Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin-
- Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
Swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
a licable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-infiltration Basin O&M-Rev.3 Page 1 ot'3
BMP element:
Potential roblem:
How I will remediate theproblem:
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth,
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
Provide additional erosion
riprap is displaced.
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion roblems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area
A visible layer of sediment
Search for the source of the
has accumulated.
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Water is standing more than
Replace the top few inches of filter
5 days after a storm event.
media and see if this corrects the
standing water problem. If so,
rvegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Weeds and noxious plants are
Remove the plants by hand or by
growing in the main
wiping them with pesticide (do not
treatment area,
spray).
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment.
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 Page 2 ol'3
Permit Number. .SWC 12-04f0 f
(to be provided by UWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Cumberland Park
BMP drainage area number: I
Print name: Lorraine Mohler
Title: Owner
Address: 7670 Raeford Road, Fayetteville, NC 28304
Phone: 910-221-99K
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
j1 W4 County of SCtri)sRK do hereby certify that
b/'ra;rl r �tr personally appeared before me this
day of r, 2612 , and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
SEAL
My commission expires aolS
Form SW40I-infiltration Basin O&M-Rev.3 Page 3 of 3