — Snow Camp Permit No. SW4130801 Alamance County Dear Mr. Barnes: John E. Skvarla, III Secretary On November 3, 2014, Aana Taylor -Smith of the Winston-Salem Regional Office of the Division of Energy, Mineral, and Land Resources (DEMLR) inspected the Dollar General — Snow Camp site in Alamance County to determine compliance with Stormwater Management Permit Number SW4130801 issued on August 13, 2013. DEMLR file review and site inspection revealed that the site is compliant with the terms and conditions of this permit. Please find a copy of the completed form entitled "Stormwater Inspection Report" attached to this letter. Please be advised that you are required to comply with the terms, conditions and limitations of your Stormwater Management Permit under Title 15A North Carolina Administrative Code 211.1003 and North Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater system. If the project has changed name, ownership or mailing address, a formal change of name/ownership form must be submitted to DEMLR within 30 calendar days detailing the change. Please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the Stormwater Management Permit may be subject to a civil penalty assessment of up to $25,000.00 per day for each violation. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact Ms. Taylor -Smith or me at (336) 776-9800. Sincerely, Matthew E. Gantt, PE Regional Engineer Land Quality Section Enclosure: Stormwater Inspection Report cc: WSRO Files DWR Central Files Division of Energy, Mineral, and Land Resources Land Quality Section • Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27107 • Phone: 336-776-98001 FAX: 336-771-4631 Compliance Inspection Report Permit: SW4130801 Eftective:08/13113 Expiration: 08/12/21 Project: Dollar General - Snow Camp Owner: Glandon Forest Equity LLC County: Alamance Adress: W Greensboro Chapel Hill Rd Region: Winston-Salem CitylState/Zip: Snow Camp NC 27349 Contact Person: George T Barnes Title: Phone: 919-459-2600 Directions to Project: Approx 450 ft west of the intersection of snow camp rd and w greensboro chapel hill rd. Type of Project: State Stormwater - General Permit Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 11/03/2014 Entry Time: 09:00AM Primary Inspector: Aana Taylor -Smith Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® State Stormwater (See attachment summary) 13 Exit Time: 09:15AM Phone: 336-771-5000 Inspection Type: Compliance Evaluation page: 1 Permit: SW4130801 owner- Project: Glandon Forest Equity LLC Inspection Dale: 1110312014 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Please refer to attached inspection letter. File Review Yes No NA NE Is the permit active? ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ® ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® 1111 ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? ® ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ® ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ® ❑ ❑ ❑ Comment: page: 2