Loading...
HomeMy WebLinkAboutSW6120401_Admin Review_20120412Application Completeness Review First Submittal ❑ Re -submittal Date Received Development/Project Name: _Gu-B#et-4N4 r Receiving stream name Elm z- Date Reviewed: y I a .r2 By classification: For post -construction requirements, a program will be deemed compliant for the areas.where it is implementing any of the following programs: WS-I, WS-Il, WS-III, WS-IV, HOW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&B Species (Goose Creek, Waxhaw Creek or Six Mile Creek YVater Sheds): �,+' Latitude and Longitude: `�'1' 3f 10ti ?9�I `��'! Jurisdiction Project Address: + Al. -4" t 4' sT •� X4 J9,*o4b --A* As � �*V2 Engineer name and firm: su-rT Wow V,A9 _ yA 51TW- so Litr/w .� ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets L" High Density ❑ Other 401/404 impacts to surface waters, wetlandsand buffers (add I nguage to cover letter and/or addinfo letter) d BUA 3C . 2 1 _ ✓o-r � �[ Check for $505.00 included L-r Original signature (not photocopy) on application' t' Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation http://www.secretary.state.nc,us/corporations/thepage,aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. I'For subdivided projects, a signed and notarized deed restriction statement ar� Sealed, signed & dated calculations e' Correct supplement and O&M provided fo each BM on site (check all that were provided & number of each) ❑ Bioretention o Dry Detention Basin ❑ Filter Strip ❑ Grass Swale Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road 13' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details Cf Narrative Description of stormwater management provided e<_-Soils report provided. Wetlands delineated or a note on the plans that none exist on site and/or adjacent property e� Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; -a-- Dimensions & slopes provided Drainage areas delineated 1915'ervious and impervious reported for each ❑ Areas of high density 'A 6�"' Inspection and maintenance agree�peents provided ❑ Application complete OVApplication Incomplete Returned: (Date) Comment IM`- rd. YE. 24f-1K Ul4t✓4 (3YP4;04' VFS M �tfit 51?-#2 co^✓ J"'r/^,6� J�' �fSlrS/S February 9, 2009 Revision